# 304 Brazil Ave

Block 6080, lot 043. Page: https://www.permitgraph.org/a/6080/043

- City's use: Multi-Family Residential
- Built: 1910
- Stories: 2
- Units: 2
- Rooms: 3 bathrooms
- Building: 2,365 sq ft
- Lot: 2,500 sq ft
- Zoning: RM1
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

6 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202408229241](https://www.permitgraph.org/p/202408229241) | Aug 22, 2024 | Completed: final sign-off Sep 2024 | [304 Brazil Av](https://www.permitgraph.org/a/6080/043) | [New High Protection Roofing](https://www.permitgraph.org/contractor/new-high-protection-roofing-593391) | re-roofing | $11,000 |
| [202406114162](https://www.permitgraph.org/p/202406114162) | Jun 11, 2024 | Completed: final sign-off Oct 2024 | [304 Brazil Av](https://www.permitgraph.org/a/6080/043) | [Yong Hong Construction Inc.](https://www.permitgraph.org/contractor/yong-hong-construction-inc-855109) | replace kitchen cabinets and countertop. upgrade electrical outlets and add 8 recess lights in kitchen. no other work in kitchen. bathroom remodel, replace bathtub with showerpan | $20,000 |
| [202406114198](https://www.permitgraph.org/p/202406114198) | Jun 11, 2024 | Completed: final sign-off Oct 2024 | [304 Brazil Av](https://www.permitgraph.org/a/6080/043) | [Yong Hong Construction Inc.](https://www.permitgraph.org/contractor/yong-hong-construction-inc-855109) | remove existing 2 front windows and replace with wood aluminum clad windows in the existing openings. single/double hung operation. | $3,000 |
| [201501125502](https://www.permitgraph.org/p/201501125502) | Jan 12, 2015 | Completed: final sign-off Feb 2015 | [304 Brazil Av](https://www.permitgraph.org/a/6080/043) |  | lower level unit - to comply with nov 201517631 - kitchen remodel only; no removal of walls; to compy with cec150.0(k)3 | $2,000 |
| [201309176997](https://www.permitgraph.org/p/201309176997) | Sep 17, 2013 | Expired or cancelled: withdrawn Nov 2013 | [306 Brazil Av](https://www.permitgraph.org/a/6080/043) |  | to comply with violation no. 201318521. at the front of the property change out existing windows (3) and install in their place either wood, wood aluminum clad or architectual grade fiberglass window… | $400 |
| [201209119392](https://www.permitgraph.org/p/201209119392) | Sep 11, 2012 | Completed: final sign-off Mar 2013 | [306 Brazil Av](https://www.permitgraph.org/a/6080/043) | [Ac And Company](https://www.permitgraph.org/contractor/ac-and-company-735228) | comply with nov# 201201221. remove kitchen at attic level. legalize family room, playroom, bathroom, and bedroom at attic level. repair or replace rear stair treads and guardrail as required. | $20,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Yong Hong Construction Inc.](https://www.permitgraph.org/contractor/yong-hong-construction-inc-855109) (2), [Ac And Company](https://www.permitgraph.org/contractor/ac-and-company-735228), [New High Protection Roofing](https://www.permitgraph.org/contractor/new-high-protection-roofing-593391)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/6080/043.
