# 3 D Design & Construction Inc

Contractor license 888327. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/3-d-design-construction-inc-888327
- JSON: https://www.permitgraph.org/api/contractor?license=888327
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=888327

28 permits since 2000: 27 completed, 1 never finaled. Typically 3 days from filing to permit and 212 days from permit to final inspection. Of the 1 never-finaled permit, 1 is over 10 years old.

- Based in: San Anselmo
- On San Francisco permits: Nov 2009 to May 2015
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2009 | 2 | 0 | 0 | 0 |
| 2010 | 3 | 0 | 0 | 0 |
| 2011 | 3 | 0 | 0 | 0 |
| 2012 | 10 | 0 | 0 | 0 |
| 2013 | 3 | 0 | 0 | 0 |
| 2014 | 1 | 0 | 0 | 0 |
| 2015 | 5 | 0 | 1 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 2 | 1 | 0 | 1 | 0 | 6 | 430 |
| Kitchen remodel | 6 | 6 | 0 | 0 | 0 | 0 | 125 |
| Bathroom remodel | 8 | 8 | 0 | 0 | 0 | 0 | 188 |
| Deck | 2 | 1 | 0 | 1 | 0 | 322 | 886 |
| Roof deck | 2 | 2 | 0 | 0 | 0 | 226 | 304 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201505287351](https://www.permitgraph.org/p/201505287351) | May 28, 2015 | Completed: final sign-off Dec 2016 | [430 El Camino Del Mar](https://www.permitgraph.org/a/1308/008) | enclose 48 sf of (e). roof deck @ 4th flr to create (n) powder room. approved variance, case no.214.1376v (staff contact: alexandra kirby) | $20,000 |
| [201505287357](https://www.permitgraph.org/p/201505287357) | May 28, 2015 | Completed: final sign-off Mar 2016 | [430 El Camino Del Mar](https://www.permitgraph.org/a/1308/008) | revision to pa 2015 0114 5695 - minor changes due to (e) site conditions |  |
| [201504304976](https://www.permitgraph.org/p/201504304976) | Apr 30, 2015 | Completed: final sign-off May 2016 | [151 Union St](https://www.permitgraph.org/a/0112/001) | remodel accessory spaces to existing cafe. two extg storage rooms to be converted to a scullery and modified storage. includes related plumbing connection to new sinks. n/a for maher. | $35,000 |
| [201502037374](https://www.permitgraph.org/p/201502037374) | Feb 3, 2015 | Completed: final sign-off May 2015 | [154 Lombard St](https://www.permitgraph.org/a/0059/139) | remodel 2 bathrooms, replace plumbing and electrical fixtures, & 2 vent fans, create pass-thru at kitchen to diningroom wall. install new living room cabinetry, replace (1) sliding glass door & (1) w… | $54,350 |
| [201501266641](https://www.permitgraph.org/p/201501266641) | Jan 26, 2015 | Never finaled: issued Feb 2015, no final | [83 Carmel St](https://www.permitgraph.org/a/1293/023) | architectural and structural revision to 201207245630. reduce rear deck size to accomodate stair headroom. shift rear window to center with windows above. enlarge two windows on front elevation for e… | $2,250 |
| [201501145695](https://www.permitgraph.org/p/201501145695) | Jan 14, 2015 | Completed: final sign-off Mar 2016 | [430 El Camino Del Mar](https://www.permitgraph.org/a/1308/008) | build out former storage room to create guest room. add full bathroom, add windows and modify extg windows at back. no exterior expansion. mep under seperate permit. | $20,000 |
| [201405095359](https://www.permitgraph.org/p/201405095359) | May 9, 2014 | Completed: final sign-off Dec 2014 | [340 Post St](https://www.permitgraph.org/a/0295/005) | 3rd floor culinary center:scope includes new student work stations with new kitchen equipment in the extg culinary center and new dishwasher in the extg scullery with associated plumbing work. | $25,000 |
| [201308053533](https://www.permitgraph.org/p/201308053533) | Aug 5, 2013 | Completed: final sign-off Dec 2013 | [150 Lombard St](https://www.permitgraph.org/a/0059/071) | unit 901j - remodel kitchen & 2 bathrooms; new hardwood flooring ; relocate elec. panel out of close per code reqt; install new light fixtures; new paint; all new lighting shall be "led" in the kitch… | $72,000 |
| [201307101452](https://www.permitgraph.org/p/201307101452) | Jul 10, 2013 | Completed: final sign-off Sep 2013 | [101 Lombard St](https://www.permitgraph.org/a/0080/165) | remodel bathroom. replace bathtub with shower, install new tile, shower doors, vanity, sink, fuacet and bentilation fan. relocate light fixture location. relocate gfci location. install built in book… | $14,800 |
| [201305237793](https://www.permitgraph.org/p/201305237793) | May 23, 2013 | Completed: final sign-off Jan 2014 | [2015 Chestnut St](https://www.permitgraph.org/a/0491/001) | interior t.i to repair and restore (e) cafe that was damaged by fire. scope of work include exterior awning over new walk-in unit. mech, electrcial and plumbing work to be submitted under sep permit. | $35,000 |
| [201210162139](https://www.permitgraph.org/p/201210162139) | Oct 16, 2012 | Completed: final sign-off Feb 2013 | [3250 Van Ness Av](https://www.permitgraph.org/a/0451/004) | tenant improvement of accessory use of the space for test kitchen, new appliances, cabinetry, finishes & non structural partitions | $425,000 |
| [201209069069](https://www.permitgraph.org/p/201209069069) | Sep 6, 2012 | Completed: final sign-off Mar 2013 | [101 Lombard St](https://www.permitgraph.org/a/0080/211) | remodel bathroom, reface kitchen cabinets, install new lighting, new counter top, refinish floors, paint, install new built in cabinets. | $80,000 |
| [201208228032](https://www.permitgraph.org/p/201208228032) | Aug 22, 2012 | Completed: final sign-off Feb 2013 | [3250 Van Ness Av](https://www.permitgraph.org/a/0451/004) | installation of green wall. structural modifications to an existing walls. amendment to pa# 201207064227. | $10,000 |
| [201207306045](https://www.permitgraph.org/p/201207306045) | Jul 30, 2012 | Completed: final sign-off Feb 2013 | [3250 Van Ness Av](https://www.permitgraph.org/a/0451/004) | revision to appl #2012.0515.0473 - installation of light weight stock shelving. | $3,000 |
| [201207245630](https://www.permitgraph.org/p/201207245630) | Jul 24, 2012 | Completed: final sign-off Sep 2016 | [83 Carmel St](https://www.permitgraph.org/a/1293/023) | horizontal & vertical addition on third floor. interior remodel of (e) second fl and rear bedroom extension, including a (n) rear deck @ 2nd floor level. | $150,000 |
| [201207064280](https://www.permitgraph.org/p/201207064280) | Jul 6, 2012 | Completed: final sign-off Jan 2013 | [120 Shrader St](https://www.permitgraph.org/a/1193/024) | master bathroom remodel - relocate toilet and vanity sink. remove tub and install new shower. all new finishes. no structural changes. install new forced air unit to service upstairs of sfd, in close… | $65,000 |
| [201207064227](https://www.permitgraph.org/p/201207064227) | Jul 6, 2012 | Completed: final sign-off Oct 2013 | [3250 Van Ness Av](https://www.permitgraph.org/a/0451/004) | tenant improvement-3rd. floor of existing office building wall removal, movable partition install, new finishes & casework. work in bay cafe only. | $200,000 |
| [201206273540](https://www.permitgraph.org/p/201206273540) | Jun 27, 2012 | Completed: final sign-off Feb 2013 | [3250 Van Ness Av](https://www.permitgraph.org/a/0451/004) | revision to appl #2012.05.15.0473: new wall, adjustment of walls. sprinklers and fire alarm under separate permit | $10,000 |
| [201205150473](https://www.permitgraph.org/p/201205150473) | May 15, 2012 | Completed: final sign-off Nov 2012 | [3250 Van Ness Av](https://www.permitgraph.org/a/0451/004) | 1st floor-tenant improvement-re design of office, storage & exhibit space. selective removal of walls, new non structural walls & finishes. | $350,000 |
| [201201273059](https://www.permitgraph.org/p/201201273059) | Jan 27, 2012 | Completed: final sign-off Jun 2012 | [156 02nd St](https://www.permitgraph.org/a/3722/005) | interior non structural remodel on basement and ground floor areas | $65,000 |
| [201112150772](https://www.permitgraph.org/p/201112150772) | Dec 15, 2011 | Completed: final sign-off Jan 2013 | [156 02nd St](https://www.permitgraph.org/a/3722/005) | demolition of partitions, doors, ceilings. non structural demo only at 1st fl and basement. tenant improvement under sep permit | $32,000 |
| [201109295808](https://www.permitgraph.org/p/201109295808) | Sep 29, 2011 | Completed: final sign-off Feb 2013 | [3250 Van Ness Av](https://www.permitgraph.org/a/0451/004) | 3rd floor demolish (1) existing exterior wall & demo (e) planter & exterior pauers. enclose (e) ext courtyard w/eifs constr on mtl stud wall including steel roof joists, mtl roof deck w.foam roof ins… | $100,000 |
| [201108233070](https://www.permitgraph.org/p/201108233070) | Aug 23, 2011 | Completed: final sign-off Jun 2012 | [156 02nd St](https://www.permitgraph.org/a/3722/005) | interior non structural remodel of floors 2-6 new partitions, finishes and lighting. fire alarm and mechanical work under seperate permit. | $200,000 |
| [201009010033](https://www.permitgraph.org/p/201009010033) | Sep 1, 2010 | Completed: final sign-off May 2011 | [2132 Bryant St](https://www.permitgraph.org/a/4081/008) | as-build revision per plan: "framing approval subject to revision & approval of changes to bedroom#1 @ rear of bldg. ok to insulate all areas except bed #1".revision to app #201002257117 | $1,500 |
| [201002257117](https://www.permitgraph.org/p/201002257117) | Feb 25, 2010 | Completed: final sign-off May 2011 | [2132 Bryant St](https://www.permitgraph.org/a/4081/008) | remodel e dwelling. reconfigure interior halls, remodel kitchen and 1 bath, 1 new bath. partial n roof framing, replacment of windows and doors, replace interior stair, reconfigure interior lightwell… | $85,000 |
| [201002015636](https://www.permitgraph.org/p/201002015636) | Feb 1, 2010 | Completed: final sign-off May 2011 | [2132 Bryant St](https://www.permitgraph.org/a/4081/008) | revision to pa# 2009.12.10.2963 1st floor to structural details shown as delta 1 on plans, dated jan.28.2010 | $3,500 |
| [200912102963](https://www.permitgraph.org/p/200912102963) | Dec 10, 2009 | Completed: final sign-off May 2011 | [2132 Bryant St](https://www.permitgraph.org/a/4081/008) | partial remodel of existing 2 story building. scope includes tenant improvment of 1st floor only. includes replace existing light fixtures, add outlets, replace gas furnace, add ada bath,voluntary in… | $48,500 |
| [200911020362](https://www.permitgraph.org/p/200911020362) | Nov 2, 2009 | Completed: final sign-off Apr 2010 | [430 El Camino Del Mar](https://www.permitgraph.org/a/1308/008) | repair water damaged sheetrock and flooring. remove tile decking. new waterproofing roof, reinstall shweetrock, flooring, decking, and any dryrot associated in demolition. replace existing tile deck… | $101,800 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/3-d-design-construction-inc-888327.
