# A & W Contractors

Contractor license 443478. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/a-w-contractors-443478
- JSON: https://www.permitgraph.org/api/contractor?license=443478
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=443478

207 permits since 2000: 167 completed, 31 never finaled, 9 expired or cancelled. Typically 0 days from filing to permit and 73 days from permit to final inspection. Of the 31 never-finaled permits, 3 are 3 to 5 years old, 11 are 5 to 10 years old, 17 are over 10 years old. 1 was filed but never issued.

- Based in: San Francisco
- On San Francisco permits: Jan 2000 to Jan 2025
- Last 24 months: 1 permit filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 1 | 0 | 0 | 1 |
| 2001 | 3 | 0 | 0 | 0 |
| 2002 | 2 | 0 | 0 | 1 |
| 2003 | 1 | 0 | 0 | 1 |
| 2004 | 2 | 0 | 1 | 0 |
| 2005 | 3 | 0 | 0 | 0 |
| 2006 | 6 | 0 | 0 | 0 |
| 2007 | 8 | 0 | 1 | 3 |
| 2008 | 1 | 0 | 1 | 1 |
| 2009 | 3 | 0 | 0 | 0 |
| 2010 | 11 | 0 | 1 | 0 |
| 2011 | 14 | 0 | 2 | 0 |
| 2012 | 11 | 0 | 1 | 0 |
| 2013 | 6 | 0 | 2 | 0 |
| 2014 | 15 | 0 | 2 | 0 |
| 2015 | 13 | 0 | 4 | 0 |
| 2016 | 15 | 0 | 3 | 0 |
| 2017 | 14 | 0 | 3 | 0 |
| 2018 | 5 | 0 | 1 | 0 |
| 2019 | 8 | 0 | 4 | 0 |
| 2020 | 3 | 0 | 1 | 1 |
| 2021 | 5 | 0 | 1 | 1 |
| 2022 | 8 | 0 | 0 | 0 |
| 2023 | 5 | 0 | 3 | 0 |
| 2024 | 3 | 0 | 0 | 0 |
| 2025 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 14 | 13 | 0 | 1 | 0 | 0 | 95 |
| Stairs | 5 | 5 | 0 | 0 | 0 | 0 | 128 |
| Kitchen remodel | 15 | 11 | 0 | 3 | 1 | 0 | 80 |
| Deck | 1 | 1 | 0 | 0 | 0 | 80 | 308 |

## Most recent permits

The 100 most recent of 207.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202501087966](https://www.permitgraph.org/p/202501087966) | Jan 8, 2025 | Completed: final sign-off Feb 2025 | [86 Fairfield Wy](https://www.permitgraph.org/a/3281/034) | replace 6 front of the house windows to match existing size and style in kind, in same openings | $3,200 |
| [202408289662](https://www.permitgraph.org/p/202408289662) | Aug 28, 2024 | Completed: final sign-off Oct 2024 | [523 38th Av](https://www.permitgraph.org/a/1506/003) | unit #a: to install 3 vinyl windows & sliding door in kind at rear wall of ground floor. to comply w/ nov #202426438. | $1,500 |
| [202405162251](https://www.permitgraph.org/p/202405162251) | May 16, 2024 | Completed: final sign-off Sep 2024 | [1562 Fulton St](https://www.permitgraph.org/a/1177/017) | replace (7) windows in (e) frame all double hung in kind. all window in front. street facing. to comply w/ nov# 20230712/ces 202306544 item #2. replacement will be wood hung or wood aluminum clad hung | $15,000 |
| [202405162253](https://www.permitgraph.org/p/202405162253) | May 16, 2024 | Completed: final sign-off Apr 2025 | [68 Beaver St](https://www.permitgraph.org/a/3561/065B) | replace (8) windows in (e) frame in front. all in kind with top grids. existing wood with true divided lites | $9,000 |
| [202312202811](https://www.permitgraph.org/p/202312202811) | Dec 20, 2023 | Completed: final sign-off Jan 2024 | [2032 Mcallister St](https://www.permitgraph.org/a/1160/010) | replace (6) alum windows in (e) frame - facing front. all in kind. one in back of building. aluminum to aluminum u=.30max | $7,000 |
| [202312041884](https://www.permitgraph.org/p/202312041884) | Dec 4, 2023 | Completed: final sign-off Dec 2023 | [40 Constanso Wy](https://www.permitgraph.org/a/2524/018) | replace 4 front windoows with the same size and style. 3 windows will be visible from street and will be aluminum wood clad by marvin, no bedroom window. | $6,000 |
| [202311130642](https://www.permitgraph.org/p/202311130642) | Nov 13, 2023 | Completed: final sign-off Apr 2024 | [4076 17th St](https://www.permitgraph.org/a/2623/083) | replace 42 vinyl windows and 6 sliding doors in existing frame. all in back & side, in kind | $58,000 |
| [202306200447](https://www.permitgraph.org/p/202306200447) | Jun 20, 2023 | Never finaled: issued Jun 2023, no final | [1363 14th Av](https://www.permitgraph.org/a/1769/013) | replace (5) all wood window in front. double hung. (3) white vinyl in back of building. | $9,500 |
| [202306200453](https://www.permitgraph.org/p/202306200453) | Jun 20, 2023 | Never finaled: issued Jun 2023, no final | [55 Octavia St](https://www.permitgraph.org/a/0856/001) | replace 11 windows in front in kind. og look | $22,000 |
| [202305016849](https://www.permitgraph.org/p/202305016849) | May 1, 2023 | Never finaled: issued May 2023, no final | [232 Hermann St](https://www.permitgraph.org/a/0868/092) | replace six wood windows in existing frame. all in kind (face fronting) | $13,800 |
| [202305016850](https://www.permitgraph.org/p/202305016850) | May 1, 2023 | Completed: final sign-off May 2023 | [166 Alpine Tr](https://www.permitgraph.org/a/2609/048) | replace 3 wood window in front, 2 are double hung, 1 is fixed. all work in-kind. max u-factor 0.30 or better. | $5,800 |
| [202305016848](https://www.permitgraph.org/p/202305016848) | May 1, 2023 | Completed: final sign-off Aug 2023 | [1349 York St](https://www.permitgraph.org/a/4275/018A) | replace 7 wood windows in (e) frame. all in-kind. change alum wndow to all wood double hung change alum window to wood double hung | $9,500 |
| [202211146369](https://www.permitgraph.org/p/202211146369) | Nov 14, 2022 | Completed: final sign-off Feb 2023 | [1754 Bay St](https://www.permitgraph.org/a/0436F/098) | replace 5 wood windows in front. all in kind. | $8,500 |
| [202211146368](https://www.permitgraph.org/p/202211146368) | Nov 14, 2022 | Completed: final sign-off Jan 2023 | [645 Webster St](https://www.permitgraph.org/a/0804/001A) | replace fourteen wood window in existing frame. nine with arch top in front and side. all in kind. | $16,000 |
| [202208120475](https://www.permitgraph.org/p/202208120475) | Aug 12, 2022 | Completed: final sign-off Oct 2022 | [1629 Washington St](https://www.permitgraph.org/a/0620/027) | replace (1) vinyl window in existing frame in the kitchen, not facing street. u-factor not to exceed 0.30. | $800 |
| [202208120474](https://www.permitgraph.org/p/202208120474) | Aug 12, 2022 | Completed: final sign-off Oct 2022 | [969 Burnett Av](https://www.permitgraph.org/a/2847/044) | units #1, 2, 3, 6. replace (6) white vinyl windows and one sliding door in existing frame. all in back of building. apt #1: (1) wd, #3 (1) wd, #2 (1) wd, #6 (3) wds & (1) door. not visible from stree… | $8,000 |
| [202206307545](https://www.permitgraph.org/p/202206307545) | Jun 30, 2022 | Completed: final sign-off Sep 2022 | [1191 South Van Ness Av](https://www.permitgraph.org/a/3638/026) | replace (9) all wood windows in back of building. | $6,000 |
| [202204051556](https://www.permitgraph.org/p/202204051556) | Apr 5, 2022 | Completed: final sign-off Jul 2022 | [855 Castro St](https://www.permitgraph.org/a/3622/036) | replace (e) supply and install 9 all wood windows in front. all in kind. | $11,000 |
| [202204051555](https://www.permitgraph.org/p/202204051555) | Apr 5, 2022 | Completed: final sign-off Jul 2022 | [144 10th Av](https://www.permitgraph.org/a/1369/027) | replace one vinyl window in back of bedroom, make the living room window open and lock. | $1,000 |
| [202202168055](https://www.permitgraph.org/p/202202168055) | Feb 16, 2022 | Completed: final sign-off Apr 2022 | [2501 Cabrillo St](https://www.permitgraph.org/a/1669/049) | replace 14 all wood windows in existing frame. rate .30 all in kind | $15,000 |
| [202106172640](https://www.permitgraph.org/p/202106172640) | Jun 17, 2021 | Completed: final sign-off Sep 2021 | [65 Hermann St](https://www.permitgraph.org/a/0872/017) | unit 5: replace (2) vinyl windows in back, (1) sliding door & (1) window in front (aluminum), u-factor 0.30 max. | $4,500 |
| [202106041655](https://www.permitgraph.org/p/202106041655) | Jun 4, 2021 | Completed: final sign-off Sep 2021 | [2479 38th Av](https://www.permitgraph.org/a/2387/049) | replace five alum windows in front. seven vinyl windows in back of teh bldg and one sliding door. no rough opening changes, same dimension. u factor shall not exceed 0.30. ok for vynyl in the front. | $9,000 |
| [202106011345](https://www.permitgraph.org/p/202106011345) | Jun 1, 2021 | Completed: final sign-off Jul 2021 | [2479 38th Av](https://www.permitgraph.org/a/2387/049) | renew expired permit # 9807901 for final inspection. |  |
| [202104088143](https://www.permitgraph.org/p/202104088143) | Apr 8, 2021 | Expired or cancelled: expired May 2026 | [1882 Mcallister St](https://www.permitgraph.org/a/1158/022) | replace 18 wood double hung windows in front. | $24,000 |
| [202102255317](https://www.permitgraph.org/p/202102255317) | Feb 25, 2021 | Completed: final sign-off Jun 2021 | [494 Ulloa St](https://www.permitgraph.org/a/2923/041) | replace four alum windows in existing frame in front. ten vinyl windows in back of building. max u-factor 0.30. | $7,500 |
| [202102043947](https://www.permitgraph.org/p/202102043947) | Feb 4, 2021 | Completed: final sign-off Apr 2021 | [3714 Kirkham St](https://www.permitgraph.org/a/1812/020) | replace (5) windows in back of building in existing frame. u-factor. 30max. | $2,500 |
| [202102043945](https://www.permitgraph.org/p/202102043945) | Feb 4, 2021 | Never finaled: issued Feb 2021, no final | [2272 Lombard St](https://www.permitgraph.org/a/0490/004) | #2 and #4: replace (14) alumn window in existing frame, all in kind at front. u-factor .30 max. | $10,000 |
| [202009224697](https://www.permitgraph.org/p/202009224697) | Sep 22, 2020 | Completed: final sign-off Jul 2021 | [1057 Cole St](https://www.permitgraph.org/a/1277/009) | replace all windows (16) wood windows in (e) frames. all work in-kind size. wood hung with og lugs | $13,000 |
| [202009224695](https://www.permitgraph.org/p/202009224695) | Sep 22, 2020 | Completed: final sign-off Nov 2020 | [642 41st Av](https://www.permitgraph.org/a/1583/039) | replace 3 alum-wood window in front. all windows in-kind size. windows to be wood interior aluminum clad exterior | $5,000 |
| [202008202138](https://www.permitgraph.org/p/202008202138) | Aug 20, 2020 | Completed: final sign-off Aug 2021 | [75 Hancock St](https://www.permitgraph.org/a/3585/038) | apt #1 & #3: replace 18 fiberglass windows in existing frame. 12 windows are located in the front. all in kind. | $25,000 |
| [202008051125](https://www.permitgraph.org/p/202008051125) | Aug 5, 2020 | Never finaled: filed Aug 2020, never issued | [978 Valencia St](https://www.permitgraph.org/a/3608/008) | replace 27 wood windows in existing frame. all wood, casement windows at dides of bays, picture window at center. all windows visible from street. existing transoms to remain. |  |
| [202005207635](https://www.permitgraph.org/p/202005207635) | May 20, 2020 | Expired or cancelled: cancelled Jan 2026 | [50 Lupine Av](https://www.permitgraph.org/a/1058/001) | unit #5. replace 2 miglard aluminum series (thin profile) windows in existing frame in kind. street facing front windows. | $3,000 |
| [201912068850](https://www.permitgraph.org/p/201912068850) | Dec 6, 2019 | Never finaled: issued Dec 2019, no final | [740 47th Av](https://www.permitgraph.org/a/1598/035) | replace one window at front with wood casement window. replace three windows at back with vinyl sliders. | $3,500 |
| [201912068855](https://www.permitgraph.org/p/201912068855) | Dec 6, 2019 | Completed: final sign-off May 2020 | [3829 Judah St](https://www.permitgraph.org/a/1810/041) | replace four aluminum windows with aluminum clad wood windows- same operation. replace four vinyl windows at the back of the building. | $9,000 |
| [201912068845](https://www.permitgraph.org/p/201912068845) | Dec 6, 2019 | Completed: final sign-off Feb 2020 | [160 Blake St](https://www.permitgraph.org/a/1090/018) | unit 1 & 3: replace four aluminum slider windows at front in-kind. | $5,000 |
| [201910083931](https://www.permitgraph.org/p/201910083931) | Oct 8, 2019 | Never finaled: issued Oct 2019, no final | [212 Francisco St](https://www.permitgraph.org/a/0039/009) | replace eight (8) alum windows in existing frame. four (4) in front. four (4) in back. to match existing. | $4,600 |
| [201910083935](https://www.permitgraph.org/p/201910083935) | Oct 8, 2019 | Completed: final sign-off May 2020 | [2010 31st Av](https://www.permitgraph.org/a/2150/018A) | replace two alum clad windows in front. replace four vinyl windows in back of building. all in existing frame. front windows visible to street. | $5,000 |
| [201908088324](https://www.permitgraph.org/p/201908088324) | Aug 8, 2019 | Completed: final sign-off Aug 2019 | [1812 47th Av](https://www.permitgraph.org/a/2083/045) | units #2 & #4: replace four aluminum windows in existing frames with new aluminum, all four face the street. two vinyl windows in back. all windows 0.30 | $4,000 |
| [201906143499](https://www.permitgraph.org/p/201906143499) | Jun 14, 2019 | Completed: final sign-off Jun 2019 | [1269 24th Av](https://www.permitgraph.org/a/1726/014) | replace (3) vinyl windows in (e) frame in back of building | $1,500 |
| [201904117775](https://www.permitgraph.org/p/201904117775) | Apr 11, 2019 | Completed: final sign-off Jun 2020 | [135 Middlefield Dr](https://www.permitgraph.org/a/7267/005) | replace two front vinyl sliders with marvin ultra (per preservation planner shelley c.) casements and fixed windows; all non-visible windows any material okay; replace total (11) fiberglass windows,… | $8,500 |
| [201904117790](https://www.permitgraph.org/p/201904117790) | Apr 11, 2019 | Completed: final sign-off Jun 2019 | [1271 23rd Av](https://www.permitgraph.org/a/1727/015) | replace eleven windows at front facade with wood-framed casements with arched, divided upper lites to match existing. | $6,000 |
| [201903074689](https://www.permitgraph.org/p/201903074689) | Mar 7, 2019 | Completed: final sign-off Apr 2019 | [10 Crestline Dr](https://www.permitgraph.org/a/2845/015) | replace 22 windows in existing frame. 16 aluminum windows face to street. 6 vinyl windows in back of building. | $10,000 |
| [201902213440](https://www.permitgraph.org/p/201902213440) | Feb 21, 2019 | Never finaled: issued Feb 2019, no final | [370 Teresita Bl](https://www.permitgraph.org/a/2948A/011) | replace eight all wood windows in existing frame. all in kind rat .31 face to street. same operation and with grids. | $8,000 |
| [201901251326](https://www.permitgraph.org/p/201901251326) | Jan 25, 2019 | Never finaled: issued Apr 2019, no final | [3621 Clement St](https://www.permitgraph.org/a/1468/023) | 1/f: remodel (e) 3 bathrooms & 1 kitchen. remove walls to create "open concept." add large windows/doors on southside (rear). update electrical. add radiant heating, add skylight on flat roof. replac… | $75,000 |
| [201811024910](https://www.permitgraph.org/p/201811024910) | Nov 2, 2018 | Completed: final sign-off Jan 2019 | [2101 26th Av](https://www.permitgraph.org/a/2191/001) | to clear violation 201857311 legalize fence | $1,000 |
| [201811024909](https://www.permitgraph.org/p/201811024909) | Nov 2, 2018 | Completed: final sign-off Feb 2019 | [733 Rockdale Dr](https://www.permitgraph.org/a/2947A/033) | replace ten all wood window in exsiting frame all in-kind | $8,000 |
| [201806131802](https://www.permitgraph.org/p/201806131802) | Jun 13, 2018 | Never finaled: issued Jun 2018, no final | [550 27th St](https://www.permitgraph.org/a/6581/055) | unit 102. replacing 2 windows and 2 sliding doors at rear of building in (e) frame and same location | $4,000 |
| [201803052923](https://www.permitgraph.org/p/201803052923) | Mar 5, 2018 | Completed: final sign-off Jul 2018 | [1000 Masonic Av](https://www.permitgraph.org/a/1222/025) | replace seven existing windows with matching, full wood double-hung windows within existing openings. windows to include integrated ogee lugs. | $6,000 |
| [201803052902](https://www.permitgraph.org/p/201803052902) | Mar 5, 2018 | Completed: final sign-off Mar 2018 | [1391 33rd Av](https://www.permitgraph.org/a/1788/014B) | replace six milgard white vinyl window in existing frame. all window in back of bldg. u factor 0.32 | $3,000 |
| [201801118451](https://www.permitgraph.org/p/201801118451) | Jan 11, 2018 | Completed: final sign-off Apr 2018 | [1969 17th Av](https://www.permitgraph.org/a/2117/007) | replace ten vinyl windows in existing frame. all windows in back of building. replace one bedroom door in (e) frame | $5,500 |
| [201712045423](https://www.permitgraph.org/p/201712045423) | Dec 4, 2017 | Never finaled: issued Dec 2017, no final | [692 San Jose Av](https://www.permitgraph.org/a/6617/008) | replace 63 windows in existing frame 51 wood windows, 7 vinyl windows.u.32 | $60,000 |
| [201712045438](https://www.permitgraph.org/p/201712045438) | Dec 4, 2017 | Completed: final sign-off Apr 2018 | [1280 Grove St](https://www.permitgraph.org/a/1181/014A) | replace 54 vinyl windows in back of building in (e) frame u=0.32 | $25,000 |
| [201710262370](https://www.permitgraph.org/p/201710262370) | Oct 26, 2017 | Completed: final sign-off Apr 2018 | [7533 Geary Bl](https://www.permitgraph.org/a/1505/034) | replace three milgard essence wood windows in front with wood windows. two fiberglass in back of the building. | $4,000 |
| [201710262391](https://www.permitgraph.org/p/201710262391) | Oct 26, 2017 | Completed: final sign-off Nov 2017 | [225 Collingwood St](https://www.permitgraph.org/a/2696/028) | replace 9 vinyl windows in back of building, kitchen windows. n/a ordinance #155-13 | $4,500 |
| [201709198901](https://www.permitgraph.org/p/201709198901) | Sep 19, 2017 | Completed: final sign-off Apr 2018 | [3235 Santiago St](https://www.permitgraph.org/a/2372/044) | replace two existing front facing windows with two milgard essence wood windows in kind in the existing frame. no other work. | $2,300 |
| [201709198899](https://www.permitgraph.org/p/201709198899) | Sep 19, 2017 | Completed: final sign-off Dec 2017 | [1900 35th Av](https://www.permitgraph.org/a/2100/029) | replace 7 existing street facing windows with milgard essence series wood window in existing frame in kind. no other work. | $7,000 |
| [201709198968](https://www.permitgraph.org/p/201709198968) | Sep 19, 2017 | Completed: final sign-off Nov 2017 | [430 Pacheco St](https://www.permitgraph.org/a/2817/029) | replace all windows at front and side with matching wood windows. same opening material, method of operation as existing. replace windows at doors at non-visible rear with vinyl. no visibility of rea… | $16,000 |
| [201709198909](https://www.permitgraph.org/p/201709198909) | Sep 19, 2017 | Completed: final sign-off Dec 2017 | [2140 18th Av](https://www.permitgraph.org/a/2200/002A) | replace five existing casement bay windows on the front facade with marvin wood windows in existing frame in kind. existing five transom windows on front facade to remain. replace one existing double… | $8,000 |
| [201708154815](https://www.permitgraph.org/p/201708154815) | Aug 15, 2017 | Never finaled: issued Aug 2017, no final | [4076 17th St](https://www.permitgraph.org/a/2623/083) | replace (22) aluminum windows in (e) frame. all in the back and side. max u-factor .32 | $18,000 |
| [201708154807](https://www.permitgraph.org/p/201708154807) | Aug 15, 2017 | Completed: final sign-off Oct 2017 | [550 27th St](https://www.permitgraph.org/a/6581/055) | inkind replacement of 6 aluminum windows on the front facade.u-factor .32 | $4,500 |
| [201705187019](https://www.permitgraph.org/p/201705187019) | May 18, 2017 | Completed: final sign-off Aug 2017 | [1750 Lane St](https://www.permitgraph.org/a/5342/002) | replace sixteen windows in existing frame. front six windows with aluminum windows ten windows back of building with vinyl. rate=.32 | $10,000 |
| [201705187021](https://www.permitgraph.org/p/201705187021) | May 18, 2017 | Completed: final sign-off Jun 2017 | [4338 26th St](https://www.permitgraph.org/a/6556/012B) | replace seven wood windows in-kind in existing frame, all double hung. .32 | $4,900 |
| [201704204442](https://www.permitgraph.org/p/201704204442) | Apr 20, 2017 | Completed: final sign-off Aug 2017 | [1000 Masonic Av](https://www.permitgraph.org/a/1222/025) | replace five (5) street facing wood windows in-kind (wood for wood, same dimensions), four (4) vinyl windows in back (with vinyl). no other work per this permit. | $7,500 |
| [201704204411](https://www.permitgraph.org/p/201704204411) | Apr 20, 2017 | Completed: final sign-off Aug 2017 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | replace eighteen milgar wood windows in existing frame. side street; max u-factor 0.32 | $15,000 |
| [201704204410](https://www.permitgraph.org/p/201704204410) | Apr 20, 2017 | Completed: final sign-off Jan 2018 | [1849 24th Av](https://www.permitgraph.org/a/2061/010) | replace three wood windows in existing frame in-kind (front window). max u factor 0.32 | $4,500 |
| [201702230009](https://www.permitgraph.org/p/201702230009) | Feb 23, 2017 | Completed: final sign-off Nov 2017 | [70 Lupine Av](https://www.permitgraph.org/a/1058/001) | replace six windows total (apt. 2 & 3), to match prior permit approval. new windows to be clad wood windows in the same size and configuration as the historic, 3-part windows. milgard essence wood wi… | $5,500 |
| [201702099015](https://www.permitgraph.org/p/201702099015) | Feb 9, 2017 | Never finaled: issued Feb 2017, no final | [635 Castro St](https://www.permitgraph.org/a/3602/071) | inkind replacement of 6 wood dgh w/ ogee lugs on upper floor front | $400 |
| [201612275889](https://www.permitgraph.org/p/201612275889) | Dec 27, 2016 | Completed: final sign-off Feb 2017 | [1635 Jones St](https://www.permitgraph.org/a/0156/003) | #22: install 10 vinyl windows in back and side of building in (e) frame. no windows in front | $4,500 |
| [201612134845](https://www.permitgraph.org/p/201612134845) | Dec 13, 2016 | Completed: final sign-off Mar 2017 | [2934 Gough St](https://www.permitgraph.org/a/0504/024) | replace 6 wood windows in front. all in kind. u factor .32. n/a maher | $8,500 |
| [201612134875](https://www.permitgraph.org/p/201612134875) | Dec 13, 2016 | Never finaled: issued Dec 2016, no final | [1746 09th Av](https://www.permitgraph.org/a/2041/030B) | replace five wood windows on front facade in existing fram. in-kind. windows will be custom-made to match existing operation and design. u-factor .32 | $4,500 |
| [201611152767](https://www.permitgraph.org/p/201611152767) | Nov 15, 2016 | Completed: final sign-off Mar 2017 | [3618 Broderick St](https://www.permitgraph.org/a/0914/003C) | replace ten windows in the front with ten milgard wood windows in front all in-kind. all casement wood windows. | $10,000 |
| [201609299198](https://www.permitgraph.org/p/201609299198) | Sep 29, 2016 | Completed: final sign-off Jan 2017 | [2139 Noriega St](https://www.permitgraph.org/a/2065/004A) | replace two vinyl windows in back of building, two wood clad window in front. | $5,000 |
| [201609299200](https://www.permitgraph.org/p/201609299200) | Sep 29, 2016 | Completed: final sign-off Mar 2017 | [2030 18th Av](https://www.permitgraph.org/a/2137/005) | replace twelve (12) vinyl windows in back of building. five woodclad windows in front. casement windows. | $8,500 |
| [201609016625](https://www.permitgraph.org/p/201609016625) | Sep 1, 2016 | Completed: final sign-off Mar 2017 | [2363 32nd Av](https://www.permitgraph.org/a/2361/009) | replace 9 vinyl windows in back of building, 2 sliding door too. replace 3 alum wood clad windows in front.all in kind. (front aluminum sling window with aluminum-clad wood sliding window - consultat… | $7,000 |
| [201609016619](https://www.permitgraph.org/p/201609016619) | Sep 1, 2016 | Completed: final sign-off Mar 2017 | [1526 Funston Av](https://www.permitgraph.org/a/1858/018) | inkind replacement of 4 front aluminum sliding windows on c.1952 building | $4,000 |
| [201607263391](https://www.permitgraph.org/p/201607263391) | Jul 26, 2016 | Completed: final sign-off Aug 2016 | [608 Judah St](https://www.permitgraph.org/a/1766/019) | replace three vinyl windows in back of building. two in front are alum windows, in kind. | $3,900 |
| [201607263390](https://www.permitgraph.org/p/201607263390) | Jul 26, 2016 | Completed: final sign-off Aug 2016 | [1253 Waller St](https://www.permitgraph.org/a/1256/048) | replace eleven all wood windows. all double hung. four in front. seven in back of building. | $7,000 |
| [201607263373](https://www.permitgraph.org/p/201607263373) | Jul 26, 2016 | Never finaled: issued Jul 2016, no final | [3301 Clay St](https://www.permitgraph.org/a/1008/001) | replace twenty five vinyl windows in back of building. all in kind. rate .32 | $11,000 |
| [201607263389](https://www.permitgraph.org/p/201607263389) | Jul 26, 2016 | Completed: final sign-off Mar 2017 | [756 05th Av](https://www.permitgraph.org/a/1647/025) | replace five wood clad windows in front in kind and five vinyl windows in back of building. | $5,000 |
| [201606039031](https://www.permitgraph.org/p/201606039031) | Jun 3, 2016 | Completed: final sign-off Sep 2016 | [741 26th Av](https://www.permitgraph.org/a/1618/003B) | replace 5 aluminum windows facing street, in kind. eleven vinyl windows in rear of building. u-factor shall not exceed 0.32 | $8,600 |
| [201605137348](https://www.permitgraph.org/p/201605137348) | May 13, 2016 | Completed: final sign-off May 2016 | [3301 Clay St](https://www.permitgraph.org/a/1008/001) | #304, 401, 403, 605- replace (13) vinyl windows in existing frame, all windows are in back of building, rate 0.32 | $7,000 |
| [201604195192](https://www.permitgraph.org/p/201604195192) | Apr 19, 2016 | Completed: final sign-off Mar 2017 | [50 Lupine Av](https://www.permitgraph.org/a/1058/001) | replace six existing aluminum sliders at the north elevation with fiberglass clad wood windows. no other work.facing street | $5,300 |
| [201603293423](https://www.permitgraph.org/p/201603293423) | Mar 29, 2016 | Completed: final sign-off Apr 2016 | [1634 Leavenworth St](https://www.permitgraph.org/a/0156/040) | replace 3 aluminum sliders with solid wood-framed double hung sashes. | $2,000 |
| [201603091644](https://www.permitgraph.org/p/201603091644) | Mar 9, 2016 | Never finaled: issued Mar 2016, no final | [2032 Wawona St](https://www.permitgraph.org/a/2466A/006) | replace 18 wood windows in existing frames. max u-factor .32 some face to street. 3-light true divided-light sash, fixed and double-hung. | $10,000 |
| [201602169712](https://www.permitgraph.org/p/201602169712) | Feb 16, 2016 | Completed: final sign-off Apr 2016 | [1487 47th Av](https://www.permitgraph.org/a/1806/013A) | replace 2 windows at front with aluminum-clad and rear windows with vinyl. | $5,800 |
| [201510230688](https://www.permitgraph.org/p/201510230688) | Oct 23, 2015 | Completed: final sign-off Mar 2016 | [123 Maddux Av](https://www.permitgraph.org/a/5353A/013) | replace two fiberglass with wood inside, wood clad window in (e) frame. rate 0.32, front windows. | $3,000 |
| [201510230689](https://www.permitgraph.org/p/201510230689) | Oct 23, 2015 | Completed: final sign-off Feb 2016 | [2936 Polk St](https://www.permitgraph.org/a/0476/006) | replace ninteen wood clad windows ( fiberglass, inside wood) in existing frames. rate .32 front windows, apt. 1, 16, 7, 12. | $12,000 |
| [201509258138](https://www.permitgraph.org/p/201509258138) | Sep 25, 2015 | Completed: final sign-off Dec 2015 | [1212 11th Av](https://www.permitgraph.org/a/1740/044) | unit #5: replace kitchen cabinet, tile & bath tile, one shower faucet and one light in bath. | $7,000 |
| [201509258151](https://www.permitgraph.org/p/201509258151) | Sep 25, 2015 | Completed: final sign-off Mar 2016 | [1280 Grove St](https://www.permitgraph.org/a/1181/014A) | inkind replacement of 24 front facade windows with true-divided-lite (same mullion pattern) wood windows with same operating style (casement and fixed - will match existing), same upper mullion patte… | $28,000 |
| [201508194767](https://www.permitgraph.org/p/201508194767) | Aug 19, 2015 | Completed: final sign-off Oct 2015 | [80 Dawnview Wy](https://www.permitgraph.org/a/2853/056) | replace three wood windows in existing frames. all in kind front windows rate.32, all wood material including divided lines | $4,500 |
| [201507242435](https://www.permitgraph.org/p/201507242435) | Jul 24, 2015 | Completed: final sign-off Oct 2015 | [80 De Soto St](https://www.permitgraph.org/a/6930/020) | replace nine wood windows in existing frame. all in kind. 3 in front, 6 side windows. | $7,000 |
| [201507141494](https://www.permitgraph.org/p/201507141494) | Jul 14, 2015 | Never finaled: issued Jul 2015, no final | [1950 22nd Av](https://www.permitgraph.org/a/2113/040) | replace three aluminum windows in existing frames at front rate .32 | $3,500 |
| [201507141483](https://www.permitgraph.org/p/201507141483) | Jul 14, 2015 | Completed: final sign-off Feb 2017 | [1741 Jones St](https://www.permitgraph.org/a/0151/004) | replace 12 vinyl windows in existing frame, all in back of building kitchen, dr bath, u=0.32 | $5,000 |
| [201507141473](https://www.permitgraph.org/p/201507141473) | Jul 14, 2015 | Completed: final sign-off Oct 2015 | [302 23rd Av](https://www.permitgraph.org/a/1454/034) | replace 13 2nd floor windows with all wood doublehung windows with ogee lugs. no open pc code enforcement cases or bbns. u=0.32 | $11,000 |
| [201507141469](https://www.permitgraph.org/p/201507141469) | Jul 14, 2015 | Completed: final sign-off Oct 2015 | [222 Scott St](https://www.permitgraph.org/a/0846/078) | inkind replacement of 19 wood doublehung windows with ogee lugs (6 on front) with wood windows with same style. no bbns or open pc code enforcement cases. | $11,000 |
| [201507020579](https://www.permitgraph.org/p/201507020579) | Jul 2, 2015 | Completed: final sign-off Jul 2016 | [87 Masonic Av](https://www.permitgraph.org/a/1092/042) | replace 11 windows in existing frames.six windows facing street with aluminum frame; 5 at rear vinyl/ rate.32 | $5,500 |
| [201504204119](https://www.permitgraph.org/p/201504204119) | Apr 20, 2015 | Never finaled: issued Apr 2015, no final | [408 Stanyan St](https://www.permitgraph.org/a/1191/051) | replace six wood windows in the front. all inkind - sasme as old ones. 408 stanyan street window replacement custom made wood windows to match the existing operation and patters including true divide… | $9,000 |
| [201504022688](https://www.permitgraph.org/p/201504022688) | Apr 2, 2015 | Completed: final sign-off May 2015 | [2272 Lombard St](https://www.permitgraph.org/a/0490/004) | unit 3: replace five (5) aluminum windows in (e) frame. all windows in back of building. u=0.32 factor. | $3,000 |
| [201503231576](https://www.permitgraph.org/p/201503231576) | Mar 23, 2015 | Never finaled: issued Mar 2015, no final | [3418 Moraga St](https://www.permitgraph.org/a/1903/025) | replace 3 windows with aluminium wood clad windowa. | $1,800 |
| [201503160989](https://www.permitgraph.org/p/201503160989) | Mar 16, 2015 | Completed: final sign-off Apr 2015 | [539 21st Av](https://www.permitgraph.org/a/1564/007) | replace eight vinyl windows in (e) frame in back of building. (6 in sunroom, 2 in kitchen) | $3,500 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/a-w-contractors-443478.
