# 144 Clipper St

Block 6549, lot 015. Page: https://www.permitgraph.org/a/6549/015

- City's use: Single Family Residential
- Built: 1904
- Stories: 2
- Units: 1
- Rooms: 4 bedrooms, 2 bathrooms
- Building: 2,555 sq ft
- Lot: 2,850 sq ft
- Zoning: RH2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

11 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202406204905](https://www.permitgraph.org/p/202406204905) | Jun 20, 2024 | Completed: final sign-off Sep 2024 | [144 Clipper St](https://www.permitgraph.org/a/6549/015) | [Liaison Landscapes Inc](https://www.permitgraph.org/contractor/liaison-landscapes-inc-1022478) | extend existing 110 (v) circuit into landscape for future use. trench a 18" depth and stub up junction box above the landscape grade. | $800 |
| [202301120117](https://www.permitgraph.org/p/202301120117) | Jan 12, 2023 | Completed: final sign-off Sep 2023 | [144 Clipper St](https://www.permitgraph.org/a/6549/015) | [Christopher Gate Construction Inc](https://www.permitgraph.org/contractor/christopher-gate-construction-inc-840805) | revision to bpa#202210073977, interior renoto removal all (e) floor joists in kitchen currently in substandard state, frame new flooring to provide continuous floor level btwn kitchen & library | $1,500 |
| [202210073977](https://www.permitgraph.org/p/202210073977) | Oct 7, 2022 | Completed: final sign-off Sep 2023 | [144 Clipper St](https://www.permitgraph.org/a/6549/015) | [Christopher Gate Construction Inc](https://www.permitgraph.org/contractor/christopher-gate-construction-inc-840805) | interior renovations of garage laundry, 1st floor kitchen and powder room, 2nd floor master suite, office and bath. exterior window replacement, new garage door, entry handrail, deck guard rails, lig… | $700,000 |
| [202204222808](https://www.permitgraph.org/p/202204222808) | Apr 22, 2022 | Completed: final sign-off May 2022 | [144 Clipper St](https://www.permitgraph.org/a/6549/015) |  | replace like for like - dry rot at garage door. repair trim around garage in kind. no work on door itself. | $2,000 |
| [201911127049](https://www.permitgraph.org/p/201911127049) | Nov 12, 2019 | Completed: final sign-off Sep 2020 | [144 Clipper St](https://www.permitgraph.org/a/6549/015) |  | repair (e) rear deck; less than 50% - addendum to permit pa# 2019-1001-3170 to address dry rot. not visible from street. | $2,500 |
| [201910013170](https://www.permitgraph.org/p/201910013170) | Oct 1, 2019 | Completed: final sign-off Sep 2020 | [144 Clipper St](https://www.permitgraph.org/a/6549/015) |  | reroof flat 20 x 10 extension, replace like for like water damage and dry rot. including decking and siding as needed. not visible from street. less than 50% | $5,000 |
| [M425447](https://www.permitgraph.org/p/M425447) | Sep 11, 2013 | Never finaled: issued Sep 2013, no final | [144 Clipper St](https://www.permitgraph.org/a/6549/015) |  | street space & sidewalk permit |  |
| [200902031307](https://www.permitgraph.org/p/200902031307) | Feb 3, 2009 | Completed: final sign-off Aug 2009 | [144 Clipper St](https://www.permitgraph.org/a/6549/015) | [Peter Harris Construction Inc](https://www.permitgraph.org/contractor/peter-harris-construction-inc-683264) | strenghten an (e) victorian staircase by updating the system of beams, posts & headers of the opening (replace 2 (e) & add 1 new beam)-interior only. | $5,000 |
| [200702083670](https://www.permitgraph.org/p/200702083670) | Feb 8, 2007 | Completed: final sign-off Jun 2007 | [144 Clipper St](https://www.permitgraph.org/a/6549/015) | [Peter Harris Construction Inc](https://www.permitgraph.org/contractor/peter-harris-construction-inc-683264) | revision to pa#200506235879. delete master bath (sheet a1.2) |  |
| [200606194374](https://www.permitgraph.org/p/200606194374) | Jun 19, 2006 | Completed: final sign-off Oct 2008 | [144 Clipper St](https://www.permitgraph.org/a/6549/015) |  | structural revision to pa# 2005/06/23/5879 project is under construction: revision to roof framing at front to limit disruption to (e) roof framing, revised 7/s5 to reflect as-built condition. |  |
| [200506235879](https://www.permitgraph.org/p/200506235879) | Jun 23, 2005 | Completed: final sign-off Apr 2007 | [144 Clipper St](https://www.permitgraph.org/a/6549/015) |  | interior remodel to include reworking of (e)bathrooms,new interior stair to garage and addition of entry foyer.new bath & modify hallway upstairs,new closet,a master bedroom.new storage-garage.exteri… | $170,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Christopher Gate Construction Inc](https://www.permitgraph.org/contractor/christopher-gate-construction-inc-840805) (2), [Peter Harris Construction Inc](https://www.permitgraph.org/contractor/peter-harris-construction-inc-683264) (2), [Liaison Landscapes Inc](https://www.permitgraph.org/contractor/liaison-landscapes-inc-1022478)
- Architects: [Abigail S Lubniewski](https://www.permitgraph.org/professional/abigail-s-lubniewski-C36248) (2), [Scott Colson](https://www.permitgraph.org/professional/scott-colson-C13145)
- Engineers: [Cheng Tang](https://www.permitgraph.org/professional/cheng-tang-S2984) (2), [David Yadegar](https://www.permitgraph.org/professional/david-yadegar-C73922), [Dil Kazzaz](https://www.permitgraph.org/professional/dil-kazzaz-C30065)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/6549/015.