Bay Build Design Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Jul 2026
- Last 24 months
- 28 permits filed
315 permits since 2000: 223 completed, 12 in progress, 49 never finaled, 31 expired or cancelled.
Of the 49 never-finaled permits, 5 are 3 to 5 years old, 13 are 5 to 10 years old, 31 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
7 roof deck permits: 6 completed, 1 never finaled. Typically 16 days from filing to permit and 342 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2024 | Completed final sign-off Apr 2025 | 1242 Pierce St | to abate 202173254 for rev 202105200698- revise framing for roof deckDetails
to abate 202173254 for rev 202105200698- revise framing for roof deck | |
| Oct 7, 2020 | Completed final sign-off Oct 2020 | 942 Kirkham St | dry rot repair @ roof deck. 50% or less underlanment membrane 20 sq ft sidinng.Details
dry rot repair @ roof deck. 50% or less underlanment membrane 20 sq ft sidinng. | $5,000 |
| Sep 26, 2020 | Never finaled filed Sep 2020, never issued | 120 Santa Marina St | move single story main house from rear to front of property. add new basement and 1st flr below exist. flr. relocated kitchen and bath. add 2 new baths and 1/2 bath. new roof deck over exist. garage.Details
move single story main house from rear to front of property. add new basement and 1st flr below exist. flr. relocated kitchen and bath. add 2 new baths and 1/2 bath. new roof deck over exist. garage. | $90,000 |
| Sep 17, 2020 | Completed final sign-off Jan 2022 | 73 05th Av | 1st fl - new bedroom under (e) deck; (e) 2nd fl - wood deck to be replaced w/waterproof deck; (e) deck to yard staris to be replaced with newDetails
1st fl - new bedroom under (e) deck; (e) 2nd fl - wood deck to be replaced w/waterproof deck; (e) deck to yard staris to be replaced with new | $80,000 |
| Dec 28, 2015 | Completed final sign-off Mar 2016 | 1227 Union St | comply with physical inspection report cc-7580. items 2 and 3 only. item 2 remove 1st fl retractable ladder to non accessible rear yard. close ladder opening in the metal balcony with metal slats to match existing. item 3 remove existing roof deckDetails
comply with physical inspection report cc-7580. items 2 and 3 only. item 2 remove 1st fl retractable ladder to non accessible rear yard. close ladder opening in the metal balcony with metal slats to match existing. item 3 remove existing roof deck | $3,500 |
| Jul 23, 2015 | Completed final sign-off Dec 2017 | 2832 Pierce St | revision to 201502279493, reconfigure proposed roof deck: set back deck 3'5 from south prop line, insulation of south prop line wall at 4thf fl living roomDetails
revision to 201502279493, reconfigure proposed roof deck: set back deck 3'5 from south prop line, insulation of south prop line wall at 4thf fl living room | |
| Feb 27, 2015 | Completed final sign-off Dec 2017 | 2832 Pierce St | work on 1st floor garage & on top unit 2832 pierce (4th floor ). expand garage into adjacent storage, infill lightwell in garage, new bath @ 4th floor, new stairs from top unit to new deck, new roof deck, structural upgrade at garage level. no work @ #2828, 2830 pierce st. sprinklers deferred.Details
work on 1st floor garage & on top unit 2832 pierce (4th floor ). expand garage into adjacent storage, infill lightwell in garage, new bath @ 4th floor, new stairs from top unit to new deck, new roof deck, structural upgrade at garage level. no work @ #2828, 2830 pierce st. sprinklers deferred. | $140,000 |