# All Bay Cities Construction

Contractor license 872779. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/all-bay-cities-construction-872779
- JSON: https://www.permitgraph.org/api/contractor?license=872779
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=872779

87 permits since 2000: 73 completed, 1 in progress, 6 never finaled, 7 expired or cancelled. Typically 3 days from filing to permit and 137 days from permit to final inspection. Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old.

- Based in: San Francisco
- On San Francisco permits: Oct 2001 to Apr 2026
- Last 24 months: 4 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2001 | 1 | 0 | 0 | 0 |
| 2003 | 0 | 0 | 0 | 1 |
| 2006 | 5 | 0 | 0 | 0 |
| 2007 | 7 | 0 | 0 | 0 |
| 2008 | 2 | 0 | 0 | 1 |
| 2009 | 4 | 0 | 0 | 1 |
| 2010 | 2 | 0 | 0 | 0 |
| 2011 | 1 | 0 | 0 | 0 |
| 2012 | 3 | 0 | 0 | 0 |
| 2013 | 4 | 0 | 0 | 0 |
| 2014 | 3 | 0 | 0 | 0 |
| 2015 | 2 | 0 | 0 | 0 |
| 2016 | 5 | 0 | 0 | 0 |
| 2017 | 8 | 0 | 2 | 2 |
| 2018 | 3 | 0 | 2 | 1 |
| 2019 | 1 | 0 | 0 | 0 |
| 2020 | 1 | 0 | 0 | 0 |
| 2021 | 8 | 0 | 0 | 0 |
| 2022 | 5 | 0 | 2 | 1 |
| 2023 | 3 | 1 | 0 | 0 |
| 2024 | 1 | 0 | 0 | 0 |
| 2025 | 2 | 0 | 0 | 0 |
| 2026 | 2 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 29 | 26 | 0 | 2 | 1 | 2 | 135 |
| Kitchen remodel | 21 | 20 | 0 | 0 | 1 | 2 | 168 |
| Stairs | 8 | 8 | 0 | 0 | 0 | 27 | 218 |
| Deck | 2 | 2 | 0 | 0 | 0 | 16 | 196 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202604068930](https://www.permitgraph.org/p/202604068930) | Apr 6, 2026 | Completed: final sign-off Sep 2026 | [1845 Irving St](https://www.permitgraph.org/a/1774/042) | deferred mechanical for pa# 2026032246368: new mechanical system, new lighting, new plumbing for new restroom and water heater. | $20,000 |
| [202602246368](https://www.permitgraph.org/p/202602246368) | Feb 24, 2026 | Completed: final sign-off Sep 2026 | [1845 Irving St](https://www.permitgraph.org/a/1774/042) | 1)change of occupancy and change of use from group m (retail) to group a-3 (indoor play ground). 2) new ada restroom. 3) convert existing non ada restroom into janitor rm. 4) new play structures, chi… | $55,000 |
| [202504245201](https://www.permitgraph.org/p/202504245201) | Apr 24, 2025 | Completed: final sign-off Jun 2025 | [5020 California St](https://www.permitgraph.org/a/1372/021) | unit #5: replace 8 windows in kind. 4 at front, 4 at rear. vinyl | $2,000 |
| [202501319457](https://www.permitgraph.org/p/202501319457) | Jan 31, 2025 | Completed: final sign-off Jun 2025 | [5020 California St](https://www.permitgraph.org/a/1372/021) | unit 5: interior remodel on 3rd fl: change e) dining rm to a bedroom, remodel e) kitchen & bathroom. no exterior work | $50,000 |
| [202411185198](https://www.permitgraph.org/p/202411185198) | Nov 18, 2024 | Completed: final sign-off Jan 2025 | [837 33rd Av](https://www.permitgraph.org/a/1676/002) | adding new siding to (e) wood siding. install building paper to protect against water leak use bilt woven house wrap. remove and install all windows & door trim. install eave flashing on top of the s… | $22,500 |
| [202309136437](https://www.permitgraph.org/p/202309136437) | Sep 13, 2023 | In progress: issued Nov 2024 | [62 Tingley St](https://www.permitgraph.org/a/6800/013) | legalize 1st flr unit per state adu program. replace existing front windows in kind. to comply with nov no. 202309442. (single family + adu) | $100,000 |
| [202308184746](https://www.permitgraph.org/p/202308184746) | Aug 18, 2023 | Completed: final sign-off Jun 2024 | [515 Columbus Av](https://www.permitgraph.org/a/0117/005) | renewal pa# 2017-0510-6224 to complete work. |  |
| [202308184748](https://www.permitgraph.org/p/202308184748) | Aug 18, 2023 | Completed: final sign-off Apr 2024 | [515 Columbus Av](https://www.permitgraph.org/a/0117/005) | to obtain final inspection for work approved under pa# 2017-0906-7044. all work is complete. |  |
| [202306059236](https://www.permitgraph.org/p/202306059236) | Jun 5, 2023 | Completed: final sign-off Jul 2023 | [519 Columbus Av](https://www.permitgraph.org/a/0117/005) | recommencment and completion of work approved under pa# 201712186734 | $40,000 |
| [202206236966](https://www.permitgraph.org/p/202206236966) | Jun 23, 2022 | Completed: final sign-off May 2023 | [537 Columbus Av](https://www.permitgraph.org/a/0117/005) | barrier removal (interior): voluntary relocate restroom to comply with ada requirement. vacant unit. | $4,000 |
| [202204262990](https://www.permitgraph.org/p/202204262990) | Apr 26, 2022 | Never finaled: issued Apr 2022, no final | [53 Lupine Av](https://www.permitgraph.org/a/1057/020) | to comply with complaints 202289785 and 202289788: remove/install new furnace heating unit with about 10 ft of duct. same location (replacement). | $4,000 |
| [202203281028](https://www.permitgraph.org/p/202203281028) | Mar 28, 2022 | Expired or cancelled: withdrawn Apr 2022 | [254 Laguna Honda Bl](https://www.permitgraph.org/a/2819/052) | re-do wheelchair ramp, about 100'. | $18,000 |
| [202203250927](https://www.permitgraph.org/p/202203250927) | Mar 25, 2022 | Completed: final sign-off Aug 2022 | [1250 Clay St](https://www.permitgraph.org/a/0214/067) | revision to permit #202201266671. location of range hood will not move(stay the same). no bathroom fan. ste 303 | $35,000 |
| [202202188305](https://www.permitgraph.org/p/202202188305) | Feb 18, 2022 | Completed: final sign-off May 2022 | [254 Laguna Honda Bl](https://www.permitgraph.org/a/2819/052) | revision to 202105039710 and 202108065976 to update path of travel. no change to path of travel of exiting | $20,000 |
| [202202158006](https://www.permitgraph.org/p/202202158006) | Feb 15, 2022 | Never finaled: issued Mar 2022, no final | [355 01st St](https://www.permitgraph.org/a/3748/191) | unit # 309: remodel (e) 2 bathroom (no layout change), replace vanities & water closets. replace tiles in shower & bathtub area. replace baths & hallway floor tiles. add 1 gfci receptacle in master b… | $20,000 |
| [202201266671](https://www.permitgraph.org/p/202201266671) | Jan 26, 2022 | Completed: final sign-off Aug 2022 | [1250 Clay St](https://www.permitgraph.org/a/0214/067) | like for like 1 kitchen remodel: like kind 1 bathroom remodel: install laminate floors, add 10 recessed light, move location of range hood, install bathroom fan. | $35,000 |
| [202201216423](https://www.permitgraph.org/p/202201216423) | Jan 21, 2022 | Completed: final sign-off Oct 2022 | [1524 Palou Av](https://www.permitgraph.org/a/5323/004) | revision to bpa 202110281404. convert media room to kitchenette. re-build front stairway. add window and entry at front of 1/f. | $23,000 |
| [202110281404](https://www.permitgraph.org/p/202110281404) | Oct 28, 2021 | Completed: final sign-off Oct 2022 | [1524 Palou Av](https://www.permitgraph.org/a/5323/004) | 1/f: add media room, bathroom, office & family, & laundry room. | $45,000 |
| [202109289370](https://www.permitgraph.org/p/202109289370) | Sep 28, 2021 | Completed: final sign-off Apr 2022 | [1809 Union St](https://www.permitgraph.org/a/0543/034) | revision to pa 2021 0623 3084. revise "clean area" layout |  |
| [202109027692](https://www.permitgraph.org/p/202109027692) | Sep 2, 2021 | Completed: final sign-off Nov 2021 | [527 Columbus Av](https://www.permitgraph.org/a/0117/005) | recommencement & completion of work approved under bpa#201712186736 |  |
| [202108065976](https://www.permitgraph.org/p/202108065976) | Aug 6, 2021 | Completed: final sign-off May 2022 | [254 Laguna Honda Bl](https://www.permitgraph.org/a/2819/052) | rev to pa202105039710: new fence at (e) exterior deck. no change to occupancy, exiting and accessibility path of travel. | $3,000 |
| [202108065982](https://www.permitgraph.org/p/202108065982) | Aug 6, 2021 | Completed: final sign-off Aug 2021 | [521 Columbus Av](https://www.permitgraph.org/a/0117/005) | commencement of work not started under previously approved permit application #201704275073. |  |
| [202106233084](https://www.permitgraph.org/p/202106233084) | Jun 23, 2021 | Completed: final sign-off Apr 2022 | [1809 Union St](https://www.permitgraph.org/a/0543/034) | new restaurant d.b.a dumpling union. work include new all gender restroom, stair and kitchen equipment. | $150,000 |
| [202106041633](https://www.permitgraph.org/p/202106041633) | Jun 4, 2021 | Completed: final sign-off Sep 2022 | [461 02nd St](https://www.permitgraph.org/a/3764/074) | unit #c105: one in-kind kitchen and one bathroom remodel. non-structural work | $20,000 |
| [202105039710](https://www.permitgraph.org/p/202105039710) | May 3, 2021 | Completed: final sign-off May 2022 | [254 Laguna Honda Bl](https://www.permitgraph.org/a/2819/052) | change of use: tenant improvement of existing ground floor tenant space for a new childcare facility. scope of work includes a new ada restrooms and new exterior exit doors. | $50,000 |
| [202001303166](https://www.permitgraph.org/p/202001303166) | Jan 30, 2020 | Completed: final sign-off Jan 2024 | [55 Lupine Av](https://www.permitgraph.org/a/1057/020) | per adu ordinance# 162-16, add 1 new studio unit on (e) conditional space. | $26,876 |
| [201909050825](https://www.permitgraph.org/p/201909050825) | Sep 5, 2019 | Completed: final sign-off Aug 2021 | [515 Columbus Av](https://www.permitgraph.org/a/0117/005) | comply with planning case 2019005438enf. restoration of historic storefront at 515-527 columbus including installation of a storefront system, wood framed doors and transoms, tiled bulkheads, tiled e… | $30,000 |
| [201810032150](https://www.permitgraph.org/p/201810032150) | Oct 3, 2018 | Expired or cancelled: withdrawn Nov 2018 | [1250 Jones St](https://www.permitgraph.org/a/0221/072) | 11th fl: remodel kitchen, bathroom, add sink in powder room, add washer/dryer, add den. | $60,000 |
| [201805229847](https://www.permitgraph.org/p/201805229847) | May 22, 2018 | Completed: final sign-off May 2021 | [265 Flournoy St](https://www.permitgraph.org/a/7169/010) | rear yard addition. remodel kitchen, bathrooms, floor finish, rear yard addition 2-story (270x2=540 sf) 2 bed/2 bath. expand kitchen with addition of 50 sf, new spiral stairs to ground floor. ground… | $105,000 |
| [201803133512](https://www.permitgraph.org/p/201803133512) | Mar 13, 2018 | Completed: final sign-off Jan 2019 | [3075 25th Av](https://www.permitgraph.org/a/7212/004A) | convert (e) garage space to have a (n) adu w/ 2 bedrms. 2 full bathes, a kitchen and living/dining area. per ord# 95-17. | $38,000 |
| [201803093286](https://www.permitgraph.org/p/201803093286) | Mar 9, 2018 | Completed: final sign-off Jun 2018 | [3075 25th Av](https://www.permitgraph.org/a/7212/004A) | 2nd fl: remodel (e) kitchen and bathroom. add one full bath. | $20,000 |
| [201803083254](https://www.permitgraph.org/p/201803083254) | Mar 8, 2018 | Never finaled: issued May 2018, no final | [501 Columbus Av](https://www.permitgraph.org/a/0117/005) | ada restroom per seismic retrofit for soft story retrofit per 2016 cebc appendix a-4 related to app#201802222022 (commercial) sof story program; n/a maher | $118,000 |
| [201802222022](https://www.permitgraph.org/p/201802222022) | Feb 22, 2018 | Never finaled: issued May 2018, no final | [501 Columbus Av](https://www.permitgraph.org/a/0117/005) | seismic retrofit per mandatory soft story per sfebc chapter 4d 2016 cebc app a-4. (residential) maher n/a | $200,000 |
| [201712186734](https://www.permitgraph.org/p/201712186734) | Dec 18, 2017 | Expired or cancelled: expired Jul 2023 | [519 Columbus Av](https://www.permitgraph.org/a/0117/005) | commercial t.i. for ada accessible entrance. n/a for maher | $90,000 |
| [201712186736](https://www.permitgraph.org/p/201712186736) | Dec 18, 2017 | Completed: final sign-off Nov 2021 | [527 Columbus Av](https://www.permitgraph.org/a/0117/005) | 1) commercial t.i. to comply with complaint #201630151 ada accessible entrance. ada restroom. n/a for maher | $90,000 |
| [201712116124](https://www.permitgraph.org/p/201712116124) | Dec 11, 2017 | Completed: final sign-off Feb 2018 | [88 King St](https://www.permitgraph.org/a/3793/082) | remodel bathroom, same location, no moving of walls, doors or windows, maintain accessible heights & clearances if it is an accessible unit; maher ord 155=13 na. | $8,000 |
| [201709067044](https://www.permitgraph.org/p/201709067044) | Sep 6, 2017 | Expired or cancelled: expired Apr 2024 | [515 Columbus Av](https://www.permitgraph.org/a/0117/005) | install slab and replace foundation per plan and repair dry rot where occurs. to comply with complaint #201790541 | $20,000 |
| [201708165056](https://www.permitgraph.org/p/201708165056) | Aug 16, 2017 | Completed: final sign-off Dec 2017 | [2575 39th Av](https://www.permitgraph.org/a/2440/019) | 2/f: remodel bathroom. | $8,500 |
| [201708074029](https://www.permitgraph.org/p/201708074029) | Aug 7, 2017 | Completed: final sign-off Apr 2019 | [2215 19th Av](https://www.permitgraph.org/a/2330/002) | revision to pa#201701127062. reconfigure layout per plans. |  |
| [201707071296](https://www.permitgraph.org/p/201707071296) | Jul 7, 2017 | Never finaled: issued Jul 2017, no final | [88 King St](https://www.permitgraph.org/a/3793/034) | unit #302 - remodel a bathroom. | $8,000 |
| [201707071295](https://www.permitgraph.org/p/201707071295) | Jul 7, 2017 | Completed: final sign-off Nov 2017 | [1903 09th Av](https://www.permitgraph.org/a/2125/013) | replace about 200 l.f. of wood siding in lightwell, not visible from street. | $4,000 |
| [201705106224](https://www.permitgraph.org/p/201705106224) | May 10, 2017 | Never finaled: issued May 2017, no final | [515 Columbus Av](https://www.permitgraph.org/a/0117/005) | barrier removal, upgrade e toilet, entry doors only, auto door opener bar is installed against the exterior wall | $15,000 |
| [201705096083](https://www.permitgraph.org/p/201705096083) | May 9, 2017 | Completed: final sign-off Apr 2019 | [2215 19th Av](https://www.permitgraph.org/a/2330/002) | revision to app#201701127062 to replace foundation at rear bedroom. | $500 |
| [201704275073](https://www.permitgraph.org/p/201704275073) | Apr 27, 2017 | Completed: final sign-off Aug 2021 | [521 Columbus Av](https://www.permitgraph.org/a/0117/005) | tenant improvement: construct new ada restroom at ground floor. reconfigure extg storefront at ground floor. n/a for maher | $20,000 |
| [201702018415](https://www.permitgraph.org/p/201702018415) | Feb 1, 2017 | Completed: final sign-off Apr 2017 | [1776 Sacramento St](https://www.permitgraph.org/a/0622/058) | remodel 2 bathrooms, no change on walls. | $10,000 |
| [201610311472](https://www.permitgraph.org/p/201610311472) | Oct 31, 2016 | Completed: final sign-off Dec 2016 | [950 Stockton St](https://www.permitgraph.org/a/0210A/014) | close opening with interior non load bearing partition. new accessible door at restroom and replace entry door hardware. mep, ls under separate permit. | $2,500 |
| [201610119999](https://www.permitgraph.org/p/201610119999) | Oct 11, 2016 | Completed: final sign-off Jan 2017 | [1601 Irving St](https://www.permitgraph.org/a/1772/001) | g/f shop -barrier removal only. upgrade existing restroom to meet current accessibility requirement with restroom expansion | $25,000 |
| [201609289026](https://www.permitgraph.org/p/201609289026) | Sep 28, 2016 | Completed: final sign-off Nov 2016 | [151 Middlefield Dr](https://www.permitgraph.org/a/7267/007) | to comply with nov#201637432- add 1/4 to 1/2" sand topping in (e) concrete walkway & driveway, add crub to property line. change 2 garage doors. | $5,000 |
| [201605056697](https://www.permitgraph.org/p/201605056697) | May 5, 2016 | Completed: final sign-off Dec 2016 | [263 Vernon St](https://www.permitgraph.org/a/7076/006) | revision to pa #201511243490 - extend basement floor pusing back retaining wall, new beam at ground floor. addition of 130 sf habitable area at basement. | $5,000 |
| [201603111789](https://www.permitgraph.org/p/201603111789) | Mar 11, 2016 | Completed: final sign-off Apr 2016 | [2801 Sacramento St](https://www.permitgraph.org/a/1026/001) | unit #3: upgrade kitchen, counter top,sink,change one bath tub, 1 sink , no change existing appliances. | $20,000 |
| [201511243490](https://www.permitgraph.org/p/201511243490) | Nov 24, 2015 | Completed: final sign-off Dec 2016 | [263 Vernon St](https://www.permitgraph.org/a/7076/006) | remodel upper stair kitchen/bathroom. add one bath on 2nd floor. garage level convert into 2 bedrooms, one bath, and 1 car parking. basement cellars convert into 2 beds and one bath. | $100,000 |
| [201506300335](https://www.permitgraph.org/p/201506300335) | Jun 30, 2015 | Completed: final sign-off Dec 2015 | [300 03rd St](https://www.permitgraph.org/a/3751/191) | unit #318: remodel extg kitchen, bathrooms only. new floor finishes. n/a for maher | $25,000 |
| [201412093350](https://www.permitgraph.org/p/201412093350) | Dec 9, 2014 | Completed: final sign-off Apr 2015 | [693 10th Av](https://www.permitgraph.org/a/1634/012) | change front 1 windodow to wood clad aluminum or wood, double or single hung on second floor. u factor 0.32 max. revision to pa# 201409025218 to remodel bathroo also. | $500 |
| [201410300364](https://www.permitgraph.org/p/201410300364) | Oct 30, 2014 | Completed: final sign-off May 2015 | [2779 38th Av](https://www.permitgraph.org/a/2507/015) | in 1st flr: convert (e) rooms to have two bedrooms, one full bath, laundry area | $45,000 |
| [201409025218](https://www.permitgraph.org/p/201409025218) | Sep 2, 2014 | Completed: final sign-off May 2015 | [693 10th Av](https://www.permitgraph.org/a/1634/012) | remodel existing kitchen and upgrade electrical panel | $9,000 |
| [201312275160](https://www.permitgraph.org/p/201312275160) | Dec 27, 2013 | Completed: final sign-off Jul 2014 | [708 Plymouth Av](https://www.permitgraph.org/a/7057/022) | add 1 new bathroom. family room and bedroom at gr fl per plan | $30,000 |
| [201310018162](https://www.permitgraph.org/p/201310018162) | Oct 1, 2013 | Completed: final sign-off Feb 2014 | [1687 23rd Av](https://www.permitgraph.org/a/1920/022) | recise application # 201308194618 to increase construciton cost per building inspector. | $30,000 |
| [201308194618](https://www.permitgraph.org/p/201308194618) | Aug 19, 2013 | Completed: final sign-off Feb 2014 | [1687 23rd Av](https://www.permitgraph.org/a/1920/022) | relocate kitchen & convert (e) kitchen into (n) study/office room at 2nd floor. legalize one bedroom, & (e) bathroom, construct one new bedroom, one bathroom & infill under (e) sunroom at ground floo… | $68,000 |
| [201307222355](https://www.permitgraph.org/p/201307222355) | Jul 22, 2013 | Completed: final sign-off Jan 2014 | [1849 23rd Av](https://www.permitgraph.org/a/2060/010) | to add a family room, a full bath, laundry room for sfd ue only. | $35,000 |
| [201209260637](https://www.permitgraph.org/p/201209260637) | Sep 26, 2012 | Completed: final sign-off Nov 2012 | [500 Paul Av](https://www.permitgraph.org/a/5431A/001K) | roof repair. | $2,000 |
| [201204269147](https://www.permitgraph.org/p/201204269147) | Apr 26, 2012 | Completed: final sign-off Aug 2012 | [642 30th Av](https://www.permitgraph.org/a/1572/016F) | replace front stucco | $5,000 |
| [201203166259](https://www.permitgraph.org/p/201203166259) | Mar 16, 2012 | Completed: final sign-off Jun 2012 | [2463 37th Av](https://www.permitgraph.org/a/2388/009) | to legalize extg guest bedroom, family room and 2 baths at ground floor. | $38,000 |
| [201101047839](https://www.permitgraph.org/p/201101047839) | Jan 4, 2011 | Completed: final sign-off Feb 2011 | [78 Division St](https://www.permitgraph.org/a/3799/007) | reference 201002096205. revised ceiling plan for storage room. |  |
| [201010273868](https://www.permitgraph.org/p/201010273868) | Oct 27, 2010 | Completed: final sign-off Dec 2010 | [3632 Ulloa St](https://www.permitgraph.org/a/2388/017) | remodel kitchen on 2nd flr only, non structural lighting to comply with cec 150(k) | $10,000 |
| [201002096205](https://www.permitgraph.org/p/201002096205) | Feb 9, 2010 | Completed: final sign-off Feb 2011 | [78 Division St](https://www.permitgraph.org/a/3799/007) | minor remodel of (e) showroom; (n) ceiling & lighting, (n) ceiling height, non-bearing partitions & new finish materials. | $32,000 |
| [200910290174](https://www.permitgraph.org/p/200910290174) | Oct 29, 2009 | Expired or cancelled: expired Dec 2009 | [680 Clay St](https://www.permitgraph.org/a/0208/011) | to obtain final inspection for work approved under pa3200809232348. all work is complete. |  |
| [200910229600](https://www.permitgraph.org/p/200910229600) | Oct 22, 2009 | Completed: final sign-off Jul 2010 | [432 30th St](https://www.permitgraph.org/a/6639/013) | enclose existing balcony on 2nd floor in front of building. | $20,000 |
| [200907152647](https://www.permitgraph.org/p/200907152647) | Jul 15, 2009 | Completed: final sign-off Sep 2009 | [2820 Kirkham St](https://www.permitgraph.org/a/1821/018) | remodel kitchen , no lighting change, change panel to 100a. | $10,000 |
| [200905138341](https://www.permitgraph.org/p/200905138341) | May 13, 2009 | Completed: final sign-off Jun 2009 | [1629 Jackson St](https://www.permitgraph.org/a/0598/013) | replace 1 wood post and provide new footing within ground floor commercial space | $1,800 |
| [200902121938](https://www.permitgraph.org/p/200902121938) | Feb 12, 2009 | Completed: final sign-off Feb 2009 | [2323 46th Av](https://www.permitgraph.org/a/2375/003) | to botain a permit of remodel kitchen from previous owner, per inspector's request. | $12,000 |
| [200810164404](https://www.permitgraph.org/p/200810164404) | Oct 16, 2008 | Completed: final sign-off Feb 2009 | [2323 46th Av](https://www.permitgraph.org/a/2375/003) | interior remodeling . add bath room to ground floor. remodel family room on ground floor and remove interior stair. 2nd floor add a new bath . to legalize ground floor | $19,000 |
| [200809232348](https://www.permitgraph.org/p/200809232348) | Sep 23, 2008 | Expired or cancelled: expired Dec 2009 | [680 Clay St](https://www.permitgraph.org/a/0208/011) | remove cap shower, washer, dryer in basement. to comply w/nov#200860751. | $800 |
| [200805021213](https://www.permitgraph.org/p/200805021213) | May 2, 2008 | Completed: final sign-off Feb 2009 | [28 02nd St](https://www.permitgraph.org/a/3707/002) | change of use from retail to restaurant on 1st floor - interior remodel for self serve, 2 new d.a. accessible restrooms, new corridor, new stair. replace glazing at existing storefront. occupant load… | $195,000 |
| [200712281554](https://www.permitgraph.org/p/200712281554) | Dec 28, 2007 | Completed: final sign-off Jun 2008 | [343 Wheeler Av](https://www.permitgraph.org/a/5083/013) | remodel (e) kitchen & bathroom. tile floor on bathroom kitchen. new cabinet & counter top with back flashing. new plumbing fixture. | $14,500 |
| [200709112350](https://www.permitgraph.org/p/200709112350) | Sep 11, 2007 | Completed: final sign-off Jan 2008 | [40 Gellert Dr](https://www.permitgraph.org/a/7259/021) | add full bath @ ground floor. | $6,000 |
| [200708149703](https://www.permitgraph.org/p/200708149703) | Aug 14, 2007 | Completed: final sign-off Aug 2007 | [2022 31st Av](https://www.permitgraph.org/a/2150/016C) | repair front wall dry rot between 2 windows about 100 sq.ft. remove stucco, do repairs and re-stucco | $5,000 |
| [200705292419](https://www.permitgraph.org/p/200705292419) | May 29, 2007 | Completed: final sign-off Sep 2007 | [522 22nd Av](https://www.permitgraph.org/a/1564/039) | to comply nov #200671972: to remove existing kitchen sink, cabinet in 1/f, turn existing space back to original space per appl#7800449, repair termit damage to existing exterior wood stair. | $3,000 |
| [200703226977](https://www.permitgraph.org/p/200703226977) | Mar 22, 2007 | Completed: final sign-off Aug 2007 | [2219 47th Av](https://www.permitgraph.org/a/2302/005) | interior renovation: to add a family room, a bath. remodel (e) bath, bedroom in lower (1st floor). repair (e) rear deck and stair. (horizontal addition) | $20,000 |
| [200701262678](https://www.permitgraph.org/p/200701262678) | Jan 26, 2007 | Completed: final sign-off Feb 2007 | [300 Country Club Dr](https://www.permitgraph.org/a/7272/048) | dryrot replace at front door. approx. 20 sqft. replace in kind. | $1,000 |
| [200701101419](https://www.permitgraph.org/p/200701101419) | Jan 10, 2007 | Completed: final sign-off May 2007 | [220 San Benito Wy](https://www.permitgraph.org/a/3254/003) | renovate (e) kitchen and bathrooms only on 2nd floor. | $15,000 |
| [200610306340](https://www.permitgraph.org/p/200610306340) | Oct 30, 2006 | Completed: final sign-off Mar 2007 | [300 Country Club Dr](https://www.permitgraph.org/a/7272/048) | to legalize bathroom in 1st floor for single family use only | $6,000 |
| [200608088906](https://www.permitgraph.org/p/200608088906) | Aug 8, 2006 | Completed: final sign-off Sep 2006 | [191 Evelyn Wy](https://www.permitgraph.org/a/2901E/013) | remodel kitchen cabinets, 8 countertops. replace glazing for 4 existing windows in front buildings windows. | $2,500 |
| [200607318027](https://www.permitgraph.org/p/200607318027) | Jul 31, 2006 | Completed: final sign-off Sep 2006 | [191 Evelyn Wy](https://www.permitgraph.org/a/2901E/013) | install (n) window, (n) glass door, (n) folding door, and (n) garage door - rev. to pa# 2006/05/15/1627 | $2,000 |
| [200607247331](https://www.permitgraph.org/p/200607247331) | Jul 24, 2006 | Completed: final sign-off Sep 2006 | [191 Evelyn Wy](https://www.permitgraph.org/a/2901E/013) | revision to appl#200605151627 legalize (e) rooms to living spaces | $2,000 |
| [200605151627](https://www.permitgraph.org/p/200605151627) | May 15, 2006 | Completed: final sign-off Sep 2006 | [191 Evelyn Wy](https://www.permitgraph.org/a/2901E/013) | install 1 bedroom, 1 laundry room & 1 bathroom at garage floor. legalize storage rooms & 1 bathroom at garage floor. install 1 bathroom at 2nd floor. | $25,000 |
| [200308121846](https://www.permitgraph.org/p/200308121846) | Aug 12, 2003 | Expired or cancelled: expired Dec 2007 | [2120 Stockton St](https://www.permitgraph.org/a/0039/047) | change kchn cabinets only in #103 | $800 |
| [200110302097](https://www.permitgraph.org/p/200110302097) | Oct 30, 2001 | Completed: final sign-off Jan 2002 | [1259 Oak St](https://www.permitgraph.org/a/1219/030) | change bathroom tile floor. tub wall | $2,800 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/all-bay-cities-construction-872779.
