{"city":"Rancho Santa Fe","complete":0,"failed":0,"firstFiled":"2025-07-22","last24mo":3,"lastFiled":"2025-07-22","license":"1101521","name":"Pe Management Group Inc","names":["Pe Management Group Inc"],"open":3,"rowHash":"ad83c186a2a28e93","stale":0,"stale10plus":0,"stale3to5":0,"stale5to10":0,"staleNeverIssued":0,"total":3,"yearly":[{"complete":0,"failed":0,"open":3,"stale":0,"year":2025}],"byType":[{"type":"deck","n":3,"complete":0,"failed":0,"stale":0,"open":3,"medIssueDays":170}],"permits":[{"address":"1838 Geneva Av","block":"6423","cost":10000,"description":"bldg c: repair pedestrian deck coating and expansion joints on the elevated walkways on a case by case basis. remove non-structural soffit framing that spans across expansions joints and repair stucco. to comply with nov # 202536811.","filedDate":"2025-07-22","issuedDate":"2026-01-08","lat":37.709912779,"licenses":["1101521"],"lng":-122.425106364,"lot":"236","neighborhood":"Excelsior","outcome":"open","ownerBuilder":false,"permitNumber":"202507030171","rowHash":"ddb69c9b1745ba91","status":"issued","statusDate":"2026-01-08","tags":["deck"],"use":"apartments","useClass":"apartments","useSource":"city"},{"address":"1828 Geneva Av","block":"6423","cost":15000,"description":"bldg d: repair pedestrian deck coating and expansion joints on the elevated walkways on a case by case basis. remove non-structural soffit framing that spans across expansions joints and repair stucco. install 4'x4' roof hatches at elevator #4 for the one time access to hoistways for the modernizati","filedDate":"2025-07-22","issuedDate":"2026-01-08","lat":37.710038817,"licenses":["1101521"],"lng":-122.425028029,"lot":"236","neighborhood":"Excelsior","outcome":"open","ownerBuilder":false,"permitNumber":"202507030168","rowHash":"1d36906228bc4a09","status":"issued","statusDate":"2026-01-08","tags":["deck"],"use":"apartments","useClass":"apartments","useSource":"city"},{"address":"1858 Geneva Av","block":"6423","cost":15000,"description":"bldg a: repair pedestrian deck coating and expansion joints on the elevated walkways on a case by case basis. remove non-structural soffit framing that spans across expansions joints and repair stucco. install 4'x4' roof hatches at elevator #1 for the one time access. to comply with nov # 202536811.","filedDate":"2025-07-22","issuedDate":"2026-01-08","lat":37.709894668,"licenses":["1101521"],"lng":-122.424862625,"lot":"236","neighborhood":"Excelsior","outcome":"open","ownerBuilder":false,"permitNumber":"202507030173","rowHash":"f604c9a36d11c829","status":"issued","statusDate":"2026-01-08","tags":["deck"],"use":"apartments","useClass":"apartments","useSource":"city"}],"page":"/contractor/pe-management-group-inc-1101521","stateLicenseRecord":"https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1101521"}