# Balch Petroleum Contractors & Builders

Contractor license 396575. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/balch-petroleum-contractors-builders-396575
- JSON: https://www.permitgraph.org/api/contractor?license=396575
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=396575

32 permits since 2000: 27 completed, 5 never finaled. Typically 20 days from filing to permit and 124 days from permit to final inspection. Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.

- Based in: Milpitas
- On San Francisco permits: Jul 2001 to Jul 2025
- Last 24 months: 1 permit filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2001 | 0 | 0 | 1 | 0 |
| 2002 | 7 | 0 | 0 | 0 |
| 2003 | 2 | 0 | 0 | 0 |
| 2005 | 4 | 0 | 0 | 0 |
| 2007 | 1 | 0 | 0 | 0 |
| 2009 | 0 | 0 | 1 | 0 |
| 2010 | 1 | 0 | 0 | 0 |
| 2011 | 2 | 0 | 0 | 0 |
| 2013 | 0 | 0 | 1 | 0 |
| 2014 | 3 | 0 | 0 | 0 |
| 2015 | 4 | 0 | 0 | 0 |
| 2016 | 1 | 0 | 0 | 0 |
| 2017 | 1 | 0 | 0 | 0 |
| 2021 | 0 | 0 | 1 | 0 |
| 2022 | 0 | 0 | 1 | 0 |
| 2025 | 1 | 0 | 0 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202506259429](https://www.permitgraph.org/p/202506259429) | Jul 23, 2025 | Completed: final sign-off Oct 2025 | [7355 Geary Bl](https://www.permitgraph.org/a/1507/034) | removal of service station gas dispensor canopy. disconnect & remove all tank and fuel island trim. remove gas storage tanks and backfill. | $20,000 |
| [202212158436](https://www.permitgraph.org/p/202212158436) | Dec 15, 2022 | Never finaled: issued Dec 2022, no final | [945 Sacramento St](https://www.permitgraph.org/a/0243/058) | install a remote fuel fill system for an e roof top mounted generator. fill box located flush in exterior building wall at street level. fill pipe runs through building, up to roof through an existin… | $110,000 |
| [202101052106](https://www.permitgraph.org/p/202101052106) | Jan 5, 2021 | Never finaled: issued Apr 2021, no final | [185 Berry St](https://www.permitgraph.org/a/3803/005) | relocation (removal/replacement) of (2) 2" remote fill lines, (2) 6" single wall emergency, (2) 2" single wall normal vent lines and 1 remote fill box on the (e) above ground diesel tank located in t… | $100,000 |
| [201705187014](https://www.permitgraph.org/p/201705187014) | May 18, 2017 | Completed: final sign-off May 2019 | [151 Beach St](https://www.permitgraph.org/a/0019/001) | temporary shoring and excavation. ref 2017-0213-9309, construction 24" concrete hydrocap. maher applicable > 50 yrds | $300,000 |
| [201604195150](https://www.permitgraph.org/p/201604195150) | Apr 19, 2016 | Completed: final sign-off Jun 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | replacement of fill port for fire pump diesel tank. no work to bldg exterior. | $8,000 |
| [201510301291](https://www.permitgraph.org/p/201510301291) | Oct 30, 2015 | Completed: final sign-off Mar 2016 | [2700 03rd St](https://www.permitgraph.org/a/4230/001) | replace 5 under dispenser cabinets in (e) fuel station, demo 2 unused under dispenser boxes. compliance with maher ordinance no 155-13 not required. | $20,000 |
| [201510169962](https://www.permitgraph.org/p/201510169962) | Oct 16, 2015 | Completed: final sign-off Nov 2016 | [2270 Jerrold Av](https://www.permitgraph.org/a/5230/008) | demo one story canopy. | $10,000 |
| [201509177317](https://www.permitgraph.org/p/201509177317) | Sep 17, 2015 | Completed: final sign-off Nov 2016 | [2270 Jerrold Av](https://www.permitgraph.org/a/5230/008) | removal of one 15,000 gal capacity underground storage tank (diesel) installation of one 25,000 gal split tank gas - 15,000 gal & disel - 10,000 gal. installation of canopy 20' x 20' over fueling are… | $20,000 |
| [201509177335](https://www.permitgraph.org/p/201509177335) | Sep 17, 2015 | Completed: final sign-off Nov 2016 | [2270 Jerrold Av](https://www.permitgraph.org/a/5230/008) | erect 1-story, gas station canopy. ** maher: compliance with ordinance no# 155-13 not required ** | $2,000 |
| [201408143855](https://www.permitgraph.org/p/201408143855) | Aug 14, 2014 | Completed: final sign-off Dec 2014 | [2845 Cesar Chavez St](https://www.permitgraph.org/a/5512/028) | replacing the drop tube system & adding a phase 1 vapor recovery to what is now a diesel tank. remove two existing fuel dispansers & replace them with new ones. n/a maher ordinance | $70,000 |
| [201404213717](https://www.permitgraph.org/p/201404213717) | Apr 21, 2014 | Completed: final sign-off Jun 2014 | [973 Market St](https://www.permitgraph.org/a/3704/069) | revision to pa #2014.02.21.8982 - install 2 hour fire proofing to all internal double trac fuel piping at ground level. compliance with ordinance #155-13 not required | $5,000 |
| [201402218982](https://www.permitgraph.org/p/201402218982) | Feb 21, 2014 | Completed: final sign-off Jun 2014 | [973 Market St](https://www.permitgraph.org/a/3704/069) | installation fuel port and exterior fuel supply line from ground level to (e) diesel generator at roof level. work includes low voltage controls. generator installed under app# 2013 1021 9777 complia… | $43,000 |
| [201302120064](https://www.permitgraph.org/p/201302120064) | Feb 12, 2013 | Never finaled: issued Feb 2013, no final | [455 Golden Gate Av](https://www.permitgraph.org/a/0765/003) | remove existing underground fuel oil supply and return lines and replace with western fiberglass co-flex line and convert to existing fuel lines inside building at basement level. | $35,000 |
| [201103162212](https://www.permitgraph.org/p/201103162212) | Mar 16, 2011 | Completed: final sign-off Sep 2011 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | revision of wrap on insulation to spray on foam.insulation to pipe supports in basement per permit #201101128263. fuel filling sequence note added. |  |
| [201101128263](https://www.permitgraph.org/p/201101128263) | Jan 12, 2011 | Completed: final sign-off Jun 2011 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | secondary contained diesel fuel, 1-200 gallon day tank, fos and for between extg ust and new daytank on roof of 45 beal street. separate permits required for arch, mech, fire alarm, sprinklers, emerg… | $230,000 |
| [201006013539](https://www.permitgraph.org/p/201006013539) | Jun 1, 2010 | Completed: final sign-off Aug 2010 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | replace fill sump and spill bucket including manhole covers to 18,000 gallon diesel underground storage tank (ust) in open space. | $17,980 |
| [200908114543](https://www.permitgraph.org/p/200908114543) | Aug 11, 2009 | Never finaled: issued Dec 2009, no final | [2700 03rd St](https://www.permitgraph.org/a/4230/001) | change existing gasoline ust to diesel ust inc. modify spill bucket and dispenser. | $49,245 |
| [200703196644](https://www.permitgraph.org/p/200703196644) | Mar 19, 2007 | Completed: final sign-off Dec 2008 | [3750 03rd St](https://www.permitgraph.org/a/5225/010) | new canopy on (e) dispense area. new trash enclosure & food mart addition. upgrading the restrooms to meet the current accessibilty standard. | $80,000 |
| [200510256479](https://www.permitgraph.org/p/200510256479) | Oct 25, 2005 | Completed: final sign-off Nov 2005 | [470 West Portal Av](https://www.permitgraph.org/a/2484/008) | shoring for removal on tank removal per app #200505162553 | $5,000 |
| [200505162553](https://www.permitgraph.org/p/200505162553) | May 16, 2005 | Completed: final sign-off Nov 2005 | [470 West Portal Av](https://www.permitgraph.org/a/2484/008) | desiel storage tank removal. shoring work to be submitted under separate permit. | $40,000 |
| [200502175761](https://www.permitgraph.org/p/200502175761) | Feb 17, 2005 | Completed: final sign-off Apr 2005 | [1330 16th St](https://www.permitgraph.org/a/3939/001) | remove underground gasoline storage tank & associated dispenser | $40,000 |
| [200502175764](https://www.permitgraph.org/p/200502175764) | Feb 17, 2005 | Completed: final sign-off Apr 2005 | [610 Brannan St](https://www.permitgraph.org/a/3778/047) | remove underground gasoline storage tank & associated dispenser | $40,000 |
| [200302258280](https://www.permitgraph.org/p/200302258280) | Feb 25, 2003 | Completed: final sign-off Sep 2003 | [4199 Mission St](https://www.permitgraph.org/a/5869/014) | erect sign for electric, wall , double face |  |
| [200302258278](https://www.permitgraph.org/p/200302258278) | Feb 25, 2003 | Completed: final sign-off Sep 2003 | [4199 Mission St](https://www.permitgraph.org/a/5869/014) | erect sign for electric, wall , single face |  |
| [200212133535](https://www.permitgraph.org/p/200212133535) | Dec 13, 2002 | Completed: final sign-off Sep 2003 | [4199 Mission St](https://www.permitgraph.org/a/5869/014) | repl one new yard light/install 1 new yard light/remove (e)yard light (rev. 200201167103 | $1,500 |
| [200211191721](https://www.permitgraph.org/p/200211191721) | Nov 19, 2002 | Completed: final sign-off Nov 2003 | [4199 Mission St](https://www.permitgraph.org/a/5869/014) | rev#200201167103 more detail on fuel piping as built. canopy work done under separated permited. in |  |
| [200210038093](https://www.permitgraph.org/p/200210038093) | Oct 3, 2002 | Completed: final sign-off Oct 2002 | [2690 Geary Bl](https://www.permitgraph.org/a/1071/004) | change of detail from bolting attachment to welding to coincide with special inspctn/200203010464 |  |
| [200209277616](https://www.permitgraph.org/p/200209277616) | Sep 27, 2002 | Completed: final sign-off Nov 2003 | [4199 Mission St](https://www.permitgraph.org/a/5869/014) | revision #200201167103 for shoring plans |  |
| [200207171665](https://www.permitgraph.org/p/200207171665) | Jul 17, 2002 | Completed: final sign-off Mar 2003 | [20 Heron St](https://www.permitgraph.org/a/3755/044) | verizon wireless cell site;12 antennas mounted to roof structure | $100,000 |
| [200203010464](https://www.permitgraph.org/p/200203010464) | Mar 1, 2002 | Completed: final sign-off Oct 2002 | [2690 Geary Bl](https://www.permitgraph.org/a/1071/004) | install 6 new antennas and supporting radio equipment on the roof. | $45,000 |
| [200203010467](https://www.permitgraph.org/p/200203010467) | Mar 1, 2002 | Completed: final sign-off Aug 2002 | [20 Woodside Av](https://www.permitgraph.org/a/2888A/001) | installation of (3) panel antennas and (1) gps antenna to be located inside (e) church bell tower, e | $45,000 |
| [200107123548](https://www.permitgraph.org/p/200107123548) | Jul 12, 2001 | Never finaled: issued Jan 2002, no final | [200 Larkin St](https://www.permitgraph.org/a/0353/001) | install one 3000 gallon underground disel storage tard and piping, shoring for excavation is in plac | $60,000 |

---