# Baseline Homes

Contractor license 681955. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/baseline-homes-681955
- JSON: https://www.permitgraph.org/api/contractor?license=681955
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=681955

18 permits since 2000: 16 completed, 2 never finaled. Typically 0 days from filing to permit and 180 days from permit to final inspection. Of the 2 never-finaled permits, 2 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Mar 2003 to Dec 2017
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2003 | 0 | 0 | 1 | 0 |
| 2006 | 1 | 0 | 0 | 0 |
| 2008 | 1 | 0 | 0 | 0 |
| 2009 | 0 | 0 | 1 | 0 |
| 2010 | 1 | 0 | 0 | 0 |
| 2011 | 1 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 4 | 0 | 0 | 0 |
| 2014 | 1 | 0 | 0 | 0 |
| 2015 | 1 | 0 | 0 | 0 |
| 2016 | 2 | 0 | 0 | 0 |
| 2017 | 3 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 10 | 9 | 0 | 1 | 0 | 4 | 216 |
| Kitchen remodel | 6 | 5 | 0 | 1 | 0 | 0 | 216 |
| Deck | 1 | 0 | 0 | 1 | 0 | 0 |  |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201712206957](https://www.permitgraph.org/p/201712206957) | Dec 20, 2017 | Completed: final sign-off Feb 2018 | [1625 Oak St](https://www.permitgraph.org/a/1223/022) | revision to 201606270916 - alteration to existing fence to 10' high. maher na | $800 |
| [201709066983](https://www.permitgraph.org/p/201709066983) | Sep 6, 2017 | Completed: final sign-off Feb 2018 | [1625 Oak St](https://www.permitgraph.org/a/1223/022) | rev. to pa#201606270916, steps to rear yard and bathroom pocket door. |  |
| [201703020554](https://www.permitgraph.org/p/201703020554) | Mar 2, 2017 | Completed: final sign-off Aug 2017 | [389 Crestlake Dr](https://www.permitgraph.org/a/2524/021) | replace existing windows & stucco alum clad wood windows. no structural work. | $50,000 |
| [201606270916](https://www.permitgraph.org/p/201606270916) | Jun 27, 2016 | Completed: final sign-off Feb 2018 | [1625 Oak St](https://www.permitgraph.org/a/1223/022) | remodel kitchen, add powder room, remodel w baths upstairs, add bedroom, bath in garage, upsdate all electric to code | $175,000 |
| [201602129553](https://www.permitgraph.org/p/201602129553) | Feb 12, 2016 | Completed: final sign-off Oct 2016 | [2240 Lombard St](https://www.permitgraph.org/a/0490/003A) | provide shear walls at ground floor per sfbc chapter 34b soft story retrofit program, engineering design criteria per 2012 iebc appendix a-4. n/a for maher | $40,000 |
| [201512185476](https://www.permitgraph.org/p/201512185476) | Dec 18, 2015 | Completed: final sign-off Aug 2017 | [389 Crestlake Dr](https://www.permitgraph.org/a/2524/021) | reconfigure (e) 2.5 baths to 3.5 baths. add family room & home office at garage | $80,000 |
| [201403070166](https://www.permitgraph.org/p/201403070166) | Mar 7, 2014 | Completed: final sign-off May 2014 | [666 42nd Av](https://www.permitgraph.org/a/1584/019I) | replace finishes and fixtures in bath in same location electrical update in bathroom, check wiring in storage room (electrical permit by others) | $20,000 |
| [201309237486](https://www.permitgraph.org/p/201309237486) | Sep 23, 2013 | Completed: final sign-off Mar 2014 | [1283 Arguello Bl](https://www.permitgraph.org/a/1750/007) | revision to 201308305699. relocate new windo on 2nd floor rear bath | $800 |
| [201308305699](https://www.permitgraph.org/p/201308305699) | Aug 30, 2013 | Completed: final sign-off Mar 2014 | [1283 Arguello Bl](https://www.permitgraph.org/a/1750/007) | remodel (e) bathroom, replace fixtures & move sinks. add new 2nd bathroom within closet. update same both electrical & plumbing per code | $20,000 |
| [201306149586](https://www.permitgraph.org/p/201306149586) | Jun 14, 2013 | Completed: final sign-off Aug 2013 | [1449 05th Av](https://www.permitgraph.org/a/1848/012) | to replace kitchen cabinets, countertops. separate electrical and plumbing permits. | $10,000 |
| [201302079730](https://www.permitgraph.org/p/201302079730) | Feb 7, 2013 | Completed: final sign-off Aug 2014 | [1443 24th Av](https://www.permitgraph.org/a/1829/008) | 1st floor: relocate extg bath, create lounge area and expand bedroom. infill below existing. 2nd floor: provide child proof electrical outlets. | $60,000 |
| [201209210407](https://www.permitgraph.org/p/201209210407) | Sep 21, 2012 | Completed: final sign-off Apr 2013 | [2 Castenada Av](https://www.permitgraph.org/a/2817/015) | revision for pa# 201112281395s. remove plaster, update electrical, insulate drywall - living room, dining room, kitchen & breakfast room. | $10,000 |
| [201112281395](https://www.permitgraph.org/p/201112281395) | Dec 28, 2011 | Completed: final sign-off Apr 2013 | [2 Castenada Av](https://www.permitgraph.org/a/2817/015) | kitchen & 2nd floor bathroom renovation - remodel. demolition & rebuild addition in same footprint - family room. | $150,000 |
| [201007066031](https://www.permitgraph.org/p/201007066031) | Jul 6, 2010 | Completed: final sign-off Oct 2010 | [28 Clarendon Av](https://www.permitgraph.org/a/2688/011) | (n) garage door (replacement) provide 200 sq. in. of venting @ door. | $1,500 |
| [200909287813](https://www.permitgraph.org/p/200909287813) | Sep 28, 2009 | Never finaled: issued Sep 2009, no final | [30 Clarendon Av](https://www.permitgraph.org/a/2688/012) | deck dryrot repair at rear. repair in kind less than 50%. | $6,000 |
| [200810234874](https://www.permitgraph.org/p/200810234874) | Oct 23, 2008 | Completed: final sign-off Dec 2008 | [301 Monterey Bl](https://www.permitgraph.org/a/3118/001) | stucco siding repair on south side of the building into hardie plank. approx 600 sq. ft. not visible from street. | $10,000 |
| [200604259780](https://www.permitgraph.org/p/200604259780) | Apr 25, 2006 | Completed: final sign-off Nov 2006 | [1265 37th Av](https://www.permitgraph.org/a/1713/013) | interior remodeling: kitchen, bath (3). kitchen replace cabinets, countertop. floor, sink, electrical & appliances. bath: replace bathtub, sink, shower stall, flooring, electric work. | $50,000 |
| [200303119414](https://www.permitgraph.org/p/200303119414) | Mar 11, 2003 | Never finaled: issued Mar 2003, no final | [638 Parnassus Av](https://www.permitgraph.org/a/1758/021) | 2 bathroom,1 kitchen remodeling. no wall removal. | $10,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/baseline-homes-681955.
