Back to kitchen remodel contractors
Bashland Inc. Dba Bashland Builders
- Based in
- Emeryville
- On San Francisco permits
- Mar 2000 to Apr 2024
- Last 24 months
- 0 permits filed
145 permits since 2000: 113 completed, 1 in progress, 11 never finaled, 20 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
31 kitchen remodel permits: 23 completed, 8 never finaled. Typically 0 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2024 | Completed final sign-off Mar 2025 | 345 Folsom St | unit# 301: interior remodel, no structural or architectural changes. 1) kitchen remodel: replace (e) cabinets, counters, appliances, lights. 2) main bath: replace (e) cabs, counters, fixtures, finishes and lights.Details
unit# 301: interior remodel, no structural or architectural changes. 1) kitchen remodel: replace (e) cabinets, counters, appliances, lights. 2) main bath: replace (e) cabs, counters, fixtures, finishes and lights. | $288,000 |
| Mar 31, 2023 | Completed final sign-off Jan 2024 | 1070 Green St | kitchen: new cabinets, counters, fixtures and finishes to replace (e) in same location bath 1&2: new cabinets counters, fixtures and finishes to replace (e) in same location, replace (e) window in kind at side elevation (not visible from street) w/(n) window to match building standard.Details
kitchen: new cabinets, counters, fixtures and finishes to replace (e) in same location bath 1&2: new cabinets counters, fixtures and finishes to replace (e) in same location, replace (e) window in kind at side elevation (not visible from street) w/(n) window to match building standard. | $78,000 |
| Jul 7, 2022 | Completed final sign-off Oct 2023 | 999 Green St | unit 2901: non structural interior remodel. remove and relocate interior partitoin walls. remodel kitchen and baths. new finishes. enclose balcony to match existingDetails
unit 2901: non structural interior remodel. remove and relocate interior partitoin walls. remodel kitchen and baths. new finishes. enclose balcony to match existing | $138,000 |
| Sep 24, 2021 | Completed final sign-off Feb 2023 | 1998 Broadway | unit 1504: interior remodeling of kitchen, 2 bathrooms, 2 bedrooms and living area.Details
unit 1504: interior remodeling of kitchen, 2 bathrooms, 2 bedrooms and living area. | $200,000 |
| Jun 10, 2021 | Completed final sign-off Sep 2022 | 180 Palo Alto Av | non-structural interior remodeling with no change to fl. plan or walls, kitchen remodel: replace cabinets, fixtures and all finishes bathroom remodel: replace cabinets, fixtures and finishes, (2) bathrooms interior finishes: replace (e) finish material wit new finsh material at walls, ceilingsDetails
non-structural interior remodeling with no change to fl. plan or walls, kitchen remodel: replace cabinets, fixtures and all finishes bathroom remodel: replace cabinets, fixtures and finishes, (2) bathrooms interior finishes: replace (e) finish material wit new finsh material at walls, ceilings | $78,000 |
| Jun 7, 2021 | Completed final sign-off Sep 2021 | 2562 Green St | replace existing kitchen cabinetry- counters, and appliances in same layout as existing. no other changes, all work due to water damage. non structural.Details
replace existing kitchen cabinetry- counters, and appliances in same layout as existing. no other changes, all work due to water damage. non structural. | $90,000 |
| Mar 22, 2021 | Never finaled issued May 2021, no final | 10 Presidio Av | revision to pa# 202012110866. reduce opening size at (e) closet & den. (e) wall to remain. opening to be created at (e) kitchen & den.Details
revision to pa# 202012110866. reduce opening size at (e) closet & den. (e) wall to remain. opening to be created at (e) kitchen & den. | |
| Dec 11, 2020 | Never finaled issued Jan 2021, no final | 10 Presidio Av | interior remodeling on the 2nd flr. remove interior wall between (e) kitchen & (e) den. remove interior wall between (e) closet & (e) den. remodel (e) kitchen.Details
interior remodeling on the 2nd flr. remove interior wall between (e) kitchen & (e) den. remove interior wall between (e) closet & (e) den. remodel (e) kitchen. | $38,000 |
| Aug 9, 2019 | Never finaled issued Apr 2022, no final | 130 Russ St | renovate (e) 2nd flr into 1 bedrm apartment. no addt sf. no structural work. current 2nd flr storage area may have been a residential unit at some time in the past but no kitchen remains nowDetails
renovate (e) 2nd flr into 1 bedrm apartment. no addt sf. no structural work. current 2nd flr storage area may have been a residential unit at some time in the past but no kitchen remains now | $200,000 |
| Jul 2, 2019 | Never finaled issued Jul 2019, no final | 2127 Broadway | replacing cabinetry in kitchen, replacing gas cook top appliance and hood range.Details
replacing cabinetry in kitchen, replacing gas cook top appliance and hood range. | $35,000 |
| Mar 26, 2019 | Completed final sign-off Nov 2019 | 1301 Page St | unit #1: interior remodel - remodel kitchen, rmeove wall between kitchen & fmaily rm. provide (n) structural beam where wall removed. replace (e) window in like kind on south(non-street facing elevation). unit #2: new post/solid bearing from (n) beam at 2nd fl above to existing foundation.Details
unit #1: interior remodel - remodel kitchen, rmeove wall between kitchen & fmaily rm. provide (n) structural beam where wall removed. replace (e) window in like kind on south(non-street facing elevation). unit #2: new post/solid bearing from (n) beam at 2nd fl above to existing foundation. | $89,800 |
| Dec 23, 2016 | Never finaled issued Feb 2017, no final | 999 Green St | unit #1005: interior remodeling, 1 bathroom, kitchen. remove/relocate non-bearing partition walls. enclose balcony & replace (e) sliding glass doors/windows to exactly match existing.Details
unit #1005: interior remodeling, 1 bathroom, kitchen. remove/relocate non-bearing partition walls. enclose balcony & replace (e) sliding glass doors/windows to exactly match existing. | $118,000 |
| Jun 9, 2015 | Completed final sign-off Aug 2016 | 170 Pacific Av | #27: new kitchen and bath surfaces, new lighting, painting and flooring. new structural opening between kitchen and living room.Details
#27: new kitchen and bath surfaces, new lighting, painting and flooring. new structural opening between kitchen and living room. | $280,000 |
| Jun 3, 2015 | Completed final sign-off Feb 2016 | 1010 Lombard St | kitchen and breakfast room remodel. relocate laundry to utility room. make over laundry into exercise room. change entrance to house from garage. newl lighting in garageDetails
kitchen and breakfast room remodel. relocate laundry to utility room. make over laundry into exercise room. change entrance to house from garage. newl lighting in garage | $260,000 |
| Mar 16, 2015 | Never finaled issued Mar 2015, no final | 1998 Broadway | unit #607: remodel kitchen & baths. add washer & dryerDetails
unit #607: remodel kitchen & baths. add washer & dryer | $182,000 |
| Jan 16, 2015 | Completed final sign-off May 2015 | 2128 Vallejo St | #4 - kitchen remodel, new cabinets, enlarge window, new fixtures.Details
#4 - kitchen remodel, new cabinets, enlarge window, new fixtures. | $83,500 |
| Nov 8, 2013 | Completed final sign-off May 2014 | 1760 Pacific Av | unit #8-renovation to (e) kitchen, master bathroom, guest bathroom & wet bar including replacement of (e) plumbing fixtures, finishes, cabinetry & light fixtures. carpet to be replaced & wood floors to be refinished to match newDetails
unit #8-renovation to (e) kitchen, master bathroom, guest bathroom & wet bar including replacement of (e) plumbing fixtures, finishes, cabinetry & light fixtures. carpet to be replaced & wood floors to be refinished to match new | $75,000 |
| Aug 14, 2013 | Never finaled issued Aug 2013, no final | 550 Davis St | #37 - replace kitchen & bath cabinetry, install drop ceiling in kitchen, recessed led lighting, retrim apartment, install new doors. drop ceiling to be under separate permit.Details
#37 - replace kitchen & bath cabinetry, install drop ceiling in kitchen, recessed led lighting, retrim apartment, install new doors. drop ceiling to be under separate permit. | $110,000 |
| Jan 31, 2012 | Completed final sign-off Jul 2012 | 999 Green St | interior remodel and window replacement in kind at 1-bedroom condominium unit on 23rd floor of a 32 story residential tower. work includes kitchen and bath remodel. new windows and sliding glass doors, new lighting finishes and decoration. no sprinklers in area of work.Details
interior remodel and window replacement in kind at 1-bedroom condominium unit on 23rd floor of a 32 story residential tower. work includes kitchen and bath remodel. new windows and sliding glass doors, new lighting finishes and decoration. no sprinklers in area of work. | $110,000 |
| Aug 13, 2010 | Completed final sign-off Dec 2010 | 550 Davis St | kitchen and remodel of 3 baths, new plumbing &electrical fixtures, cabinets, flooring. no exterior work, no changes to structural elements.Details
kitchen and remodel of 3 baths, new plumbing &electrical fixtures, cabinets, flooring. no exterior work, no changes to structural elements. | $160,000 |
| Jun 29, 2010 | Completed final sign-off Sep 2010 | 279 Dalewood Wy | remodel kitchen-new cabinets, appliances, lighting. replace window in (e) opening. add kitchen island.Details
remodel kitchen-new cabinets, appliances, lighting. replace window in (e) opening. add kitchen island. | $80,000 |
| Nov 12, 2009 | Completed final sign-off Mar 2010 | 550 Davis St | unit #15 @ 2nd fl. kitchen remodel, remodel downstairs bath. new cabinets, counters , appliances, lighting fixtures, plumbing fixtures. no interior wall removal. no exterior work under this permit.Details
unit #15 @ 2nd fl. kitchen remodel, remodel downstairs bath. new cabinets, counters , appliances, lighting fixtures, plumbing fixtures. no interior wall removal. no exterior work under this permit. | $85,000 |
| Sep 3, 2009 | Completed final sign-off Dec 2009 | 233 Kensington Wy | kitchen remodel - no ext. changes, remove & replace cabinetry, remove non-bearing walls.Details
kitchen remodel - no ext. changes, remove & replace cabinetry, remove non-bearing walls. | $115,000 |
| Mar 21, 2008 | Completed final sign-off Sep 2008 | 1070 Green St | replace all floor coverings w/stone tile, replace all 1 bathroom plumbing fixtures and tile, new eight fixtures same locations, reface 1 kitchen cabinets, replace glass in (e) windows w/new laminated glass. no structural work, no moving of (e) plumbing locations, paint entire unit. no change inDetails
replace all floor coverings w/stone tile, replace all 1 bathroom plumbing fixtures and tile, new eight fixtures same locations, reface 1 kitchen cabinets, replace glass in (e) windows w/new laminated glass. no structural work, no moving of (e) plumbing locations, paint entire unit. no change in | $165,000 |
| May 15, 2007 | Completed final sign-off Dec 2007 | 1245 Stanyan St | remodel 1 kitchen, rebuild e greenhouse window with new double glazed unit. replace door at exterior, extend floor in breakfast nook under e cantilevered bedroom above. replace stair railings, fur up sunken living room floorDetails
remodel 1 kitchen, rebuild e greenhouse window with new double glazed unit. replace door at exterior, extend floor in breakfast nook under e cantilevered bedroom above. replace stair railings, fur up sunken living room floor | $175,000 |
| Mar 21, 2007 | Completed final sign-off Sep 2007 | 999 Green St | work @ unit# 2504 (lot# 107) only. kitchen cabinet swap out, appliances to remain in current positions. 1 new electrical circuit from ex panel.Details
work @ unit# 2504 (lot# 107) only. kitchen cabinet swap out, appliances to remain in current positions. 1 new electrical circuit from ex panel. | $40,000 |
| Sep 12, 2005 | Completed final sign-off Jan 2006 | 66 Saint Germain Av | removal all cabs, appliances, floor covering in kitchen new lighting & plugs new insulation & sheetrDetails
removal all cabs, appliances, floor covering in kitchen new lighting & plugs new insulation & sheetr | $105,000 |
| Nov 19, 2001 | Never finaled issued Nov 2001, no final | 1901 California St | kitchen remodel:cabinets, plumbiing fixtures, sotve and oven, etcDetails
kitchen remodel:cabinets, plumbiing fixtures, sotve and oven, etc | $10,000 |
| Aug 8, 2001 | Completed final sign-off Jan 2002 | 2164 Hyde St | new surfaces,cabinets,appliances in kitchen,new pedistal sink,new vanity & retiling of flr & showerDetails
new surfaces,cabinets,appliances in kitchen,new pedistal sink,new vanity & retiling of flr & shower | $150,000 |
| Sep 11, 2000 | Completed final sign-off Feb 2001 | 2100 Green St | replace kitchen cabinets & countersDetails
replace kitchen cabinets & counters | $30,000 |
| Jun 19, 2000 | Completed final sign-off Jan 2001 | 2265 Broadway | kitchen remodeling, plumbing fixtures, exterior touch, paint to match bldg schemeDetails
kitchen remodeling, plumbing fixtures, exterior touch, paint to match bldg scheme | $38,500 |