# Alameda Structural Inc

Contractor license 606483. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/alameda-structural-inc-606483
- JSON: https://www.permitgraph.org/api/contractor?license=606483
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=606483

12 permits since 2000: 10 completed, 1 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 54 days from permit to final inspection. Of the 1 never-finaled permit, 1 is over 10 years old.

- Based in: Alameda
- On San Francisco permits: Jul 2007 to Aug 2014
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2007 | 1 | 0 | 0 | 0 |
| 2008 | 1 | 0 | 0 | 0 |
| 2009 | 0 | 0 | 0 | 1 |
| 2010 | 3 | 0 | 1 | 0 |
| 2011 | 1 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2014 | 3 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 2 | 1 | 0 | 1 | 0 | 0 | 124 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201408274871](https://www.permitgraph.org/p/201408274871) | Aug 27, 2014 | Completed: final sign-off Oct 2014 | [2459 Larkin St](https://www.permitgraph.org/a/0524/001) | revision to application number 201407282349; cap approximately 37 lineal feet of foundation, replace garage slab. maher n/a | $6,000 |
| [201408184070](https://www.permitgraph.org/p/201408184070) | Aug 18, 2014 | Completed: final sign-off Dec 2016 | [2323 Larkin St](https://www.permitgraph.org/a/0525/007) | iebc appendix a4- strengthening of walls at the entry/storage level of the existing 4 story building. includes additon of 1 steel frame at the east side door opening. plywood sheathing, anchor bolts,… | $67,000 |
| [201407282349](https://www.permitgraph.org/p/201407282349) | Jul 28, 2014 | Completed: final sign-off Oct 2014 | [2459 Larkin St](https://www.permitgraph.org/a/0524/001) | replace 46 lineal feet deteriorated retaining wall; replace 18 lineal feet deteriorated foundation; add a foundation cap at isolated footing; and a spread footing in crawl space | $18,000 |
| [201202144115](https://www.permitgraph.org/p/201202144115) | Feb 14, 2012 | Completed: final sign-off Apr 2012 | [954 Florida St](https://www.permitgraph.org/a/4146/010) | foundation strengthening. remove 21 ft of extg foundation replace with concrete and ufer and grate. install new mudsill, anchors,hold downs and shearwall replacement. | $14,000 |
| [201110136713](https://www.permitgraph.org/p/201110136713) | Oct 13, 2011 | Completed: final sign-off Oct 2011 | [781 Chenery St](https://www.permitgraph.org/a/6743/020) | to obtain final inspection for work approved under pa 200911020356; all work is complete (partial fndtn rep, voluntary structural strengthening of lower level) |  |
| [201008279697](https://www.permitgraph.org/p/201008279697) | Aug 27, 2010 | Completed: final sign-off Oct 2010 | [192 Downey St](https://www.permitgraph.org/a/1269/142) | repair to foundation: replace brick sections | $11,900 |
| [201007227267](https://www.permitgraph.org/p/201007227267) | Jul 22, 2010 | Completed: final sign-off Nov 2010 | [3008 Pine St](https://www.permitgraph.org/a/1031/012) | lateral strengthening ( voluntary). demolition, foundation bolting, hold downs, shear walls/clips, cosmetic repair, front porch repair from inside ( stair reinforcement)/ concrete mat slabs. cavity b… | $35,000 |
| [201007227280](https://www.permitgraph.org/p/201007227280) | Jul 22, 2010 | Never finaled: issued Jul 2010, no final | [3008 Pine St](https://www.permitgraph.org/a/1031/012) | rpair front stairs in kind, less than 50% | $1,000 |
| [201003248833](https://www.permitgraph.org/p/201003248833) | Mar 24, 2010 | Completed: final sign-off Apr 2010 | [1101 Greenwich St](https://www.permitgraph.org/a/0094/001) | unit #1105 - replace substandard portions of the (e) foundation at the crawl space as shown on the site plan. | $8,728 |
| [200911020356](https://www.permitgraph.org/p/200911020356) | Nov 2, 2009 | Expired or cancelled: expired Oct 2011 | [781 Chenery St](https://www.permitgraph.org/a/6743/020) | partial foundation replacement, voluntary structural strengthening of lowe level | $36,000 |
| [200801102266](https://www.permitgraph.org/p/200801102266) | Jan 10, 2008 | Completed: final sign-off Mar 2008 | [2145 Castro St](https://www.permitgraph.org/a/6612/024) | voluntary foundation upgrade on south side and portion of east side of building in existing crawl space; addition of shear wall. | $25,000 |
| [200707136667](https://www.permitgraph.org/p/200707136667) | Jul 13, 2007 | Completed: final sign-off Nov 2007 | [3104 Buchanan St](https://www.permitgraph.org/a/0518/021) | replace (e) brick foundation with reinforced concrete foundations and shear wall | $27,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/alameda-structural-inc-606483.
