# All Best Buildrs.Inc./All Trusty Bldrs.

Contractor license 909984. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/all-best-buildrs-inc-all-trusty-bldrs-909984
- JSON: https://www.permitgraph.org/api/contractor?license=909984
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=909984

61 permits since 2000: 51 completed, 6 in progress, 4 never finaled. Typically 39 days from filing to permit and 182 days from permit to final inspection. Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Jul 2008 to Sep 2026
- Last 24 months: 12 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2008 | 2 | 0 | 0 | 0 |
| 2010 | 2 | 0 | 0 | 0 |
| 2011 | 1 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 1 | 0 | 1 | 0 |
| 2015 | 1 | 0 | 0 | 0 |
| 2016 | 13 | 0 | 0 | 0 |
| 2017 | 1 | 0 | 0 | 0 |
| 2018 | 6 | 0 | 0 | 0 |
| 2019 | 4 | 0 | 0 | 0 |
| 2020 | 3 | 0 | 0 | 0 |
| 2021 | 5 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 3 | 0 |
| 2023 | 3 | 0 | 0 | 0 |
| 2024 | 2 | 0 | 0 | 0 |
| 2025 | 2 | 2 | 0 | 0 |
| 2026 | 3 | 4 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 3 | 3 | 0 | 0 | 0 | 98 | 351 |
| Deck | 2 | 2 | 0 | 0 | 0 | 110 | 164 |
| Kitchen remodel | 13 | 11 | 2 | 0 | 0 | 10 | 325 |
| Bathroom remodel | 15 | 13 | 2 | 0 | 0 | 14 | 250 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202609148067](https://www.permitgraph.org/p/202609148067) | Sep 14, 2026 | In progress: issued Oct 2026 | [1708 Cabrillo St](https://www.permitgraph.org/a/1626/009) | interior remodel 3fl to kitchen to be relocated one bathroom to be remodeled and one bahtrooom to be added . new electrical heat pump hvac to be installed. 3x (n) skylights to be added , 1 (e) skyuli… | $250,000 |
| [202607165149](https://www.permitgraph.org/p/202607165149) | Jul 16, 2026 | In progress: issued Jul 2026 | [685 27th Av](https://www.permitgraph.org/a/1570/010B) | rev to pa# 2025-0829-4284: revised structural footing along line 1 and 8. | $10 |
| [202607104853](https://www.permitgraph.org/p/202607104853) | Jul 10, 2026 | Completed: final sign-off Oct 2026 | [2258 34th Av](https://www.permitgraph.org/a/2316/002M) | remove existing fire place in 2nd floor and install a new electrical fire place in the middle of the north wall in the living room. replace 9 pieces of interior/back windows. | $5,000 |
| [202605040624](https://www.permitgraph.org/p/202605040624) | May 4, 2026 | In progress: issued Jun 2026 | [200 Cayuga Av](https://www.permitgraph.org/a/6784/034) | revision to pa # 202601063329. replace existing windows at sunroom. rebuild existing garage. repair dry rot at existing south low roof. | $70,030 |
| [202604068984](https://www.permitgraph.org/p/202604068984) | Apr 6, 2026 | Completed: final sign-off Apr 2026 | [930 Sutter St](https://www.permitgraph.org/a/0280/008) | to obtain final inspection for work approved under pa# 201601288233. all work is approved. |  |
| [202601284762](https://www.permitgraph.org/p/202601284762) | Jan 28, 2026 | Completed: final sign-off Mar 2026 | [930 Sutter St](https://www.permitgraph.org/a/0280/008) | recommencement and completion of work approved under pa# 201806293452 | $38,000 |
| [202601063329](https://www.permitgraph.org/p/202601063329) | Jan 6, 2026 | In progress: issued Jan 2026 | [200 Cayuga Av](https://www.permitgraph.org/a/6784/034) | 1st fl: remodel (e) kitchen, laundry, bathrooms and new wetbar. 2nd fl: remodel (e) bathroom. add new bath and skylights. | $188,900 |
| [202508294284](https://www.permitgraph.org/p/202508294284) | Sep 18, 2025 | In progress: issued Jun 2026 | [687 27th Av](https://www.permitgraph.org/a/1570/010B) | add 3rd & 4th flr addition to (e) 2-story bldg that will consist of a 3-bedroom unit. excavate under rear of the 2nd flr & into basement to create a (n) 504 sq.st. one bedroom apartment. convert 2nd… | $800,000 |
| [202509175553](https://www.permitgraph.org/p/202509175553) | Sep 17, 2025 | Completed: final sign-off Oct 2025 | [447 Silver Av](https://www.permitgraph.org/a/5894/009) | replace all kitchen cabinets and countertop in the kitchen | $5,000 |
| [202509175550](https://www.permitgraph.org/p/202509175550) | Sep 17, 2025 | In progress: issued Sep 2025 | [360 Hyde St](https://www.permitgraph.org/a/0334/021) | comply with nov 202430311 demolition of a partition wall. remove awning and raised platform. | $500 |
| [202504224995](https://www.permitgraph.org/p/202504224995) | Apr 22, 2025 | Completed: final sign-off Mar 2026 | [2258 34th Av](https://www.permitgraph.org/a/2316/002M) | relocate kitchen add a full bathroom at 2nd flr | $5,000 |
| [202412166893](https://www.permitgraph.org/p/202412166893) | Dec 16, 2024 | Completed: final sign-off Mar 2026 | [2258 34th Av](https://www.permitgraph.org/a/2316/002M) | remove all sheetrock of the 2nd floor, add lights and outles, replace rusted drain lines, fill insulation, cover new sheetrock and paint. second floor kitchen and bathrooms(2) remodel in kind | $40,000 |
| [202402065368](https://www.permitgraph.org/p/202402065368) | Feb 6, 2024 | Completed: final sign-off Jun 2024 | [1596 28th Av](https://www.permitgraph.org/a/1873/037) | install hydronic heating system in the 3 units only; all previous work under permit # 202111233056 | $15,000 |
| [202312041866](https://www.permitgraph.org/p/202312041866) | Dec 4, 2023 | Completed: final sign-off Feb 2025 | [231 Stratford Dr](https://www.permitgraph.org/a/7241/041) | interior remodeling. replace (e) windows per plan. reconfigure rear stair access to the backyard on the mainfloor. | $13,000 |
| [202308315692](https://www.permitgraph.org/p/202308315692) | Aug 31, 2023 | Completed: final sign-off Mar 2026 | [2258 34th Av](https://www.permitgraph.org/a/2316/002M) | in respose to 2022-011286enf enforcement by planning dept. to legalize unauthorized dwelling unit at 1st fl. legalize unpermitted structure due to removal of the (e) beam and post on the 1st fl. fron… | $50,000 |
| [202306150200](https://www.permitgraph.org/p/202306150200) | Jun 15, 2023 | Completed: final sign-off Feb 2024 | [84 Whitney St](https://www.permitgraph.org/a/6654/022) | in revision to #202104078081. change the rafters from lvl 1-3/4"x9-1/4" to double lvl 1-3/4"x4-5/8" rafters for the addition roof. (btwn grid a.3 to b) | $200 |
| [202211106271](https://www.permitgraph.org/p/202211106271) | Nov 10, 2022 | Never finaled: issued Oct 2023, no final | [240 West Portal Av](https://www.permitgraph.org/a/2988A/013) | abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe# 202001160980 |  |
| [202211106273](https://www.permitgraph.org/p/202211106273) | Nov 10, 2022 | Never finaled: issued Oct 2023, no final | [242 West Portal Av](https://www.permitgraph.org/a/2988A/013) | abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe # 202001160981 |  |
| [202211106274](https://www.permitgraph.org/p/202211106274) | Nov 10, 2022 | Never finaled: issued Oct 2023, no final | [244 West Portal Av](https://www.permitgraph.org/a/2988A/013) | abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe #202001160982 |  |
| [202206136223](https://www.permitgraph.org/p/202206136223) | Jun 13, 2022 | Completed: final sign-off Jul 2022 | [820 Battery St](https://www.permitgraph.org/a/0141/011) | add (1) lavatory for child in toilet and 1 lavatory in classroom area for accessibility | $10,000 |
| [202111233056](https://www.permitgraph.org/p/202111233056) | Nov 23, 2021 | Completed: final sign-off Jun 2024 | [1598 28th Av](https://www.permitgraph.org/a/1873/037) | addition a new adu at the first floor. | $328,000 |
| [202109098035](https://www.permitgraph.org/p/202109098035) | Sep 9, 2021 | Completed: final sign-off Jun 2022 | [734 27th Av](https://www.permitgraph.org/a/1618/010A) | revision to 201303182425, 1st fl convert 1/2 bath to full, add storage and closets. 2nd fl reconfigure walls and relocate fire place. 3rd fl reconfigure laundry and closets | $25,000 |
| [202107094032](https://www.permitgraph.org/p/202107094032) | Jul 9, 2021 | Completed: final sign-off Feb 2022 | [2501 Cabrillo St](https://www.permitgraph.org/a/1669/049) | remodel (e) kitchen, bathroom. construct 1 full bathroom & install new lighting. all work on 2nd floor. | $32,000 |
| [202104078081](https://www.permitgraph.org/p/202104078081) | Apr 7, 2021 | Completed: final sign-off Feb 2024 | [84 Whitney St](https://www.permitgraph.org/a/6654/022) | kitchen renovation, second floor addition, and dormer office space addition | $350,000 |
| [202103126499](https://www.permitgraph.org/p/202103126499) | Mar 12, 2021 | Completed: final sign-off Jul 2021 | [1435 41st Av](https://www.permitgraph.org/a/1812/006) | add new deck at rear yard. | $10,000 |
| [202009275178](https://www.permitgraph.org/p/202009275178) | Sep 27, 2020 | Completed: final sign-off Jan 2022 | [734 27th Av](https://www.permitgraph.org/a/1618/010A) | replace retaining wall at rear & add concrete steps. | $35,000 |
| [202007130067](https://www.permitgraph.org/p/202007130067) | Jul 13, 2020 | Completed: final sign-off Dec 2020 | [751 26th Av](https://www.permitgraph.org/a/1618/003D) | inkind replacement of stucco siding (315 sqft) on front with new waterproofing, replace all existing 11 front windows with aluminum-clad wood casement windows. no muntins nor grid pattern on the wind… | $45,000 |
| [202001172206](https://www.permitgraph.org/p/202001172206) | Jan 17, 2020 | Completed: final sign-off Jan 2022 | [734 27th Av](https://www.permitgraph.org/a/1618/010A) | replace stucco on front elevation due to dry rot/ weatherproofing. front to be replaced in kind stucco entire front of building 25' x 25' | $3,000 |
| [201908088256](https://www.permitgraph.org/p/201908088256) | Aug 8, 2019 | Completed: final sign-off Nov 2023 | [555 Ofarrell St](https://www.permitgraph.org/a/0323/022) | revision to 2016012235814 revise layout in units 3 & 4. revise escape/rescue winodwn path to public way for units 4, 6, 7 per dbi information sheet eg-05. |  |
| [201906133372](https://www.permitgraph.org/p/201906133372) | Jun 13, 2019 | Completed: final sign-off Oct 2019 | [581 Arguello Bl](https://www.permitgraph.org/a/1543/015) | replace 4 front windows (wood clad) | $4,000 |
| [201903215903](https://www.permitgraph.org/p/201903215903) | Mar 21, 2019 | Completed: final sign-off Aug 2021 | [1600 36th Av](https://www.permitgraph.org/a/1908/050) | rev to pa# 201805048220; install hydrolic heathing system to replace gas furnance, no other work scope. | $8,500 |
| [201902142939](https://www.permitgraph.org/p/201902142939) | Feb 14, 2019 | Completed: final sign-off Apr 2020 | [841 Shrader St](https://www.permitgraph.org/a/1262/010) | interior work: remove interior wall at 2nd fl. add sky lights, replace doors at 2nd fl. deck repair dry rot at study | $75,000 |
| [201809180555](https://www.permitgraph.org/p/201809180555) | Sep 18, 2018 | Completed: final sign-off Dec 2022 | [50 Reardon Rd](https://www.permitgraph.org/a/4700/052) | revision to 201609087102, 201609087103, 201609087104, 201609087105 soft story retrofit (4) |  |
| [201808288590](https://www.permitgraph.org/p/201808288590) | Aug 28, 2018 | Completed: final sign-off Aug 2021 | [1600 36th Av](https://www.permitgraph.org/a/1908/050) | repair about 25 sf dry rot exterior wall on 36th ave. replace 17 windows, wood casement at front and side, vinyl at rear. | $10,000 |
| [201805148980](https://www.permitgraph.org/p/201805148980) | May 14, 2018 | Completed: final sign-off Apr 2019 | [379 15th Av](https://www.permitgraph.org/a/1447/018) | remodel two full bathrooms, one in each unit. | $12,000 |
| [201805048220](https://www.permitgraph.org/p/201805048220) | May 4, 2018 | Completed: final sign-off Aug 2021 | [1600 36th Av](https://www.permitgraph.org/a/1908/050) | 1st fl: convert existing office room to new bedroom. relocate bathroom and closet. 2nd fl: remove the non-bearing wall between kitchen & dining area. add new tube skylight. relocate the toilet and ad… | $150,000 |
| [201803163857](https://www.permitgraph.org/p/201803163857) | Mar 16, 2018 | Completed: final sign-off Jun 2023 | [555 Ofarrell St](https://www.permitgraph.org/a/0323/022) | voluntary strengthening - upgrade 3 concrete shear walls at gr fl. ref 201612235814 for adu renovation work. maher n/a | $20,000 |
| [201802161602](https://www.permitgraph.org/p/201802161602) | Feb 16, 2018 | Completed: final sign-off Oct 2018 | [3830 Noriega St](https://www.permitgraph.org/a/2004/025) | revision to structural permit # 2016-1104-1970. revised foundation plan at front facade. revised beam @ front facade/per site review. remove non-strl box awning @ front. re # 2016-1024-0989. |  |
| [201702038564](https://www.permitgraph.org/p/201702038564) | Feb 3, 2017 | Completed: final sign-off Oct 2018 | [543 Los Palmos Dr](https://www.permitgraph.org/a/3054/061) | enclose front porch, remodel entry hall, kitchen, stairs & master suite. add guest bath, laundry & storage, replace elec. wiring, paint. | $125,000 |
| [201612235814](https://www.permitgraph.org/p/201612235814) | Dec 23, 2016 | Completed: final sign-off Nov 2023 | [555 Ofarrell St](https://www.permitgraph.org/a/0323/022) | renovation of existing residential bldg ground floor, add 7 adu, struct reinf as required per code, mech, elect, plumb as required per code. seismic strengthing per application 2018-0316-3857. | $150,000 |
| [201611041970](https://www.permitgraph.org/p/201611041970) | Nov 4, 2016 | Completed: final sign-off Oct 2018 | [3830 Noriega St](https://www.permitgraph.org/a/2004/025) | structural work - drawings and calculations for ref 2016-1102-1167 and 2016-1024-0989 (proposed childcare) | $25,000 |
| [201611021767](https://www.permitgraph.org/p/201611021767) | Nov 2, 2016 | Completed: final sign-off Oct 2018 | [3830 Noriega St](https://www.permitgraph.org/a/2004/025) | front facade to receive new windows and doors, insulated wall, new exterior finishes and planter. associated with 2016-1024-0989. | $57,300 |
| [201610240989](https://www.permitgraph.org/p/201610240989) | Oct 24, 2016 | Completed: final sign-off Oct 2018 | [3830 Noriega St](https://www.permitgraph.org/a/2004/025) | repair rear facade (new window and finish) & interior ti for childcare use. required fire alarm under deferred submittal. | $243,700 |
| [201609087104](https://www.permitgraph.org/p/201609087104) | Sep 8, 2016 | Completed: final sign-off Nov 2018 | [145 Kiska Rd](https://www.permitgraph.org/a/4700/052) | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as… | $15,000 |
| [201609087100](https://www.permitgraph.org/p/201609087100) | Sep 8, 2016 | Completed: final sign-off Nov 2018 | [54 Reardon Rd](https://www.permitgraph.org/a/4700/052) | voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a. | $15,000 |
| [201609087103](https://www.permitgraph.org/p/201609087103) | Sep 8, 2016 | Completed: final sign-off Nov 2018 | [50 Reardon Rd](https://www.permitgraph.org/a/4700/052) | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as… | $15,000 |
| [201609087101](https://www.permitgraph.org/p/201609087101) | Sep 8, 2016 | Completed: final sign-off Nov 2018 | [71 Reardon Rd](https://www.permitgraph.org/a/4700/052) | voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a. | $15,000 |
| [201609087096](https://www.permitgraph.org/p/201609087096) | Sep 8, 2016 | Completed: final sign-off Nov 2018 | [26 Reardon Rd](https://www.permitgraph.org/a/4700/052) | voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a. | $15,000 |
| [201609087105](https://www.permitgraph.org/p/201609087105) | Sep 8, 2016 | Completed: final sign-off Nov 2018 | [135 Kiska Rd](https://www.permitgraph.org/a/4700/052) | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as… | $15,000 |
| [201609087099](https://www.permitgraph.org/p/201609087099) | Sep 8, 2016 | Completed: final sign-off Nov 2018 | [10 Reardon Rd](https://www.permitgraph.org/a/4700/052) | voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a. | $15,000 |
| [201609087102](https://www.permitgraph.org/p/201609087102) | Sep 8, 2016 | Completed: final sign-off Nov 2018 | [95 Reardon Rd](https://www.permitgraph.org/a/4700/052) | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as… | $15,000 |
| [201606230681](https://www.permitgraph.org/p/201606230681) | Jun 23, 2016 | Completed: final sign-off Feb 2017 | [1738 29th Av](https://www.permitgraph.org/a/2021/027) | ground floor remodel only: add 1 new full bathroom, one bedroom and play room. relocate the (e) washer/dryer & laundry sink | $30,000 |
| [201511182953](https://www.permitgraph.org/p/201511182953) | Nov 18, 2015 | Completed: final sign-off Jan 2016 | [80 Springfield Dr](https://www.permitgraph.org/a/7253/027) | add new full bathroom @ ground floor. | $8,000 |
| [201308194691](https://www.permitgraph.org/p/201308194691) | Aug 19, 2013 | Never finaled: issued Aug 2013, no final | [2450 Fulton St](https://www.permitgraph.org/a/1168/017) | replace 6 side window, u-factor 0.40 max. | $10,000 |
| [201303182425](https://www.permitgraph.org/p/201303182425) | Mar 18, 2013 | Completed: final sign-off Jun 2022 | [734 27th Av](https://www.permitgraph.org/a/1618/010A) | horizontal addition @ rear & 1-story vertical addition over (e) 2-story bldg & rearrange kitchen & bathroom's location. construct 3'-0" height retaining wall @ backyard. | $100,000 |
| [201202134021](https://www.permitgraph.org/p/201202134021) | Feb 13, 2012 | Completed: final sign-off Mar 2012 | [1931 42nd Av](https://www.permitgraph.org/a/2092/008) | comply with complaint #201074726. 1)legalize one bed room, one full bath room, and upgrade one bed room at ground floor. 2)remove illegal addition at rear bldg. | $28,000 |
| [201104013276](https://www.permitgraph.org/p/201104013276) | Apr 1, 2011 | Completed: final sign-off Sep 2011 | [215 Fremont St](https://www.permitgraph.org/a/3738/012) | space 5b: commercial ti in existing space for new cafe tenant at ground fl. coffee/sandwich shop. new customer area. new appliances. no on site cooking. | $5,000 |
| [201012106526](https://www.permitgraph.org/p/201012106526) | Dec 10, 2010 | Completed: final sign-off Mar 2011 | [2578 42nd Av](https://www.permitgraph.org/a/2442/015) | remodel kitchen & 2 bathrooms, paint interior, re-finish floor. kitchen: at least 50% high efficacy (by wattage), bathroom: high efficacy or occupancy sensor. | $4,000 |
| [201011034278](https://www.permitgraph.org/p/201011034278) | Nov 3, 2010 | Completed: final sign-off Mar 2011 | [2578 42nd Av](https://www.permitgraph.org/a/2442/015) | replace 1 kitchen window, 4x4 | $500 |
| [200810174507](https://www.permitgraph.org/p/200810174507) | Oct 17, 2008 | Completed: final sign-off Mar 2009 | [4 Carnelian Wy](https://www.permitgraph.org/a/7501/157) | move wall at ground floor between entry and garage. 2nd fl remodel bath, kitchen, add island and cabinets, remove bearing wall between kitchen and living room, replace handrail at 3rd fl stair. insta… | $35,000 |
| [200807307948](https://www.permitgraph.org/p/200807307948) | Jul 30, 2008 | Completed: final sign-off Dec 2008 | [470 West Portal Av](https://www.permitgraph.org/a/2484/008) | split existing classroom r113 and staffrooom r211: provide new 1 hour rated wall. relocate e light fixtures, provide additional light switch. provide hornstrobe device at new spaces as required. | $15,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/all-best-buildrs-inc-all-trusty-bldrs-909984.