Back to kitchen remodel contractors
B R S Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to May 2026
- Last 24 months
- 6 permits filed
72 permits since 2000: 67 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
32 kitchen remodel permits: 32 completed. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 10, 2024 | Completed final sign-off Sep 2024 | 317 Crestlake Dr | kitchen remodeling and 4 bathrooms. 12'x12' kitchen, 8'x8' master bathroom and 6'x6' guest bathroom on 1st flr. 5'x8' 1/2 bathroom on ground floor, 5'x6' powder room on main flr. new electrical, plumbing, drywall, cabinery, applicants, flooring.Details
kitchen remodeling and 4 bathrooms. 12'x12' kitchen, 8'x8' master bathroom and 6'x6' guest bathroom on 1st flr. 5'x8' 1/2 bathroom on ground floor, 5'x6' powder room on main flr. new electrical, plumbing, drywall, cabinery, applicants, flooring. | $50,000 |
| Feb 24, 2023 | Completed final sign-off Oct 2023 | 225 03rd Av | kitchen remodel & expansion, convert e bedroom #2 to dining room, remove e bearing wall @ kitchen & 2nd flr bedroomDetails
kitchen remodel & expansion, convert e bedroom #2 to dining room, remove e bearing wall @ kitchen & 2nd flr bedroom | $150,000 |
| Jan 4, 2023 | Completed final sign-off May 2023 | 495 Crestlake Dr | in kind remodeling. no removal of walls 1. 12'x12 kitchen remodling / elect, plumbing, cabinets. 2. 3'x5' powder room wc/remodling, plumbing, elec fixtures. 3. family room upgrade/electrical, flooring, tv, cabinets-entertaiment.Details
in kind remodeling. no removal of walls 1. 12'x12 kitchen remodling / elect, plumbing, cabinets. 2. 3'x5' powder room wc/remodling, plumbing, elec fixtures. 3. family room upgrade/electrical, flooring, tv, cabinets-entertaiment. | $35,000 |
| Aug 12, 2022 | Completed final sign-off Jan 2023 | 2237 North Point St | in-kind kitchen remodeling, guest bathroom, master bathroom, no structural work, new plumbing, electrical, fixtures, 10 x 10 kitchen, 6 x 6 guest bathroom, 6 x 10 master bathroom. in kind, no new wall openingDetails
in-kind kitchen remodeling, guest bathroom, master bathroom, no structural work, new plumbing, electrical, fixtures, 10 x 10 kitchen, 6 x 6 guest bathroom, 6 x 10 master bathroom. in kind, no new wall opening | $30,000 |
| Mar 28, 2022 | Completed final sign-off Mar 2023 | 168 Jordan Av | 1) kitchen & half bath remodel. 2) remove portion or rear wall & install sliding glass foor to existing deck 3) convert pantry into breakfast nook.Details
1) kitchen & half bath remodel. 2) remove portion or rear wall & install sliding glass foor to existing deck 3) convert pantry into breakfast nook. | $33,000 |
| Nov 23, 2021 | Completed final sign-off Oct 2022 | 2260 09th Av | revision to pa 2021-1008-0163 (no plans) kitchen remodel and enlarge kitchen area into (e) laundry room; no exterior changesDetails
revision to pa 2021-1008-0163 (no plans) kitchen remodel and enlarge kitchen area into (e) laundry room; no exterior changes | |
| Oct 8, 2021 | Completed final sign-off Oct 2022 | 2260 09th Av | in kind kitchen remodeling 12x12. mew electrical and plumbing work. new cabinets and appliances. title 24 lights and appliances/hood vent.Details
in kind kitchen remodeling 12x12. mew electrical and plumbing work. new cabinets and appliances. title 24 lights and appliances/hood vent. | $20,000 |
| Jun 10, 2021 | Completed final sign-off Feb 2022 | 30 Escondido Av | relocate kitchen in dinning area & (e) kitchen to become a home office.Details
relocate kitchen in dinning area & (e) kitchen to become a home office. | $25,000 |
| Apr 9, 2021 | Completed final sign-off Jul 2021 | 3718 20th St | no rough opening changrd u-factor for glazing shall not exceed0.30. new flooring & painting in-kind. replace 1 window and 1 door @ rear. kitchen remodel in-kind, painting, dry wall patch, fix dry rot siding 4 sf. no street facing. no structural work.Details
no rough opening changrd u-factor for glazing shall not exceed0.30. new flooring & painting in-kind. replace 1 window and 1 door @ rear. kitchen remodel in-kind, painting, dry wall patch, fix dry rot siding 4 sf. no street facing. no structural work. | $10,000 |
| Jul 10, 2019 | Completed final sign-off Aug 2019 | 3700 20th St | unit 30: kitchen (10'x10') remodel, electrical/plumbing/cabinets/countertops/appliances; bathroom (10'x8') remodel, electrical/plumbing/cabinets/tiles. no structural workDetails
unit 30: kitchen (10'x10') remodel, electrical/plumbing/cabinets/countertops/appliances; bathroom (10'x8') remodel, electrical/plumbing/cabinets/tiles. no structural work | $25,000 |
| Apr 29, 2019 | Completed final sign-off Jun 2019 | 1504 10th Av | 14'x14' kitchen remodeling. 8x8 bathroom remodeling. electrical upgrade. plumbing upgrade, no structural. cabinets, appliances, fixtures. no framing modification.Details
14'x14' kitchen remodeling. 8x8 bathroom remodeling. electrical upgrade. plumbing upgrade, no structural. cabinets, appliances, fixtures. no framing modification. | $25,000 |
| Apr 2, 2019 | Completed final sign-off May 2019 | 3700 20th St | unit 31: 8x8 kitchen remodeling with new cabinets, countertops, appliances, electrical and plumbing upgrade/no structural work 6x6 bathroom remodeling with new tiles, toilet, vanity, plumbing work and electrical work upgrade.Details
unit 31: 8x8 kitchen remodeling with new cabinets, countertops, appliances, electrical and plumbing upgrade/no structural work 6x6 bathroom remodeling with new tiles, toilet, vanity, plumbing work and electrical work upgrade. | $15,000 |
| Nov 20, 2018 | Completed final sign-off Apr 2019 | 68 Walter St | 12'x12' kitchen remodel, new cabinets, counter, appliances. 8'x8' bathroom remodel, new fixtures, tiles, cabinetry. no structural work, new electrical and plumbing by code and title 24. no change in wall layout or openings.Details
12'x12' kitchen remodel, new cabinets, counter, appliances. 8'x8' bathroom remodel, new fixtures, tiles, cabinetry. no structural work, new electrical and plumbing by code and title 24. no change in wall layout or openings. | $25,000 |
| Jul 26, 2018 | Completed final sign-off Oct 2018 | 211 Cornwall St | unit 10: remodel (e) kitchen new fixtures & appliances including countertops, cabinets & vanity. no alteration to walls, windows and doors.existing layout to remain unchanged. no change to occupancy, egress or modification to common areas. no fire alarm or fire sprinkler work done.Details
unit 10: remodel (e) kitchen new fixtures & appliances including countertops, cabinets & vanity. no alteration to walls, windows and doors.existing layout to remain unchanged. no change to occupancy, egress or modification to common areas. no fire alarm or fire sprinkler work done. | $18,750 |
| Jul 9, 2018 | Completed final sign-off Oct 2018 | 211 Cornwall St | unit 2: remodel (e) kitchen & 2 bathroom with new fixtures & appliances including countertops, cabinets & vanity. no alteration to walls, windows and doors.existing layout to remain unchanged. no change to occupancy, egress or modification to common areas. no fire alarm or fire sprinkler work done.Details
unit 2: remodel (e) kitchen & 2 bathroom with new fixtures & appliances including countertops, cabinets & vanity. no alteration to walls, windows and doors.existing layout to remain unchanged. no change to occupancy, egress or modification to common areas. no fire alarm or fire sprinkler work done. | $18,750 |
| Mar 3, 2017 | Completed final sign-off May 2017 | 1391 Francisco St | 8'x12' - kitchen remodeling only, new cabinets, counters, appliances, electrical and plumbing updates. no structural work.Details
8'x12' - kitchen remodeling only, new cabinets, counters, appliances, electrical and plumbing updates. no structural work. | $25,000 |
| Mar 3, 2017 | Completed final sign-off May 2017 | 1389 Francisco St | 8'x12' - kitchen remodeling only, new cabinets, counters, appliances, electrical and plumbing updates. no structural work.Details
8'x12' - kitchen remodeling only, new cabinets, counters, appliances, electrical and plumbing updates. no structural work. | $25,000 |
| Oct 14, 2016 | Completed final sign-off Dec 2016 | 1950 Sacramento St | unit#3 kitchen remodel. bathroom replace (e) toilet & sink only. upgrade laundry room. n/a for maher.Details
unit#3 kitchen remodel. bathroom replace (e) toilet & sink only. upgrade laundry room. n/a for maher. | $20,000 |
| Jun 28, 2016 | Completed final sign-off Mar 2017 | 517 Lawton St | proposed interior remodel to 2nd flr: expanding the kitchen & adding 1 half bath & 1 new entertainment room. no work @ 1st & 3rd floor, no change to front facade. all work to be performed within (e) boundary of the bldg.Details
proposed interior remodel to 2nd flr: expanding the kitchen & adding 1 half bath & 1 new entertainment room. no work @ 1st & 3rd floor, no change to front facade. all work to be performed within (e) boundary of the bldg. | $50,000 |
| Dec 8, 2015 | Completed final sign-off Feb 2016 | 3700 20th St | unit #19. kitchen remodeling-no structural work, electrical and plumbing upgrade, new cabinets, counter tops, appliances, led light fixtures. bathroom upgrade-no demolition, replace toilet w/1.28 gallon. new vanity, tile over (e) walls, no eelctrical work, no rough plumbing.Details
unit #19. kitchen remodeling-no structural work, electrical and plumbing upgrade, new cabinets, counter tops, appliances, led light fixtures. bathroom upgrade-no demolition, replace toilet w/1.28 gallon. new vanity, tile over (e) walls, no eelctrical work, no rough plumbing. | $17,500 |
| Jul 23, 2015 | Completed final sign-off Aug 2015 | 3700 20th St | unit #35: kitchen remodel: new cabinets, counter top, appliances, electrical, plumbin, title 24, lights. no structural work or removing walls. infield-close one kitchen door and window.Details
unit #35: kitchen remodel: new cabinets, counter top, appliances, electrical, plumbin, title 24, lights. no structural work or removing walls. infield-close one kitchen door and window. | $15,000 |
| May 8, 2014 | Completed final sign-off Jun 2014 | 401 Vicente St | kitchen remodel, new cabinets & counters, plumbing & electrical upgrade - title 24, no structural workDetails
kitchen remodel, new cabinets & counters, plumbing & electrical upgrade - title 24, no structural work | $14,000 |
| Feb 24, 2014 | Completed final sign-off Apr 2014 | 3700 20th St | one (1) kitchen remodeling, electrical and plumbing upgrade. no change of wall, windows and doors. compliance with maher ordinance # 155-13 does not apply.Details
one (1) kitchen remodeling, electrical and plumbing upgrade. no change of wall, windows and doors. compliance with maher ordinance # 155-13 does not apply. | $10,000 |
| May 29, 2013 | Completed final sign-off Aug 2013 | 555 Joost Av | kitchen remodeling: new cabinetry, plumbing upgrade, electrical upgrade, titel 24.Details
kitchen remodeling: new cabinetry, plumbing upgrade, electrical upgrade, titel 24. | $8,000 |
| Oct 30, 2012 | Completed final sign-off Oct 2013 | 270 Crestlake Dr | conversion of existing storage to habitable space with stair connection to 1st fl. remodel to accomodate 1 new bdroom, 2 new baths and relocation of 2 bedrooms from 1st fl to basement level. foundation and structural upgrade. all work done within e building envelope. remodel kitchen & bath @ 1/f.Details
conversion of existing storage to habitable space with stair connection to 1st fl. remodel to accomodate 1 new bdroom, 2 new baths and relocation of 2 bedrooms from 1st fl to basement level. foundation and structural upgrade. all work done within e building envelope. remodel kitchen & bath @ 1/f. | $150,000 |
| Nov 18, 2011 | Completed final sign-off Feb 2012 | 2129 Bay St | kitchen remodeling - no walls - relocation area 9'x12'; bathroom remodeling - no walls relocation area 6'x8'. lighting must comply with cec 150 (k)Details
kitchen remodeling - no walls - relocation area 9'x12'; bathroom remodeling - no walls relocation area 6'x8'. lighting must comply with cec 150 (k) | $30,000 |
| Oct 21, 2011 | Completed final sign-off Dec 2011 | 1386 21st Av | kitchen remodeling, electrical & plumbing upgrade.Details
kitchen remodeling, electrical & plumbing upgrade. | $20,000 |
| Jul 21, 2011 | Completed final sign-off Oct 2011 | 210 San Leandro Wy | kitchen remodeling - electrical & plumbing. lighting to comply with cec 150 (k). no change to walls window, doors.Details
kitchen remodeling - electrical & plumbing. lighting to comply with cec 150 (k). no change to walls window, doors. | $20,000 |
| Jan 18, 2011 | Completed final sign-off Mar 2011 | 584 Castro St | kitchen remodeling. no structural work on the 2nd floor residential unit.Details
kitchen remodeling. no structural work on the 2nd floor residential unit. | $20,000 |
| Dec 6, 2010 | Completed final sign-off Feb 2011 | 2235 North Point St | kitchen remodeling - new cabinets & countertop. min. 50% of kitchen lighting wattage to be of high efficency lights.Details
kitchen remodeling - new cabinets & countertop. min. 50% of kitchen lighting wattage to be of high efficency lights. | $20,000 |
| Nov 5, 2010 | Completed final sign-off Apr 2011 | 534 Utah St | kitchen and bathroom remodelingDetails
kitchen and bathroom remodeling | $30,000 |
| Oct 20, 2010 | Completed final sign-off Jan 2011 | 278 Francisco St | unit #a: kitchen remodeling, new cabinets and counter top, bathroom remodeling new shower stall/pan, provide exhaust fan to outside, he light on manual on o.s. in bathroomDetails
unit #a: kitchen remodeling, new cabinets and counter top, bathroom remodeling new shower stall/pan, provide exhaust fan to outside, he light on manual on o.s. in bathroom | $26,000 |