# Advantage Roofing (See Notes)

Contractor license 533121. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/advantage-roofing-see-notes-533121
- JSON: https://www.permitgraph.org/api/contractor?license=533121
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=533121

579 permits since 2000: 352 completed, 50 in progress, 170 never finaled, 7 expired or cancelled. Typically 0 days from filing to permit and 17 days from permit to final inspection. Of the 170 never-finaled permits, 80 are 3 to 5 years old, 80 are 5 to 10 years old, 10 are over 10 years old.

- Based in: Daly City
- On San Francisco permits: Nov 2004 to Sep 2026
- Last 24 months: 77 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2004 | 4 | 0 | 0 | 0 |
| 2005 | 1 | 0 | 1 | 0 |
| 2007 | 1 | 0 | 0 | 0 |
| 2010 | 1 | 0 | 0 | 0 |
| 2011 | 5 | 0 | 0 | 0 |
| 2012 | 0 | 0 | 1 | 0 |
| 2013 | 3 | 0 | 3 | 0 |
| 2014 | 8 | 0 | 2 | 0 |
| 2015 | 13 | 0 | 3 | 1 |
| 2016 | 2 | 0 | 0 | 0 |
| 2017 | 4 | 0 | 4 | 1 |
| 2018 | 29 | 0 | 10 | 1 |
| 2019 | 41 | 0 | 15 | 0 |
| 2020 | 17 | 0 | 21 | 3 |
| 2021 | 14 | 0 | 30 | 0 |
| 2022 | 32 | 0 | 44 | 1 |
| 2023 | 49 | 1 | 36 | 0 |
| 2024 | 74 | 29 | 0 | 0 |
| 2025 | 40 | 18 | 0 | 0 |
| 2026 | 14 | 2 | 0 | 0 |

## Most recent permits

The 100 most recent of 579.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202609308857](https://www.permitgraph.org/p/202609308857) | Sep 30, 2026 | Completed: final sign-off Oct 2026 | [150 Prospect Av](https://www.permitgraph.org/a/5616/066) | to obtain final inspection for work approved under pa# 2024-0515-2218. all work is complete. |  |
| [202606253940](https://www.permitgraph.org/p/202606253940) | Jun 25, 2026 | Completed: final sign-off Aug 2026 | [231 08th Av](https://www.permitgraph.org/a/1425/006) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $31,048 |
| [202606032451](https://www.permitgraph.org/p/202606032451) | Jun 3, 2026 | Completed: final sign-off Jun 2026 | [570 Precita Av](https://www.permitgraph.org/a/5515/035) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,300 |
| [202605060834](https://www.permitgraph.org/p/202605060834) | May 6, 2026 | Completed: final sign-off Jun 2026 | [272 07th Av](https://www.permitgraph.org/a/1427/022) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,700 |
| [202604300457](https://www.permitgraph.org/p/202604300457) | Apr 30, 2026 | Completed: final sign-off Jun 2026 | [16 Bronte St](https://www.permitgraph.org/a/5688/002) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $23,825 |
| [202604280197](https://www.permitgraph.org/p/202604280197) | Apr 28, 2026 | Completed: final sign-off May 2026 | [2131 43rd Av](https://www.permitgraph.org/a/2174/008) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,600 |
| [202603268316](https://www.permitgraph.org/p/202603268316) | Mar 26, 2026 | Completed: final sign-off Apr 2026 | [3918 20th St](https://www.permitgraph.org/a/3600/094) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $25,700 |
| [202603107273](https://www.permitgraph.org/p/202603107273) | Mar 10, 2026 | Completed: final sign-off Mar 2026 | [62 Midcrest Wy](https://www.permitgraph.org/a/2824/009) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,467 |
| [202603107272](https://www.permitgraph.org/p/202603107272) | Mar 10, 2026 | Completed: final sign-off Mar 2026 | [731 Duboce Av](https://www.permitgraph.org/a/2611/036) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $9,798 |
| [202603036834](https://www.permitgraph.org/p/202603036834) | Mar 3, 2026 | Completed: final sign-off Jun 2026 | [424 28th St](https://www.permitgraph.org/a/6603/014) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,595 |
| [202603036835](https://www.permitgraph.org/p/202603036835) | Mar 3, 2026 | Completed: final sign-off Mar 2026 | [326 27th Av](https://www.permitgraph.org/a/1407/038) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $38,942 |
| [202602055268](https://www.permitgraph.org/p/202602055268) | Feb 5, 2026 | Completed: final sign-off Feb 2026 | [25 Genebern Wy](https://www.permitgraph.org/a/5833/018) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,217 |
| [202601264565](https://www.permitgraph.org/p/202601264565) | Jan 26, 2026 | In progress: issued Jan 2026 | [1243 Brussels St](https://www.permitgraph.org/a/6194/017A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| [202601194082](https://www.permitgraph.org/p/202601194082) | Jan 19, 2026 | Completed: final sign-off Feb 2026 | [255 Prospect Av](https://www.permitgraph.org/a/5644/017) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,493 |
| [202601153974](https://www.permitgraph.org/p/202601153974) | Jan 15, 2026 | In progress: issued Jan 2026 | [1609 Baker St](https://www.permitgraph.org/a/1047/041) | re-roofing: tear off existing composition shingles and install new composition shingles on 22 sq. no hot works. | $36,614 |
| [202601123623](https://www.permitgraph.org/p/202601123623) | Jan 12, 2026 | Completed: final sign-off Jan 2026 | [7 Brighton Av](https://www.permitgraph.org/a/7018/020) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,785 |
| [202511290583](https://www.permitgraph.org/p/202511290583) | Nov 29, 2025 | In progress: issued Nov 2025 | [4741 18th St](https://www.permitgraph.org/a/2689/021) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,521 |
| [202511200033](https://www.permitgraph.org/p/202511200033) | Nov 20, 2025 | In progress: issued Nov 2025 | [4969 17th St](https://www.permitgraph.org/a/1289/059) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $25,253 |
| [202511189839](https://www.permitgraph.org/p/202511189839) | Nov 18, 2025 | Completed: final sign-off Nov 2025 | [224 Mangels Av](https://www.permitgraph.org/a/3062/005) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $11,885 |
| [202511179765](https://www.permitgraph.org/p/202511179765) | Nov 17, 2025 | In progress: issued Nov 2025 | [107 Jarboe Av](https://www.permitgraph.org/a/5680/005) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,267 |
| [202511099228](https://www.permitgraph.org/p/202511099228) | Nov 9, 2025 | In progress: issued Nov 2025 | [301 Edgehill Wy](https://www.permitgraph.org/a/2876/005) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $11,800 |
| [202510318721](https://www.permitgraph.org/p/202510318721) | Oct 31, 2025 | Completed: final sign-off Nov 2025 | [284 Sussex St](https://www.permitgraph.org/a/7553/018) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,460 |
| [202510308538](https://www.permitgraph.org/p/202510308538) | Oct 30, 2025 | Completed: final sign-off Nov 2025 | [1232 Brussels St](https://www.permitgraph.org/a/6193/003A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,775 |
| [202510217826](https://www.permitgraph.org/p/202510217826) | Oct 21, 2025 | In progress: issued Oct 2025 | [634 Cayuga Av](https://www.permitgraph.org/a/6795A/019) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,930 |
| [202510177625](https://www.permitgraph.org/p/202510177625) | Oct 17, 2025 | In progress: issued Oct 2025 | [185 Los Palmos Dr](https://www.permitgraph.org/a/3028B/067) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,958 |
| [202509175439](https://www.permitgraph.org/p/202509175439) | Sep 17, 2025 | Completed: final sign-off Oct 2025 | [1942 Vicente St](https://www.permitgraph.org/a/2431/015B) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,635 |
| [202509094936](https://www.permitgraph.org/p/202509094936) | Sep 9, 2025 | Completed: final sign-off Sep 2025 | [79 Tiffany Av](https://www.permitgraph.org/a/6596/013K) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,500 |
| [202509084833](https://www.permitgraph.org/p/202509084833) | Sep 8, 2025 | Completed: final sign-off Sep 2025 | [3965 20th St](https://www.permitgraph.org/a/3605/059) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,554 |
| [202509024332](https://www.permitgraph.org/p/202509024332) | Sep 2, 2025 | In progress: issued Sep 2025 | [1865 24th Av](https://www.permitgraph.org/a/2061/014) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,500 |
| [202508062481](https://www.permitgraph.org/p/202508062481) | Aug 6, 2025 | Completed: final sign-off Aug 2025 | [569 Chenery St](https://www.permitgraph.org/a/6726/034) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $25,400 |
| [202507211238](https://www.permitgraph.org/p/202507211238) | Jul 21, 2025 | Completed: final sign-off Jan 2026 | [1495 Francisco St](https://www.permitgraph.org/a/0481/030) | install new tpo roof as an overlay. roof not visible from street, no hot work. | $30,865 |
| [202507211236](https://www.permitgraph.org/p/202507211236) | Jul 21, 2025 | Completed: final sign-off Aug 2025 | [85 Valparaiso St](https://www.permitgraph.org/a/0091/025) | tear off existing roof. install tpo roof. roof not visible from street. no hot work. | $15,850 |
| [202507171072](https://www.permitgraph.org/p/202507171072) | Jul 17, 2025 | In progress: issued Jul 2025 | [275 Diamond St](https://www.permitgraph.org/a/2697/037) | reroof no hot works | $21,153 |
| [202507171071](https://www.permitgraph.org/p/202507171071) | Jul 17, 2025 | Completed: final sign-off Aug 2025 | [865 Elizabeth St](https://www.permitgraph.org/a/2829/020) | reroof. no hot works | $23,854 |
| [202507040207](https://www.permitgraph.org/p/202507040207) | Jul 4, 2025 | Completed: final sign-off Jul 2025 | [1245 24th Av](https://www.permitgraph.org/a/1726/008) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,375 |
| [202506178817](https://www.permitgraph.org/p/202506178817) | Jun 17, 2025 | Completed: final sign-off Jun 2026 | [196 Liberty St](https://www.permitgraph.org/a/3607/056A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,000 |
| [202506168774](https://www.permitgraph.org/p/202506168774) | Jun 16, 2025 | Completed: final sign-off Aug 2025 | [733 Baker St](https://www.permitgraph.org/a/1158/005) | re-roofing (no hot work) | $57,119 |
| [202506158728](https://www.permitgraph.org/p/202506158728) | Jun 15, 2025 | In progress: issued Jun 2025 | [18 Cordova St](https://www.permitgraph.org/a/6446/002) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $23,662 |
| [202505206840](https://www.permitgraph.org/p/202505206840) | May 20, 2025 | In progress: issued May 2025 | [2170 44th Av](https://www.permitgraph.org/a/2174/033) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,435 |
| [202505146448](https://www.permitgraph.org/p/202505146448) | May 14, 2025 | Completed: final sign-off Aug 2025 | [33 Idora Av](https://www.permitgraph.org/a/2914/046) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,825 |
| [202505065880](https://www.permitgraph.org/p/202505065880) | May 6, 2025 | In progress: issued May 2025 | [2477 Sutter St](https://www.permitgraph.org/a/1076/022) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,601 |
| [202504154400](https://www.permitgraph.org/p/202504154400) | Apr 15, 2025 | Completed: final sign-off Nov 2025 | [3607 Folsom St](https://www.permitgraph.org/a/5652/031) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,000 |
| [202504154469](https://www.permitgraph.org/p/202504154469) | Apr 15, 2025 | Completed: final sign-off Apr 2025 | [120 Shotwell St](https://www.permitgraph.org/a/3552/030) | reroofing. no hot works. | $33,810 |
| [202504154438](https://www.permitgraph.org/p/202504154438) | Apr 15, 2025 | Completed: final sign-off Apr 2025 | [158 Middlefield Dr](https://www.permitgraph.org/a/7268/017) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,445 |
| [202504154439](https://www.permitgraph.org/p/202504154439) | Apr 15, 2025 | In progress: issued Apr 2025 | [1866 18th Av](https://www.permitgraph.org/a/2054/018) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $27,963 |
| [202504124294](https://www.permitgraph.org/p/202504124294) | Apr 12, 2025 | Completed: final sign-off Apr 2025 | [1101 Crescent Av](https://www.permitgraph.org/a/5736/014) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,591 |
| [202504083982](https://www.permitgraph.org/p/202504083982) | Apr 8, 2025 | Completed: final sign-off Apr 2025 | [367 27th St](https://www.permitgraph.org/a/6592/080) | reroofing no hot works | $22,500 |
| [202504073887](https://www.permitgraph.org/p/202504073887) | Apr 7, 2025 | In progress: issued Apr 2025 | [758 Myra Wy](https://www.permitgraph.org/a/2947A/013) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,900 |
| [202504073883](https://www.permitgraph.org/p/202504073883) | Apr 7, 2025 | Completed: final sign-off Apr 2025 | [371 27th St](https://www.permitgraph.org/a/6592/038) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $24,500 |
| [202504033623](https://www.permitgraph.org/p/202504033623) | Apr 3, 2025 | In progress: issued Apr 2025 | [1990 22nd Av](https://www.permitgraph.org/a/2113/030) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $25,000 |
| [202504023526](https://www.permitgraph.org/p/202504023526) | Apr 2, 2025 | Completed: final sign-off Apr 2025 | [786 Myra Wy](https://www.permitgraph.org/a/2947A/020) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,331 |
| [202503313365](https://www.permitgraph.org/p/202503313365) | Mar 31, 2025 | In progress: issued Mar 2025 | [2835 Larkin St](https://www.permitgraph.org/a/0476/001B) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,725 |
| [202503263123](https://www.permitgraph.org/p/202503263123) | Mar 26, 2025 | Completed: final sign-off Apr 2025 | [783 38th Av](https://www.permitgraph.org/a/1606/019) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $25,221 |
| [202503232832](https://www.permitgraph.org/p/202503232832) | Mar 23, 2025 | Completed: final sign-off Apr 2025 | [20 Westwood Dr](https://www.permitgraph.org/a/3175/016) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $31,000 |
| [202503192615](https://www.permitgraph.org/p/202503192615) | Mar 19, 2025 | Completed: final sign-off Mar 2025 | [3921 Clement St](https://www.permitgraph.org/a/1472/023) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $24,800 |
| [202503122105](https://www.permitgraph.org/p/202503122105) | Mar 12, 2025 | Completed: final sign-off Apr 2025 | [1611 Franklin St](https://www.permitgraph.org/a/0648/002) | re-roofing no hot work | $40,000 |
| [202503081853](https://www.permitgraph.org/p/202503081853) | Mar 8, 2025 | Completed: final sign-off Mar 2025 | [329 Molimo Dr](https://www.permitgraph.org/a/3007/021) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,587 |
| [202503031394](https://www.permitgraph.org/p/202503031394) | Mar 3, 2025 | Completed: final sign-off Mar 2025 | [739 Foerster St](https://www.permitgraph.org/a/3027A/087) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,500 |
| [202502251089](https://www.permitgraph.org/p/202502251089) | Feb 25, 2025 | In progress: issued Feb 2025 | [1935 14th Av](https://www.permitgraph.org/a/2120B/002A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $22,000 |
| [202502240902](https://www.permitgraph.org/p/202502240902) | Feb 24, 2025 | In progress: issued Feb 2025 | [1970 12th Av](https://www.permitgraph.org/a/2123B/001O) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,000 |
| [202502230890](https://www.permitgraph.org/p/202502230890) | Feb 23, 2025 | Completed: final sign-off Apr 2025 | [436 Colon Av](https://www.permitgraph.org/a/3051/018) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $25,353 |
| [202502150444](https://www.permitgraph.org/p/202502150444) | Feb 15, 2025 | Completed: final sign-off Feb 2025 | [2444 21st Av](https://www.permitgraph.org/a/2405/028) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,121 |
| [202502150443](https://www.permitgraph.org/p/202502150443) | Feb 15, 2025 | Completed: final sign-off Feb 2025 | [11 Wright St](https://www.permitgraph.org/a/5532/016) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,633 |
| [202501279114](https://www.permitgraph.org/p/202501279114) | Jan 27, 2025 | Completed: final sign-off Jun 2025 | [1750 Geneva Av](https://www.permitgraph.org/a/6423/136) | bldg 4000: re-roofing. no hot works. | $95,000 |
| [202501279109](https://www.permitgraph.org/p/202501279109) | Jan 27, 2025 | Completed: final sign-off Jun 2025 | [1750 Geneva Av](https://www.permitgraph.org/a/6423/136) | bldg 1000: re-roofing. no hot works. | $95,000 |
| [202501249029](https://www.permitgraph.org/p/202501249029) | Jan 24, 2025 | In progress: issued Jan 2025 | [90 Venus St](https://www.permitgraph.org/a/5354/024) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,565 |
| [202501228864](https://www.permitgraph.org/p/202501228864) | Jan 22, 2025 | Completed: final sign-off Feb 2025 | [665 Faxon Av](https://www.permitgraph.org/a/3191/001) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $27,556 |
| [202501218740](https://www.permitgraph.org/p/202501218740) | Jan 21, 2025 | Completed: final sign-off Feb 2025 | [2440 Green St](https://www.permitgraph.org/a/0537/040) | reroofing: tpo overlay. no hot works. | $34,100 |
| [202501148287](https://www.permitgraph.org/p/202501148287) | Jan 14, 2025 | Completed: final sign-off Jan 2025 | [327 Gaven St](https://www.permitgraph.org/a/5860/041) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,225 |
| [202501098070](https://www.permitgraph.org/p/202501098070) | Jan 9, 2025 | Completed: final sign-off Jan 2025 | [720 Rolph St](https://www.permitgraph.org/a/6419/021) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,750 |
| [202501098069](https://www.permitgraph.org/p/202501098069) | Jan 9, 2025 | Completed: final sign-off Jan 2025 | [406 Capistrano Av](https://www.permitgraph.org/a/3204/003) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,000 |
| [202501017597](https://www.permitgraph.org/p/202501017597) | Jan 1, 2025 | Completed: final sign-off Feb 2025 | [2635 43rd Av](https://www.permitgraph.org/a/2453/001C) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,446 |
| [202501017596](https://www.permitgraph.org/p/202501017596) | Jan 1, 2025 | Completed: final sign-off Feb 2025 | [138 Princeton St](https://www.permitgraph.org/a/5936/010) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,932 |
| [202501017595](https://www.permitgraph.org/p/202501017595) | Jan 1, 2025 | Completed: final sign-off Jan 2025 | [3658 Folsom St](https://www.permitgraph.org/a/5651/010) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,962 |
| [202412187119](https://www.permitgraph.org/p/202412187119) | Dec 18, 2024 | In progress: issued Dec 2024 | [330 Bridgeview Dr](https://www.permitgraph.org/a/5353A/005A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,500 |
| [202412146849](https://www.permitgraph.org/p/202412146849) | Dec 14, 2024 | Completed: final sign-off Jan 2025 | [330 Bridgeview Dr](https://www.permitgraph.org/a/5353A/005A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,500 |
| [202412025940](https://www.permitgraph.org/p/202412025940) | Dec 2, 2024 | In progress: issued Dec 2024 | [3333 Cesar Chavez St](https://www.permitgraph.org/a/5501/062) | re-roofing. remove (e) comp shingles install new comp shingles. no hot works | $30,520 |
| [202411185219](https://www.permitgraph.org/p/202411185219) | Nov 18, 2024 | In progress: issued Nov 2024 | [143 Cortland Av](https://www.permitgraph.org/a/5670/017A) | re-roofing no hot work | $21,910 |
| [202411185216](https://www.permitgraph.org/p/202411185216) | Nov 18, 2024 | Completed: final sign-off Jun 2025 | [566 Filbert St](https://www.permitgraph.org/a/0088/012) | re-roofing no hot work | $23,600 |
| [202411155098](https://www.permitgraph.org/p/202411155098) | Nov 15, 2024 | Completed: final sign-off Dec 2024 | [36 Macedonia St](https://www.permitgraph.org/a/5536A/006) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,045 |
| [202411155150](https://www.permitgraph.org/p/202411155150) | Nov 15, 2024 | Completed: final sign-off Dec 2024 | [1259 Florida St](https://www.permitgraph.org/a/4268/052) | re-roof: no hot works | $28,045 |
| [202411044317](https://www.permitgraph.org/p/202411044317) | Nov 4, 2024 | In progress: issued Nov 2024 | [3719 16th St](https://www.permitgraph.org/a/2622/040) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $28,200 |
| [202410314172](https://www.permitgraph.org/p/202410314172) | Oct 31, 2024 | Completed: final sign-off Dec 2024 | [3244 San Bruno Av](https://www.permitgraph.org/a/6157/006A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,736 |
| [202410294002](https://www.permitgraph.org/p/202410294002) | Oct 29, 2024 | Completed: final sign-off Jun 2025 | [401 Stoneridge Ln](https://www.permitgraph.org/a/6423/141) | reroofing | $95,000 |
| [202410294003](https://www.permitgraph.org/p/202410294003) | Oct 29, 2024 | Completed: final sign-off Jun 2025 | [201 Stoneridge Ln](https://www.permitgraph.org/a/6423/191) | bldg 6000- tear off (e) composition shingle roof install (n) composition shingle roof. (common area) | $93,275 |
| [202410283839](https://www.permitgraph.org/p/202410283839) | Oct 28, 2024 | Completed: final sign-off Oct 2024 | [4015 Ortega St](https://www.permitgraph.org/a/2087/039) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,500 |
| [202410243704](https://www.permitgraph.org/p/202410243704) | Oct 24, 2024 | In progress: filed Oct 2024, not yet issued | [1750 Geneva Av](https://www.permitgraph.org/a/6423/153) | reroofing: tear off (e) shingle and flat roofs - install new comp shingle and modified bitumen roofs. torchdown. | $93,275 |
| [202410213402](https://www.permitgraph.org/p/202410213402) | Oct 21, 2024 | In progress: issued Oct 2024 | [2639 17th Av](https://www.permitgraph.org/a/2479/010) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,389 |
| [202410213359](https://www.permitgraph.org/p/202410213359) | Oct 21, 2024 | Completed: final sign-off Nov 2024 | [622 44th Av](https://www.permitgraph.org/a/1586/030) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $25,300 |
| [202410142885](https://www.permitgraph.org/p/202410142885) | Oct 14, 2024 | In progress: issued Oct 2024 | [649 Faxon Av](https://www.permitgraph.org/a/3191/003) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $23,528 |
| [202410072448](https://www.permitgraph.org/p/202410072448) | Oct 7, 2024 | Completed: final sign-off Oct 2024 | [1451 22nd Av](https://www.permitgraph.org/a/1831/010) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,243 |
| [202410022210](https://www.permitgraph.org/p/202410022210) | Oct 2, 2024 | In progress: issued Oct 2024 | [1522 Funston Av](https://www.permitgraph.org/a/1858/019) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $36,612 |
| [202410022211](https://www.permitgraph.org/p/202410022211) | Oct 2, 2024 | Completed: final sign-off Oct 2024 | [547 Oak Park Dr](https://www.permitgraph.org/a/2686/009) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,369 |
| [202410012017](https://www.permitgraph.org/p/202410012017) | Oct 1, 2024 | Completed: final sign-off Oct 2024 | [762 Myra Wy](https://www.permitgraph.org/a/2947A/014) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $23,456 |
| [202409181090](https://www.permitgraph.org/p/202409181090) | Sep 18, 2024 | Completed: final sign-off Sep 2024 | [68 Martha Av](https://www.permitgraph.org/a/6735/045) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $24,000 |
| [202409160881](https://www.permitgraph.org/p/202409160881) | Sep 16, 2024 | In progress: issued Sep 2024 | [121 03rd Av](https://www.permitgraph.org/a/1363/056) | re-roofing | $24,780 |
| [202409160877](https://www.permitgraph.org/p/202409160877) | Sep 16, 2024 | Completed: final sign-off Jul 2026 | [1119 Castro St](https://www.permitgraph.org/a/3655/025) | re-roofing | $23,800 |
| [202409050106](https://www.permitgraph.org/p/202409050106) | Sep 5, 2024 | Completed: final sign-off Oct 2024 | [538 Joost Av](https://www.permitgraph.org/a/3088/011) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,940 |
| [202409050133](https://www.permitgraph.org/p/202409050133) | Sep 5, 2024 | Completed: final sign-off Sep 2024 | [105 Bradford St](https://www.permitgraph.org/a/5657/016) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,560 |
| [202409050102](https://www.permitgraph.org/p/202409050102) | Sep 5, 2024 | Completed: final sign-off Sep 2024 | [1825 Castro St](https://www.permitgraph.org/a/6581/027) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,373 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/advantage-roofing-see-notes-533121.