# 4618 03rd St

Block 5306, lot 025. Page: https://www.permitgraph.org/a/5306/025

- City's use: Commercial Retail
- Built: 1907
- Stories: 2
- Units: 2
- Rooms: 2 bathrooms
- Building: 2,760 sq ft
- Lot: 3,157 sq ft
- Zoning: NC3
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

20 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202507140707](https://www.permitgraph.org/p/202507140707) | Jul 14, 2025 | In progress: issued Jul 2025 | [4618 03rd St](https://www.permitgraph.org/a/5306/025) | [A Glass & Mirror Company Corp.](https://www.permitgraph.org/contractor/a-glass-mirror-company-corp-1139319) | replacing facade windows with same size and same location, "in-kind" replacement. | $33,000 |
| [202104208890](https://www.permitgraph.org/p/202104208890) | Apr 20, 2021 | Never finaled: issued Apr 2021, no final | [4616 03rd St](https://www.permitgraph.org/a/5306/025) |  | repair leaky roof,sheathing approx. 64 sf on pitch roof & roof shingles locally,repair some siding replacement at rear of bldg approx 50 sf. | $5,000 |
| [M830887](https://www.permitgraph.org/p/M830887) | Sep 12, 2017 | Never finaled: issued Sep 2017, no final | [4618 03rd St](https://www.permitgraph.org/a/5306/025) |  | street space |  |
| [201706068567](https://www.permitgraph.org/p/201706068567) | Jun 6, 2017 | Completed: final sign-off Jun 2017 | [4616 03rd St](https://www.permitgraph.org/a/5306/025) | [Cbs Construction Inc.](https://www.permitgraph.org/contractor/cbs-construction-inc-955448) | to obtain final inspection for work approved under pa 201303212727. all work is complete. |  |
| [201705176864](https://www.permitgraph.org/p/201705176864) | May 17, 2017 | Completed: final sign-off Dec 2017 | [4618 03rd St](https://www.permitgraph.org/a/5306/025) | [Lmnop-Design Inc.](https://www.permitgraph.org/contractor/lmnop-design-inc-993598) | to bring (e) restaurant into compliance with ada requirements for entry, cashier stand, dining surfaces and restroom. | $60,000 |
| [201610311540](https://www.permitgraph.org/p/201610311540) | Oct 31, 2016 | Completed: final sign-off Jun 2017 | [4616 03rd St](https://www.permitgraph.org/a/5306/025) | [Cbs Construction Inc.](https://www.permitgraph.org/contractor/cbs-construction-inc-955448) | to the lower unit, a new carrier furnace is proposed where a heat pump was suggested. revisions to permit #s: 2014-1126-2660 and 2013-0321-2727 r-1 | $3,200 |
| [M724207](https://www.permitgraph.org/p/M724207) | Sep 21, 2016 | Never finaled: issued Sep 2016, no final | [4616 03rd St](https://www.permitgraph.org/a/5306/025) |  | per pa #201303212727, add adddress to 2nd unit at block 5306, lot 025 as; 4616a 3rd street |  |
| [201411262660](https://www.permitgraph.org/p/201411262660) | Nov 26, 2014 | Completed: final sign-off Jun 2017 | [4616 03rd St](https://www.permitgraph.org/a/5306/025) | [Cbs Construction Inc.](https://www.permitgraph.org/contractor/cbs-construction-inc-955448) | rev. to pa#2013/0321/2727. no final until easement is recorded. relocate non-load bearing walls & revise windows & entry door. |  |
| [201303212727](https://www.permitgraph.org/p/201303212727) | Mar 21, 2013 | Expired or cancelled: expired Jun 2017 | [4616 03rd St](https://www.permitgraph.org/a/5306/025) | [Cbs Construction Inc.](https://www.permitgraph.org/contractor/cbs-construction-inc-955448), [Infinite Construction](https://www.permitgraph.org/contractor/infinite-construction-968384) | conversion of (e) sfd into a 2 family dwelling by creation of dwelling unit lower leve. add 1 dwelling unit at lower level of rear bldg; no cfc until easement has been recorded; see pa#201310169347. | $19,000 |
| [201204027276](https://www.permitgraph.org/p/201204027276) | Apr 2, 2012 | Completed: final sign-off May 2012 | [4616 03rd St](https://www.permitgraph.org/a/5306/025) | [Infinite Construction](https://www.permitgraph.org/contractor/infinite-construction-968384) | revision to permit application #201203025241: replace footing, add wall. add one doorway close off 2 doorways. not visible from street. | $10,000 |
| [201203025241](https://www.permitgraph.org/p/201203025241) | Mar 2, 2012 | Completed: final sign-off May 2012 | [4616 03rd St](https://www.permitgraph.org/a/5306/025) |  | update plumbing, electrical in kitchen & bath. replace cabinets in kitchen, new sheetrock & tile in bath. all (n) lighting must comply with cec 150(k)10+8, house is not visable at all from street. | $10,000 |
| [M269587](https://www.permitgraph.org/p/M269587) | Jun 21, 2011 | Never finaled: issued Jun 2011, no final | [4618 03rd St](https://www.permitgraph.org/a/5306/025) |  | street space |  |
| [201101218786](https://www.permitgraph.org/p/201101218786) | Jan 21, 2011 | Completed: final sign-off Jul 2011 | [4618 03rd St](https://www.permitgraph.org/a/5306/025) | [Avalon Construction Co](https://www.permitgraph.org/contractor/avalon-construction-co-820688) | removal of (e) security gate at main entrance, remove (e) wall sign, replace pendent light in kind, new paint on facade, new awning & new roll up security grille | $10,000 |
| [201101218789](https://www.permitgraph.org/p/201101218789) | Jan 21, 2011 | Completed: final sign-off Jul 2011 | [4618 03rd St](https://www.permitgraph.org/a/5306/025) | [Avalon Construction Co](https://www.permitgraph.org/contractor/avalon-construction-co-820688) | install new projecting sign, non illuminated | $1,500 |
| [201101218790](https://www.permitgraph.org/p/201101218790) | Jan 21, 2011 | Completed: final sign-off Jul 2011 | [4618 03rd St](https://www.permitgraph.org/a/5306/025) | [Avalon Construction Co](https://www.permitgraph.org/contractor/avalon-construction-co-820688) | install new raised letter wall sign, non illuminated | $700 |
| [200611077078](https://www.permitgraph.org/p/200611077078) | Nov 7, 2006 | Expired or cancelled: expired Mar 2007 | [4618 03rd St](https://www.permitgraph.org/a/5306/025) | [H K Fire Protection Inc.* Check I.D. ***](https://www.permitgraph.org/contractor/h-k-fire-protection-inc-check-i-d-670272) | install an automatic fire suppression system to the cooking hood using ul-300 range guard system | $2,600 |
| [200609132207](https://www.permitgraph.org/p/200609132207) | Sep 13, 2006 | Expired or cancelled: expired Mar 2007 | [4618 03rd St](https://www.permitgraph.org/a/5306/025) |  | hood installation for pmt#200606144075 exhaust & make-up air | $10,000 |
| [200606144075](https://www.permitgraph.org/p/200606144075) | Jun 14, 2006 | Completed: final sign-off Feb 2007 | [4618 03rd St](https://www.permitgraph.org/a/5306/025) |  | remodel commercial space extg restroom and extg kchn to meet ada | $42,000 |
| [200503187910](https://www.permitgraph.org/p/200503187910) | Mar 18, 2005 | Never finaled: issued Mar 2005, no final | [4618 03rd St](https://www.permitgraph.org/a/5306/025) |  | barrier removal / ada access remodel. replace exist windows, door. stucco over (e) wood pressure | $7,900 |
| [200212274273](https://www.permitgraph.org/p/200212274273) | Dec 27, 2002 | Expired or cancelled: withdrawn Feb 2005 | [4616 03rd St](https://www.permitgraph.org/a/5306/025) |  | replace the existing roof of the subsidewalk basement with a new concrete slab during the constructi | $2,600 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Cbs Construction Inc.](https://www.permitgraph.org/contractor/cbs-construction-inc-955448) (4), [Avalon Construction Co](https://www.permitgraph.org/contractor/avalon-construction-co-820688) (3), [Infinite Construction](https://www.permitgraph.org/contractor/infinite-construction-968384) (2), [A Glass & Mirror Company Corp.](https://www.permitgraph.org/contractor/a-glass-mirror-company-corp-1139319), [H K Fire Protection Inc.* Check I.D. ***](https://www.permitgraph.org/contractor/h-k-fire-protection-inc-check-i-d-670272), [Lmnop-Design Inc.](https://www.permitgraph.org/contractor/lmnop-design-inc-993598)
- Architects: [Luis A. Robles](https://www.permitgraph.org/professional/luis-a-robles-C21700) (2), [Timothy Lorenz](https://www.permitgraph.org/professional/timothy-lorenz-C26395) (2), [Irvin Gonsales](https://www.permitgraph.org/professional/irvin-gonsales-C19332)
- Engineers: [Nate Williams](https://www.permitgraph.org/professional/nate-williams-C62068)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/5306/025.