# Alan Zhu Construction

Contractor license 643453. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/alan-zhu-construction-643453
- JSON: https://www.permitgraph.org/api/contractor?license=643453
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=643453

19 permits since 2000: 18 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 42 days from permit to final inspection.

- Based in: San Francisco
- On San Francisco permits: Mar 2000 to Dec 2013
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 3 | 0 | 0 | 0 |
| 2001 | 0 | 0 | 0 | 1 |
| 2002 | 2 | 0 | 0 | 0 |
| 2004 | 1 | 0 | 0 | 0 |
| 2006 | 2 | 0 | 0 | 0 |
| 2008 | 2 | 0 | 0 | 0 |
| 2009 | 1 | 0 | 0 | 0 |
| 2011 | 3 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 3 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 1 | 1 | 0 | 0 | 0 | 0 | 45 |
| Bathroom remodel | 6 | 6 | 0 | 0 | 0 | 0 | 64 |
| Stairs | 4 | 4 | 0 | 0 | 0 | 0 | 28 |
| Deck | 2 | 2 | 0 | 0 | 0 | 0 | 36 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201312023115](https://www.permitgraph.org/p/201312023115) | Dec 2, 2013 | Completed: final sign-off Jan 2014 | [2782 Golden Gate Av](https://www.permitgraph.org/a/1143/011A) | abate complaint : 201328491 - building front stucco & wood sheathing repair- to remove front stucco and repair wood. all architectual features on the front facade will be replaced in kind. all 3 leve… | $12,800 |
| [201311041073](https://www.permitgraph.org/p/201311041073) | Nov 4, 2013 | Completed: final sign-off Dec 2013 | [120 Locksley Av](https://www.permitgraph.org/a/2634/090) | unit #2-comply with complaint# 201329301-repair stairs, less than 50%. handrail height between 34" & 38" & guardrail height at 42" | $3,800 |
| [201306109107](https://www.permitgraph.org/p/201306109107) | Jun 10, 2013 | Completed: final sign-off Jul 2013 | [2721 Clay St](https://www.permitgraph.org/a/0632/001C) | replace back stairs less than 50%. | $6,000 |
| [201211164429](https://www.permitgraph.org/p/201211164429) | Nov 16, 2012 | Completed: final sign-off Feb 2013 | [1682 33rd Av](https://www.permitgraph.org/a/1911/008C) | convert existing space ground floor to a living area (game room) and full bath | $18,000 |
| [201112120486](https://www.permitgraph.org/p/201112120486) | Dec 12, 2011 | Completed: final sign-off Jan 2012 | [106 Delano Av](https://www.permitgraph.org/a/3202/003) | bathroom, tile, fan, faucet, floor tile, remodel bathroom, no change on walls and opening | $7,000 |
| [201111018085](https://www.permitgraph.org/p/201111018085) | Nov 1, 2011 | Completed: final sign-off Nov 2011 | [1209 03rd Av](https://www.permitgraph.org/a/1747/002) | repair stair handrail per nov#201166147 item #2, repair in kind, no structural work. | $1,900 |
| [201104043451](https://www.permitgraph.org/p/201104043451) | Apr 4, 2011 | Completed: final sign-off Apr 2011 | [246 08th Av](https://www.permitgraph.org/a/1426/034) | #3 - remove shower tile, floor tile, faucet and replace with new per nov#201189433 | $3,200 |
| [200902242667](https://www.permitgraph.org/p/200902242667) | Feb 24, 2009 | Completed: final sign-off Mar 2009 | [767 Sweeny St](https://www.permitgraph.org/a/5900A/017) | revised approved apn#2008/0919/2080 to show as built. raised sub-floor on ground floor. reduce bath area at ground floor. |  |
| [200809192080](https://www.permitgraph.org/p/200809192080) | Sep 19, 2008 | Completed: final sign-off May 2009 | [767 Sweeny St](https://www.permitgraph.org/a/5900A/017) | proposed install bedroom, family room & bathroom at 1st floor. | $28,000 |
| [200806164559](https://www.permitgraph.org/p/200806164559) | Jun 16, 2008 | Completed: final sign-off Jul 2008 | [3040 21st Av](https://www.permitgraph.org/a/7218/009) | remove and install 1 kitchen cabinet, sink and floor, change furnace heater @ garage. no change of windows, door or exterior. | $8,500 |
| [200611066920](https://www.permitgraph.org/p/200611066920) | Nov 6, 2006 | Completed: final sign-off Apr 2007 | [133 Cornwall St](https://www.permitgraph.org/a/1431/045) | remodel kchn. cabinets countertop. sink floor. remoding bathroom. tile vanity faucet. change furnace heater. floruescent lighting efficiency 80% work on unit 133 only | $18,500 |
| [200606224782](https://www.permitgraph.org/p/200606224782) | Jun 22, 2006 | Completed: final sign-off Aug 2006 | [476 39th Av](https://www.permitgraph.org/a/1470/022) | renew pa# 200412060695-deck reconstruction & enlarge at the rear yard of existing single family dwelling. | $8,000 |
| [200408192069](https://www.permitgraph.org/p/200408192069) | Aug 19, 2004 | Completed: final sign-off Sep 2004 | [1330 40th Av](https://www.permitgraph.org/a/1794/035) | replace stucco front wall. | $6,800 |
| [200208164238](https://www.permitgraph.org/p/200208164238) | Aug 16, 2002 | Completed: final sign-off Sep 2002 | [1767 Union St](https://www.permitgraph.org/a/0544/011B) | repair stucco to outer walls of side of the buildings. | $3,800 |
| [200201116738](https://www.permitgraph.org/p/200201116738) | Jan 11, 2002 | Completed: final sign-off Jun 2002 | [847 31st Av](https://www.permitgraph.org/a/1674/001J) | 3 bedroom living rm.dining rm.drywall,insulation.remove & replace wall covering above wains cotting | $10,000 |
| [200104277863](https://www.permitgraph.org/p/200104277863) | Apr 27, 2001 | Expired or cancelled: expired Oct 2001 | [1894 41st Av](https://www.permitgraph.org/a/2077/027) | repair stucco front way & sidewalk 250 sq ft. | $5,500 |
| [200010193552](https://www.permitgraph.org/p/200010193552) | Oct 19, 2000 | Completed: final sign-off Dec 2000 | [39 Carmel St](https://www.permitgraph.org/a/1293/008) | repair bathroom, change vanity, tub & tile. | $3,800 |
| [200005028855](https://www.permitgraph.org/p/200005028855) | May 2, 2000 | Completed: final sign-off Nov 2000 | [1140 Burrows St](https://www.permitgraph.org/a/5972/017) | add rooms at ground floor. | $8,700 |
| [200003104099](https://www.permitgraph.org/p/200003104099) | Mar 10, 2000 | Completed: final sign-off Apr 2000 | [26 Clement St](https://www.permitgraph.org/a/1432/019) | repair back stairway, decking & post, correct n.o.v. 200002430 |  |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/alan-zhu-construction-643453.
