# Alive Design & Construction

Contractor license 884910. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/alive-design-construction-884910
- JSON: https://www.permitgraph.org/api/contractor?license=884910
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=884910

31 permits since 2000: 20 completed, 1 in progress, 4 never finaled, 6 expired or cancelled. Typically 1 days from filing to permit and 168 days from permit to final inspection. Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.

- Based in: Moraga
- On San Francisco permits: Feb 2007 to Feb 2025
- Last 24 months: 1 permit filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2007 | 4 | 0 | 1 | 0 |
| 2011 | 2 | 0 | 0 | 4 |
| 2012 | 0 | 0 | 0 | 1 |
| 2013 | 3 | 0 | 1 | 0 |
| 2014 | 2 | 0 | 1 | 0 |
| 2015 | 2 | 0 | 0 | 0 |
| 2016 | 1 | 0 | 0 | 0 |
| 2017 | 4 | 0 | 0 | 0 |
| 2019 | 0 | 0 | 1 | 0 |
| 2020 | 0 | 0 | 0 | 1 |
| 2023 | 2 | 0 | 0 | 0 |
| 2025 | 0 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 9 | 6 | 1 | 0 | 2 | 0 | 312 |
| Kitchen remodel | 12 | 7 | 1 | 1 | 3 | 27 | 334 |
| Deck | 1 | 1 | 0 | 0 | 0 | 16 | 427 |
| Stairs | 2 | 2 | 0 | 0 | 0 | 6 | 182 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202502271225](https://www.permitgraph.org/p/202502271225) | Feb 27, 2025 | In progress: issued Apr 2025 | [601 Laguna Honda Bl](https://www.permitgraph.org/a/2889/013) | interior remodeling, new bath and family room at car/basement remodel kitchen and bath at level 1. remodel master bath at level 2. exterior add (2) window basement. 1 (n) door at ground level. replac… | $108,000 |
| [202306291213](https://www.permitgraph.org/p/202306291213) | Jun 29, 2023 | Completed: final sign-off Apr 2024 | [2472 21st Av](https://www.permitgraph.org/a/2405/023) | rev to pa# 2023-0419-6015: all new laundry hook in the upper level remodel (e) half bathroom new smn new tolilet replace bathroom windows to meet code tempered glass required |  |
| [202304196015](https://www.permitgraph.org/p/202304196015) | Apr 19, 2023 | Completed: final sign-off Apr 2024 | [2472 21st Av](https://www.permitgraph.org/a/2405/023) | bathroom and kitchen remodel in-kind, upgrade hvac and electrical per code. | $100,000 |
| [202010076116](https://www.permitgraph.org/p/202010076116) | Oct 7, 2020 | Expired or cancelled: withdrawn Apr 2023 | [2472 21st Av](https://www.permitgraph.org/a/2405/023) | in law addition in the basement(1st floor as marked on plans) and 1/2 bath addition in the existing floor, kitchen remodel and bath remodel in the 1st floor. adu per ordinance no. 162-16. | $250,000 |
| [201903145282](https://www.permitgraph.org/p/201903145282) | Mar 14, 2019 | Never finaled: issued Apr 2019, no final | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | install new hvac unit on roof. no work involving kitchen exhaust hood system. | $25,000 |
| [201709148107](https://www.permitgraph.org/p/201709148107) | Sep 14, 2017 | Completed: final sign-off Mar 2018 | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | health only: dph deferred submittal dwgs for bar/serving counter. ref pa #201705106163. |  |
| [201708245821](https://www.permitgraph.org/p/201708245821) | Aug 24, 2017 | Completed: final sign-off Mar 2018 | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | revision to pa 2017-0510-6163 (already reviewed by dph), primary entry - ramp - ada compliant |  |
| [201708245823](https://www.permitgraph.org/p/201708245823) | Aug 24, 2017 | Completed: final sign-off Mar 2018 | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | revision to pa 2017-0510-6163 (already reviewed by dph); reduce scope of work - remove ramp |  |
| [201705106163](https://www.permitgraph.org/p/201705106163) | May 10, 2017 | Completed: final sign-off Mar 2018 | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | interior work only, relocating existing stairs to mezzanine and making primary entry ada compliant. | $32,895 |
| [201604053935](https://www.permitgraph.org/p/201604053935) | Apr 5, 2016 | Completed: final sign-off Nov 2017 | [1875 38th Av](https://www.permitgraph.org/a/2075/005G) | remodel kitchen & bath; add (2)(n) bathrooms; rear addition; remodel (e) multipurpose room/den | $205,000 |
| [201510089290](https://www.permitgraph.org/p/201510089290) | Oct 8, 2015 | Completed: final sign-off Mar 2016 | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | to obtain final inspection for work approved under pa#201112050108 & 201108253285. all work is complete. |  |
| [201510089291](https://www.permitgraph.org/p/201510089291) | Oct 8, 2015 | Completed: final sign-off Mar 2016 | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | to obtain final inspection for work approved under pa# 201201202693 & 201112070213. all work is complete |  |
| [201411252529](https://www.permitgraph.org/p/201411252529) | Nov 25, 2014 | Completed: final sign-off Feb 2016 | [264 Evelyn Wy](https://www.permitgraph.org/a/2938A/024) | ground fl: new bath, laundry room, remodel e bedroom, new floor slab. 2nd fl: kitchen/dining room, remodel/relocate bedroom to livng room, new entry. aprox. 40% existing interior framing to remain. n… | $200,000 |
| [201406198876](https://www.permitgraph.org/p/201406198876) | Jun 19, 2014 | Never finaled: issued Jan 2016, no final | [900 22nd St](https://www.permitgraph.org/a/4106/014) | reconstruct bulkhead and trim. re-habilitate (e) entry. window replacement of the same like & kind. replacement of restaurant sign with new sign of similar material (metal) under separate permit. | $2,000 |
| [201401166483](https://www.permitgraph.org/p/201401166483) | Jan 16, 2014 | Completed: final sign-off Jun 2014 | [900 22nd St](https://www.permitgraph.org/a/4106/014) | install new kitchen hood, duct work, extractor and makeup air motors on roof. ref app#201310310809 | $8,000 |
| [201312234896](https://www.permitgraph.org/p/201312234896) | Dec 23, 2013 | Completed: final sign-off Jun 2014 | [900 22nd St](https://www.permitgraph.org/a/4106/014) | new electical/ lighting installation. ref app#201103212740/r1 | $5,000 |
| [201312033251](https://www.permitgraph.org/p/201312033251) | Dec 3, 2013 | Never finaled: issued Jan 2014, no final | [900 22nd St](https://www.permitgraph.org/a/4106/014) | revision to app# 201103212470 - replace broken window and frame for new window. visible from the street. | $500 |
| [201311051167](https://www.permitgraph.org/p/201311051167) | Nov 5, 2013 | Completed: final sign-off Apr 2014 | [1900 08th Av](https://www.permitgraph.org/a/2127/002) | remodel kitchen and install toilet room at 1st floor and replace bathroom fixtures at 2nd floor. | $40,000 |
| [201310310809](https://www.permitgraph.org/p/201310310809) | Oct 31, 2013 | Completed: final sign-off Jun 2014 | [900 22nd St](https://www.permitgraph.org/a/4106/014) | revision to pa# 2011-0321-2470-relocation of bar counter & kitchen equipment layout per application referred to above | $10,000 |
| [201201202653](https://www.permitgraph.org/p/201201202653) | Jan 20, 2012 | Expired or cancelled: expired Mar 2016 | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | as-built floor plan & revised bathroom layout @ men's. |  |
| [201112060193](https://www.permitgraph.org/p/201112060193) | Dec 6, 2011 | Expired or cancelled: expired Mar 2016 | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | change of use from church to full service restaurant. |  |
| [201112050108](https://www.permitgraph.org/p/201112050108) | Dec 5, 2011 | Expired or cancelled: expired Mar 2016 | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | "as-built" plan revision to p.a.#2011-0825-3285 for final inspection. | $3,000 |
| [201111048331](https://www.permitgraph.org/p/201111048331) | Nov 4, 2011 | Completed: final sign-off Jan 2012 | [5126 03rd St](https://www.permitgraph.org/a/5358/027) | repair wood siding at side of bldg due to fire damaged from adjacent structure. repair front door jamb. repair stair hand rail. | $2,500 |
| [201110176906](https://www.permitgraph.org/p/201110176906) | Oct 17, 2011 | Expired or cancelled: expired Mar 2016 | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | install a 10' hood in the kitchen. | $10,000 |
| [201108253285](https://www.permitgraph.org/p/201108253285) | Aug 25, 2011 | Expired or cancelled: expired Mar 2016 | [1429 Mendell St](https://www.permitgraph.org/a/5323/015) | remodel kitchen, install 2 new ada accessible rest rooms, add 1-hr. corridor. | $40,000 |
| [201103212470](https://www.permitgraph.org/p/201103212470) | Mar 21, 2011 | Completed: final sign-off Jun 2014 | [900 22nd St](https://www.permitgraph.org/a/4106/014) | change of use from coffee house to full service restaurant. interior tenant improvement. remodel (e) kitchen to include class i hood & associated cooking equipment. light plumbing & electrical includ… | $18,000 |
| [200707166889](https://www.permitgraph.org/p/200707166889) | Jul 16, 2007 | Never finaled: issued Jul 2007, no final | [2479 Diamond St](https://www.permitgraph.org/a/7549/013) | renew pa# 2005/04/13/9944 & pa# 2005/03/14/7479 for final inspection only. |  |
| [200705020302](https://www.permitgraph.org/p/200705020302) | May 2, 2007 | Completed: final sign-off Jul 2007 | [2479 Diamond St](https://www.permitgraph.org/a/7549/013) | renew pa#200506145016 for final inspection. |  |
| [200704199190](https://www.permitgraph.org/p/200704199190) | Apr 19, 2007 | Completed: final sign-off Jun 2007 | [5126 03rd St](https://www.permitgraph.org/a/5358/027) | upgrade extg restroom to be ada accessible(voluntary upgrade) | $7,000 |
| [200703055466](https://www.permitgraph.org/p/200703055466) | Mar 5, 2007 | Completed: final sign-off Jun 2007 | [1050 North Point St](https://www.permitgraph.org/a/0451/167) | remove old bath tub/new frame work for the new tub. install new valves and new tub. minor tile repair work. install new light fixture. install new medicine cabinets | $6,000 |
| [200702144147](https://www.permitgraph.org/p/200702144147) | Feb 14, 2007 | Completed: final sign-off Jun 2007 | [5126 03rd St](https://www.permitgraph.org/a/5358/027) | replace damaged plaster with new drywall @ ground floor office & meeting area exterior walls. repair dry rot @ interior wall (north side bldg.) only. | $3,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/alive-design-construction-884910.
