# Able Window Inc.

Contractor license 739973. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/able-window-inc-739973
- JSON: https://www.permitgraph.org/api/contractor?license=739973
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=739973

124 permits since 2000: 97 completed, 12 never finaled, 15 expired or cancelled. Typically 0 days from filing to permit and 49 days from permit to final inspection. Of the 12 never-finaled permits, 3 are 5 to 10 years old, 9 are over 10 years old.

- Based in: Pacifica
- On San Francisco permits: Nov 2000 to Aug 2022
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 0 | 0 | 0 | 1 |
| 2001 | 7 | 0 | 0 | 7 |
| 2002 | 7 | 0 | 0 | 3 |
| 2003 | 6 | 0 | 1 | 2 |
| 2004 | 2 | 0 | 1 | 0 |
| 2005 | 2 | 0 | 1 | 0 |
| 2006 | 1 | 0 | 0 | 0 |
| 2007 | 9 | 0 | 1 | 0 |
| 2008 | 6 | 0 | 0 | 0 |
| 2009 | 1 | 0 | 1 | 0 |
| 2010 | 8 | 0 | 1 | 0 |
| 2011 | 8 | 0 | 1 | 0 |
| 2012 | 8 | 0 | 0 | 0 |
| 2013 | 3 | 0 | 0 | 1 |
| 2014 | 5 | 0 | 2 | 0 |
| 2015 | 9 | 0 | 0 | 0 |
| 2016 | 3 | 0 | 0 | 0 |
| 2017 | 3 | 0 | 0 | 0 |
| 2018 | 6 | 0 | 0 | 0 |
| 2019 | 0 | 0 | 1 | 0 |
| 2020 | 1 | 0 | 1 | 0 |
| 2021 | 1 | 0 | 1 | 0 |
| 2022 | 1 | 0 | 0 | 1 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 4 | 2 | 0 | 2 | 0 | 0 | 48 |
| Stairs | 2 | 2 | 0 | 0 | 0 | 0 | 66 |
| Kitchen remodel | 5 | 5 | 0 | 0 | 0 | 0 | 35 |

## Most recent permits

The 100 most recent of 124.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202208220981](https://www.permitgraph.org/p/202208220981) | Aug 22, 2022 | Expired or cancelled: expired Feb 2024 | [2170 Pacific Av](https://www.permitgraph.org/a/0579/042) | replace (17) "stone wht" wood clad windows (like for like) at west side, east side and south side of house on the 3rd level. max u-factor = 0.30 not visible from street. | $92,886 |
| [202201216407](https://www.permitgraph.org/p/202201216407) | Jan 21, 2022 | Completed: final sign-off Feb 2022 | [531 21st Av](https://www.permitgraph.org/a/1564/005) | installation of 10 milgard white vinyl windows at rear of house (cannot be seen from street) like for like. u factor 0.30 max. | $19,000 |
| [202109208767](https://www.permitgraph.org/p/202109208767) | Sep 20, 2021 | Completed: final sign-off Nov 2021 | [241 Everglade Dr](https://www.permitgraph.org/a/7269/004) | install 10 marvin wood windows like for like (whole house)max. u-factor=0.30. | $42,854 |
| [202109208768](https://www.permitgraph.org/p/202109208768) | Sep 20, 2021 | Never finaled: issued Sep 2021, no final | [376 Highland Av](https://www.permitgraph.org/a/5717/047) | install 5 white vinyl windows and 2 sliding patio doors (like for like) at rear of house- max u-factor=0.30 | $22,750 |
| [202012231626](https://www.permitgraph.org/p/202012231626) | Dec 23, 2020 | Never finaled: issued Dec 2020, no final | [55 West Clay St](https://www.permitgraph.org/a/1336/030) | install 2 marvin windows like for like. bathroom & hallway not visible from street front of the side of the house. | $5,269 |
| [202006108387](https://www.permitgraph.org/p/202006108387) | Jun 10, 2020 | Completed: final sign-off Sep 2020 | [297 Baltimore Wy](https://www.permitgraph.org/a/6499/040) | replace 8 vinyl windows on side and rear of house, in-kind. replace 2 aluminum windows at front of house, in-kind. | $14,078 |
| [201907176167](https://www.permitgraph.org/p/201907176167) | Jul 17, 2019 | Never finaled: issued Jul 2019, no final | [58 Mirabel Av](https://www.permitgraph.org/a/5519/034) | install (4) vinyl windows in sun room, like-for-like @ rear of house; install (1) vinyl window in bathroom, like-for-like @ rear of house. not visible from street. | $6,880 |
| [201812118015](https://www.permitgraph.org/p/201812118015) | Dec 11, 2018 | Completed: final sign-off Feb 2019 | [3055 Pacific Av](https://www.permitgraph.org/a/0975/019) | both window & hinged door at back of bldg. not visible from street. 1 milgard tuscany series double hung window block frame & hinged french door, nail fin. | $5,523 |
| [201812118010](https://www.permitgraph.org/p/201812118010) | Dec 11, 2018 | Completed: final sign-off Jan 2019 | [55 Yerba Buena Av](https://www.permitgraph.org/a/3076A/008) | installtion of (4) marvin windows like for like in size, specs & grid pattern block frames. not visible from street. | $17,159 |
| [201809211024](https://www.permitgraph.org/p/201809211024) | Sep 21, 2018 | Completed: final sign-off Sep 2018 | [1125 Rivera St](https://www.permitgraph.org/a/2328/018) | back of house: install 4 wood windows & 1 wood door. able window is providing labor & trim only to install. manufaturer is supplying windows and door | $5,645 |
| [201809211015](https://www.permitgraph.org/p/201809211015) | Sep 21, 2018 | Completed: final sign-off Nov 2018 | [55 West Clay St](https://www.permitgraph.org/a/1336/030) | like-for-like in size with block frames. -replace 6 double hung windows with 6 essence wood windows with vintage grids in top sash (3w 1h): stairs and hall. -replace 2 bedroom windows with 2 essence… | $6,079 |
| [201803204125](https://www.permitgraph.org/p/201803204125) | Mar 20, 2018 | Completed: final sign-off Apr 2018 | [532 Visitacion Av](https://www.permitgraph.org/a/6249/006) | replace two windows with marvin primed pine wood windows 1-closet 1-bath block frame - like for like in size and location - true divided lites two over two and having og lugs | $5,163 |
| [201801118391](https://www.permitgraph.org/p/201801118391) | Jan 11, 2018 | Completed: final sign-off Feb 2018 | [3832 Kirkham St](https://www.permitgraph.org/a/1811/022) | replace 3 windows in back of house, like for like, block frame retrofit. milgard tuscany | $4,335 |
| [201709229375](https://www.permitgraph.org/p/201709229375) | Sep 22, 2017 | Completed: final sign-off Nov 2017 | [10 Cedro Av](https://www.permitgraph.org/a/6908/009) | replace (20) windows and 1 door, martin wood windows in existing opening. all windows sizes and locations are to remain unchanged. | $40,000 |
| [201706058476](https://www.permitgraph.org/p/201706058476) | Jun 5, 2017 | Completed: final sign-off Jun 2017 | [530 Visitacion Av](https://www.permitgraph.org/a/6249/006) | replace six windows in two bays, marvin all wood windows block frames in kind including divided light panes. u factor = 0.32 or better | $19,496 |
| [201706058483](https://www.permitgraph.org/p/201706058483) | Jun 5, 2017 | Completed: final sign-off Jun 2017 | [130 Carl St](https://www.permitgraph.org/a/1267/015) | replace 8 windows at back of building (can not be seen from the street) milgard style line series, block frames slope sill adaptors in unit b & c u factor 032 or better | $8,420 |
| [201610120069](https://www.permitgraph.org/p/201610120069) | Oct 12, 2016 | Completed: final sign-off Nov 2016 | [575 Junipero Serra Bl](https://www.permitgraph.org/a/6905/030) | install 17 marvin wood windows like for like in size. install 2 milgard tuscany series windows (back of house). | $43,913 |
| [201604255621](https://www.permitgraph.org/p/201604255621) | Apr 25, 2016 | Completed: final sign-off May 2016 | [575 Junipero Serra Bl](https://www.permitgraph.org/a/6905/030) | replace 1 living room window, like for like with marvin wood. | $2,100 |
| [201602018484](https://www.permitgraph.org/p/201602018484) | Feb 1, 2016 | Completed: final sign-off Feb 2016 | [1563 44th Av](https://www.permitgraph.org/a/1890/009) | replace 6 windows like for like at back of house 2nd story | $8,600 |
| [201510291152](https://www.permitgraph.org/p/201510291152) | Oct 29, 2015 | Completed: final sign-off Jun 2016 | [40 Whiting St](https://www.permitgraph.org/a/0061/013) | replace 18 windws and 1 patio door with milgard windows like in size. brown exterior ultra fiberglass oprbility to be the same. | $17,200 |
| [201510210390](https://www.permitgraph.org/p/201510210390) | Oct 21, 2015 | Completed: final sign-off Nov 2015 | [60 Mirabel Av](https://www.permitgraph.org/a/5519/034) | back of house: replace 3 windows like for like in-size, milgartd styleline serices, u-facotr = 0.30. | $2,391 |
| [201510068990](https://www.permitgraph.org/p/201510068990) | Oct 6, 2015 | Completed: final sign-off Sep 2017 | [470 Athens St](https://www.permitgraph.org/a/6076/014) | replace existing kitchen windows (1) with milgard essence wood window, like for like in size & grid pattern. u factor = 0.29 | $2,433 |
| [201507282687](https://www.permitgraph.org/p/201507282687) | Jul 28, 2015 | Completed: final sign-off Oct 2015 | [186 Cook St](https://www.permitgraph.org/a/1089/015) | install 2 milgard essence wood windows like for like double hung, picture, double hung living room double hung. | $5,572 |
| [201507282678](https://www.permitgraph.org/p/201507282678) | Jul 28, 2015 | Completed: final sign-off Dec 2015 | [57 Rockaway Av](https://www.permitgraph.org/a/2936A/014) | install 11 milgard essence wood windows block frames. all street facing windows to be wood clad casment. except center picture window. | $16,018 |
| [201507080987](https://www.permitgraph.org/p/201507080987) | Jul 8, 2015 | Completed: final sign-off Oct 2015 | [11 Coleridge St](https://www.permitgraph.org/a/5610/022) | repair & replace in kind or better dryrot. sheeting/plywood, blocking 50 sq ft. | $3,200 |
| [201504133481](https://www.permitgraph.org/p/201504133481) | Apr 13, 2015 | Completed: final sign-off Oct 2015 | [11 Coleridge St](https://www.permitgraph.org/a/5610/022) | install 9 essence series windows manufactured by milgard frames twilight fuberglass exterior - interior pine wood -brick mould casing with silhose and harns vintage grids tempered glass. | $28,739 |
| [201503039834](https://www.permitgraph.org/p/201503039834) | Mar 3, 2015 | Completed: final sign-off Apr 2015 | [3234 Washington St](https://www.permitgraph.org/a/0983/008) | replace 2 patio doors and 1 bathroom window like for like in size. milgard tuscany servies vinyl with nail fins | $5,300 |
| [201503039839](https://www.permitgraph.org/p/201503039839) | Mar 3, 2015 | Completed: final sign-off Apr 2015 | [1969 Clay St](https://www.permitgraph.org/a/0624/112) | replace back 5 windows, milgard syleline vinyl windows, single hung, block frames like for like in size and location | $3,642 |
| [201412153737](https://www.permitgraph.org/p/201412153737) | Dec 15, 2014 | Completed: final sign-off Jan 2015 | [22 Idora Av](https://www.permitgraph.org/a/2891/008) | replace 7 back windows with millgard tuscany windows. like for like in size. block frames. u-factor 0.32 max. | $7,000 |
| [201408053052](https://www.permitgraph.org/p/201408053052) | Aug 5, 2014 | Completed: final sign-off Oct 2014 | [55 Yerba Buena Av](https://www.permitgraph.org/a/3076A/008) | install 4 windows with marvin ulitmate series, one with marvin magnum series. all windows wood clad. all windows will have sdl. windows like for like in size and sdl. | $20,000 |
| [201405135582](https://www.permitgraph.org/p/201405135582) | May 13, 2014 | Completed: final sign-off May 2014 | [3351 Noriega St](https://www.permitgraph.org/a/2077/048) | replace (7) windows with milgard ultraine windows (street facing). replace (2) windows with milgard tuscany windows (not visible) like for like . u factor 0.4. street-facing windows within existing o… | $9,700 |
| [201405135579](https://www.permitgraph.org/p/201405135579) | May 13, 2014 | Never finaled: issued May 2014, no final | [378 Los Palmos Dr](https://www.permitgraph.org/a/3001/012) | replace 3 windows with milgard ultralime windows. replace 3 windows with milgard tuscany windows. like 4 like 2 visible from the street. windows in front to be wood casement ultras. max u - 0.4 | $8,300 |
| [201402118304](https://www.permitgraph.org/p/201402118304) | Feb 11, 2014 | Completed: final sign-off Jan 2015 | [4732 Fulton St](https://www.permitgraph.org/a/1666/026) | install 16 fiberglass windows at front of house all like for like install 11 vinyl windows at rear. | $26,457 |
| [201401297347](https://www.permitgraph.org/p/201401297347) | Jan 29, 2014 | Never finaled: issued Jan 2014, no final | [55 West Clay St](https://www.permitgraph.org/a/1336/030) | replacxe 6 windows @ upper story like for like fiberglass wood clad essence, not street facing. | $7,300 |
| [201401297349](https://www.permitgraph.org/p/201401297349) | Jan 29, 2014 | Completed: final sign-off Jan 2014 | [504 Andover St](https://www.permitgraph.org/a/5717/002) | replacxe 1 sliding glass door @ rear of house kitchen/dining, like for like vinyl. | $2,057 |
| [201312063517](https://www.permitgraph.org/p/201312063517) | Dec 6, 2013 | Completed: final sign-off Mar 2014 | [121 Edgehill Wy](https://www.permitgraph.org/a/2933/008) | replace 21 windows & 2 doors. replace original aluminum windows for vinyl. all in the rear. remove mulion post @ 2 openings @ lower bedroom and ofc. install new header, king & trimmer studs. | $31,866 |
| [201307303165](https://www.permitgraph.org/p/201307303165) | Jul 30, 2013 | Completed: final sign-off Oct 2013 | [368 Highland Av](https://www.permitgraph.org/a/5717/044) | install 6 essence fiberglass/wood windows like for like, 1 at entry by stairs, 2 at master bedroom, 2 at girls room and 1 at baby's room. visible from street. u-factor 0.40 max. | $7,488 |
| [201306058764](https://www.permitgraph.org/p/201306058764) | Jun 5, 2013 | Completed: final sign-off Jan 2014 | [55 West Clay St](https://www.permitgraph.org/a/1336/030) | remove window sashes from 2 windows and insert 2 windows in (e) openings - windows are on 3rd floor . windows are essence wood by milgard (windows not visible from public way). | $2,500 |
| [201302210631](https://www.permitgraph.org/p/201302210631) | Feb 21, 2013 | Expired or cancelled: expired Mar 2015 | [3701 Kirkham St](https://www.permitgraph.org/a/1887/001) | replace 5 window like for like fiberglass/wood milgaro essence, 20 front (living room/kichen) 3 @ back bedrooms. | $6,236 |
| [201210010958](https://www.permitgraph.org/p/201210010958) | Oct 1, 2012 | Completed: final sign-off Dec 2012 | [1763 Chestnut St](https://www.permitgraph.org/a/0494/014) | replace 2 windows with white vinyl milgard windows. windows are to be block frame, inserts into existing frames. no bedrooms & not seen from street, u-factor 0.40. | $1,700 |
| [201209210331](https://www.permitgraph.org/p/201209210331) | Sep 21, 2012 | Completed: final sign-off Dec 2012 | [122 Stillings Av](https://www.permitgraph.org/a/3033/020) | replace 2 front windows with milgrad ultraline series fiberglass windows, replace 2 rear windows (non street visable) with milgrad tuscany windows, same size & location. | $4,630 |
| [201209119421](https://www.permitgraph.org/p/201209119421) | Sep 11, 2012 | Completed: final sign-off Nov 2012 | [3521 Alemany Bl](https://www.permitgraph.org/a/7135/047) | replace 11 windows, like for like, ultra fiberglass @ front street side, all others vinyl. all windows facing street to be fiberglass including windows flanking chimney on side elevation only. may u… | $7,546 |
| [201204309390](https://www.permitgraph.org/p/201204309390) | Apr 30, 2012 | Completed: final sign-off Apr 2013 | [181 Kenwood Wy](https://www.permitgraph.org/a/3282/011) | in kind replacement 2 windows, street view with wood material windows, max u factor 0.40 | $2,794 |
| [201203125835](https://www.permitgraph.org/p/201203125835) | Mar 12, 2012 | Completed: final sign-off Mar 2013 | [1486 24th Av](https://www.permitgraph.org/a/1830/024D) | replacement of picture window in front of house. same size, no structural work. u factor equal to or less than 0.40. | $1,500 |
| [201202174444](https://www.permitgraph.org/p/201202174444) | Feb 17, 2012 | Completed: final sign-off Mar 2012 | [3701 Kirkham St](https://www.permitgraph.org/a/1887/001) | replace two front living room windows like for like with 2 essence wood clad/fiberglass casement windows. block frames. reveal from stucco molding to sache approxz. 1 3/4" proposed to be the same. u… | $1,762 |
| [201202073735](https://www.permitgraph.org/p/201202073735) | Feb 7, 2012 | Completed: final sign-off Feb 2012 | [82 Rockaway Av](https://www.permitgraph.org/a/2916/029) | install 16 ultraline series wood windows by milgard, 14 windows are to be block/retrofit, 2 windows in master bedroom will be nail on to repaired dry rot, windows are to be same style as the ones rep… | $17,400 |
| [201201041692](https://www.permitgraph.org/p/201201041692) | Jan 4, 2012 | Completed: final sign-off Feb 2012 | [34 Shore View Av](https://www.permitgraph.org/a/1468/007) | (2) 40"x46" windows at upper back room - marvin nail-on (1) block frame window at side of house block-frame vinyl. not visible from street. | $4,969 |
| [201112120485](https://www.permitgraph.org/p/201112120485) | Dec 12, 2011 | Completed: final sign-off Mar 2012 | [60 Thor Av](https://www.permitgraph.org/a/6739/001) | replace window on 1/f & 2/f, max u-factor 0.40 | $7,947 |
| [201112029953](https://www.permitgraph.org/p/201112029953) | Dec 2, 2011 | Completed: final sign-off Jan 2012 | [372 Byxbee St](https://www.permitgraph.org/a/6996/039) | remove & replace 2 front windows, like for like. | $3,005 |
| [201110277803](https://www.permitgraph.org/p/201110277803) | Oct 27, 2011 | Completed: final sign-off Dec 2011 | [187 Bronte St](https://www.permitgraph.org/a/5697/018) | install 5 windows including flashing and trim. no change to size or location. max u-factor 0.40 | $5,422 |
| [201110056203](https://www.permitgraph.org/p/201110056203) | Oct 5, 2011 | Completed: final sign-off Oct 2011 | [1980 Sutter St](https://www.permitgraph.org/a/0677/101) | to obtain final inspection for work approved under pa#200505102045. |  |
| [201109225303](https://www.permitgraph.org/p/201109225303) | Sep 22, 2011 | Completed: final sign-off Nov 2011 | [679 Teresita Bl](https://www.permitgraph.org/a/3000B/016) | installation of 8 windows, 6 vinyl & 2 wood clad painted white. all windows are retrofit with no change the look of house. | $7,000 |
| [201108192822](https://www.permitgraph.org/p/201108192822) | Aug 19, 2011 | Completed: final sign-off Oct 2011 | [45 Santa Rosa Av](https://www.permitgraph.org/a/3147/027) | replace 4 windows in left front & front of house, window will be empire pacific windows, dual glases, low e windows will be retrofit white with no change in look or style | $2,600 |
| [201108051893](https://www.permitgraph.org/p/201108051893) | Aug 5, 2011 | Completed: final sign-off Sep 2011 | [1763 Chestnut St](https://www.permitgraph.org/a/0494/014) | we will install 12 milgard vinyl windows into existing frames, all windows are in the back of house, windows in bedrooms are sized so one in room will meet egress | $7,400 |
| [201104194381](https://www.permitgraph.org/p/201104194381) | Apr 19, 2011 | Completed: final sign-off May 2011 | [45 Santa Rosa Av](https://www.permitgraph.org/a/3147/027) | install 10 vinyl windows at back and rear side lower floor, replace in kind, no structural work. not visible from street u-factor .40 max, not affecting and egress | $6,413 |
| [201104194382](https://www.permitgraph.org/p/201104194382) | Apr 19, 2011 | Never finaled: issued Apr 2011, no final | [5546 Anza St](https://www.permitgraph.org/a/1498/027) | remove existing one vinyl window install new vinyl window same size same layout to repair leak, re-stucco, repair in kind u factor .40 max, work to be done on existing addition visible from street | $3,915 |
| [201011305773](https://www.permitgraph.org/p/201011305773) | Nov 30, 2010 | Completed: final sign-off Feb 2011 | [1966 Grove St](https://www.permitgraph.org/a/1188/029) | replace damaged garden window with like garden window (73x57") white vinyl framed, single hung vents on side, completely remove (e) window. new window will be flashed and caulked into place, exterior… | $2,489 |
| [201011154958](https://www.permitgraph.org/p/201011154958) | Nov 15, 2010 | Completed: final sign-off Dec 2010 | [197 Beaumont Av](https://www.permitgraph.org/a/1138/011A) | we will remove and replace (12) windows. new windows are to be marvin wood inserts (retrofit). we will also repalce (1) door with a therma -tru door. | $23,500 |
| [201008309825](https://www.permitgraph.org/p/201008309825) | Aug 30, 2010 | Completed: final sign-off Nov 2010 | [1252 47th Av](https://www.permitgraph.org/a/1704/033) | remove 2 windows in living room & 2 in kitchen, replace with block retrofit windows, woodclad by milgard, no change to existing frame of window. | $4,200 |
| [201008138778](https://www.permitgraph.org/p/201008138778) | Aug 13, 2010 | Completed: final sign-off Aug 2010 | [24 Dearborn St](https://www.permitgraph.org/a/3577/086) | replace rotten frame work like for like, at reat wall, about 10 ft x 10 ft area @ 2nd flr, dry rot work discovered during 201007267448 work | $1,500 |
| [201007267450](https://www.permitgraph.org/p/201007267450) | Jul 26, 2010 | Completed: final sign-off Aug 2010 | [115 Manor Dr](https://www.permitgraph.org/a/3277/007) | we will replace (3) winodws and (1) sliding door. all windows are to be wood - windows will be same size and style as existing. 1 fixed and 2 casements @ flankers. | $11,000 |
| [201007267448](https://www.permitgraph.org/p/201007267448) | Jul 26, 2010 | Completed: final sign-off Aug 2010 | [24 Dearborn St](https://www.permitgraph.org/a/3577/086) | replace (3) windows in back of res. we will install marvin wood windows. | $6,700 |
| [201007146650](https://www.permitgraph.org/p/201007146650) | Jul 14, 2010 | Completed: final sign-off Jul 2010 | [4010 Crescent Wy](https://www.permitgraph.org/a/4991/578) | damaged window is to be replaced under warranty. stuccco to be broken back - new window installed and then stucco to be done. not visible from street. | $3,749 |
| [201004291327](https://www.permitgraph.org/p/201004291327) | Apr 29, 2010 | Completed: final sign-off Sep 2010 | [15 Fernwood Dr](https://www.permitgraph.org/a/3043/027) | replace existing windows. 42 total, 15 streetview. replace in kind, casement operation. existing openings wood clad | $20,000 |
| [201003037479](https://www.permitgraph.org/p/201003037479) | Mar 3, 2010 | Never finaled: issued Mar 2010, no final | [25 Camp St](https://www.permitgraph.org/a/3568/050) | replace 4 windows at back of unit #3 & #6, dual glazed vinyl from aluminum. not visible from street. bedroom windows meet rescue window requirements | $6,700 |
| [200910280053](https://www.permitgraph.org/p/200910280053) | Oct 28, 2009 | Completed: final sign-off Nov 2009 | [2694 21st Av](https://www.permitgraph.org/a/2476/028) | remove glass & sashes in 6 windows & install new vinyl window in existing opening (not visible from street). | $4,900 |
| [200910209388](https://www.permitgraph.org/p/200910209388) | Oct 20, 2009 | Never finaled: issued Oct 2009, no final | [331 Missouri St](https://www.permitgraph.org/a/4037/024) | window replacement, front windows (12). | $16,000 |
| [200812299277](https://www.permitgraph.org/p/200812299277) | Dec 29, 2008 | Completed: final sign-off Mar 2009 | [60 Sears St](https://www.permitgraph.org/a/7141/037) | replacing total 6 windows. 2 master bedroom, 2 kid bedroom, , 1 spane guest room. 1 laundry room. all work is like to like, cases to meet egress. no windows are facing the street. same size & same lo… | $5,000 |
| [200808088796](https://www.permitgraph.org/p/200808088796) | Aug 8, 2008 | Completed: final sign-off Aug 2008 | [740 Victoria St](https://www.permitgraph.org/a/6922/016) | replace front windows wih andersen wood round top. replace sides & rear with milgard vinyl. total 24 windows. | $26,924 |
| [200806174631](https://www.permitgraph.org/p/200806174631) | Jun 17, 2008 | Completed: final sign-off Aug 2008 | [3148 Turk St](https://www.permitgraph.org/a/1141/014) | remove all windows completely & replace with fiberglass milgard windows. stucco to be broken out & new stucco to be add with copper roof over 4 windows on unit# 3150 (3rd floor) & handi cement board… | $30,000 |
| [200804119515](https://www.permitgraph.org/p/200804119515) | Apr 11, 2008 | Completed: final sign-off May 2008 | [1826 47th Av](https://www.permitgraph.org/a/2083/042) | replace two windows at front of house in kind. | $3,482 |
| [200803147214](https://www.permitgraph.org/p/200803147214) | Mar 14, 2008 | Completed: final sign-off May 2008 | [54 Benton Av](https://www.permitgraph.org/a/5840/021) | remove & replace 9 windows at 2nd fl side and back in existing openning. bedrooms to meet egress. | $12,300 |
| [200803147212](https://www.permitgraph.org/p/200803147212) | Mar 14, 2008 | Completed: final sign-off Jun 2011 | [1891 39th Av](https://www.permitgraph.org/a/2076/019) | install 11 windows and 1 door, windows are to be restrofit w/ no change in existing size, door will be install w/ stucco to be broken back & new stucco installed windows in bedrooms will be casenent… | $11,800 |
| [200711289125](https://www.permitgraph.org/p/200711289125) | Nov 28, 2007 | Completed: final sign-off Jan 2008 | [28 Santa Rosa Av](https://www.permitgraph.org/a/6796/014) | replace seven windows at back of house in kind. | $3,905 |
| [200709213345](https://www.permitgraph.org/p/200709213345) | Sep 21, 2007 | Completed: final sign-off Nov 2007 | [165 Garcia Av](https://www.permitgraph.org/a/2924/002A) | install 3 andersen windows & 1 andersen door by removing old frame & replaceing with new. new trim / stucco to match (e). install 3 marvin tilt-pac window into (e) frames. no windows visable from str… | $11,000 |
| [200708170248](https://www.permitgraph.org/p/200708170248) | Aug 17, 2007 | Never finaled: issued Aug 2007, no final | [79 Tucker Av](https://www.permitgraph.org/a/6203/033) | remove existing broken aluminum frame patio sliding door and replace with vinyl energy efficient lowe patio sliding door to rear of house. | $2,215 |
| [200707277962](https://www.permitgraph.org/p/200707277962) | Jul 27, 2007 | Completed: final sign-off Aug 2007 | [2851 Gough St](https://www.permitgraph.org/a/0520/001A) | remove existing (n) windows + replacw with insulated vinyl windows-10 windows total all in back of unit-the windows to have min u factor of 0.67. not visible from street. | $12,000 |
| [200707187084](https://www.permitgraph.org/p/200707187084) | Jul 18, 2007 | Completed: final sign-off Jan 2008 | [273 Dalewood Wy](https://www.permitgraph.org/a/2970/007) | replace/install 11 white vinyl windows with new trim. we will not change the look of window except to change from al to viny/ 3 windows to face street. u factor .67 max. | $14,000 |
| [200703206738](https://www.permitgraph.org/p/200703206738) | Mar 20, 2007 | Completed: final sign-off Apr 2007 | [3055 Pacific Av](https://www.permitgraph.org/a/0975/019) | work on apt#1 only.install 5 windows into (e) wood frames. not touch exterior siding or change look of windows. bedroom window will meet egress. not visible from street. u<.67 | $3,900 |
| [200702123922](https://www.permitgraph.org/p/200702123922) | Feb 12, 2007 | Completed: final sign-off Mar 2007 | [459 Teresita Bl](https://www.permitgraph.org/a/2954A/009A) | replace 3 alum windows with vinyl. kitchen and dining room and lvg room. not visible from the street. min u factor 0.67 | $3,840 |
| [200702123919](https://www.permitgraph.org/p/200702123919) | Feb 12, 2007 | Completed: final sign-off Mar 2007 | [1408 Douglass St](https://www.permitgraph.org/a/7519/002) | replace windows like for like marvin wood sash. 2 at front and 3 including patio door at back including 1 bay at rear of house lvg room , min u factor 0.67 | $24,000 |
| [200702063514](https://www.permitgraph.org/p/200702063514) | Feb 6, 2007 | Completed: final sign-off Feb 2007 | [862 39th Av](https://www.permitgraph.org/a/1681/006N) | rectify installation of one window in kind. | $2,225 |
| [200701121640](https://www.permitgraph.org/p/200701121640) | Jan 12, 2007 | Completed: final sign-off Jan 2007 | [780 Florida St](https://www.permitgraph.org/a/4082/015) | remove glass in office windows - install retrofit windows over existing frame. replace windows in-kind. no structural work. | $4,500 |
| [200608220164](https://www.permitgraph.org/p/200608220164) | Aug 22, 2006 | Completed: final sign-off Nov 2006 | [228 Clipper St](https://www.permitgraph.org/a/6548/008) | due to leaking of windows, replace old aluminum frame windows with new vinyl white frame window. it will be likes for likes. window will be dual glazed low-e. it will reduce noise from the street and… | $7,000 |
| [200508029199](https://www.permitgraph.org/p/200508029199) | Aug 2, 2005 | Completed: final sign-off Aug 2005 | [340 Laidley St](https://www.permitgraph.org/a/6696/009) | replace / repair wood window sashes with wood window sashes to keep same look. 9 windows to be | $9,200 |
| [200505102025](https://www.permitgraph.org/p/200505102025) | May 10, 2005 | Completed: final sign-off Jul 2005 | [486 18th Av](https://www.permitgraph.org/a/1527/027) | replace 2 wndws like for like in front/replace kchn wndws with greenhouse wndw on side courtyard | $5,520 |
| [200501072764](https://www.permitgraph.org/p/200501072764) | Jan 7, 2005 | Never finaled: issued Jan 2005, no final | [22 Rae Av](https://www.permitgraph.org/a/7097/022) | 8 marvin wood clad windows at front & one onside; replace one vinyl window at back | $4,600 |
| [200410055964](https://www.permitgraph.org/p/200410055964) | Oct 5, 2004 | Completed: final sign-off Nov 2004 | [1451 46th Av](https://www.permitgraph.org/a/1807/006) | replace 5 windows, remove exist alum inserts and install new vinyl windows. block frame applications | $3,500 |
| [200410055961](https://www.permitgraph.org/p/200410055961) | Oct 5, 2004 | Never finaled: issued Oct 2004, no final | [47 Yale St](https://www.permitgraph.org/a/5912/017) | reokace 6 windows 1 patio door. remove exist alum from windows and door,replace white vinyl wndw and | $6,200 |
| [200408131495](https://www.permitgraph.org/p/200408131495) | Aug 13, 2004 | Completed: final sign-off Oct 2004 | [1563 44th Av](https://www.permitgraph.org/a/1890/009) | install 4 windows & 1 door,2 @basement,like for like, another window will be lower and install door. | $7,000 |
| [200309255737](https://www.permitgraph.org/p/200309255737) | Sep 25, 2003 | Completed: final sign-off Nov 2003 | [1270 Church St](https://www.permitgraph.org/a/6536/004) | remove (e) wooden sashs & install new vinyl block frame windows with slope sill, 8 windows, | $7,700 |
| [200309255738](https://www.permitgraph.org/p/200309255738) | Sep 25, 2003 | Completed: final sign-off Dec 2003 | [634 30th Av](https://www.permitgraph.org/a/1572/016H) | repair (e)glass & sashes, install new white vinyl windows, trim interior w/trim, seal units, 8 windo | $5,400 |
| [200309225341](https://www.permitgraph.org/p/200309225341) | Sep 22, 2003 | Expired or cancelled: expired Jan 2006 | [2844 Gough St](https://www.permitgraph.org/a/0521/019A) | replace 8 window sashes,replace old double-hung window sashes w/new, 4 in rear & 4 @ side | $3,418 |
| [200307230137](https://www.permitgraph.org/p/200307230137) | Jul 23, 2003 | Expired or cancelled: expired Apr 2004 | [240 Alma St](https://www.permitgraph.org/a/1282/012) | replace 3 windows with like windows, replace stucco broken back 15 front of house | $3,691 |
| [200306167134](https://www.permitgraph.org/p/200306167134) | Jun 16, 2003 | Completed: final sign-off Jul 2003 | [445 Amazon Av](https://www.permitgraph.org/a/6351/007B) | replace windows (like for like) with block frame sliping. total of 9 (visible from street | $2,355 |
| [200305134452](https://www.permitgraph.org/p/200305134452) | May 13, 2003 | Never finaled: issued May 2003, no final | [1442 08th Av](https://www.permitgraph.org/a/1846/036A) | remove old sashes from 12 existing double hung windows repair existing frames as required. install | $10,000 |
| [200302207897](https://www.permitgraph.org/p/200302207897) | Feb 20, 2003 | Completed: final sign-off Jul 2003 | [3193 California St](https://www.permitgraph.org/a/1031/045) | replace windows 9 like for like in both front 3 and back | $5,848 |
| [200302066859](https://www.permitgraph.org/p/200302066859) | Feb 6, 2003 | Completed: final sign-off Mar 2003 | [26 Southwood Dr](https://www.permitgraph.org/a/3189/006) | replace some windows around house. 16 windows like for like some visible | $13,500 |
| [200301225654](https://www.permitgraph.org/p/200301225654) | Jan 22, 2003 | Completed: final sign-off Feb 2003 | [333 Wawona St](https://www.permitgraph.org/a/2483/025A) | replace 2 windows in living room (side of bldg) like for like | $2,966 |
| [200210088510](https://www.permitgraph.org/p/200210088510) | Oct 8, 2002 | Completed: final sign-off Oct 2002 | [171 Saint Charles Av](https://www.permitgraph.org/a/7130/022) | replace 7 windows, like for like, no structural changes | $6,100 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/able-window-inc-739973.
