Back to bathroom remodel contractors
At6 Design Build
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Apr 2026
- Last 24 months
- 5 permits filed
89 permits since 2000: 77 completed, 2 in progress, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
45 bathroom remodel permits: 43 completed, 1 in progress, 1 never finaled. Typically 7 days from filing to permit and 288 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2026 | In progress issued Apr 2026 | 900 Clayton St | remodel to include 153 sf addition at floor 3 with flat service platform above and 61 sf addition at level 1 garage. all within (e) footprint. (n) windows at level 3 at rear facade and lightwell, replace (1) door at level 2 rear, 2 window sashs at level 3 front , 1 skylight and bathroom remodel, (n)Details
remodel to include 153 sf addition at floor 3 with flat service platform above and 61 sf addition at level 1 garage. all within (e) footprint. (n) windows at level 3 at rear facade and lightwell, replace (1) door at level 2 rear, 2 window sashs at level 3 front , 1 skylight and bathroom remodel, (n) | $250,000 |
| Mar 19, 2026 | Completed final sign-off Sep 2026 | 539 Noe St | remodel upper unit at existing 2 unit dwelling. work to include 60 sq ft addition at level 2 (upper unit) with new bathroom plus a kitchen renovation.Details
remodel upper unit at existing 2 unit dwelling. work to include 60 sq ft addition at level 2 (upper unit) with new bathroom plus a kitchen renovation. | $160,000 |
| Jan 22, 2025 | Completed final sign-off Aug 2026 | 1851 Church St | legalize 296sf of unpermiited living space at garage level to include 4 bathroom and 4 bedroom. no change to exterior envelopeDetails
legalize 296sf of unpermiited living space at garage level to include 4 bathroom and 4 bedroom. no change to exterior envelope | $76,000 |
| Dec 23, 2024 | Completed final sign-off Mar 2026 | 148 Highland Av | 114 sf addition at lvl 1. convert 30 sf of unconditioned garage space to conditioned living space, kitchen & bathroom renovation including filling in lightwell at level 2. lvl 2: new door & windows & replacing 1 door lvl 1: rear facade replacing (1) door. add 2 skylights. n)furnance & tankless w/hDetails
114 sf addition at lvl 1. convert 30 sf of unconditioned garage space to conditioned living space, kitchen & bathroom renovation including filling in lightwell at level 2. lvl 2: new door & windows & replacing 1 door lvl 1: rear facade replacing (1) door. add 2 skylights. n)furnance & tankless w/h | $189,000 |
| Apr 4, 2024 | Completed final sign-off Jun 2025 | 2929 20th Av | interior remodel to (e) sfd: 1 bathroom remodel, convert a portion of garage to conditioned space (179 sf). seismic upgrades to ground fl. (note: all work at lvl 2 & exterior under 202403218358)Details
interior remodel to (e) sfd: 1 bathroom remodel, convert a portion of garage to conditioned space (179 sf). seismic upgrades to ground fl. (note: all work at lvl 2 & exterior under 202403218358) | $65,000 |
| Mar 21, 2024 | Completed final sign-off Jun 2025 | 2929 20th Av | interior remodel to existing sfd. work to include kitchen rennovation, (1) bathroom remodel, (1) new bathroom and window replacements at the side (6) totalDetails
interior remodel to existing sfd. work to include kitchen rennovation, (1) bathroom remodel, (1) new bathroom and window replacements at the side (6) total | $85,000 |
| Nov 14, 2023 | Completed final sign-off Jul 2025 | 3771 Clay St | remodel (e) kitchen renovation, (3) bathroom renovations, window replacements at rear and sash replacements at front elevation, (3) skylights at (e) openings. (n) heating and water heater upgrades. minor 'fill in' at level 1 under.Details
remodel (e) kitchen renovation, (3) bathroom renovations, window replacements at rear and sash replacements at front elevation, (3) skylights at (e) openings. (n) heating and water heater upgrades. minor 'fill in' at level 1 under. | $438,000 |
| Sep 20, 2023 | Completed final sign-off Aug 2024 | 468 Hazelwood Av | to comply w/nov# 202303882, repair inkind (e) structure after major fallen tree damage, replaris includes rebuilding a portion of the rear wall,replacing the roof inkind, replacing 3 damaged windows & 1 door, no upgrades to structure beyond replacement/rebuilding in-kind. bathroom reno inkind & elecDetails
to comply w/nov# 202303882, repair inkind (e) structure after major fallen tree damage, replaris includes rebuilding a portion of the rear wall,replacing the roof inkind, replacing 3 damaged windows & 1 door, no upgrades to structure beyond replacement/rebuilding in-kind. bathroom reno inkind & elec | $288,000 |
| Jul 27, 2023 | Completed final sign-off Feb 2024 | 515 Noe St | interior remodel at gr fl, bath renovation and heating system upgrade. add zoned damper for heating control downstairs. replace 1 window at bathroom. max u-factor 0.30Details
interior remodel at gr fl, bath renovation and heating system upgrade. add zoned damper for heating control downstairs. replace 1 window at bathroom. max u-factor 0.30 | $30,000 |
| Jun 16, 2023 | Completed final sign-off Jul 2024 | 729 Congo St | interior remodel of 1-kitchen and 2-baths, installation of a/c and new outdoor shower at level 4 deck.Details
interior remodel of 1-kitchen and 2-baths, installation of a/c and new outdoor shower at level 4 deck. | $80,000 |
| May 31, 2023 | Completed final sign-off Jun 2026 | 3240 25th St | addition to level 1. work to include 2 (n) bedrooms, bath, and laundry closet at level 1. (n) roof deck at level 2.Details
addition to level 1. work to include 2 (n) bedrooms, bath, and laundry closet at level 1. (n) roof deck at level 2. | $150,000 |
| Sep 16, 2022 | Completed final sign-off Mar 2025 | 149 Hartford St | remodel to existing two family residence, work to include converting 120sf of garage to condition kitchen/pantry, minor fill in addition at rear (27sf) for storage interior remodel to include kitchen (total 2), 3 baths, new deck exterior stairs at rearDetails
remodel to existing two family residence, work to include converting 120sf of garage to condition kitchen/pantry, minor fill in addition at rear (27sf) for storage interior remodel to include kitchen (total 2), 3 baths, new deck exterior stairs at rear | $350,000 |
| Feb 8, 2021 | Completed final sign-off Nov 2021 | 162 11th Av | additional work to pa 201811075299: interior remodel of level 3 bedrooms & addition of 1 bathroom. no exterior work.Details
additional work to pa 201811075299: interior remodel of level 3 bedrooms & addition of 1 bathroom. no exterior work. | $80,000 |
| Dec 4, 2020 | Completed final sign-off Jan 2022 | 112 Baden St | interior remodel & legalizing unwarranted living space, including bathroom at 1st fl, family room & adding new rear deck at grade. new sliding doors. replace siding at rear & seismic upgrade at 1st fl.Details
interior remodel & legalizing unwarranted living space, including bathroom at 1st fl, family room & adding new rear deck at grade. new sliding doors. replace siding at rear & seismic upgrade at 1st fl. | $70,000 |
| Oct 16, 2020 | Completed final sign-off Jun 2022 | 2561 Washington St | add half bathroom at level 4. includes 12'-0" x 9'-7" dormer at roof - not visible from street. dormer includes one window and one skylight.Details
add half bathroom at level 4. includes 12'-0" x 9'-7" dormer at roof - not visible from street. dormer includes one window and one skylight. | $20,000 |
| Aug 29, 2020 | Completed final sign-off Jun 2022 | 2561 Washington St | revision to pa# 202002144538 - remove interior brick chimneys; convert bedroom to new bathroom. convert master closet back to a bedroom, invluding adding non-bearing partitions. add 5 skylights.Details
revision to pa# 202002144538 - remove interior brick chimneys; convert bedroom to new bathroom. convert master closet back to a bedroom, invluding adding non-bearing partitions. add 5 skylights. | $20,000 |
| Jul 13, 2020 | Completed final sign-off Apr 2021 | 134 Taraval St | interior remodel to (e) sfd. remodel of kitchen and 5 bathrooms, rebuild stair to level 1. new french door at family room, new egress window at bedroom 3 and fill in existing door at level 1. replace 3 windows and fill in one window at the kitchen (level 2). fill in one window at master bedroom atDetails
interior remodel to (e) sfd. remodel of kitchen and 5 bathrooms, rebuild stair to level 1. new french door at family room, new egress window at bedroom 3 and fill in existing door at level 1. replace 3 windows and fill in one window at the kitchen (level 2). fill in one window at master bedroom at | $180,000 |
| Feb 14, 2020 | Completed final sign-off Jul 2022 | 2561 Washington St | remodel kitchen and 3.5 bathrooms, remove 33 sf floor area & replace 3 windows and 2 door units. no exterior work visible from street, convert bedroom & master closet, including adding non-bearing partitions.Details
remodel kitchen and 3.5 bathrooms, remove 33 sf floor area & replace 3 windows and 2 door units. no exterior work visible from street, convert bedroom & master closet, including adding non-bearing partitions. | $268,000 |
| Feb 11, 2020 | Completed final sign-off Mar 2021 | 60 Pearl St | small additoin at e lightwell at lvel 2 and interior remodel to unit 60a and 62. work to include kitchen and bath remodel at levels 2 and 3Details
small additoin at e lightwell at lvel 2 and interior remodel to unit 60a and 62. work to include kitchen and bath remodel at levels 2 and 3 | $140,000 |
| Sep 27, 2019 | Completed final sign-off Jan 2022 | 136 Lawton St | 1 story vertical addition above (e) 2 story. scope to include interior remodel & conditioning of (e) entry way & some basement space. project will add 3 bedrooms & 2 bathrooms.Details
1 story vertical addition above (e) 2 story. scope to include interior remodel & conditioning of (e) entry way & some basement space. project will add 3 bedrooms & 2 bathrooms. | $216,447 |
| May 7, 2019 | Completed final sign-off Feb 2020 | 37 Aztec St | remodel to sfr. work to include rmeodel to level 1 bath, rmeodel kitchen, new windows at west and rear (not visible from street), lightwell infill (not visible from st). new roof.Details
remodel to sfr. work to include rmeodel to level 1 bath, rmeodel kitchen, new windows at west and rear (not visible from street), lightwell infill (not visible from st). new roof. | $95,000 |
| Mar 12, 2019 | Completed final sign-off Feb 2020 | 769 Clayton St | interior remodel to e residence. work to include new flooring at level 2 and 3, remodel 2 baths, powder rm, kitchen and master bath to level 3. small extension at lvel 1 media room and rebuild e deck at level 1Details
interior remodel to e residence. work to include new flooring at level 2 and 3, remodel 2 baths, powder rm, kitchen and master bath to level 3. small extension at lvel 1 media room and rebuild e deck at level 1 | $244,000 |
| Jan 29, 2019 | Completed final sign-off Aug 2019 | 747 Natoma St | unit #203: interior remodel of extg 1 story plus loft residential unit on top floor. work include new finishes throughout, including kitchen and bathroom, fixtures and finishes, nw guardrail, fireplace surround, and fireplace insert. n/a for maherDetails
unit #203: interior remodel of extg 1 story plus loft residential unit on top floor. work include new finishes throughout, including kitchen and bathroom, fixtures and finishes, nw guardrail, fireplace surround, and fireplace insert. n/a for maher | $43,000 |
| Apr 13, 2018 | Completed final sign-off Dec 2018 | 468 Hazelwood Av | remodle to (e) 2-story s.f.r. convert (e) garage space to media room, bathroom = & laundry at level 1. replace conc. slab at garage.Details
remodle to (e) 2-story s.f.r. convert (e) garage space to media room, bathroom = & laundry at level 1. replace conc. slab at garage. | $75,000 |
| Mar 5, 2018 | Completed final sign-off Jun 2018 | 468 Hazelwood Av | kitchen remodel to extg s.f.d. to include new linen closet at extg bathroom and new gas insert at extg fire place.Details
kitchen remodel to extg s.f.d. to include new linen closet at extg bathroom and new gas insert at extg fire place. | $11,000 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 791 Dolores St | replace fixtures and finishes in extg bathroom at upper level, and add new powder room at lower level.Details
replace fixtures and finishes in extg bathroom at upper level, and add new powder room at lower level. | $15,000 |
| Jun 19, 2017 | Completed final sign-off Jan 2018 | 235 Yerba Buena Av | interior remodel to include conditioning e space at gr fl to include 2 bedrooms, 1 full bath, 1 new bath, kitchen remodel, bathrooms remodelDetails
interior remodel to include conditioning e space at gr fl to include 2 bedrooms, 1 full bath, 1 new bath, kitchen remodel, bathrooms remodel | $152,000 |
| Feb 16, 2017 | Completed final sign-off Nov 2017 | 50 Arnold Av | revision to pa 2016-1223-5859 - remove non load bearing wall between kitchen & dining room. new cabinets, finishes & fixtures at existing locations in kitchen. new fixtures & finishes at 2nd floor bathroomDetails
revision to pa 2016-1223-5859 - remove non load bearing wall between kitchen & dining room. new cabinets, finishes & fixtures at existing locations in kitchen. new fixtures & finishes at 2nd floor bathroom | $40,000 |
| Dec 23, 2016 | Completed final sign-off Nov 2017 | 50 Arnold Av | interior remodel to extg single family res. work to include converting approx 321 sqf of extg garage & ext entry space into int. conditioned space. nw mudroom at entry, nw fixtures & finishes at extg bathroom.also replace extg front windows & replace window & extg door at rear bedroom at 2nd fl.Details
interior remodel to extg single family res. work to include converting approx 321 sqf of extg garage & ext entry space into int. conditioned space. nw mudroom at entry, nw fixtures & finishes at extg bathroom.also replace extg front windows & replace window & extg door at rear bedroom at 2nd fl. | $80,000 |
| Nov 21, 2016 | Completed final sign-off Mar 2019 | 2227 Lincoln Wy | horizontal addition & remodel to (e) 3 story sfd. work to include (n) rec room @ lvl 1, (n) powder rm @ lvl 2, (n) bathroom & laundry @ lvl 3, replace (e) front windows in kind, repave (e) driveway (permeable) & (n) planters.Details
horizontal addition & remodel to (e) 3 story sfd. work to include (n) rec room @ lvl 1, (n) powder rm @ lvl 2, (n) bathroom & laundry @ lvl 3, replace (e) front windows in kind, repave (e) driveway (permeable) & (n) planters. | $320,000 |
| May 18, 2016 | Completed final sign-off Oct 2018 | 219 Douglass St | interior remodel, including new kitchen, new bathroom, and new windows, windows not facing street.Details
interior remodel, including new kitchen, new bathroom, and new windows, windows not facing street. | $175,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2016 | 2040 Leavenworth St | replace fixtures, appliances & cabinets in kitchen; replace 2 toilets & vanities; replace floor tile in 2 bathrooms; add laundry hookups in (e) closet (electrical dryer-no gas), dryer vent but not to exceed 14' w/o booster; (e) lights to remain, (n) fan @ bathroom w/humidifier to terminateDetails
replace fixtures, appliances & cabinets in kitchen; replace 2 toilets & vanities; replace floor tile in 2 bathrooms; add laundry hookups in (e) closet (electrical dryer-no gas), dryer vent but not to exceed 14' w/o booster; (e) lights to remain, (n) fan @ bathroom w/humidifier to terminate | $25,000 |
| Jan 20, 2016 | Completed final sign-off Nov 2016 | 2 20th Av | misc.interior renovations @ 1st level, work to include replacement of french doors, replacement in kind of 2 windows,new cabinetry, new bathroom finishes & electrical work.Details
misc.interior renovations @ 1st level, work to include replacement of french doors, replacement in kind of 2 windows,new cabinetry, new bathroom finishes & electrical work. | $35,000 |
| Nov 24, 2015 | Completed final sign-off Nov 2016 | 3731 20th St | remodel kitchen & bathroom on 1st floor of (e) s.f. r. work to include (n) fixtures & finishes. also replace (e) ceiling light @ hallway.Details
remodel kitchen & bathroom on 1st floor of (e) s.f. r. work to include (n) fixtures & finishes. also replace (e) ceiling light @ hallway. | $50,000 |
| Oct 22, 2015 | Completed final sign-off Oct 2016 | 798 Green St | kitchen and 2 bathrooms remodel. work to include new flooring and lighting throughtout. replace extg skylight. replace extg lightwell windows that are not visible from street.Details
kitchen and 2 bathrooms remodel. work to include new flooring and lighting throughtout. replace extg skylight. replace extg lightwell windows that are not visible from street. | $140,000 |
| Mar 6, 2014 | Completed final sign-off Jun 2017 | 124 Alpine Tr | 215 sf addition & renovation includes 10 sf "fill-in" addition under 2nd roof cantilever at rear of bldg. new cabinetry, appliances, rear doors & windows. work at 2/f includes dividing (e) bedroom into 2 bedrooms, renovate (e) bath, add (n) bath & (n) exterior door @ rear, (n) skylights.Details
215 sf addition & renovation includes 10 sf "fill-in" addition under 2nd roof cantilever at rear of bldg. new cabinetry, appliances, rear doors & windows. work at 2/f includes dividing (e) bedroom into 2 bedrooms, renovate (e) bath, add (n) bath & (n) exterior door @ rear, (n) skylights. | $160,000 |
| Jan 17, 2014 | Completed final sign-off Mar 2014 | 3627 23rd St | widen opening between kitchen & dining, add central heating, replace fixtures in bath.Details
widen opening between kitchen & dining, add central heating, replace fixtures in bath. | $20,000 |
| Oct 25, 2013 | Completed final sign-off Apr 2014 | 2666 35th Av | convert 770 sf of garage to conditioned space including a new master suite sitting room and laundry at the first floor. note: (e) family room and bathroom at 1st floor are unwarranted.Details
convert 770 sf of garage to conditioned space including a new master suite sitting room and laundry at the first floor. note: (e) family room and bathroom at 1st floor are unwarranted. | $94,000 |
| Mar 13, 2013 | Completed final sign-off Jun 2013 | 3731 20th St | bathroom renovation including (n) fixtures, finishes. no work on the first floor.Details
bathroom renovation including (n) fixtures, finishes. no work on the first floor. | $15,000 |
| Jan 29, 2013 | Completed final sign-off Apr 2013 | 200 Brannan St | one bathroom remodel, replace bathtub, tile & vanity in one bathroom, no change to rough plumbing .Details
one bathroom remodel, replace bathtub, tile & vanity in one bathroom, no change to rough plumbing . | $8,000 |
| Jul 17, 2012 | Completed final sign-off Feb 2013 | 521 Buena Vista West Av | renovation of 3rd floor - relocate kitchen, add gas fireplace, reduce full bath to 1/2 bath, add ma bath,replace (e) rear yard/west facing window & french door w/fixed casement unit & sliding glass door,remove (e)rear yard/west facing ext door, relocate attic access, disable 2nd flr liv rm fireplaceDetails
renovation of 3rd floor - relocate kitchen, add gas fireplace, reduce full bath to 1/2 bath, add ma bath,replace (e) rear yard/west facing window & french door w/fixed casement unit & sliding glass door,remove (e)rear yard/west facing ext door, relocate attic access, disable 2nd flr liv rm fireplace | $125,000 |
| Jun 27, 2012 | Never finaled issued Jun 2012, no final | 145 Broderick St | replace finishes only in 2 bathrooms, repair sheetrock damage & flooringDetails
replace finishes only in 2 bathrooms, repair sheetrock damage & flooring | $25,000 |
| Mar 21, 2012 | Completed final sign-off Sep 2012 | 44 Arnold Av | convert portion of extg first level garage and storage room to bedroom and bathroom. enclose and re-build stairway, add skylight and new parapet wall at roof. replace siding and add new doors and windows at roof facade.Details
convert portion of extg first level garage and storage room to bedroom and bathroom. enclose and re-build stairway, add skylight and new parapet wall at roof. replace siding and add new doors and windows at roof facade. | $65,000 |
| Jul 22, 2011 | Completed final sign-off Dec 2011 | 44 Arnold Av | kitchen: remove non bearing partition at kitchen/dining wall, replace cabinets, sink, and range hood, tile floor. bath: remove e stall shower, new showerhead over e tub, replace e sink and toilet, tile shower and floorDetails
kitchen: remove non bearing partition at kitchen/dining wall, replace cabinets, sink, and range hood, tile floor. bath: remove e stall shower, new showerhead over e tub, replace e sink and toilet, tile shower and floor | $25,000 |
| Jun 16, 2010 | Completed final sign-off Jan 2011 | 1907 Leavenworth St | kitchen and bath remodel, replace 4 1/2 ft of bearing wall with beam. move e subpanel, replace closet doors, resolve complaint 201038258Details
kitchen and bath remodel, replace 4 1/2 ft of bearing wall with beam. move e subpanel, replace closet doors, resolve complaint 201038258 | $45,000 |