# 501 Tunnel Ave

Block 5104, lot 004. Page: https://www.permitgraph.org/a/5104/004

- City's use: Miscellaneous/Mixed-Use
- Lot: 10,698 sq ft
- Zoning: M2
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

11 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202606163314](https://www.permitgraph.org/p/202606163314) | Jun 16, 2026 | Completed: final sign-off Sep 2026 | [501 Tunnel Av](https://www.permitgraph.org/a/5104/004) | [Central Roofing Co.](https://www.permitgraph.org/contractor/central-roofing-co-412891) | reroofing. no hotworks. | $68,100 |
| [202201055388](https://www.permitgraph.org/p/202201055388) | Jan 5, 2022 | Completed: final sign-off Jun 2022 | [501 Tunnel Av](https://www.permitgraph.org/a/5104/004) | [Orr Protection Systems Inc](https://www.permitgraph.org/contractor/orr-protection-systems-inc-952133) | new sprinler riser into (e) fire control panel furnish and install (2) monitor modules for the new sprinkler riser water flow and tamper switches. | $5,000 |
| [202106041700](https://www.permitgraph.org/p/202106041700) | Jun 4, 2021 | Completed: final sign-off Dec 2021 | [501 Tunnel Av](https://www.permitgraph.org/a/5104/004) | [Titus Maintenance & Installation Service](https://www.permitgraph.org/contractor/titus-maintenance-installation-service-872945) | install an integreated material recovery facility (imrf) for recology. the imrf design will included but not limit to erection of new recycling facility. no structural work to the (e) building. no mo… | $800,000 |
| [202105100058](https://www.permitgraph.org/p/202105100058) | May 10, 2021 | Never finaled: issued Jun 2021, no final | [501 Tunnel Av](https://www.permitgraph.org/a/5104/004) |  | remove and replace old voluntary back up generator on exterior of waste transfer facility. generator will be removed and installed by owners operating engineers (slef performed). install 600kw diesel… | $100,000 |
| [202105039700](https://www.permitgraph.org/p/202105039700) | May 3, 2021 | Completed: final sign-off Aug 2021 | [501 Tunnel Av](https://www.permitgraph.org/a/5104/004) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | install 500' of supply piping to reconnect 2nd water source to existing building. 20' underground 480' aboue ground. | $80,000 |
| [202104158702](https://www.permitgraph.org/p/202104158702) | Apr 15, 2021 | Completed: final sign-off Jun 2021 | [501 Tunnel Av](https://www.permitgraph.org/a/5104/004) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | submitting as-built drawings per inspector during final inspection for approval. ref # 2020-1215-1028 |  |
| [202012151028](https://www.permitgraph.org/p/202012151028) | Dec 15, 2020 | Completed: final sign-off Jun 2021 | [501 Tunnel Av](https://www.permitgraph.org/a/5104/004) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | 1. demo all sprinkler piping & sprinkler heads in existing conveyer and platform in area 'a' only. 2. install new fire riser at (e) riser area to apply existing and new platforms & conveyer new sprin… | $200,000 |
| [201909262764](https://www.permitgraph.org/p/201909262764) | Sep 26, 2019 | Completed: final sign-off Apr 2022 | [501 Tunnel Av](https://www.permitgraph.org/a/5104/004) | [Orr Protection Systems Inc](https://www.permitgraph.org/contractor/orr-protection-systems-inc-952133) | fire alarm system ti - replace (e) fire alarm panel in bld ga/gc | $10,321 |
| [201908239649](https://www.permitgraph.org/p/201908239649) | Aug 23, 2019 | Completed: final sign-off Mar 2020 | [501 Tunnel Av](https://www.permitgraph.org/a/5104/004) | [Orr Protection Systems Inc](https://www.permitgraph.org/contractor/orr-protection-systems-inc-952133) | add fire alarm panel to monitor (e) sprinkler system in (hhwcf) hazardous waste | $7,966 |
| [201812057546](https://www.permitgraph.org/p/201812057546) | Dec 5, 2018 | Completed: final sign-off Dec 2018 | [501 Tunnel Av](https://www.permitgraph.org/a/5104/004) | [American Solar Corporation](https://www.permitgraph.org/contractor/american-solar-corporation-905389) | as built for pa e2018-1009-6354, 2018-0611-1544 and 2018-0925-1268 |  |
| [201809251268](https://www.permitgraph.org/p/201809251268) | Sep 25, 2018 | Completed: final sign-off Dec 2018 | [501 Tunnel Av](https://www.permitgraph.org/a/5104/004) | [American Solar Corporation](https://www.permitgraph.org/contractor/american-solar-corporation-905389) | add 330 solar panels to (e) solar system on new west wing structure | $1,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Orr Protection Systems Inc](https://www.permitgraph.org/contractor/orr-protection-systems-inc-952133) (3), [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) (3), [American Solar Corporation](https://www.permitgraph.org/contractor/american-solar-corporation-905389) (2), [Central Roofing Co.](https://www.permitgraph.org/contractor/central-roofing-co-412891), [Titus Maintenance & Installation Service](https://www.permitgraph.org/contractor/titus-maintenance-installation-service-872945)
- Engineers: [Stephen Shafeer](https://www.permitgraph.org/professional/stephen-shafeer-E21097)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/5104/004.