Back to bathroom remodel contractors
Bai Yuan Li
- Based in
- San Francisco
- On San Francisco permits
- Apr 2009 to Sep 2026
- Last 24 months
- 8 permits filed
79 permits since 2000: 74 completed, 1 in progress, 4 never finaled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
42 bathroom remodel permits: 41 completed, 1 never finaled. Typically 0 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2025 | Completed final sign-off Mar 2026 | 1998 08th Av | remodel two bathrooms on second flr in kind (except change tubs to showers). no walls to be moved.each bathroom appropx 64 sq ft.Details
remodel two bathrooms on second flr in kind (except change tubs to showers). no walls to be moved.each bathroom appropx 64 sq ft. | $25,000 |
| Oct 20, 2025 | Completed final sign-off Dec 2025 | 2270 Filbert St | 1 bathroom remodel, no wall moving. change tub to shower.Details
1 bathroom remodel, no wall moving. change tub to shower. | $12,000 |
| Jun 18, 2025 | Completed final sign-off Oct 2025 | 1566 46th Av | remodel the kitchen and bathroom on first floor in kind. no removal of walls. no change to floor layout. no change on wall layout. no structural work.Details
remodel the kitchen and bathroom on first floor in kind. no removal of walls. no change to floor layout. no change on wall layout. no structural work. | $26,800 |
| May 30, 2025 | Completed final sign-off Aug 2025 | 694 08th Av | remodel the bathroom and laundry room on 3rd floor. no remove walls.Details
remodel the bathroom and laundry room on 3rd floor. no remove walls. | $21,000 |
| Feb 21, 2025 | Completed final sign-off Apr 2025 | 2446 30th Av | remodeling kitchen and bathroom on first floor. no structural work. and replace a new central heater. no removal of wallsDetails
remodeling kitchen and bathroom on first floor. no structural work. and replace a new central heater. no removal of walls | $40,000 |
| Sep 12, 2023 | Completed final sign-off Apr 2024 | 2127 35th Av | 1/f: new bedroom, new media room, construct 2 new bathrooms, replace mech, new bar, laundry. 2/f: relocate (e) kitchen, new bedroom and 2 new bathrooms.Details
1/f: new bedroom, new media room, construct 2 new bathrooms, replace mech, new bar, laundry. 2/f: relocate (e) kitchen, new bedroom and 2 new bathrooms. | $250,000 |
| Jun 21, 2023 | Completed final sign-off Apr 2024 | 3241 Taraval St | unit 1:to comply with nov# 202200151: kitchen and bathroom remodel (replace in kind). installation of washer/dryer in closet. no demo of walls. 100 sq. in. make-up air. vent to rear, 3' from pl and openings into the building. maintain rated separation.Details
unit 1:to comply with nov# 202200151: kitchen and bathroom remodel (replace in kind). installation of washer/dryer in closet. no demo of walls. 100 sq. in. make-up air. vent to rear, 3' from pl and openings into the building. maintain rated separation. | $5,000 |
| Dec 30, 2022 | Completed final sign-off Oct 2023 | 51 De Long St | g/f: relocate bathroom, new media room, bar, relocate mechanical room. 2/f: new bathroom & remodel (e) kitchen in-kind.Details
g/f: relocate bathroom, new media room, bar, relocate mechanical room. 2/f: new bathroom & remodel (e) kitchen in-kind. | $105,000 |
| Jun 14, 2022 | Completed final sign-off Aug 2022 | 2021 Judah St | one bathroom renovation. no structural work.Details
one bathroom renovation. no structural work. | $14,500 |
| Apr 19, 2022 | Completed final sign-off Aug 2022 | 273 Pixley St | (1) bathroom renovation, no structural work.Details
(1) bathroom renovation, no structural work. | $10,000 |
| Oct 19, 2020 | Completed final sign-off May 2021 | 3337 Steiner St | apt 3: remodel of (e) bathroom & kitchen. upgrade all electrical throughout & plumbing fixtures.Details
apt 3: remodel of (e) bathroom & kitchen. upgrade all electrical throughout & plumbing fixtures. | $25,000 |
| Sep 2, 2020 | Completed final sign-off Nov 2020 | 27 Riverton Dr | g/f: remodel (e) bathroom & replace laminate floor, painting.Details
g/f: remodel (e) bathroom & replace laminate floor, painting. | $4,500 |
| Aug 20, 2020 | Completed final sign-off May 2021 | 3337 Steiner St | apt 2: remodel of (e) bathroom & kitchen. upgrade all electrical throughout & plumbing fixtures.Details
apt 2: remodel of (e) bathroom & kitchen. upgrade all electrical throughout & plumbing fixtures. | $22,000 |
| Jun 5, 2020 | Completed final sign-off Dec 2020 | 2821 Polk St | #3: remodel kitchen & 1-1/2 bathroom. replace 4 windows at back (nonstreet visible) rewire all electrical. replace hardwood floor & painting.Details
#3: remodel kitchen & 1-1/2 bathroom. replace 4 windows at back (nonstreet visible) rewire all electrical. replace hardwood floor & painting. | $49,000 |
| Mar 13, 2020 | Completed final sign-off May 2021 | 3337 Steiner St | apt 4: remodel kitchen and bathroom, laundry room, rewire electrical; in-kind replacement.Details
apt 4: remodel kitchen and bathroom, laundry room, rewire electrical; in-kind replacement. | $40,000 |
| Oct 1, 2019 | Completed final sign-off Feb 2020 | 2821 Polk St | #1: remodel kitchen & two full bathroom. rewire all electrical. replace hardwood floor & painting.Details
#1: remodel kitchen & two full bathroom. rewire all electrical. replace hardwood floor & painting. | $45,000 |
| Jun 3, 2019 | Completed final sign-off Sep 2019 | 2821 Polk St | #2: remodel kitchen & bathroom. rewire all electrical. replace hardwood floor and painting.Details
#2: remodel kitchen & bathroom. rewire all electrical. replace hardwood floor and painting. | $38,000 |
| May 8, 2019 | Completed final sign-off Jan 2020 | 451 38th Av | revise application #201708296254 to change floor layout within bldg envelope. rearrange rooms and stairs, add a bath on 2nd floor. rearrange rooms on 1st floor.Details
revise application #201708296254 to change floor layout within bldg envelope. rearrange rooms and stairs, add a bath on 2nd floor. rearrange rooms on 1st floor. | $12,000 |
| Feb 20, 2019 | Never finaled issued May 2019, no final | 2658 40th Av | extend walls to grade below (e) building room foot print, (1965 sf) repair damaged deck & construct new deck (985 sf) to connect w/ (e) deck, new bathroomDetails
extend walls to grade below (e) building room foot print, (1965 sf) repair damaged deck & construct new deck (985 sf) to connect w/ (e) deck, new bathroom | $10,000 |
| Sep 24, 2018 | Completed final sign-off Mar 2020 | 2146 18th Av | remodel bathroom at 2nd floor. remodel kitchen. no change in existing floor plan.Details
remodel bathroom at 2nd floor. remodel kitchen. no change in existing floor plan. | $24,000 |
| Sep 24, 2018 | Completed final sign-off Jan 2019 | 1930 31st Av | remodel bathroom at 2nd floor. remodel kitchen, add lighting. replace existing furnace with new furnace. no change of existing floor plan.Details
remodel bathroom at 2nd floor. remodel kitchen, add lighting. replace existing furnace with new furnace. no change of existing floor plan. | $37,040 |
| Jul 12, 2018 | Completed final sign-off Aug 2019 | 727 16th Av | re-arrange rooms, add baths, relocate stairs on 2nd fl. relocate kitchen, dining & living room to 1st fl. relocate/replace furnace, water heater & washer dryer. upgrade electrical & plumbing systemDetails
re-arrange rooms, add baths, relocate stairs on 2nd fl. relocate kitchen, dining & living room to 1st fl. relocate/replace furnace, water heater & washer dryer. upgrade electrical & plumbing system | $150,000 |
| Jun 21, 2018 | Completed final sign-off Oct 2018 | 27 Garcia Av | remove kitvchen on 2/f, no change to walls & opening layout, add efficacy lighting, remodel bathroomDetails
remove kitvchen on 2/f, no change to walls & opening layout, add efficacy lighting, remodel bathroom | $25,000 |
| Jun 21, 2018 | Completed final sign-off Jul 2018 | 1657 12th Av | remodel bathroom. replace furnaceDetails
remodel bathroom. replace furnace | $7,800 |
| Mar 17, 2017 | Completed final sign-off Jan 2018 | 411 34th Av | remodel (e) kitchen, replace cabinets, fixtures & countertop and construct one new bath room (size 3x7'-6") on the 3rd floor. remodel (e) bathroom.Details
remodel (e) kitchen, replace cabinets, fixtures & countertop and construct one new bath room (size 3x7'-6") on the 3rd floor. remodel (e) bathroom. | $25,000 |
| Jul 14, 2015 | Completed final sign-off Nov 2015 | 234 Orizaba Av | remodel 2nd floor master bathroom. replace four windows two rear two front and whole house rewire. all street facing windows to be aluminum wood clad windows.Details
remodel 2nd floor master bathroom. replace four windows two rear two front and whole house rewire. all street facing windows to be aluminum wood clad windows. | $18,000 |
| Jul 14, 2015 | Completed final sign-off Nov 2015 | 89 Barcelona Av | remodel downstair kitchen/bathroom, replace hardwood floor, painting, replace dry rot deck at rear, less than 50% in kind. electrical & plumbing work under seperate permit.Details
remodel downstair kitchen/bathroom, replace hardwood floor, painting, replace dry rot deck at rear, less than 50% in kind. electrical & plumbing work under seperate permit. | $28,000 |
| Jul 13, 2015 | Completed final sign-off Nov 2015 | 234 Orizaba Av | add bedroom, family room and bath on 1st floor. new painting on 2nd floor.Details
add bedroom, family room and bath on 1st floor. new painting on 2nd floor. | $32,000 |
| Jul 13, 2015 | Completed final sign-off Jan 2016 | 696 08th Av | add family room and full bath on 1st floor. replace cabinets in 1 1/2 baths and kitchen on 2nd floor, replace sheetrocks on 2/f.Details
add family room and full bath on 1st floor. replace cabinets in 1 1/2 baths and kitchen on 2nd floor, replace sheetrocks on 2/f. | $68,000 |
| Apr 27, 2015 | Completed final sign-off Jul 2015 | 309 Dellbrook Av | remodel kitchen & 2nd flr bathroom, opening & wall layout, kitchen lighting 50% wattage high efficacy; bathroom lighting,high efficacy or controlled by manual-on sensor & high efficacy main.Details
remodel kitchen & 2nd flr bathroom, opening & wall layout, kitchen lighting 50% wattage high efficacy; bathroom lighting,high efficacy or controlled by manual-on sensor & high efficacy main. | $15,000 |
| Mar 9, 2015 | Completed final sign-off Sep 2015 | 94 Stanton St | remodel 2/f bathroom, replace (3) windows back, replace kitchen granite counter top, paint exterior house, no walls moved/removed/added. all layouts to remain unchanged.Details
remodel 2/f bathroom, replace (3) windows back, replace kitchen granite counter top, paint exterior house, no walls moved/removed/added. all layouts to remain unchanged. | $19,000 |
| Nov 24, 2014 | Completed final sign-off Mar 2015 | 2091 28th Av | remodel 2nd floor bathroom. no structural work - same locationDetails
remodel 2nd floor bathroom. no structural work - same location | $5,000 |
| Oct 24, 2014 | Completed final sign-off Mar 2015 | 2091 28th Av | add and legalize 2 bedrooms and bathroom on 1st flr: and paint on both floors.Details
add and legalize 2 bedrooms and bathroom on 1st flr: and paint on both floors. | $32,000 |
| Oct 2, 2014 | Completed final sign-off Apr 2015 | 245 Hazelwood Av | remodel 2nd floor & bathroom, additional work to bpa 201409257284.Details
remodel 2nd floor & bathroom, additional work to bpa 201409257284. | $12,000 |
| Sep 25, 2014 | Completed final sign-off May 2015 | 245 Hazelwood Av | remodel and legalize family room and full bath on ground fl. replace sheetrock and new paint on both floorsDetails
remodel and legalize family room and full bath on ground fl. replace sheetrock and new paint on both floors | $35,000 |
| Jul 15, 2014 | Completed final sign-off Dec 2015 | 1886 30th Av | remodel (e) bathroom and kitchen at 2nd floor. add new bathroom, one bedroom to be constructed at first floor.Details
remodel (e) bathroom and kitchen at 2nd floor. add new bathroom, one bedroom to be constructed at first floor. | $46,000 |
| Jun 26, 2014 | Completed final sign-off Dec 2014 | 70 Encanto Av | remodeld 2 extg bathrooms, kitchen, and closets, and add one new bathroom on 2nd floor.Details
remodeld 2 extg bathrooms, kitchen, and closets, and add one new bathroom on 2nd floor. | $53,000 |
| Mar 11, 2014 | Completed final sign-off Sep 2015 | 94 Stanton St | new deck addition to rear of (e) house. alteration to (e) basement bedroom, legalize (e) bedroom & bath.Details
new deck addition to rear of (e) house. alteration to (e) basement bedroom, legalize (e) bedroom & bath. | $20,000 |
| Jul 24, 2013 | Completed final sign-off Mar 2014 | 636 Garfield St | add rooms at g/f- construct new 1-hr rated wall to seperate the proposed 2 bedrooms, 1 full bathroom, half bathroom & storage behind garage on the ground floorDetails
add rooms at g/f- construct new 1-hr rated wall to seperate the proposed 2 bedrooms, 1 full bathroom, half bathroom & storage behind garage on the ground floor | $25,000 |
| Feb 23, 2012 | Completed final sign-off Jul 2012 | 2949 Clement St | remodel bathroom second floor, change light, no structural work.Details
remodel bathroom second floor, change light, no structural work. | $4,800 |
| Jan 28, 2011 | Completed final sign-off Mar 2011 | 4239 Folsom St | bathroom remodel at 2nd floor, no structural work. no new lightingDetails
bathroom remodel at 2nd floor, no structural work. no new lighting | $4,500 |
| Jun 26, 2009 | Completed final sign-off Aug 2010 | 2036 Great Hy | remove kitchen built without permit @ ground fl. to comply with nov # 200007817 dtd 1/30/09 items #2, # 3 pertaining to 2nd bldg on lot address 2036 great high way. install 2 new bedrooms, 1 full bathroom @ grd. fl.Details
remove kitchen built without permit @ ground fl. to comply with nov # 200007817 dtd 1/30/09 items #2, # 3 pertaining to 2nd bldg on lot address 2036 great high way. install 2 new bedrooms, 1 full bathroom @ grd. fl. | $5,000 |