# 455 Mission Bay Blvd South

Block 8721, lot 032. Page: https://www.permitgraph.org/a/8721/032

- City's use: Commercial Office
- Built: 2009
- Stories: 5
- Building: 222,000 sq ft
- Zoning: NA
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

65 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202202027124](https://www.permitgraph.org/p/202202027124) | Feb 2, 2022 | Completed: final sign-off Jun 2022 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Therma Llc](https://www.permitgraph.org/contractor/therma-llc-1027316) | remove and replace air compressor and storage tank. | $94,000 |
| [202201286883](https://www.permitgraph.org/p/202201286883) | Jan 28, 2022 | Completed: final sign-off Mar 2022 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Fire Stop Sprinkler Company](https://www.permitgraph.org/contractor/fire-stop-sprinkler-company-654769) | 4th fl: relocate 14 pendnt heads. bldg #202112033665 | $42,750 |
| [202201186128](https://www.permitgraph.org/p/202201186128) | Jan 18, 2022 | Completed: final sign-off Apr 2022 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 4/f: fire alarm t.i. adding 1 power suply, 9 horn -strobes, 5 strobes and 1 relay module to (e0 notifier nfs2-3030 fire alarm system. | $14,046 |
| [202112033665](https://www.permitgraph.org/p/202112033665) | Dec 3, 2021 | Completed: final sign-off Jun 2022 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Mai Construction Inc.](https://www.permitgraph.org/contractor/mai-construction-inc-296965) | ti of (e) labs on 4th floor including demo and installation of walls and doors, ceilings, lab furniture and equipment to build new tc labs. includes mep modifications. fire alarm/sprinkler deferred. | $1,022,340 |
| [202110019613](https://www.permitgraph.org/p/202110019613) | Oct 1, 2021 | Completed: final sign-off Nov 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Eco Fire Sprinklers Inc](https://www.permitgraph.org/contractor/eco-fire-sprinklers-inc-1004513) | 5/f: relocate 39 (e) fire sprinklers for t.i. ref pa202109017583. | $40,000 |
| [202109289336](https://www.permitgraph.org/p/202109289336) | Sep 28, 2021 | Never finaled: issued Sep 2021, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 5th fl: fire alarm ti: adding 3 strobes to (e) notifier nfs-23030 fire alarm system | $11,670 |
| [202109017583](https://www.permitgraph.org/p/202109017583) | Sep 1, 2021 | Completed: final sign-off Dec 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) | t.i. adding non bearing partitions, fixtures, mep. fire suppression under separate permit. ref partial t.i. work on 5th fl 2020 1222 1526. | $755,762 |
| [202107164578](https://www.permitgraph.org/p/202107164578) | Jul 16, 2021 | Never finaled: issued Jul 2021, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) | addition of 0,2 depletion sensors @ 1/f & 5/f gas storage areas associated w/(e) compressed gas distribution system under bpa#202106031593 & t.i. permit 202012221526 | $2,000 |
| [202106031593](https://www.permitgraph.org/p/202106031593) | Jun 3, 2021 | Completed: final sign-off Jun 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) | modification to e compressed gas distribution system serving ti under 202012221526. modification includes (n) piping runs from (e) storage room at level 1 to renovated areas at level 5 | $1,000 |
| [202105039693](https://www.permitgraph.org/p/202105039693) | May 3, 2021 | Completed: final sign-off May 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm ti: adding (13) horn-strobes and (1) strobe to existing notifier nfs2-3030 fire alarm system. | $13,076 |
| [202104279441](https://www.permitgraph.org/p/202104279441) | Apr 27, 2021 | Completed: final sign-off Jun 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Eco Fire Sprinklers Inc](https://www.permitgraph.org/contractor/eco-fire-sprinklers-inc-1004513) | to relocate 69 existing sprinklers and add 5 new sprinklers in area of work for tenant improvement. building permit ref # 2020-1222-1526 | $18,000 |
| [202103226976](https://www.permitgraph.org/p/202103226976) | Mar 22, 2021 | Completed: final sign-off Nov 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Therma Llc](https://www.permitgraph.org/contractor/therma-llc-1027316) | provide and install new 70 ton chiller. | $149,037 |
| [202012221526](https://www.permitgraph.org/p/202012221526) | Dec 22, 2020 | Completed: final sign-off Jun 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) | 5th fl: tenant improvement. fire suppression system under sep permit. deffered fire sprinklers & life safety system to remain operational during construction and alterations to be system will be desi… | $850,000 |
| [201910094013](https://www.permitgraph.org/p/201910094013) | Oct 9, 2019 | Never finaled: issued Oct 2019, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Ace Fire Equipment&Serv.](https://www.permitgraph.org/contractor/ace-fire-equipment-serv-472260) | remove co2 fire system from wet bench 2nd fl lab | $1,000 |
| [201908158903](https://www.permitgraph.org/p/201908158903) | Aug 15, 2019 | Completed: final sign-off Apr 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) | 5th flr lab/freezer storage only - interior demo. non structural demo only of non rated construction per ab017, space to remain vacant until accessible features are restored. | $12,000 |
| [201907317520](https://www.permitgraph.org/p/201907317520) | Jul 31, 2019 | Never finaled: issued Oct 2019, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | structural, mechanical, ele, plumbing engineering and design for a complete and operational fuel cell system to provide power to other components on 1455 3rd st ref pa 2019-0731-7519 and 2015 0824 50… | $75,000 |
| [201806121588](https://www.permitgraph.org/p/201806121588) | Jun 12, 2018 | Expired or cancelled: cancelled Nov 2022 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) |  | install energy storage system using lithium ion batteries to reduce peak bld load. the system is monitored remotely and will discharge power to reduce bld peak power load maher na | $48,000 |
| [201801057938](https://www.permitgraph.org/p/201801057938) | Jan 5, 2018 | Completed: final sign-off Aug 2018 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 4th flr: ti - conference room, walls & ceiling, demo & reconfiguration of small office area & conference room. new walls, ceiling & lighting. maher na | $400,000 |
| [201711274841](https://www.permitgraph.org/p/201711274841) | Nov 27, 2017 | Completed: final sign-off Dec 2017 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [R C Benson & Sons Inc.](https://www.permitgraph.org/contractor/r-c-benson-sons-inc-266650) | tenant improvement that returns extg office space into a single leaseable office space. this will be accomplished by wall removal. n/a for maher | $36,400 |
| [201710231962](https://www.permitgraph.org/p/201710231962) | Oct 23, 2017 | Never finaled: issued Oct 2017, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | f/a for part of ti for 3rd fl, building 3: 1 addressable control relay will be added to (e) notifier nfs2-3030 for elevator lobby door holder control. ref #201706290676. maher na | $4,000 |
| [201710060605](https://www.permitgraph.org/p/201710060605) | Oct 6, 2017 | Completed: final sign-off Dec 2017 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Fire Stop Sprinkler Company](https://www.permitgraph.org/contractor/fire-stop-sprinkler-company-654769) | as built for 3 sprinkler pendents being relocated to pa#201708043903. n/a ordinance #155-13 |  |
| [201709087362](https://www.permitgraph.org/p/201709087362) | Sep 8, 2017 | Completed: final sign-off Aug 2018 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | third floor t.i. reconfigure layout of small office area, includes demo of some walls, additional mep scope n/a for maher | $200,000 |
| [201709077291](https://www.permitgraph.org/p/201709077291) | Sep 7, 2017 | Completed: final sign-off Oct 2017 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | suite 145 - building 3: 2 new horn strobe and 2 new strobes added to existing notifier nsf2 3030 part of tenant improvement ref 201707172015. n/a maher | $5,450 |
| [201708225514](https://www.permitgraph.org/p/201708225514) | Aug 22, 2017 | Never finaled: issued Aug 2017, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [A M S Electric Inc](https://www.permitgraph.org/contractor/a-m-s-electric-inc-835815) | 5th fl; adding (25) 120v, 20 a outlets. add (1) ceiling mounted occupancy sensor to existing (1) 100a, 30ckt, 3 phase 4 wire panel. | $38,000 |
| [201708114548](https://www.permitgraph.org/p/201708114548) | Aug 11, 2017 | Completed: final sign-off Sep 2017 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 3rd fl ti to existing notifier nps2-3030 in bldg 3. adding 5 new horn strobe and 3 strobes maher na ti pa #201706290676. | $6,592 |
| [201708043903](https://www.permitgraph.org/p/201708043903) | Aug 4, 2017 | Completed: final sign-off Oct 2017 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Fire Stop Sprinkler Company](https://www.permitgraph.org/contractor/fire-stop-sprinkler-company-654769) | 1st and 3rd floor: t.i. fire sprinkler to relocate 5 pendent heads. 1st floor ref app#201707172015 and 3rd floor ref app#201706290676. | $7,000 |
| [201707172015](https://www.permitgraph.org/p/201707172015) | Jul 17, 2017 | Completed: final sign-off Mar 2018 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 1st fl only: some wall and ceiling demolition to reconfigure layour of office area. some new walls, ceiling, and lighting finishes to match existing. n/a maher ordinance | $600,000 |
| [201706290676](https://www.permitgraph.org/p/201706290676) | Jun 29, 2017 | Never finaled: issued Jul 2017, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 3/f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. n/a ordinance #155-13 | $800,000 |
| [201702280255](https://www.permitgraph.org/p/201702280255) | Feb 28, 2017 | Completed: final sign-off Mar 2017 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | 5th floor: add 1 sprinkler pendent to meet and extend coverage per new wall condition. ref 201702099105 maher na | $6,273 |
| [201702099105](https://www.permitgraph.org/p/201702099105) | Feb 9, 2017 | Completed: final sign-off Mar 2017 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [R C Benson & Sons Inc.](https://www.permitgraph.org/contractor/r-c-benson-sons-inc-266650) | tenant improvement that divides existing office into 2 separate leasable office areas. project area is 1466 sq ft. n/a maher | $36,400 |
| [201701207547](https://www.permitgraph.org/p/201701207547) | Jan 20, 2017 | Completed: final sign-off Jun 2017 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Fire Stop Sprinkler Company](https://www.permitgraph.org/contractor/fire-stop-sprinkler-company-654769) | 2nd floor fire sprinkler t.i. - relocate 8 pendent heads & add one upright head. ref pa #201610059559. n/a maher ordinance | $10,975 |
| [201612225734](https://www.permitgraph.org/p/201612225734) | Dec 22, 2016 | Completed: final sign-off Oct 2020 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | construction of shoring wall in association of bld construction at 1455 3rd maher na | $25,000 |
| [201612225767](https://www.permitgraph.org/p/201612225767) | Dec 22, 2016 | Completed: final sign-off Mar 2017 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 1 new h orn storbe and 2 new strobes added to existing notifier. nfs2-3030 as part of ti in building 3 2nd fl.3 e horn strobes and 1 e strobe being relocated. 2 existing standard candela orn strobes… | $8,392 |
| [201610059559](https://www.permitgraph.org/p/201610059559) | Oct 5, 2016 | Completed: final sign-off Jul 2017 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | bldg. 2, 2/f- renovation for nektar theraputics corporate headquarters to include new offices & laboratory spaces. n/a ordinance #155-13. deferred submittal for fire alarm & fire sprinkler. | $1,300,000 |
| [201512155179](https://www.permitgraph.org/p/201512155179) | Dec 15, 2015 | Expired or cancelled: cancelled Jan 2026 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) |  | vinyl sticker installed on window - '1401' & 'rock health'. n/a maher ordinance | $498 |
| [201505045233](https://www.permitgraph.org/p/201505045233) | May 4, 2015 | Expired or cancelled: cancelled Jan 2026 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) |  | bldg 3- addition of a security door with card reader within an existing passageway. n/a ordinance #155-13 | $10,000 |
| [201504224270](https://www.permitgraph.org/p/201504224270) | Apr 22, 2015 | Completed: final sign-off Jul 2015 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | bldg 3- add 1 power supply, 1 manual alarm, 4 smoke detectors, 1 duct detector, 27 horn/strobes & 10 strobes as part of a t.i. for bldg.3, 2/f. ref. to pa#201503100342. n/a ordinance #155-13 | $20,000 |
| [201504032775](https://www.permitgraph.org/p/201504032775) | Apr 3, 2015 | Never finaled: issued Apr 2015, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) |  | 2nd floor: fire sprinkler t.i. 165 new heads off (e) shell sprinkler system. ref. appl. 2015.0310.0342. maher n/a. | $43,586 |
| [201503100342](https://www.permitgraph.org/p/201503100342) | Mar 10, 2015 | Completed: final sign-off Nov 2015 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | building 3 - 2nd floor -19525 sf ti build out for 1st time occupant of shell space. bathrooms, elevators and stairs are (e). project will build office space for use of tenant. this project is on the… | $2,831,125 |
| [201502067669](https://www.permitgraph.org/p/201502067669) | Feb 6, 2015 | Completed: final sign-off Mar 2015 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | bldg. 3- add 2 monitoring modules and increase cd of one existing horn/strobe due to t.i. on 1/f. t.i.pa# 201409297544. n/a ordinance #155-13 | $1,500 |
| [201501165968](https://www.permitgraph.org/p/201501165968) | Jan 16, 2015 | Never finaled: issued Jan 2015, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [R C Benson & Sons Inc.](https://www.permitgraph.org/contractor/r-c-benson-sons-inc-266650) | #125- provide seismic bracing work for new equipment in space for pa#201409297544. n/a ordinance #155-13 | $6,000 |
| [201412184093](https://www.permitgraph.org/p/201412184093) | Dec 18, 2014 | Completed: final sign-off Mar 2025 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047) | add new co2 fire suppression system to new process tool station. ref.job #201409035284. | $15,000 |
| [201412123621](https://www.permitgraph.org/p/201412123621) | Dec 12, 2014 | Completed: final sign-off Dec 2014 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | 1st floor lab: relocate 1 head and add 1 head. total 2 heads. t.i. app#201311273048 | $4,000 |
| [201410158899](https://www.permitgraph.org/p/201410158899) | Oct 15, 2014 | Completed: final sign-off Mar 2022 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Superior Automatic Sprinkler](https://www.permitgraph.org/contractor/superior-automatic-sprinkler-287121) | relocate 5 plug off 1 fire sprinkler. ref app#201406300071 | $2,000 |
| [201409297544](https://www.permitgraph.org/p/201409297544) | Sep 29, 2014 | Never finaled: issued Dec 2014, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [R C Benson & Sons Inc.](https://www.permitgraph.org/contractor/r-c-benson-sons-inc-266650) | suite 125 - remodel of lab space including mechanical, electrical and plumbing work. ref: pa#2014-09-03-5284. maher ord n/a. | $200,000 |
| [201409035284](https://www.permitgraph.org/p/201409035284) | Sep 3, 2014 | Completed: final sign-off Oct 2014 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [R C Benson & Sons Inc.](https://www.permitgraph.org/contractor/r-c-benson-sons-inc-266650) | suite #125: interior ti. remodel of existing spaces. electrical upgrade to comply with title 24. new ada compliance kitchette. maher n/a. | $165,000 |
| [201406300071](https://www.permitgraph.org/p/201406300071) | Jun 30, 2014 | Completed: final sign-off Nov 2014 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 3rd floor:soft demolition, constuction of new partitions and mep upgrades for new offices. n/a for maher 155-13. fire sprinkler under deferred submittal | $33,000 |
| [201405196088](https://www.permitgraph.org/p/201405196088) | May 19, 2014 | Completed: final sign-off Jul 2014 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Therma Corporation](https://www.permitgraph.org/contractor/therma-corporation-270648) | add sheet metal exhaust ducts, floor drain, (1) icw line, process cda, n2 & o2 lines. n/a ordinance #155-13. | $45,256 |
| [201404102927](https://www.permitgraph.org/p/201404102927) | Apr 10, 2014 | Completed: final sign-off Jun 2015 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | installation of lab equipment & associated mep connections. reference p/a#201210051422. compliance with ordinance no.155-13 not required. | $10,000 |
| [201403049814](https://www.permitgraph.org/p/201403049814) | Mar 4, 2014 | Completed: final sign-off May 2014 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | bldg 3- connect new door holders being installed by others. na compliance #155-13. | $1,100 |
| [201402279424](https://www.permitgraph.org/p/201402279424) | Feb 27, 2014 | Completed: final sign-off Apr 2014 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Superior Automatic Sprinkler](https://www.permitgraph.org/contractor/superior-automatic-sprinkler-287121) | relocate 2 fire sprinklers | $2,800 |
| [201402067993](https://www.permitgraph.org/p/201402067993) | Feb 6, 2014 | Completed: final sign-off Jul 2014 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Integrated Engineering Services](https://www.permitgraph.org/contractor/integrated-engineering-services-810139) | installation of research and development dna synthesis equipment and supporting chemical supply cabinet into existing laboratory. laboratory is equipped with cda and ventilation. mechanical installat… | $12,000 |
| [M458707](https://www.permitgraph.org/p/M458707) | Jan 22, 2014 | Never finaled: issued Jan 2014, no final | [1401 03rd St](https://www.permitgraph.org/a/8721/032) |  | change/add address to 455 mission bay blvd south ste #124. to 1401 3rd street. |  |
| [201311212556](https://www.permitgraph.org/p/201311212556) | Nov 21, 2013 | Completed: final sign-off Dec 2013 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | 1st floor - mechanical ductwork, electrical power and lighting and plumbing for new gr fl office buildout. ref 201307121673. fire sprinkler separate | $80,000 |
| [201310179494](https://www.permitgraph.org/p/201310179494) | Oct 17, 2013 | Completed: final sign-off Nov 2013 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 1st floor-add 5 strobes, 8 horn/strobes, 2 duct detectors | $10,000 |
| [201310169391](https://www.permitgraph.org/p/201310169391) | Oct 16, 2013 | Completed: final sign-off Jan 2014 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | support of custom wood ceiling | $15,000 |
| [201309116506](https://www.permitgraph.org/p/201309116506) | Sep 11, 2013 | Completed: final sign-off Dec 2013 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [B F P Fire Protection](https://www.permitgraph.org/contractor/b-f-p-fire-protection-847906) | fire sprinkler, add 26 pendent and upright head due to new wall and ceilings. ref app#201307121673. | $12,500 |
| [201307121673](https://www.permitgraph.org/p/201307121673) | Jul 12, 2013 | Completed: final sign-off Jan 2014 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | 1st floor-first time t.i-new shell space-create offices, breakroom, restrooms including drywall, partitions, suspended ceilings, convenience kitchenette, hvac, electrical & lighting. fire protection… | $310,000 |
| [201302220745](https://www.permitgraph.org/p/201302220745) | Feb 22, 2013 | Expired or cancelled: cancelled Sep 2023 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Superior Automatic Sprinkler](https://www.permitgraph.org/contractor/superior-automatic-sprinkler-287121) | convert pre-action to wet pipe | $3,000 |
| [201210051422](https://www.permitgraph.org/p/201210051422) | Oct 5, 2012 | Never finaled: issued Jul 2013, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 3rd floor - install flame atomic absorption spectrometer to include 1ea exhaust hood, 2 - 11ov elec ckts, 1 air line, 1 acetylene line, flam gas storage cabinet w/exhaust duct. 2 acetelyene tanks. l/… | $10,000 |
| [201206061916](https://www.permitgraph.org/p/201206061916) | Jun 6, 2012 | Completed: final sign-off Jul 2012 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [B F P Fire Protection](https://www.permitgraph.org/contractor/b-f-p-fire-protection-847906) | addition of 52 pendent sprinklers per new ceiling and partition layout. | $9,800 |
| [201206061917](https://www.permitgraph.org/p/201206061917) | Jun 6, 2012 | Completed: final sign-off Jul 2012 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [B F P Fire Protection](https://www.permitgraph.org/contractor/b-f-p-fire-protection-847906) | addition of 7 wax coated pendents per new fume hoods. | $4,000 |
| [201204248970](https://www.permitgraph.org/p/201204248970) | Apr 24, 2012 | Completed: final sign-off May 2012 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | 5th floor: add one fire sprinkler head at ceiling to accommodate new demising wall. | $3,200 |
| [201204057649](https://www.permitgraph.org/p/201204057649) | Apr 5, 2012 | Completed: final sign-off May 2012 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [R C Benson & Sons Inc.](https://www.permitgraph.org/contractor/r-c-benson-sons-inc-266650) | work on the 5th floor: demise (e) office suite in half. office t.i. this project consists of a new opening to expand an (e) office suite into an (e) adjacent office suite. | $20,000 |
| [201203206482](https://www.permitgraph.org/p/201203206482) | Mar 20, 2012 | Completed: final sign-off Aug 2012 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | tenant improvement in warm shell space on 1st floor. offices, labs, no bathrooms, office partitions, lab benches, tissub couture labs. | $540,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) (11), [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) (9), [R C Benson & Sons Inc.](https://www.permitgraph.org/contractor/r-c-benson-sons-inc-266650) (6), [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) (6), [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) (5), [Fire Stop Sprinkler Company](https://www.permitgraph.org/contractor/fire-stop-sprinkler-company-654769) (4), [B F P Fire Protection](https://www.permitgraph.org/contractor/b-f-p-fire-protection-847906) (3), [Superior Automatic Sprinkler](https://www.permitgraph.org/contractor/superior-automatic-sprinkler-287121) (3), [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) (3), [Eco Fire Sprinklers Inc](https://www.permitgraph.org/contractor/eco-fire-sprinklers-inc-1004513) (2), [Therma Llc](https://www.permitgraph.org/contractor/therma-llc-1027316) (2), [A M S Electric Inc](https://www.permitgraph.org/contractor/a-m-s-electric-inc-835815), [Ace Fire Equipment&Serv.](https://www.permitgraph.org/contractor/ace-fire-equipment-serv-472260), [Integrated Engineering Services](https://www.permitgraph.org/contractor/integrated-engineering-services-810139), [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047), [Mai Construction Inc.](https://www.permitgraph.org/contractor/mai-construction-inc-296965), [Therma Corporation](https://www.permitgraph.org/contractor/therma-corporation-270648)
- Architects: [John Mickow](https://www.permitgraph.org/professional/john-mickow-C28429) (6), [Randall Dowler](https://www.permitgraph.org/professional/randall-dowler-C23107) (4), [Bonnie Bridges](https://www.permitgraph.org/professional/bonnie-bridges-C28785), [Flad & Assoc.](https://www.permitgraph.org/professional/flad-assoc-C17897), [Flad & Associates](https://www.permitgraph.org/professional/flad-associates-28429), [Kenneth F. Hom](https://www.permitgraph.org/professional/kenneth-f-hom-C7741), [Martin Gicklhorn](https://www.permitgraph.org/professional/martin-gicklhorn-C11934), [Robert Aboyme](https://www.permitgraph.org/professional/robert-aboyme-C337154)
- Engineers: [Chris Mcnamara](https://www.permitgraph.org/professional/chris-mcnamara-E21600) (2), [Charles Lew](https://www.permitgraph.org/professional/charles-lew-C62097), [Henry Holbrook Hyde Iii](https://www.permitgraph.org/professional/henry-holbrook-hyde-iii-C21290), [Jaimi Baer](https://www.permitgraph.org/professional/jaimi-baer-C25731), [Joselito Navarro](https://www.permitgraph.org/professional/joselito-navarro-C55100), [Juan F. Orosco](https://www.permitgraph.org/professional/juan-f-orosco-E13946), [Matthew Jordan](https://www.permitgraph.org/professional/matthew-jordan-S3687), [Robert Zamudio](https://www.permitgraph.org/professional/robert-zamudio-36566), [Sean Cua](https://www.permitgraph.org/professional/sean-cua-M37255), [Sherry Chaumpluke](https://www.permitgraph.org/professional/sherry-chaumpluke-M34646), [Soniya R. Chopada](https://www.permitgraph.org/professional/soniya-r-chopada-33545), [Stephen Shafeer](https://www.permitgraph.org/professional/stephen-shafeer-E21097), [Steven Joseph Rusconi](https://www.permitgraph.org/professional/steven-joseph-rusconi-20105), [Tony Shakouri](https://www.permitgraph.org/professional/tony-shakouri-31836)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/8721/032.