# Aaa Windows For Less

Contractor license 610638. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/aaa-windows-for-less-610638
- JSON: https://www.permitgraph.org/api/contractor?license=610638
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=610638

74 permits since 2000: 39 completed, 30 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 37 days from permit to final inspection. Of the 30 never-finaled permits, 6 are 5 to 10 years old, 24 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Mar 2004 to May 2021
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2004 | 5 | 0 | 5 | 2 |
| 2005 | 3 | 0 | 0 | 0 |
| 2006 | 6 | 0 | 2 | 0 |
| 2007 | 0 | 0 | 1 | 0 |
| 2009 | 2 | 0 | 2 | 0 |
| 2010 | 2 | 0 | 1 | 0 |
| 2011 | 2 | 0 | 3 | 0 |
| 2012 | 0 | 0 | 1 | 0 |
| 2013 | 1 | 0 | 3 | 1 |
| 2014 | 2 | 0 | 1 | 0 |
| 2015 | 5 | 0 | 2 | 1 |
| 2016 | 2 | 0 | 3 | 1 |
| 2017 | 3 | 0 | 1 | 0 |
| 2018 | 5 | 0 | 1 | 0 |
| 2019 | 1 | 0 | 2 | 0 |
| 2020 | 0 | 0 | 1 | 0 |
| 2021 | 0 | 0 | 1 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 1 | 1 | 0 | 0 | 0 | 14 | 353 |
| Bathroom remodel | 1 | 1 | 0 | 0 | 0 | 14 | 353 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202105140377](https://www.permitgraph.org/p/202105140377) | May 14, 2021 | Never finaled: issued May 2021, no final | [2772 Jackson St](https://www.permitgraph.org/a/0978/025) | replace 37 dbl hung windows w like wood cottage style w top vent same grides ogee logs. facing street not exceed .30.no rough opening changes, same size as existing | $58,610 |
| [202002114078](https://www.permitgraph.org/p/202002114078) | Feb 11, 2020 | Never finaled: issued Feb 2020, no final | [31 Meadowbrook Dr](https://www.permitgraph.org/a/7250/008) | replace 2 windows in a back of the house. vinyl to vinyl. u=0.29 same sizes | $1,190 |
| [201907155837](https://www.permitgraph.org/p/201907155837) | Jul 15, 2019 | Never finaled: issued Sep 2019, no final | [2929 Geary Bl](https://www.permitgraph.org/a/1090/042) | replace 12 existing aluminium windows with fiberglass, double pane, same color, same size, same configuration in front of the building. | $14,100 |
| [201905241634](https://www.permitgraph.org/p/201905241634) | May 24, 2019 | Completed: final sign-off Jul 2019 | [68 Clairview Ct](https://www.permitgraph.org/a/2784/027) | install 2 wood interior aluminum clad exterior double casement windows in the front façade and 6 vinyl windows in the rear façade of the house. u factor =0.3 | $8,390 |
| [201904057200](https://www.permitgraph.org/p/201904057200) | Apr 5, 2019 | Never finaled: issued Jun 2019, no final | [24 Loyola Tr](https://www.permitgraph.org/a/1173/026) | install three dual-glazed wood windows in front of house, same size, same configuration. | $4,990 |
| [201805148975](https://www.permitgraph.org/p/201805148975) | May 14, 2018 | Completed: final sign-off May 2018 | [1222 03rd Av](https://www.permitgraph.org/a/1748/016) | replace (8) windows in back of house, size-to-size, same operation, u-factor 0.31 | $4,170 |
| [201805148974](https://www.permitgraph.org/p/201805148974) | May 14, 2018 | Completed: final sign-off Jul 2018 | [3140 Scott St](https://www.permitgraph.org/a/0512/018) | replace (4) windows in back of house, size-to-size, same operation, u-factor 0.32 | $1,720 |
| [201804055585](https://www.permitgraph.org/p/201804055585) | Apr 5, 2018 | Never finaled: issued Apr 2018, no final | [1545 California St](https://www.permitgraph.org/a/0645/019) | replace existing windows with 12 aluminum wood clad windows in the front, double hung, front only and 27 vinyl in the back size by size. . same sizes, same locatins, max u factor 0.32 | $23,875 |
| [201803274724](https://www.permitgraph.org/p/201803274724) | Mar 27, 2018 | Completed: final sign-off Mar 2019 | [649 Spruce St](https://www.permitgraph.org/a/1065/012) | legalize lower level floor at unit #1 remodel 2nd flr unit #1, remodel kitchen and bathroom, replace plaster walls with gyp board at 2nd flr | $40,000 |
| [201802060462](https://www.permitgraph.org/p/201802060462) | Feb 6, 2018 | Completed: final sign-off Apr 2018 | [654 23rd Av](https://www.permitgraph.org/a/1622/028) | replace existing 8 front windows with wood clad. similar configuration windows, same design. | $9,900 |
| [201801239282](https://www.permitgraph.org/p/201801239282) | Jan 23, 2018 | Completed: final sign-off Jun 2018 | [255 20th Av](https://www.permitgraph.org/a/1413/011) | 1965 building. replace four front windows with milgard fiberglass windows in same openings. all other windows are non-visible and will be replaced with vinyl at back same sizes (no change of (e) open… | $13,400 |
| [201711284913](https://www.permitgraph.org/p/201711284913) | Nov 28, 2017 | Completed: final sign-off Feb 2018 | [426 27th Av](https://www.permitgraph.org/a/1458/031) | replace 12 front aluminium windows with the same configuration. milgard ultra fiberglass windows. | $19,140 |
| [201711284915](https://www.permitgraph.org/p/201711284915) | Nov 28, 2017 | Completed: final sign-off Feb 2018 | [1832 Clement St](https://www.permitgraph.org/a/1414/022) | replace existing 8 front windows with aluminium wood clad windows. same size and configuration and 8 back windows with double pane vinyl. | $17,250 |
| [201706199677](https://www.permitgraph.org/p/201706199677) | Jun 19, 2017 | Completed: final sign-off Jun 2017 | [3423 20th St](https://www.permitgraph.org/a/3610/049) | replace existing aluminum windows with new double pane vinyl windows. all windows located in the back of the bldg. u-0.31, shgc - 0.29. | $3,980 |
| [201703070797](https://www.permitgraph.org/p/201703070797) | Mar 7, 2017 | Never finaled: issued Mar 2017, no final | [620 Spruce St](https://www.permitgraph.org/a/1066/046) | install 5 alum clad wood double hung windows in existing opening, same sizes. u factor is 0.3 | $5,600 |
| [201609208184](https://www.permitgraph.org/p/201609208184) | Sep 20, 2016 | Never finaled: issued Nov 2016, no final | [3536 California St](https://www.permitgraph.org/a/1018/004B) | replace 6 vinyl windows in front with aluminum clad wood double hung windows side by side. u -0.32 max | $5,000 |
| [201608084494](https://www.permitgraph.org/p/201608084494) | Aug 8, 2016 | Expired or cancelled: expired Nov 2019 | [2177 O'farrell St](https://www.permitgraph.org/a/1101/020) | replace 9 front windows with aluminum clad wood windows and 22 windows in back with vinyl size by size. aluminum clad as double hung, vinyl as single hung. u=0.3 | $16,480 |
| [201605238178](https://www.permitgraph.org/p/201605238178) | May 23, 2016 | Completed: final sign-off Aug 2016 | [542 Grove St](https://www.permitgraph.org/a/0794/051) | replace (8) front and (12) side of building windows. u-factor shall not exceed 0.32. front windows to be wood, side to be vinyl. | $6,000 |
| [201605096944](https://www.permitgraph.org/p/201605096944) | May 9, 2016 | Never finaled: issued May 2016, no final | [201 Justin Dr](https://www.permitgraph.org/a/5842/015) | replace all windows in the house with all wood, double paned windows. | $24,710 |
| [201604184969](https://www.permitgraph.org/p/201604184969) | Apr 18, 2016 | Never finaled: issued Jun 2016, no final | [4860 17th St](https://www.permitgraph.org/a/1287/016) | replace 12 aluminum windows in front with jeld-wen - double hung pocket replacement windows are wood interior exterior aluminum clad wood product, | $11,900 |
| [201604043810](https://www.permitgraph.org/p/201604043810) | Apr 4, 2016 | Completed: final sign-off Jun 2016 | [1886 11th Av](https://www.permitgraph.org/a/2047/054) | replace front 4 aluminum windows with 4 aluminum windows - made by milgard. dimensions are the same, no changes to the structure. | $4,190 |
| [201512225704](https://www.permitgraph.org/p/201512225704) | Dec 22, 2015 | Completed: final sign-off Dec 2015 | [78 Stanyan St](https://www.permitgraph.org/a/1085/015) | install 11 double pane lowe 270 windows in the back of the building only (u factor 0.3) | $4,400 |
| [201511203229](https://www.permitgraph.org/p/201511203229) | Nov 20, 2015 | Never finaled: issued Dec 2015, no final | [130 Ortega St](https://www.permitgraph.org/a/2045/022) | replace existing single pane sahshes in front/side of house plus 3 vinyl windows in back. all street facing windows will be double hung wood. | $10,760 |
| [201511102232](https://www.permitgraph.org/p/201511102232) | Nov 10, 2015 | Never finaled: issued Dec 2015, no final | [15 Laussat St](https://www.permitgraph.org/a/0858/044) | replace existing old sashes, in 6 openings with new double pane all-wood sashes in existing frames. no change to openings | $4,600 |
| [201508103808](https://www.permitgraph.org/p/201508103808) | Aug 10, 2015 | Completed: final sign-off Mar 2016 | [2693 22nd St](https://www.permitgraph.org/a/4152/038) | replace 39 existing windows with wood double hung wood windows size by size. max u-factor 0.32, primed wood exteriors (no clad). | $27,890 |
| [201508103824](https://www.permitgraph.org/p/201508103824) | Aug 10, 2015 | Completed: final sign-off Oct 2015 | [1818 Broadway](https://www.permitgraph.org/a/0568/029) | unit 102: replace 1 door and 3 windows (one in the atrim area) with vinyl double pane lowe glass produce size by size. all product in a back of the bldg. max u factor 0.32 | $2,450 |
| [201504274638](https://www.permitgraph.org/p/201504274638) | Apr 27, 2015 | Completed: final sign-off Jun 2015 | [563 03rd Av](https://www.permitgraph.org/a/1546/013) | replace 10 windows and 1 door in a back with vinyl product. size for size, max u-factor .32 | $4,650 |
| [201504274635](https://www.permitgraph.org/p/201504274635) | Apr 27, 2015 | Expired or cancelled: cancelled Aug 2015 | [1818 Broadway](https://www.permitgraph.org/a/0568/029) | replace 1 door and 1 window size for size with vinyl double pane lowe glass products. all product in a a back of the building. max u-factor .32 | $1,490 |
| [201502047530](https://www.permitgraph.org/p/201502047530) | Feb 4, 2015 | Completed: final sign-off Apr 2015 | [190 Cayuga Av](https://www.permitgraph.org/a/6785/015) | replace exisitng aluminum windows with new wood clad fiberglass double pane windows size by size. | $4,990 |
| [201406178556](https://www.permitgraph.org/p/201406178556) | Jun 17, 2014 | Completed: final sign-off Jul 2014 | [2450 San Bruno Av](https://www.permitgraph.org/a/5925/031) | to obtain final inspection for work approved under pa #2011.0315.2077. all work is complete. |  |
| [201406168419](https://www.permitgraph.org/p/201406168419) | Jun 16, 2014 | Completed: final sign-off Sep 2014 | [206 Clipper St](https://www.permitgraph.org/a/6548/051) | replace old windows in front (street side) wilth 11 new double-hung sash replacement kit outside hartford green inside prime wood double pane, no grids. u-factor =0.4. "work in common" for 206-208 cl… | $9,450 |
| [201402269368](https://www.permitgraph.org/p/201402269368) | Feb 26, 2014 | Never finaled: issued Mar 2014, no final | [980 Oak St](https://www.permitgraph.org/a/0825/042) | remove 6 existing windows and 1 sliding door and replace with new double pane low e glass windows and door simular to unit no. 3 | $5,790 |
| [201310250234](https://www.permitgraph.org/p/201310250234) | Oct 25, 2013 | Expired or cancelled: expired Jul 2016 | [559 37th Av](https://www.permitgraph.org/a/1507/012) | repalce 12 existing alumin windows with 12 vinyl dual pane low e glass argon gas side by side front of the building | $7,300 |
| [201309197201](https://www.permitgraph.org/p/201309197201) | Sep 19, 2013 | Never finaled: issued Sep 2013, no final | [148 Sanchez St](https://www.permitgraph.org/a/3541/006) | to obtain final inspection for work approved under pa 201003248821; all work is complete |  |
| [201306199922](https://www.permitgraph.org/p/201306199922) | Jun 19, 2013 | Never finaled: issued Jun 2013, no final | [1645 Ulloa St](https://www.permitgraph.org/a/2418/008) | install 11 vinyl double pane windows in existing opening in a back of the house only, not visible from street u- factor=0.29. | $4,500 |
| [201306199932](https://www.permitgraph.org/p/201306199932) | Jun 19, 2013 | Completed: final sign-off Aug 2013 | [338 Kirkham St](https://www.permitgraph.org/a/1846/025) | replace 22 old windows with new vinyl double pane lowe glass, same sizes, 12 windows in a front | $8,800 |
| [201303051504](https://www.permitgraph.org/p/201303051504) | Mar 5, 2013 | Never finaled: issued Mar 2013, no final | [667 11th Av](https://www.permitgraph.org/a/1633/017) | replace 6 front windows with wood clad, jeld wen custom windows, side by side, u factor less than 0.40 | $4,960 |
| [201206182771](https://www.permitgraph.org/p/201206182771) | Jun 18, 2012 | Never finaled: issued Jun 2012, no final | [4800 Geary Bl](https://www.permitgraph.org/a/1444/018A) | replace 43 original windows with fiberglass vinyl windows in (e) opening side by side, white color. visible from the street. work in units 4802-4804. | $14,670 |
| [201109275546](https://www.permitgraph.org/p/201109275546) | Sep 27, 2011 | Never finaled: issued Sep 2011, no final | [1035 Grant Av](https://www.permitgraph.org/a/0178/001B) | replace existing 23 aluminum single pane windows with 23 same sizes double pane glass fiberglass composite vinyl windows. | $9,980 |
| [201108243128](https://www.permitgraph.org/p/201108243128) | Aug 24, 2011 | Completed: final sign-off Nov 2013 | [229 Pixley St](https://www.permitgraph.org/a/0515/011) | replace 6 existing wood windows (front) with 6 wood double pane, and 10 vinyl windows in the back, in kind maximum u= 0.4 | $9,800 |
| [201105045278](https://www.permitgraph.org/p/201105045278) | May 4, 2011 | Never finaled: issued May 2011, no final | [26 Clayton St](https://www.permitgraph.org/a/1188/022) | replace 10 wood windows with new wood windows, double pane. | $4,990 |
| [201103152077](https://www.permitgraph.org/p/201103152077) | Mar 15, 2011 | Never finaled: issued Mar 2011, no final | [2450 San Bruno Av](https://www.permitgraph.org/a/5925/031) | replace 15-(e) windows with 15-wood vinyl energy efficient glass windows u=0.32, shgc=032 side by side. to comply with nov#201100666. | $8,500 |
| [201102281029](https://www.permitgraph.org/p/201102281029) | Feb 28, 2011 | Completed: final sign-off Mar 2011 | [491 Gold Mine Dr](https://www.permitgraph.org/a/7532/026) | replace (e) 8 windows & 2 sliding doors w/ white color vinyl windows & doors. windows visible from the street. | $5,690 |
| [201010062408](https://www.permitgraph.org/p/201010062408) | Oct 6, 2010 | Completed: final sign-off Jun 2011 | [4200 Balboa St](https://www.permitgraph.org/a/1586/014) | replace 25 original allum windows with double pane low e(2) glass windows in existing opening, new windows white fiberglass, same size and location u-factor 0.47 max | $9,000 |
| [201007025936](https://www.permitgraph.org/p/201007025936) | Jul 2, 2010 | Completed: final sign-off Aug 2010 | [250 12th Av](https://www.permitgraph.org/a/1422/031) | replace 14 windows and 2 patio door replacement | $10,000 |
| [201003248821](https://www.permitgraph.org/p/201003248821) | Mar 24, 2010 | Never finaled: issued Mar 2010, no final | [148 Sanchez St](https://www.permitgraph.org/a/3541/006) | replace alluminum 11 windows with double pane lowe extg glass, single hung. windows in extg opening 10 in front and 1 in one back vynil wood white outside. | $3,980 |
| [200911030419](https://www.permitgraph.org/p/200911030419) | Nov 3, 2009 | Never finaled: issued Nov 2009, no final | [3033 California St](https://www.permitgraph.org/a/1030/044) | replace 20 existing alumminum windows with vinyl dual pane . 7 windows @ unit#3033 & unit#3035. 6 windows @ unit#3037. all windows located in a back of the house. | $10,000 |
| [200911030422](https://www.permitgraph.org/p/200911030422) | Nov 3, 2009 | Completed: final sign-off Jan 2010 | [939 Stanyan St](https://www.permitgraph.org/a/1266/004) | replace 27 existing alumminum windows with vinyl dual panelow e 366 glass. 12 windows @ unit#939. 15 windows @ unit#941. all windows located in a back of the house. | $13,500 |
| [200904085799](https://www.permitgraph.org/p/200904085799) | Apr 8, 2009 | Never finaled: issued Apr 2009, no final | [3501 Moraga St](https://www.permitgraph.org/a/2008/001) | replace 12 alum windows with wood/clad dual pane windows (size by size) chestnut bronze outside. | $8,600 |
| [200901059530](https://www.permitgraph.org/p/200901059530) | Jan 5, 2009 | Completed: final sign-off Jan 2009 | [130 Palm Av](https://www.permitgraph.org/a/1062/043) | replace 36 windows in exiting opening (back only) to vinyl double pane size by size. | $18,000 |
| [200708109424](https://www.permitgraph.org/p/200708109424) | Aug 10, 2007 | Never finaled: issued Aug 2007, no final | [847 Arguello Bl](https://www.permitgraph.org/a/1644/041) | replace 53 windows & sliding door. size by size. front 21 windows to the vinyl dual pane. glazing min u factor 0.67. replace in kind. | $18,000 |
| [200608038484](https://www.permitgraph.org/p/200608038484) | Aug 3, 2006 | Completed: final sign-off Nov 2006 | [1920 Ocean Av](https://www.permitgraph.org/a/3281/039) | replace existing 113 windows w/ vinyl dual pane, 45 windows are in front of the building. | $39,950 |
| [200606295343](https://www.permitgraph.org/p/200606295343) | Jun 29, 2006 | Completed: final sign-off Jul 2006 | [412 Green St](https://www.permitgraph.org/a/0115/011) | install 3 patio and 3 wndw in front of the building (vinyl dual pane) replace in kind sliding doors | $7,000 |
| [200606073432](https://www.permitgraph.org/p/200606073432) | Jun 7, 2006 | Completed: final sign-off Jun 2006 | [8 Keystone Wy](https://www.permitgraph.org/a/3282/032) | replace (48) windows in a back of the building with geige dual pane vinyl windows (side to side). at interior courtyard. | $16,400 |
| [200603096311](https://www.permitgraph.org/p/200603096311) | Mar 9, 2006 | Completed: final sign-off Mar 2006 | [404 45th Av](https://www.permitgraph.org/a/1476/027) | reinstall 14 windows in front and 4 windows in a back in (e) opening 9vinyl). no chnage to partitions on openings. | $6,000 |
| [200601253018](https://www.permitgraph.org/p/200601253018) | Jan 25, 2006 | Never finaled: issued Jan 2006, no final | [760 Clipper St](https://www.permitgraph.org/a/6541/039) | replace 9 windows and 2 doors in back with riberglass dual pane windows. rear windows only. no structural changes. | $5,100 |
| [200601253020](https://www.permitgraph.org/p/200601253020) | Jan 25, 2006 | Never finaled: issued Jan 2006, no final | [100 Anzavista Av](https://www.permitgraph.org/a/1114/015) | replace 4 patio and 1 windows in a back of the gldg with vinyl dual pane size by size. no structural change rer windows only. | $7,700 |
| [200601182410](https://www.permitgraph.org/p/200601182410) | Jan 18, 2006 | Completed: final sign-off Feb 2006 | [1322 06th Av](https://www.permitgraph.org/a/1760/045) | replace (6) front and 10 back windows size by size, 6 front-wood windows; 10 back- vinyl dual pane | $8,435 |
| [200601111911](https://www.permitgraph.org/p/200601111911) | Jan 11, 2006 | Completed: final sign-off Mar 2006 | [8 Keystone Wy](https://www.permitgraph.org/a/3282/028) | install 36 windows vinyl dual pane in existing opening all facing ocean ave. | $35,635 |
| [200510246353](https://www.permitgraph.org/p/200510246353) | Oct 24, 2005 | Completed: final sign-off Dec 2005 | [1830 35th Av](https://www.permitgraph.org/a/2071/002L) | replace (e) 5 windows,same size/location,windows facing street,double panel vinyl frames | $3,500 |
| [200510044685](https://www.permitgraph.org/p/200510044685) | Oct 4, 2005 | Completed: final sign-off Dec 2005 | [257 14th St](https://www.permitgraph.org/a/3548/056) | replace 38 windows in opening in kind. | $12,560 |
| [200506145028](https://www.permitgraph.org/p/200506145028) | Jun 14, 2005 | Completed: final sign-off Jul 2005 | [1222 15th Av](https://www.permitgraph.org/a/1736/032) | install 17 vinyl dual pane windows and 1 entry back door in existing openings. 11 windows in front | $8,950 |
| [200412010459](https://www.permitgraph.org/p/200412010459) | Dec 1, 2004 | Never finaled: issued Dec 2004, no final | [644 Spruce St](https://www.permitgraph.org/a/1066/039) | to renew for final inspection 200207262428 |  |
| [200412010446](https://www.permitgraph.org/p/200412010446) | Dec 1, 2004 | Never finaled: issued Dec 2004, no final | [399 Buena Vista East Av](https://www.permitgraph.org/a/2607/099) | replace 183 (e)single pane windows with insulated double pane vinyl windows maintaining same size | $65,000 |
| [200411159225](https://www.permitgraph.org/p/200411159225) | Nov 15, 2004 | Never finaled: issued Nov 2004, no final | [68 Sanchez St](https://www.permitgraph.org/a/3538/015) | replace extg windows with vinyl dual pane loe 2 glass size to size 54 wndws | $14,250 |
| [200411159223](https://www.permitgraph.org/p/200411159223) | Nov 15, 2004 | Completed: final sign-off Feb 2005 | [754 18th Av](https://www.permitgraph.org/a/1660/032) | install 8 wndw | $2,500 |
| [200409073434](https://www.permitgraph.org/p/200409073434) | Sep 7, 2004 | Never finaled: issued Sep 2004, no final | [2472 Geary Bl](https://www.permitgraph.org/a/1081/018) | install 9 vinyl dual pane windows in existing opening, 7 front | $2,500 |
| [200409073435](https://www.permitgraph.org/p/200409073435) | Sep 7, 2004 | Completed: final sign-off Sep 2004 | [205 Miramar Av](https://www.permitgraph.org/a/6937/018C) | install 16 w vinyl dual pane glass in existing opening | $4,800 |
| [200407068052](https://www.permitgraph.org/p/200407068052) | Jul 6, 2004 | Completed: final sign-off Aug 2004 | [770 Arkansas St](https://www.permitgraph.org/a/4162/014) | replace 3 (e) windows with dual pane vinyl | $1,200 |
| [200407068051](https://www.permitgraph.org/p/200407068051) | Jul 6, 2004 | Expired or cancelled: expired Jun 2007 | [600 25th Av](https://www.permitgraph.org/a/1567/031) | replace 22 (e) windows | $7,100 |
| [200407068053](https://www.permitgraph.org/p/200407068053) | Jul 6, 2004 | Never finaled: issued Jul 2004, no final | [1401 12th Av](https://www.permitgraph.org/a/1841/001) | replace 16 windows in (e) openings, some facing street | $5,600 |
| [200403199111](https://www.permitgraph.org/p/200403199111) | Mar 19, 2004 | Expired or cancelled: expired Dec 2019 | [2647 43rd Av](https://www.permitgraph.org/a/2453/001V) | replace 6 windows in existing opening. | $1,950 |
| [200403199108](https://www.permitgraph.org/p/200403199108) | Mar 19, 2004 | Completed: final sign-off Apr 2004 | [283 Bella Vista Wy](https://www.permitgraph.org/a/2998/020) | replace 8 windows & 1 patio sliding door side by side visible from street. | $3,100 |
| [200403199110](https://www.permitgraph.org/p/200403199110) | Mar 19, 2004 | Completed: final sign-off Nov 2007 | [1310 Church St](https://www.permitgraph.org/a/6549/002) | replace 13 windows. door side by side. visible from front. | $3,900 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/aaa-windows-for-less-610638.
