Back to bathroom remodel contractors
B R S Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to May 2026
- Last 24 months
- 6 permits filed
72 permits since 2000: 67 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
32 bathroom remodel permits: 32 completed. Typically 0 days from filing to permit and 102 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 24, 2025 | Completed final sign-off Jul 2026 | 309 Crestlake Dr | excavate existing crawl space for new basement. add 640 sq ft conditioned space (2 bed, 2 bath) & add stair up to rear yard remove chimneyDetails
excavate existing crawl space for new basement. add 640 sq ft conditioned space (2 bed, 2 bath) & add stair up to rear yard remove chimney | $193,000 |
| Mar 17, 2025 | Completed final sign-off Jun 2025 | 1586 24th Av | in kind bathroom remodeling 8'x5' size. new plumbing, electrical, tiles, fixtures.Details
in kind bathroom remodeling 8'x5' size. new plumbing, electrical, tiles, fixtures. | $25,000 |
| Feb 19, 2025 | Completed final sign-off Jul 2025 | 2314 09th Av | remodeling in-kind: kithcen, master bathroom, guest bathroom, powder room. new electrical, plumbing , tiles, appliances and fixtures.Details
remodeling in-kind: kithcen, master bathroom, guest bathroom, powder room. new electrical, plumbing , tiles, appliances and fixtures. | $75,000 |
| Oct 8, 2024 | Completed final sign-off Dec 2024 | 309 Crestlake Dr | in kind master bathroom remodeling 8'x8' (plumbing and electrical)Details
in kind master bathroom remodeling 8'x8' (plumbing and electrical) | $15,000 |
| Jan 10, 2024 | Completed final sign-off Sep 2024 | 317 Crestlake Dr | kitchen remodeling and 4 bathrooms. 12'x12' kitchen, 8'x8' master bathroom and 6'x6' guest bathroom on 1st flr. 5'x8' 1/2 bathroom on ground floor, 5'x6' powder room on main flr. new electrical, plumbing, drywall, cabinery, applicants, flooring.Details
kitchen remodeling and 4 bathrooms. 12'x12' kitchen, 8'x8' master bathroom and 6'x6' guest bathroom on 1st flr. 5'x8' 1/2 bathroom on ground floor, 5'x6' powder room on main flr. new electrical, plumbing, drywall, cabinery, applicants, flooring. | $50,000 |
| Nov 14, 2023 | Completed final sign-off Nov 2024 | 309 Crestlake Dr | 6' x 5' half bathroom remodeling - new electrical, plumbing on same location. no structural work.Details
6' x 5' half bathroom remodeling - new electrical, plumbing on same location. no structural work. | $10,000 |
| May 26, 2023 | Completed final sign-off Jul 2023 | 563 Head St | master bathroom remodel in-kind. remodeling master bathroom on 1st fl. new plumbing, electrical. no structural work.Details
master bathroom remodel in-kind. remodeling master bathroom on 1st fl. new plumbing, electrical. no structural work. | $15,000 |
| Aug 12, 2022 | Completed final sign-off Jan 2023 | 2237 North Point St | in-kind kitchen remodeling, guest bathroom, master bathroom, no structural work, new plumbing, electrical, fixtures, 10 x 10 kitchen, 6 x 6 guest bathroom, 6 x 10 master bathroom. in kind, no new wall openingDetails
in-kind kitchen remodeling, guest bathroom, master bathroom, no structural work, new plumbing, electrical, fixtures, 10 x 10 kitchen, 6 x 6 guest bathroom, 6 x 10 master bathroom. in kind, no new wall opening | $30,000 |
| Apr 26, 2022 | Completed final sign-off Jun 2022 | 1474 32nd Av | in kind 6' x 8' full bath room remodeling no structural work, new plumbing, elec, tiile 24Details
in kind 6' x 8' full bath room remodeling no structural work, new plumbing, elec, tiile 24 | $10,000 |
| Mar 28, 2022 | Completed final sign-off Mar 2023 | 168 Jordan Av | 1) kitchen & half bath remodel. 2) remove portion or rear wall & install sliding glass foor to existing deck 3) convert pantry into breakfast nook.Details
1) kitchen & half bath remodel. 2) remove portion or rear wall & install sliding glass foor to existing deck 3) convert pantry into breakfast nook. | $33,000 |
| Mar 17, 2022 | Completed final sign-off May 2022 | 2151 44th Av | in kind 6x6 bathroom remodeling: same location of all fixtures: led lights all bathroom fan. no moving wall, like for like.Details
in kind 6x6 bathroom remodeling: same location of all fixtures: led lights all bathroom fan. no moving wall, like for like. | $12,500 |
| Sep 24, 2021 | Completed final sign-off Feb 2022 | 30 Escondido Av | in kind 8'x6' one bathroom remodeling. new plumbing and electrical, new plumbing fixtures. no structural work. title 24 lights and led.Details
in kind 8'x6' one bathroom remodeling. new plumbing and electrical, new plumbing fixtures. no structural work. title 24 lights and led. | $10,000 |
| May 25, 2021 | Completed final sign-off Jul 2021 | 99 Escondido Av | in-kind remodeling of master & guest bathroom. new plumbing, new electrical, fixtuers , tiles. no change to layout, walls or openings.Details
in-kind remodeling of master & guest bathroom. new plumbing, new electrical, fixtuers , tiles. no change to layout, walls or openings. | $20,000 |
| May 25, 2021 | Completed final sign-off Jul 2021 | 69 Nebraska St | remodel in-kind master & guest bathroom. new pluming, new electrical fixtures, tilies, no change to layout of walls & openings.Details
remodel in-kind master & guest bathroom. new pluming, new electrical fixtures, tilies, no change to layout of walls & openings. | $20,000 |
| Sep 29, 2020 | Completed final sign-off May 2021 | 1935 28th Av | modifications to 1st fl area: remodeling (e) bathroom and family room, relcoate laundry room, replace water heater and furnace, new title 24 electrical upgrade, finish utility, accesory room as home office room, see plans.Details
modifications to 1st fl area: remodeling (e) bathroom and family room, relcoate laundry room, replace water heater and furnace, new title 24 electrical upgrade, finish utility, accesory room as home office room, see plans. | $65,000 |
| Jul 10, 2019 | Completed final sign-off Aug 2019 | 3700 20th St | unit 30: kitchen (10'x10') remodel, electrical/plumbing/cabinets/countertops/appliances; bathroom (10'x8') remodel, electrical/plumbing/cabinets/tiles. no structural workDetails
unit 30: kitchen (10'x10') remodel, electrical/plumbing/cabinets/countertops/appliances; bathroom (10'x8') remodel, electrical/plumbing/cabinets/tiles. no structural work | $25,000 |
| Apr 29, 2019 | Completed final sign-off Jun 2019 | 1504 10th Av | 14'x14' kitchen remodeling. 8x8 bathroom remodeling. electrical upgrade. plumbing upgrade, no structural. cabinets, appliances, fixtures. no framing modification.Details
14'x14' kitchen remodeling. 8x8 bathroom remodeling. electrical upgrade. plumbing upgrade, no structural. cabinets, appliances, fixtures. no framing modification. | $25,000 |
| Apr 2, 2019 | Completed final sign-off May 2019 | 3700 20th St | unit 31: 8x8 kitchen remodeling with new cabinets, countertops, appliances, electrical and plumbing upgrade/no structural work 6x6 bathroom remodeling with new tiles, toilet, vanity, plumbing work and electrical work upgrade.Details
unit 31: 8x8 kitchen remodeling with new cabinets, countertops, appliances, electrical and plumbing upgrade/no structural work 6x6 bathroom remodeling with new tiles, toilet, vanity, plumbing work and electrical work upgrade. | $15,000 |
| Nov 20, 2018 | Completed final sign-off Apr 2019 | 68 Walter St | 12'x12' kitchen remodel, new cabinets, counter, appliances. 8'x8' bathroom remodel, new fixtures, tiles, cabinetry. no structural work, new electrical and plumbing by code and title 24. no change in wall layout or openings.Details
12'x12' kitchen remodel, new cabinets, counter, appliances. 8'x8' bathroom remodel, new fixtures, tiles, cabinetry. no structural work, new electrical and plumbing by code and title 24. no change in wall layout or openings. | $25,000 |
| Oct 12, 2018 | Completed final sign-off Dec 2018 | 135 Forest View Dr | remodeling (e) bathroom on ground fl with new shower tiles, new fixtures, vanity, toilet, no alteration on existing wall, using same water and drain loctions. (6'x10').Details
remodeling (e) bathroom on ground fl with new shower tiles, new fixtures, vanity, toilet, no alteration on existing wall, using same water and drain loctions. (6'x10'). | $15,000 |
| Jul 9, 2018 | Completed final sign-off Oct 2018 | 211 Cornwall St | unit 2: remodel (e) kitchen & 2 bathroom with new fixtures & appliances including countertops, cabinets & vanity. no alteration to walls, windows and doors.existing layout to remain unchanged. no change to occupancy, egress or modification to common areas. no fire alarm or fire sprinkler work done.Details
unit 2: remodel (e) kitchen & 2 bathroom with new fixtures & appliances including countertops, cabinets & vanity. no alteration to walls, windows and doors.existing layout to remain unchanged. no change to occupancy, egress or modification to common areas. no fire alarm or fire sprinkler work done. | $18,750 |
| Dec 19, 2017 | Completed final sign-off Sep 2019 | 168 Jordan Av | convert portion of basement into media room, bathroom, relocate (e) laundry in basement. provide radiant floor heating in remodeled area. maher n/a.Details
convert portion of basement into media room, bathroom, relocate (e) laundry in basement. provide radiant floor heating in remodeled area. maher n/a. | $52,000 |
| Oct 14, 2016 | Completed final sign-off Dec 2016 | 1950 Sacramento St | unit#3 kitchen remodel. bathroom replace (e) toilet & sink only. upgrade laundry room. n/a for maher.Details
unit#3 kitchen remodel. bathroom replace (e) toilet & sink only. upgrade laundry room. n/a for maher. | $20,000 |
| Jun 28, 2016 | Completed final sign-off Mar 2017 | 517 Lawton St | proposed interior remodel to 2nd flr: expanding the kitchen & adding 1 half bath & 1 new entertainment room. no work @ 1st & 3rd floor, no change to front facade. all work to be performed within (e) boundary of the bldg.Details
proposed interior remodel to 2nd flr: expanding the kitchen & adding 1 half bath & 1 new entertainment room. no work @ 1st & 3rd floor, no change to front facade. all work to be performed within (e) boundary of the bldg. | $50,000 |
| Dec 8, 2015 | Completed final sign-off Feb 2016 | 3700 20th St | unit #19. kitchen remodeling-no structural work, electrical and plumbing upgrade, new cabinets, counter tops, appliances, led light fixtures. bathroom upgrade-no demolition, replace toilet w/1.28 gallon. new vanity, tile over (e) walls, no eelctrical work, no rough plumbing.Details
unit #19. kitchen remodeling-no structural work, electrical and plumbing upgrade, new cabinets, counter tops, appliances, led light fixtures. bathroom upgrade-no demolition, replace toilet w/1.28 gallon. new vanity, tile over (e) walls, no eelctrical work, no rough plumbing. | $17,500 |
| Nov 14, 2014 | Completed final sign-off Apr 2015 | 168 Jordan Av | guest & master bathroom remodeling/ repalce fixtures, upgrade plumbing/replace old galvanized waste and water lines, install new plumbing fixtures, tub, faucet, 1.6 gal toilet, upgrade electrical/ t-24, bathroom fan. n/a maher ordinance # 155-13Details
guest & master bathroom remodeling/ repalce fixtures, upgrade plumbing/replace old galvanized waste and water lines, install new plumbing fixtures, tub, faucet, 1.6 gal toilet, upgrade electrical/ t-24, bathroom fan. n/a maher ordinance # 155-13 | $20,000 |
| Sep 16, 2014 | Completed final sign-off Mar 2015 | 1970 Scott St | #1, 1st floor - reconfigure bathroom floor plan & add stacking wash/dryer. 2nd floor - reconfigure baths 2 & 3 to (n) master bath & (n) 1/2 bath.Details
#1, 1st floor - reconfigure bathroom floor plan & add stacking wash/dryer. 2nd floor - reconfigure baths 2 & 3 to (n) master bath & (n) 1/2 bath. | $35,000 |
| Oct 30, 2012 | Completed final sign-off Oct 2013 | 270 Crestlake Dr | conversion of existing storage to habitable space with stair connection to 1st fl. remodel to accomodate 1 new bdroom, 2 new baths and relocation of 2 bedrooms from 1st fl to basement level. foundation and structural upgrade. all work done within e building envelope. remodel kitchen & bath @ 1/f.Details
conversion of existing storage to habitable space with stair connection to 1st fl. remodel to accomodate 1 new bdroom, 2 new baths and relocation of 2 bedrooms from 1st fl to basement level. foundation and structural upgrade. all work done within e building envelope. remodel kitchen & bath @ 1/f. | $150,000 |
| Nov 18, 2011 | Completed final sign-off Feb 2012 | 2129 Bay St | kitchen remodeling - no walls - relocation area 9'x12'; bathroom remodeling - no walls relocation area 6'x8'. lighting must comply with cec 150 (k)Details
kitchen remodeling - no walls - relocation area 9'x12'; bathroom remodeling - no walls relocation area 6'x8'. lighting must comply with cec 150 (k) | $30,000 |
| Nov 5, 2010 | Completed final sign-off Apr 2011 | 534 Utah St | kitchen and bathroom remodelingDetails
kitchen and bathroom remodeling | $30,000 |
| Oct 20, 2010 | Completed final sign-off Jan 2011 | 278 Francisco St | unit #a: kitchen remodeling, new cabinets and counter top, bathroom remodeling new shower stall/pan, provide exhaust fan to outside, he light on manual on o.s. in bathroomDetails
unit #a: kitchen remodeling, new cabinets and counter top, bathroom remodeling new shower stall/pan, provide exhaust fan to outside, he light on manual on o.s. in bathroom | $26,000 |
| Jun 24, 2008 | Completed final sign-off Aug 2008 | 2208 Sutter St | work @ unit# 3 only. master bathroom remodel. fixture replacement. new vanity. toilet, bathtub, tiles, light fixtures.Details
work @ unit# 3 only. master bathroom remodel. fixture replacement. new vanity. toilet, bathtub, tiles, light fixtures. | $8,000 |