# 525 Phelps St

Block 5242, lot 015. Page: https://www.permitgraph.org/a/5242/015

- City's use: Industrial
- Built: 1937
- Stories: 1
- Units: 1
- Rooms: 1 bathroom
- Building: 10,000 sq ft
- Lot: 15,000 sq ft
- Zoning: M1
- Construction type: S

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

19 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [201906123218](https://www.permitgraph.org/p/201906123218) | Jun 12, 2019 | Completed: final sign-off Jun 2019 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | [Foothill Fire Protection Inc.](https://www.permitgraph.org/contractor/foothill-fire-protection-inc-783132) | as built plans for original permit# 201810183512 sidewall line was omitted from the job. n/a for maher |  |
| [201903195637](https://www.permitgraph.org/p/201903195637) | Mar 19, 2019 | Completed: final sign-off Mar 2020 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | [Devlin/Mcnally Construction](https://www.permitgraph.org/contractor/devlin-mcnally-construction-896044) | revision to pa 2017-1026-2311 change door swing at existing ramp |  |
| [201810183512](https://www.permitgraph.org/p/201810183512) | Oct 18, 2018 | Completed: final sign-off Jun 2019 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | [Foothill Fire Protection Inc.](https://www.permitgraph.org/contractor/foothill-fire-protection-inc-783132) | install fire sprinklers for new retractable roof, (sidewalls generally)add sprinkler in several areas to bring system up to code- per nfpa 13- hydro required. 55 new heads. | $54,203 |
| [201805028027](https://www.permitgraph.org/p/201805028027) | May 2, 2018 | Completed: final sign-off Mar 2020 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | [Devlin/Mcnally Construction](https://www.permitgraph.org/contractor/devlin-mcnally-construction-896044) | ref pa 2017-1026-2311 - structural work throughout animal-care facility. change from metal to wood frame. update egress diagram. n/a for maher. |  |
| [201803052885](https://www.permitgraph.org/p/201803052885) | Mar 5, 2018 | Completed: final sign-off Jun 2019 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | [K Bali Construction](https://www.permitgraph.org/contractor/k-bali-construction-965124) | soft demo per ab-017. demo (e) mezzanine and first floor partition walls, dog pool, and ramp, chip out concrete, sandblast as noted. exploratory demo at slab to locate underground plumbing. n/a for m… | $10,000 |
| [201710262311](https://www.permitgraph.org/p/201710262311) | Oct 26, 2017 | Completed: final sign-off Mar 2020 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | [K Bali Construction](https://www.permitgraph.org/contractor/k-bali-construction-965124) | remodel existing warehouse space with new retractable roof, new windows @ phelps st facade. new polycarbonate wall @galvez st facade. extend fire sprinkler where required @ new rooms - sprinkler unde… | $400,000 |
| [201004140281](https://www.permitgraph.org/p/201004140281) | Apr 14, 2010 | Expired or cancelled: cancelled Jan 2026 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) |  | awning @ front & side entry on phelps & galvez streets. | $2,000 |
| [201004120051](https://www.permitgraph.org/p/201004120051) | Apr 12, 2010 | Never finaled: issued Apr 2010, no final | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | [Matt Maloney Construction](https://www.permitgraph.org/contractor/matt-maloney-construction-769301) | deletion of scope #200908205231. overhead door to be inserted within (e) steel column opening. no widening of steel or new adhesive anchors. remove special inspection 2 bolts installed in concrete an… |  |
| [201003269080](https://www.permitgraph.org/p/201003269080) | Mar 26, 2010 | Completed: final sign-off Mar 2011 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | [Bay Alarm Company](https://www.permitgraph.org/contractor/bay-alarm-company-903821) | sprinkler waterflow and supervisory system. | $1,687 |
| [M193066](https://www.permitgraph.org/p/M193066) | Mar 15, 2010 | Never finaled: issued Mar 2010, no final | [525 Phelps St](https://www.permitgraph.org/a/5242/015) |  | sidewalk repair |  |
| [200912223646](https://www.permitgraph.org/p/200912223646) | Dec 22, 2009 | Completed: final sign-off Jan 2017 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | [Matt Maloney Construction](https://www.permitgraph.org/contractor/matt-maloney-construction-769301) | renovation of (e) approx 1000 sq ft lobby space, ada upgrades of (e) toilet (restroom), new glazing. | $200,000 |
| [200908205231](https://www.permitgraph.org/p/200908205231) | Aug 20, 2009 | Never finaled: issued Nov 2009, no final | [525 Phelps St](https://www.permitgraph.org/a/5242/015) |  | provide new service door and replace 2 man doors and add ribbon windows (not visible from street) at rear yard. new windows and doors are into unconditioned space | $65,000 |
| [200806063861](https://www.permitgraph.org/p/200806063861) | Jun 6, 2008 | Completed: final sign-off Jul 2008 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) |  | renew pa# 9912148, pa# 2000/02/11/1741, pa# 2007/09/28/4092 & pa# 2007/09/21/3331 for final inspection only. |  |
| [200709284092](https://www.permitgraph.org/p/200709284092) | Sep 28, 2007 | Completed: final sign-off Jul 2008 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) |  | to renew for final only pa#9912148,#200002111741 for final inspection. |  |
| [200709213331](https://www.permitgraph.org/p/200709213331) | Sep 21, 2007 | Completed: final sign-off Jul 2008 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) |  | renew pa#20000202920,#99197601,#200004127022 for final inspection. |  |
| [M21979](https://www.permitgraph.org/p/M21979) | Oct 16, 2002 | Never finaled: issued Oct 2002, no final | [525 Phelps St](https://www.permitgraph.org/a/5242/015) |  | street space permit |  |
| [200004127022](https://www.permitgraph.org/p/200004127022) | Apr 12, 2000 | Expired or cancelled: expired Sep 2001 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | [Sneed & Co Construction Inc.](https://www.permitgraph.org/contractor/sneed-co-construction-inc-436895) | revision to app #9919760 |  |
| [200002111741](https://www.permitgraph.org/p/200002111741) | Feb 11, 2000 | Expired or cancelled: expired Jun 2000 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912) | add 11 sprinkler heads to existing fire sprinkler | $2,500 |
| [20000202920](https://www.permitgraph.org/p/20000202920) | Feb 2, 2000 | Expired or cancelled: expired Jun 2000 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) |  | revision to pa#9919760 add non-load partition & door |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Devlin/Mcnally Construction](https://www.permitgraph.org/contractor/devlin-mcnally-construction-896044) (2), [Foothill Fire Protection Inc.](https://www.permitgraph.org/contractor/foothill-fire-protection-inc-783132) (2), [K Bali Construction](https://www.permitgraph.org/contractor/k-bali-construction-965124) (2), [Matt Maloney Construction](https://www.permitgraph.org/contractor/matt-maloney-construction-769301) (2), [Bay Alarm Company](https://www.permitgraph.org/contractor/bay-alarm-company-903821), [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912), [Sneed & Co Construction Inc.](https://www.permitgraph.org/contractor/sneed-co-construction-inc-436895)
- Architects: [Karen Curtiss](https://www.permitgraph.org/professional/karen-curtiss-C31453) (5)

---