# Ayala's Color & Concepts***See Note***

Contractor license 1104710. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/ayala-s-color-concepts-see-note-1104710
- JSON: https://www.permitgraph.org/api/contractor?license=1104710
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1104710

7 permits since 2000: 6 completed, 1 in progress. Typically 5 days from filing to permit and 68 days from permit to final inspection.

- Based in: San Francisco
- On San Francisco permits: Aug 2023 to Jun 2026
- Last 24 months: 6 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2023 | 1 | 0 | 0 | 0 |
| 2025 | 5 | 0 | 0 | 0 |
| 2026 | 0 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 1 | 0 | 1 | 0 | 0 | 35 |  |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202606163336](https://www.permitgraph.org/p/202606163336) | Jun 16, 2026 | In progress: issued Jul 2026 | [255 Capistrano Av](https://www.permitgraph.org/a/3146/008) | convert part of garage to create a media room, bathroom, and a closet; enlarge opening on exterior rear wall and add structural ply and holdowns | $70,000 |
| [202511048910](https://www.permitgraph.org/p/202511048910) | Nov 4, 2025 | Completed: final sign-off Mar 2026 | [111 Taylor St](https://www.permitgraph.org/a/0339/003) | 1st/f storage room: floor repairs, 16 ft by 18 ft, remove e) floor, reinforce & replace plywood base & lino flooring | $27,000 |
| [202508132976](https://www.permitgraph.org/p/202508132976) | Aug 13, 2025 | Completed: final sign-off Nov 2025 | [5050 Mission St](https://www.permitgraph.org/a/6969/001) | store permit to operate | $2,000 |
| [202503242920](https://www.permitgraph.org/p/202503242920) | Mar 24, 2025 | Completed: final sign-off May 2025 | [420 29th Av](https://www.permitgraph.org/a/1460/040) | unit# 104: remove a 4' x 5' area of sheetrock counter area. replace the lower cabinet area with moisture barrier 5/8" type x sheetrock. replace insulation. reinstall lower cabinets in original locati… | $800 |
| [202503242919](https://www.permitgraph.org/p/202503242919) | Mar 24, 2025 | Completed: final sign-off Jun 2025 | [367 30th Av](https://www.permitgraph.org/a/1403/009) | remove approx 100 sf of brick veneer from first floor facade (front). replace with 1 x 10 " square to match (e) above. | $2,500 |
| [202503031450](https://www.permitgraph.org/p/202503031450) | Mar 3, 2025 | Completed: final sign-off Mar 2025 | [374 Moultrie St](https://www.permitgraph.org/a/5664/014) | replace siding on north wall of 374 moultrie st. not visible from street. approx 200 sq ft. | $12,000 |
| [202308255234](https://www.permitgraph.org/p/202308255234) | Aug 25, 2023 | Completed: final sign-off May 2024 | [595 Buckingham Wy](https://www.permitgraph.org/a/7295/036) | 4/f ste 444: tenant imrpovement of existing dental office, build new partitions, interior finish work, paint, & flr coverings, cabinetry, new plumb, new water and waste lines, vacuum and air lines, n… | $120,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/ayala-s-color-concepts-see-note-1104710.
