# 10 Bernal Heights Blvd

Block 5548, lot 003. Page: https://www.permitgraph.org/a/5548/003

- City's use: Miscellaneous/Mixed-Use
- Lot: 34,121 sq ft
- Zoning: RH1D
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

13 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202603268320](https://www.permitgraph.org/p/202603268320) | Apr 8, 2026 | Completed: final sign-off Oct 2026 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) | [Mastec Network Solutions Inc](https://www.permitgraph.org/contractor/mastec-network-solutions-inc-984138) | remove 3 rru's from tower; install 3 new rrus and 1 hybride cable on tower; install 1 rp 6672 on ground. | $30,000 |
| [202406043652](https://www.permitgraph.org/p/202406043652) | Sep 4, 2024 | In progress: issued Feb 2026 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) | [Insite Telecom Llc](https://www.permitgraph.org/contractor/insite-telecom-llc-1082266) | install (1) 48kw diesel generator (240 gal), (1) fire extinguisher, (1) 4'x9' concrete pad, (1) 200a ats, and (2) emergency generator shutoff switches | $30,000 |
| [202104148536](https://www.permitgraph.org/p/202104148536) | Apr 14, 2021 | Completed: final sign-off Dec 2021 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) | [Mastec Network Solutions Inc](https://www.permitgraph.org/contractor/mastec-network-solutions-inc-984138) | t-mobile - remove 6 antennas, 3 tma's, 3 diplexers, 6 7/8" coax cables from tower, 1 cabinet, 18 radios from ground. install 9 antennas, 6 rru's, 3 swivel mounts, 4 hcs cables on tower, 1 6160 cabine… | $30,000 |
| [201802262203](https://www.permitgraph.org/p/201802262203) | Feb 26, 2018 | Expired or cancelled: cancelled May 2021 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) |  | installation of two microwave dish antennas on existing, lattice tower intalled by tpx. | $15,000 |
| [201712277434](https://www.permitgraph.org/p/201712277434) | Dec 27, 2017 | Completed: final sign-off Aug 2018 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | mechanical hvac replacement | $25,000 |
| [201602189907](https://www.permitgraph.org/p/201602189907) | Feb 18, 2016 | Completed: final sign-off Mar 2017 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) | [J R Electric](https://www.permitgraph.org/contractor/j-r-electric-942250) | t-mobile modification: (1) new rbs cabinet, (3) new antennas, (6) new coax cables. | $22,500 |
| [201204259120](https://www.permitgraph.org/p/201204259120) | Apr 25, 2012 | Completed: final sign-off Feb 2017 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) | [Metropolitan Electrical Construction](https://www.permitgraph.org/contractor/metropolitan-electrical-construction-401047), [Mastec Network Solutions Inc](https://www.permitgraph.org/contractor/mastec-network-solutions-inc-984138) | nextnav wireless telecommunications services (wts) facility. install 1 new omni antenna on existing tower, 1 new gps units, 1 new equipment cabinet & 1 new run of 7/8" coax. | $13,000 |
| [201107129999](https://www.permitgraph.org/p/201107129999) | Jul 12, 2011 | Completed: final sign-off Feb 2016 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) | [L.D. Strobel Co Ltd](https://www.permitgraph.org/contractor/l-d-strobel-co-ltd-631117) | remove & replace top section of perimeter fence, install (n) 1-inch wire mesh to inside of fence. install one (n) light fixture at nw corner of (e) bldg. legalize (e) antennas mounted to (e) tower, a… | $80,000 |
| [201012217105](https://www.permitgraph.org/p/201012217105) | Dec 21, 2010 | Expired or cancelled: withdrawn May 2014 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) |  | wireless telecomunications facility for clearwire. install 2 internet services exchange switch antennas on an existing lattice tower | $15,000 |
| [201007267435](https://www.permitgraph.org/p/201007267435) | Jul 26, 2010 | Expired or cancelled: cancelled Dec 2011 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) | [Metropolitan Electrical Construction](https://www.permitgraph.org/contractor/metropolitan-electrical-construction-401047) | installation of 5 internet service exchange antennas per case no 2010.0306c | $45,000 |
| [201005122270](https://www.permitgraph.org/p/201005122270) | May 12, 2010 | Completed: final sign-off Feb 2011 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) | [Park Place Contractors](https://www.permitgraph.org/contractor/park-place-contractors-520850) | install (n) radio cabinets inside (e) concrete building, add antennas on (e) radio tower. install 16-(n) coax cable between radio's & antennas. | $60,000 |
| [201004220863](https://www.permitgraph.org/p/201004220863) | Apr 22, 2010 | Expired or cancelled: withdrawn May 2014 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) |  | installation of landscaping and irrigation in satisfaction of cu authorization conditions of approval. landsacping method will not require on-site municipal water supply tap as rainbird supplemental… | $10,000 |
| [200804119538](https://www.permitgraph.org/p/200804119538) | Apr 11, 2008 | Expired or cancelled: cancelled Aug 2012 | [10 Bernal Heights Bl](https://www.permitgraph.org/a/5548/003) |  | install (8) anel antennas mounted to an (e) towel, with (4) ericsson cabinets with an (e) building. | $45,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Mastec Network Solutions Inc](https://www.permitgraph.org/contractor/mastec-network-solutions-inc-984138) (3), [Metropolitan Electrical Construction](https://www.permitgraph.org/contractor/metropolitan-electrical-construction-401047) (2), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696), [Insite Telecom Llc](https://www.permitgraph.org/contractor/insite-telecom-llc-1082266), [J R Electric](https://www.permitgraph.org/contractor/j-r-electric-942250), [L.D. Strobel Co Ltd](https://www.permitgraph.org/contractor/l-d-strobel-co-ltd-631117), [Park Place Contractors](https://www.permitgraph.org/contractor/park-place-contractors-520850)
- Architects: [Jeffrey Rome](https://www.permitgraph.org/professional/jeffrey-rome-C20876)
- Engineers: [Kyle F. Miller](https://www.permitgraph.org/professional/kyle-f-miller-C98004) (2), [Jason Seaverson](https://www.permitgraph.org/professional/jason-seaverson-C63342), [Jeremy K. Wooster](https://www.permitgraph.org/professional/jeremy-k-wooster-88858)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/5548/003.
