# Artco Remoldeling & Construction

Contractor license 427966. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/artco-remoldeling-construction-427966
- JSON: https://www.permitgraph.org/api/contractor?license=427966
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=427966

56 permits since 2000: 45 completed, 1 never finaled, 10 expired or cancelled. Typically 0 days from filing to permit and 153 days from permit to final inspection. Of the 1 never-finaled permit, 1 is over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Mar 2000 to Dec 2003
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 3 | 0 | 0 | 3 |
| 2001 | 12 | 0 | 0 | 2 |
| 2002 | 19 | 0 | 0 | 5 |
| 2003 | 11 | 0 | 1 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 8 | 5 | 0 | 0 | 3 | 0 | 234 |
| Deck | 3 | 0 | 0 | 0 | 3 | 0 |  |
| Kitchen remodel | 6 | 6 | 0 | 0 | 0 | 0 | 95 |
| Bathroom remodel | 6 | 6 | 0 | 0 | 0 | 0 | 110 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [200312182634](https://www.permitgraph.org/p/200312182634) | Dec 18, 2003 | Completed: final sign-off Feb 2004 | [785 02nd Av](https://www.permitgraph.org/a/1645/012) | install (n) 3'x4" skylight in kitchen, locate in roof between (e) rafters | $950 |
| [200311200765](https://www.permitgraph.org/p/200311200765) | Nov 20, 2003 | Completed: final sign-off Feb 2004 | [785 02nd Av](https://www.permitgraph.org/a/1645/012) | remodel bathroom-toilet,tile,sink&floor tile.remodel kitchen-cabinets,sink,ctr top.paint&repair fl. | $14,500 |
| [200309225416](https://www.permitgraph.org/p/200309225416) | Sep 22, 2003 | Never finaled: issued Sep 2003, no final | [1443 Page St](https://www.permitgraph.org/a/1233/042) | excavate as needed for 1447 page as per plan for appl#200309225413 |  |
| [200309225413](https://www.permitgraph.org/p/200309225413) | Sep 22, 2003 | Completed: final sign-off Mar 2004 | [1437 Page St](https://www.permitgraph.org/a/1233/036) | replace rear retaining wall per plan provided | $18,000 |
| [200309043907](https://www.permitgraph.org/p/200309043907) | Sep 4, 2003 | Completed: final sign-off Sep 2003 | [690 45th Av](https://www.permitgraph.org/a/1587/023) | correct violation as quoted 7-30-03 nov200342533. test for mold & mildew,paint wall,repair lightwell | $2,000 |
| [200309043913](https://www.permitgraph.org/p/200309043913) | Sep 4, 2003 | Completed: final sign-off Dec 2003 | [783 02nd Av](https://www.permitgraph.org/a/1645/012) | replace kitchen cabinets as needed. repair floors & walls as needed. paint after completed. bathroom | $18,000 |
| [200306237706](https://www.permitgraph.org/p/200306237706) | Jun 23, 2003 | Completed: final sign-off Feb 2004 | [216 Anzavista Av](https://www.permitgraph.org/a/1113/016) | kitchen remodel replacement stairs relocate skylight 1 new skylight addition- garage to upper level | $92,000 |
| [200305295797](https://www.permitgraph.org/p/200305295797) | May 29, 2003 | Completed: final sign-off Aug 2003 | [783 02nd Av](https://www.permitgraph.org/a/1645/012) | repair right/front corner for stucco and replace garage door/paint as needed | $3,000 |
| [200303119409](https://www.permitgraph.org/p/200303119409) | Mar 11, 2003 | Completed: final sign-off Mar 2004 | [1437 Page St](https://www.permitgraph.org/a/1233/036) | replace dry rot-right rear building | $3,000 |
| [200303079140](https://www.permitgraph.org/p/200303079140) | Mar 7, 2003 | Completed: final sign-off Jun 2003 | [1439 South Van Ness Av](https://www.permitgraph.org/a/6526/021) | repair dry rot at front balcony area and around window | $3,200 |
| [200303079138](https://www.permitgraph.org/p/200303079138) | Mar 7, 2003 | Completed: final sign-off Jun 2003 | [1439 South Van Ness Av](https://www.permitgraph.org/a/6526/021) | repair dry rot at rear stairs. less than 50% of structure | $2,800 |
| [200302066818](https://www.permitgraph.org/p/200302066818) | Feb 6, 2003 | Completed: final sign-off May 2003 | [1437 Page St](https://www.permitgraph.org/a/1233/036) | correction list for condo conversion per 3r report #3r-3713 | $12,000 |
| [200212234122](https://www.permitgraph.org/p/200212234122) | Dec 23, 2002 | Completed: final sign-off Dec 2002 | [378 27th St](https://www.permitgraph.org/a/6579/022) | renew expired permit 200205227193 |  |
| [200212234123](https://www.permitgraph.org/p/200212234123) | Dec 23, 2002 | Completed: final sign-off Dec 2002 | [378 27th St](https://www.permitgraph.org/a/6579/022) | renew expired permit 200205146582/200202128994/20020328/2560 |  |
| [200212183821](https://www.permitgraph.org/p/200212183821) | Dec 18, 2002 | Completed: final sign-off Apr 2004 | [208 Surrey St](https://www.permitgraph.org/a/6730/022) | foundation per plan revition to 200210290252 | $12,000 |
| [200210290211](https://www.permitgraph.org/p/200210290211) | Oct 29, 2002 | Completed: final sign-off Nov 2002 | [2691 Green St](https://www.permitgraph.org/a/0954/016) | renew 200202128992 for final inspection |  |
| [200210290252](https://www.permitgraph.org/p/200210290252) | Oct 29, 2002 | Completed: final sign-off Jul 2003 | [208 Surrey St](https://www.permitgraph.org/a/6730/022) | foundation & front landing & siding repair & replacements per drawings. | $24,000 |
| [200210290180](https://www.permitgraph.org/p/200210290180) | Oct 29, 2002 | Completed: final sign-off May 2003 | [1437 Page St](https://www.permitgraph.org/a/1233/036) | renew appl#200012158045, 200107103345 & 200102142133 for final inspection |  |
| [200210290212](https://www.permitgraph.org/p/200210290212) | Oct 29, 2002 | Completed: final sign-off Feb 2003 | [133 Rae Av](https://www.permitgraph.org/a/7100/003C) | renew 20011153248 200201106668 for final inspection only | $6,550 |
| [200208234810](https://www.permitgraph.org/p/200208234810) | Aug 23, 2002 | Expired or cancelled: expired Feb 2003 | [783 02nd Av](https://www.permitgraph.org/a/1645/012) | repair for rear stairs dry rot at threads,landing & stringer areas. less than 50% of the stair eleme | $4,200 |
| [200208234809](https://www.permitgraph.org/p/200208234809) | Aug 23, 2002 | Completed: final sign-off Dec 2002 | [1333 08th Av](https://www.permitgraph.org/a/1763/007) | remodel the bathroom, replace tub, toilet and sink unit, redo flr tile as needed | $11,200 |
| [200208022973](https://www.permitgraph.org/p/200208022973) | Aug 2, 2002 | Completed: final sign-off Jan 2003 | [216 Anzavista Av](https://www.permitgraph.org/a/1113/016) | hook up washer & dryer in basement,repl 3 windows back of house | $8,600 |
| [200208022972](https://www.permitgraph.org/p/200208022972) | Aug 2, 2002 | Completed: final sign-off Jan 2003 | [2017 Lincoln Wy](https://www.permitgraph.org/a/1729/025) | repl kitchen cabinets- 2 lightwell window in kind | $12,000 |
| [200208022970](https://www.permitgraph.org/p/200208022970) | Aug 2, 2002 | Expired or cancelled: expired Aug 2004 | [100 Coleridge St](https://www.permitgraph.org/a/5615/081) | repair for front wood & concrete stairs;dry rot & repl footings under stairs | $7,500 |
| [200205227193](https://www.permitgraph.org/p/200205227193) | May 22, 2002 | Completed: final sign-off Dec 2002 | [378 27th St](https://www.permitgraph.org/a/6579/022) | remodel bathroom w/ tub, sink, toilet (e) footprint to remain | $3,000 |
| [200205146583](https://www.permitgraph.org/p/200205146583) | May 14, 2002 | Expired or cancelled: expired May 2005 | [212 Prentiss St](https://www.permitgraph.org/a/5658/003) | repair dry rot at rear wall & also at inner wall | $1,900 |
| [200205146582](https://www.permitgraph.org/p/200205146582) | May 14, 2002 | Completed: final sign-off Dec 2002 | [378 27th St](https://www.permitgraph.org/a/6579/022) | revision#200203282560 to include l/r under pining |  |
| [200203292718](https://www.permitgraph.org/p/200203292718) | Mar 29, 2002 | Expired or cancelled: expired Jul 2002 | [255 Byxbee St](https://www.permitgraph.org/a/7002/008) | repair dry-rot at the deck and home conversion areas | $4,200 |
| [200203282560](https://www.permitgraph.org/p/200203282560) | Mar 28, 2002 | Completed: final sign-off Dec 2002 | [378 27th St](https://www.permitgraph.org/a/6579/022) | repair footings as per drawing | $6,000 |
| [200203282564](https://www.permitgraph.org/p/200203282564) | Mar 28, 2002 | Completed: final sign-off Aug 2002 | [466 27th St](https://www.permitgraph.org/a/6580/020) | repair footings as per drawing | $1,500 |
| [200202229834](https://www.permitgraph.org/p/200202229834) | Feb 22, 2002 | Completed: final sign-off Sep 2002 | [30 Bird St](https://www.permitgraph.org/a/3577/013) | revision to #200110312120. (n) master bedroom closet in (e) garage | $450 |
| [200202128993](https://www.permitgraph.org/p/200202128993) | Feb 12, 2002 | Completed: final sign-off Mar 2002 | [11 Coleridge St](https://www.permitgraph.org/a/5610/022) | replace (e) tub,sink,faucet,tile around tub etc. | $2,500 |
| [200202128994](https://www.permitgraph.org/p/200202128994) | Feb 12, 2002 | Completed: final sign-off Dec 2002 | [378 27th St](https://www.permitgraph.org/a/6579/022) | replace existing(4)center footings in crawl space w/ new.also,replace existing center beam w/ like k | $12,000 |
| [200202128992](https://www.permitgraph.org/p/200202128992) | Feb 12, 2002 | Expired or cancelled: expired Nov 2002 | [2691 Green St](https://www.permitgraph.org/a/0954/016) | repair dry rot rear entry door. refinish(e)concrete deck stone. | $2,700 |
| [200202128995](https://www.permitgraph.org/p/200202128995) | Feb 12, 2002 | Completed: final sign-off Aug 2002 | [466 27th St](https://www.permitgraph.org/a/6580/020) | remodel bathroom,tub,tile,toilet,sink,flor,renew same location.install washer & dryer,install bath i | $18,000 |
| [200201106668](https://www.permitgraph.org/p/200201106668) | Jan 10, 2002 | Completed: final sign-off Feb 2003 | [133 Rae Av](https://www.permitgraph.org/a/7100/003C) | install stucco around wall | $550 |
| [200111153248](https://www.permitgraph.org/p/200111153248) | Nov 15, 2001 | Completed: final sign-off Feb 2003 | [133 Rae Av](https://www.permitgraph.org/a/7100/003C) | repair dryrot under stairs, install anchra bolt in foundation, install plywood on walls @ bsmt inter | $6,000 |
| [200111153247](https://www.permitgraph.org/p/200111153247) | Nov 15, 2001 | Completed: final sign-off Jun 2002 | [279 30th Av](https://www.permitgraph.org/a/1390/003A) | repair dry rot @ basement | $11,000 |
| [200109269328](https://www.permitgraph.org/p/200109269328) | Sep 26, 2001 | Completed: final sign-off Dec 2001 | [1352 De Haro St](https://www.permitgraph.org/a/4259/039) | repair rear wall per/plans | $18,000 |
| [200109269327](https://www.permitgraph.org/p/200109269327) | Sep 26, 2001 | Completed: final sign-off Mar 2002 | [11 Coleridge St](https://www.permitgraph.org/a/5610/022) | repalce 4 footing - beams per/plan | $7,000 |
| [200108075493](https://www.permitgraph.org/p/200108075493) | Aug 7, 2001 | Completed: final sign-off Feb 2002 | [11 Coleridge St](https://www.permitgraph.org/a/5610/022) | cap the existing foundation brick & replace 12'section. | $8,000 |
| [200108075492](https://www.permitgraph.org/p/200108075492) | Aug 7, 2001 | Completed: final sign-off Aug 2001 | [148 Rae Av](https://www.permitgraph.org/a/7100/045E) | install anchor bolts 5/8"-10" long 3' 0c with 2x2 washer repair for dry rot at staircase area | $3,000 |
| [200107103345](https://www.permitgraph.org/p/200107103345) | Jul 10, 2001 | Expired or cancelled: expired Nov 2001 | [1437 Page St](https://www.permitgraph.org/a/1233/036) | to renew permit#2001/02/14/2133 for final inspection. |  |
| [200107103342](https://www.permitgraph.org/p/200107103342) | Jul 10, 2001 | Completed: final sign-off Feb 2002 | [4016 20th St](https://www.permitgraph.org/a/3601/014) | to renew permit#2000/10/24/3876 for final inspection. |  |
| [200107103346](https://www.permitgraph.org/p/200107103346) | Jul 10, 2001 | Completed: final sign-off Jul 2001 | [2523 Mcallister St](https://www.permitgraph.org/a/1170/026) | renew 9903578s for final inspection. |  |
| [200107103341](https://www.permitgraph.org/p/200107103341) | Jul 10, 2001 | Completed: final sign-off Dec 2001 | [1352 De Haro St](https://www.permitgraph.org/a/4259/040) | repair dryrot. rear door & window with like kind alum broz finish. | $6,500 |
| [200106181771](https://www.permitgraph.org/p/200106181771) | Jun 18, 2001 | Completed: final sign-off Aug 2001 | [449 11th Av](https://www.permitgraph.org/a/1533/010) | replace kitchen & bathroom cabinets,counter top,replace elecrical & plumbing fixts.repair for flr & | $14,500 |
| [200106181772](https://www.permitgraph.org/p/200106181772) | Jun 18, 2001 | Completed: final sign-off Dec 2001 | [1354 De Haro St](https://www.permitgraph.org/a/4259/040) | replace extg rear door and window with like kinds | $3,300 |
| [200105098772](https://www.permitgraph.org/p/200105098772) | May 9, 2001 | Completed: final sign-off Jun 2001 | [2691 Green St](https://www.permitgraph.org/a/0954/016) | install anchor bolt and sheer wall with hold downs | $4,400 |
| [200102142133](https://www.permitgraph.org/p/200102142133) | Feb 14, 2001 | Expired or cancelled: expired Sep 2001 | [1437 Page St](https://www.permitgraph.org/a/1233/036) | rev to 2000-12-158045 (change in use to basement) | $10,600 |
| [200012158045](https://www.permitgraph.org/p/200012158045) | Dec 15, 2000 | Expired or cancelled: expired Jan 2002 | [1437 Page St](https://www.permitgraph.org/a/1233/036) | structural work as per plans-repair rear stairs for dry rot-50 percent-repair (2) rear decks -50 per | $32,000 |
| [200010243876](https://www.permitgraph.org/p/200010243876) | Oct 24, 2000 | Completed: final sign-off Aug 2001 | [4016 20th St](https://www.permitgraph.org/a/3601/014) | replace retaining wall retained height remain the same. | $7,000 |
| [200009059635](https://www.permitgraph.org/p/200009059635) | Sep 5, 2000 | Completed: final sign-off Sep 2000 | [2521 Mcallister St](https://www.permitgraph.org/a/1170/027) | repair and replace blind wall top floor sheating only 250 - 300 sq ft (redwood or cedar | $1,400 |
| [200004116922](https://www.permitgraph.org/p/200004116922) | Apr 11, 2000 | Completed: final sign-off Feb 2001 | [812 Diamond St](https://www.permitgraph.org/a/6505/002) | as per plan install sprial stairs & walkway | $8,200 |
| [200004116926](https://www.permitgraph.org/p/200004116926) | Apr 11, 2000 | Expired or cancelled: expired Aug 2000 | [812 Diamond St](https://www.permitgraph.org/a/6505/002) | rev to 9926461-relocate b/r closet, install two s/l, in living room, instead of one large s/l |  |
| [200003083755](https://www.permitgraph.org/p/200003083755) | Mar 8, 2000 | Expired or cancelled: expired Jan 2002 | [1115 Noe St](https://www.permitgraph.org/a/6508/024A) | install missing anchor bolts, hheer basement wall, cap foundation |  |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/artco-remoldeling-construction-427966.
