# 81 Mullen Ave

Block 5515, lot 013. Page: https://www.permitgraph.org/a/5515/013

- City's use: Single Family Residential
- Built: 1908
- Stories: 2
- Units: 1
- Rooms: 2 bathrooms
- Building: 1,771 sq ft
- Lot: 1,873 sq ft
- Zoning: RH1
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

8 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [201910285736](https://www.permitgraph.org/p/201910285736) | Oct 28, 2019 | Completed: final sign-off Feb 2020 | [81 Mullen Av](https://www.permitgraph.org/a/5515/013) | [Leeward Construction Co.](https://www.permitgraph.org/contractor/leeward-construction-co-751705) | inkind replacement of wood front door | $4,400 |
| [201610170426](https://www.permitgraph.org/p/201610170426) | Oct 17, 2016 | Completed: final sign-off Feb 2020 | [81 Mullen Av](https://www.permitgraph.org/a/5515/013) | [Leeward Construction Co.](https://www.permitgraph.org/contractor/leeward-construction-co-751705) | replace approx. 14 ft. rot damaged mudsill at west side | $3,000 |
| [200911161254](https://www.permitgraph.org/p/200911161254) | Nov 16, 2009 | Completed: final sign-off Sep 2010 | [81 Mullen Av](https://www.permitgraph.org/a/5515/013) |  | as built conditions that differ from previous building appl. 200812239084 & 200901099920, plus proposed structural improvements. new bathroom configuration. | $10,000 |
| [M173286](https://www.permitgraph.org/p/M173286) | Jul 21, 2009 | Never finaled: issued Jul 2009, no final | [81 Mullen Av](https://www.permitgraph.org/a/5515/013) |  | street space & sidewalk repair. |  |
| [200901099920](https://www.permitgraph.org/p/200901099920) | Jan 9, 2009 | Completed: final sign-off Sep 2010 | [81 Mullen Av](https://www.permitgraph.org/a/5515/013) |  | remodel 1st floor. change storage space into livable space, family room and full bath. new window at front, replace @ rear wall, fixed glass with new windows in same openings | $40,000 |
| [200812239084](https://www.permitgraph.org/p/200812239084) | Dec 23, 2008 | Completed: final sign-off Sep 2010 | [81 Mullen Av](https://www.permitgraph.org/a/5515/013) |  | reinforce existing firsts floor framing plan & add foundation supports for framing. | $12,000 |
| [200812027601](https://www.permitgraph.org/p/200812027601) | Dec 2, 2008 | Completed: final sign-off Sep 2010 | [81 Mullen Av](https://www.permitgraph.org/a/5515/013) |  | remove 2 x 12 boards on top of framing at garage & tools from to expose framing & determine extent of dry rot damage. remove section of shathing at property line walls to determine extent of dry rot.… | $1,000 |
| [M33785](https://www.permitgraph.org/p/M33785) | Aug 10, 2005 | Never finaled: issued Aug 2005, no final | [81 Mullen Av](https://www.permitgraph.org/a/5515/013) |  | sidewalk repair |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Leeward Construction Co.](https://www.permitgraph.org/contractor/leeward-construction-co-751705) (2)
- Architects: [Abraham Zavala](https://www.permitgraph.org/professional/abraham-zavala-C60620)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/a/5515/013.
