# 26 Miramar Ave

Block 7016, lot 029. Page: https://www.permitgraph.org/a/7016/029

- City's use: Single Family Residential
- Built: 1927
- Stories: 2
- Units: 1
- Rooms: 2 bedrooms, 2 bathrooms
- Building: 1,581 sq ft
- Lot: 2,809 sq ft
- Zoning: RH1
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

8 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202506027658](https://www.permitgraph.org/p/202506027658) | Jun 2, 2025 | Completed: final sign-off Aug 2025 | [26 Miramar Av](https://www.permitgraph.org/a/7016/029) | [West Valley Structural Co.](https://www.permitgraph.org/contractor/west-valley-structural-co-570208) | dry rot repair per wood report (west valley structural structural)report #12689. date 5/6/25. item #1d no structural changes. like and kind. front of home. repair fungus damage, dryrot to garage, sho… | $11,000 |
| [M759127](https://www.permitgraph.org/p/M759127) | Feb 6, 2017 | Never finaled: issued Feb 2017, no final | [26 Miramar Av](https://www.permitgraph.org/a/7016/029) |  | street space |  |
| [M743087](https://www.permitgraph.org/p/M743087) | Dec 2, 2016 | Never finaled: issued Dec 2016, no final | [26 Miramar Av](https://www.permitgraph.org/a/7016/029) |  | street space |  |
| [M734087](https://www.permitgraph.org/p/M734087) | Oct 28, 2016 | Never finaled: issued Oct 2016, no final | [26 Miramar Av](https://www.permitgraph.org/a/7016/029) |  | street space permit |  |
| [201610079761](https://www.permitgraph.org/p/201610079761) | Oct 7, 2016 | Completed: final sign-off Apr 2017 | [26 Miramar Av](https://www.permitgraph.org/a/7016/029) | [Skylor Construction Dba Skycore Constr](https://www.permitgraph.org/contractor/skylor-construction-dba-skycore-constr-803702) | finish basement, add office, bathroom, family room, install outlets, lights, hvac, doors, 3 windows, flooring. remove slab, lower/replace slab. | $28,200 |
| [200707096256](https://www.permitgraph.org/p/200707096256) | Jul 9, 2007 | Completed: final sign-off Aug 2007 | [26 Miramar Av](https://www.permitgraph.org/a/7016/029) | [Home Works Inc/Kitchen Work Inc](https://www.permitgraph.org/contractor/home-works-inc-kitchen-work-inc-500896) | replace 10 windows, size for size, wood to wood composite. visible from street. u-value 0.39. | $18,000 |
| [200501243792](https://www.permitgraph.org/p/200501243792) | Jan 24, 2005 | Completed: final sign-off Mar 2005 | [26 Miramar Av](https://www.permitgraph.org/a/7016/029) | [James Labao](https://www.permitgraph.org/contractor/james-labao-740922) | insulate and sheetrock two rear bedrms on 2nd flr r-13 wall, r-30 ceiling | $3,000 |
| [200410066059](https://www.permitgraph.org/p/200410066059) | Oct 6, 2004 | Completed: final sign-off Feb 2005 | [26 Miramar Av](https://www.permitgraph.org/a/7016/029) |  | remodel exist bathroom with new sink,toilet,shower&tile floor.no structure work. | $5,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Home Works Inc/Kitchen Work Inc](https://www.permitgraph.org/contractor/home-works-inc-kitchen-work-inc-500896), [James Labao](https://www.permitgraph.org/contractor/james-labao-740922), [Skylor Construction Dba Skycore Constr](https://www.permitgraph.org/contractor/skylor-construction-dba-skycore-constr-803702), [West Valley Structural Co.](https://www.permitgraph.org/contractor/west-valley-structural-co-570208)
- Engineers: [Nicholas Blackburn](https://www.permitgraph.org/professional/nicholas-blackburn-C58816)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/7016/029.
