# 47 Northridge Rd

Block 4700, lot 041. Page: https://www.permitgraph.org/a/4700/041

The city's assessor roll has no record for this parcel.

## Permits filed here

65 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202610059027](https://www.permitgraph.org/p/202610059027) | Oct 5, 2026 | Expired or cancelled: suspend Oct 2026 | [127 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Xin Xin Construction](https://www.permitgraph.org/contractor/xin-xin-construction-870223) | drywall repair in kitchen approx 2 square feet. | $3,000 |
| [202210043711](https://www.permitgraph.org/p/202210043711) | Oct 4, 2022 | Completed: final sign-off Nov 2022 | [113 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Meloni Construction](https://www.permitgraph.org/contractor/meloni-construction-1048837) | install fence wire on guardrails to comply with complaint 202289882 | $1,000 |
| [201907024886](https://www.permitgraph.org/p/201907024886) | Jul 2, 2019 | Completed: final sign-off Jul 2019 | [73 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | revision to app#201511031595. administrative permit to correct process in which application was approved. this permit application shall acknowledge the work to be performed at unit #73 to be based on… |  |
| [201907024889](https://www.permitgraph.org/p/201907024889) | Jul 2, 2019 | Completed: final sign-off Jul 2019 | [132 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | administrative permit for tech infeasibility request for 132 and 138 kiska rd in building 727 at westbrook apts. ref 201511031581. includes "equivalent facilitation" within the plan sets for off-site… |  |
| [201907024887](https://www.permitgraph.org/p/201907024887) | Jul 2, 2019 | Completed: final sign-off Jul 2019 | [43 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | administrative permit for tech infeasibility request for 43 and 53 northridge rd building 719 westbrook apts. ref 201511031593 includes "equivalent facilitation" within the plan sets for off-site acc… |  |
| [201907024890](https://www.permitgraph.org/p/201907024890) | Jul 2, 2019 | Completed: final sign-off Jul 2019 | [75 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | administrative permit for tech infeasibility request for 75 and 81 northridge in building 725 at westbrook apts ref 201511031596 includes "equivalent facilitation" within the plan sets for off-site a… |  |
| [201907024888](https://www.permitgraph.org/p/201907024888) | Jul 2, 2019 | Completed: final sign-off Jul 2019 | [152 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | administrative permit for tech infeasibility request for 152 kiska rd in building 722 westbrook pats ref 201511031586. includes "equivalent facilitation" within the plan sets for off-site accomodatio… |  |
| [201902072309](https://www.permitgraph.org/p/201902072309) | Feb 7, 2019 | Completed: final sign-off Mar 2019 | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | revision to pa's 201511031602 and 201805240109. at community area, a storage area is converting to baby-changing accomodation (all interior work) w/ baby-changing tables being removed from mens and w… | $200 |
| [M1032247](https://www.permitgraph.org/p/M1032247) | Jan 28, 2019 | Never finaled: issued Jan 2019, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [201901110161](https://www.permitgraph.org/p/201901110161) | Jan 11, 2019 | Completed: final sign-off Mar 2019 | [43 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad program revision to pa 2015-1103-1593 add an elevated concrete patio, not higher than 3'-0'above grade, & widen back door req by mod | $34,000 |
| [201901110156](https://www.permitgraph.org/p/201901110156) | Jan 11, 2019 | Completed: final sign-off Mar 2019 | [1 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad program revision to pa 2015-1103-1590 - add backyard an elevated concrete patio & widen back door req by mod | $34,000 |
| [201901110159](https://www.permitgraph.org/p/201901110159) | Jan 11, 2019 | Completed: final sign-off Mar 2019 | [132 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad program revision to pa 2015-1103-1581 add at backyard an elevated concrete patio, not higher than 3'-0'above grade, & widen back door req by mod | $34,000 |
| [201901110160](https://www.permitgraph.org/p/201901110160) | Jan 11, 2019 | Completed: final sign-off Mar 2019 | [75 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad program revision to pa 2015-1103-1596 an elevated concrete patio, not higher than 3'-0'above grade, & widen back door req by mod | $34,000 |
| [201901110158](https://www.permitgraph.org/p/201901110158) | Jan 11, 2019 | Completed: final sign-off Mar 2019 | [152 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad program revision to pa 2015-1103-1586 elevated concrete patio & widen back door req by mod | $17,000 |
| [201901099919](https://www.permitgraph.org/p/201901099919) | Jan 9, 2019 | Completed: final sign-off May 2019 | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369) | fire sprinkler monitoring. sprinkler was installed under app#201511031602 (s-4). |  |
| [201811054989](https://www.permitgraph.org/p/201811054989) | Nov 5, 2018 | Completed: final sign-off Jun 2019 | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rev to pa# 201805240109 & 201511031602; the revised scope of work consist of the orginal scope of work in the original permit sets and additional structural support for fire sprinkler lines, mep unit… | $80,000 |
| [201808278373](https://www.permitgraph.org/p/201808278373) | Aug 27, 2018 | Expired or cancelled: cancelled Jan 2026 | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad program - build a reinforced concrete slab on grade and a three sided concrete unit wall enclosure on it. this enclosure will not have a roof or a gate. this work will also include civil utility… | $75,000 |
| [M953967](https://www.permitgraph.org/p/M953967) | Jul 24, 2018 | Never finaled: issued Jul 2018, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [M930429](https://www.permitgraph.org/p/M930429) | May 24, 2018 | Never finaled: issued May 2018, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [201805240109](https://www.permitgraph.org/p/201805240109) | May 24, 2018 | Never finaled: issued Sep 2018, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority, alta site, revision to pa #201511031602, project consists interior modernization of existing management office space & addition of new community serving spaces w/i existing footprint of… | $1,800,000 |
| [M924327](https://www.permitgraph.org/p/M924327) | May 9, 2018 | Never finaled: issued May 2018, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [M913447](https://www.permitgraph.org/p/M913447) | Apr 17, 2018 | Never finaled: issued Apr 2018, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [M913448](https://www.permitgraph.org/p/M913448) | Apr 17, 2018 | Never finaled: issued Apr 2018, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [M897187](https://www.permitgraph.org/p/M897187) | Mar 7, 2018 | Never finaled: issued Mar 2018, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [M891607](https://www.permitgraph.org/p/M891607) | Feb 21, 2018 | Never finaled: issued Feb 2018, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space permit (pa #201511031588) |  |
| [M891587](https://www.permitgraph.org/p/M891587) | Feb 21, 2018 | Never finaled: issued Feb 2018, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space permit (201511031588) |  |
| [M879807](https://www.permitgraph.org/p/M879807) | Jan 23, 2018 | Never finaled: issued Jan 2018, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space permit |  |
| [M875547](https://www.permitgraph.org/p/M875547) | Jan 11, 2018 | Never finaled: issued Jan 2018, no final | [1 Northridge Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [M845947](https://www.permitgraph.org/p/M845947) | Oct 19, 2017 | Never finaled: issued Oct 2017, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [M836047](https://www.permitgraph.org/p/M836047) | Sep 27, 2017 | Never finaled: issued Sep 2017, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [201708043941](https://www.permitgraph.org/p/201708043941) | Aug 4, 2017 | Never finaled: issued Dec 2017, no final | [21 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | priority plan review for mohcd project permnent site retaining walls. retaining walls to be constructed at the following locations: 1, 53, 81, 158 nothridge rod nd 33 harbor road. | $670,000 |
| [M814429](https://www.permitgraph.org/p/M814429) | Jul 28, 2017 | Never finaled: issued Jul 2017, no final | [43 Northridge Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [201706220123](https://www.permitgraph.org/p/201706220123) | Jun 22, 2017 | Expired or cancelled: cancelled Jan 2026 | [133 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | revision to pa #201511031601 - new title 24 report for bldg & outdoor lighting. |  |
| [201706220124](https://www.permitgraph.org/p/201706220124) | Jun 22, 2017 | Expired or cancelled: cancelled Jan 2026 | [121 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | revision to pa #201511031600 - new title 24 report for this bldg & outdoor lighting. |  |
| [201703161584](https://www.permitgraph.org/p/201703161584) | Mar 16, 2017 | Completed: final sign-off Mar 2019 | [101 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | revision to app#201511031598-s1 for additional layer of 5/8" type x gypsum board(moisture resistant) to inside of fire pump room. all walls and ceiling will have 2 layers of 5/8" type x gypsum bd. | $7,500 |
| [M765507](https://www.permitgraph.org/p/M765507) | Mar 3, 2017 | Never finaled: issued Mar 2017, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [201701268042](https://www.permitgraph.org/p/201701268042) | Jan 26, 2017 | Expired or cancelled: withdrawn Jan 2017 | [101 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | installation of over head fire sprinkler & fire pump total 52 fire sprinklers for units 101,103,105,107,111 @ apt 729. | $35,000 |
| [201701197514](https://www.permitgraph.org/p/201701197514) | Jan 19, 2017 | Expired or cancelled: withdrawn Jan 2017 | [133 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | installation of over head fire sprinkler - 50 sprinklers for units 133, 135, 137, 139, 141, 143 (apt 734) | $5,000 |
| [M750367](https://www.permitgraph.org/p/M750367) | Dec 28, 2016 | Never finaled: issued Dec 2016, no final | [100 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Mitchell Engineering](https://www.permitgraph.org/contractor/mitchell-engineering-754676) | street space permit |  |
| [M749107](https://www.permitgraph.org/p/M749107) | Dec 22, 2016 | Never finaled: issued Dec 2016, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | street space |  |
| [201609289068](https://www.permitgraph.org/p/201609289068) | Sep 28, 2016 | Completed: final sign-off Jan 2018 | [101 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Mitchell Engineering](https://www.permitgraph.org/contractor/mitchell-engineering-754676) | south poc for westbrook - install 2067' of 4" pvc fire underground piping for buildings 714-734. building 729 to have fire pump, under separate permit. most demanding sprinkler demand is 170 gpm @ 77… | $350,000 |
| [201511031600](https://www.permitgraph.org/p/201511031600) | Nov 3, 2015 | Completed: final sign-off Mar 2019 | [121 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031594](https://www.permitgraph.org/p/201511031594) | Nov 3, 2015 | Completed: final sign-off Mar 2019 | [55 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031593](https://www.permitgraph.org/p/201511031593) | Nov 3, 2015 | Completed: final sign-off Jul 2019 | [43 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure.interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031590](https://www.permitgraph.org/p/201511031590) | Nov 3, 2015 | Completed: final sign-off Apr 2019 | [1 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. ada renovations. | $2,000,000 |
| [201511031581](https://www.permitgraph.org/p/201511031581) | Nov 3, 2015 | Completed: final sign-off May 2019 | [132 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. 100 sq ft expansion of two 5 bd units and one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fi… | $1,000,000 |
| [201511031580](https://www.permitgraph.org/p/201511031580) | Nov 3, 2015 | Completed: final sign-off Mar 2019 | [120 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031597](https://www.permitgraph.org/p/201511031597) | Nov 3, 2015 | Completed: final sign-off Jul 2019 | [83 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031596](https://www.permitgraph.org/p/201511031596) | Nov 3, 2015 | Completed: final sign-off Jul 2019 | [75 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. 100 sf expansion of two 5br units, and stand alone transh enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures… | $1,000,000 |
| [201511031592](https://www.permitgraph.org/p/201511031592) | Nov 3, 2015 | Completed: final sign-off Mar 2019 | [31 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031578](https://www.permitgraph.org/p/201511031578) | Nov 3, 2015 | Completed: final sign-off Mar 2019 | [100 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. add four addresses. | $1,500,000 |
| [201511031589](https://www.permitgraph.org/p/201511031589) | Nov 3, 2015 | Completed: final sign-off Jul 2019 | [184 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031588](https://www.permitgraph.org/p/201511031588) | Nov 3, 2015 | Completed: final sign-off Jul 2019 | [172 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031587](https://www.permitgraph.org/p/201511031587) | Nov 3, 2015 | Completed: final sign-off Mar 2019 | [160 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031598](https://www.permitgraph.org/p/201511031598) | Nov 3, 2015 | Never finaled: issued Jun 2016, no final | [101 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031601](https://www.permitgraph.org/p/201511031601) | Nov 3, 2015 | Completed: final sign-off May 2019 | [133 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031582](https://www.permitgraph.org/p/201511031582) | Nov 3, 2015 | Completed: final sign-off Mar 2019 | [140 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [201511031602](https://www.permitgraph.org/p/201511031602) | Nov 3, 2015 | Never finaled: issued Jun 2016, no final | [90 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. tenant improvements: fixtures & finishes, new paint, flooring, cabinets, lighting. | $150,000 |
| [201511031595](https://www.permitgraph.org/p/201511031595) | Nov 3, 2015 | Completed: final sign-off Jul 2019 | [67 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. tenant improvements at services office. | $1,000,000 |
| [201511031599](https://www.permitgraph.org/p/201511031599) | Nov 3, 2015 | Completed: final sign-off May 2019 | [113 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,000,000 |
| [201511031586](https://www.permitgraph.org/p/201511031586) | Nov 3, 2015 | Completed: final sign-off Jul 2019 | [152 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. 100 sq ft addition to one 5 bd unit and one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixt… | $1,000,000 |
| [201511031579](https://www.permitgraph.org/p/201511031579) | Nov 3, 2015 | Completed: final sign-off Apr 2019 | [112 Kiska Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,000,000 |
| [201511031591](https://www.permitgraph.org/p/201511031591) | Nov 3, 2015 | Completed: final sign-off Apr 2019 | [19 Northridge Rd](https://www.permitgraph.org/a/4700/041) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) | rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| [200802043898](https://www.permitgraph.org/p/200802043898) | Feb 4, 2008 | Expired or cancelled: expired May 2017 | [100 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | construct new conc. and p.y.wood retaining walls. repair and provide new pipe rails and conc. footings. | $15,000 |
| [200501314367](https://www.permitgraph.org/p/200501314367) | Jan 31, 2005 | Expired or cancelled: expired Dec 2005 | [172 Kiska Rd](https://www.permitgraph.org/a/4700/041) |  | fill and excavate | $15,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Nibbi Bros Assoc Inc.](https://www.permitgraph.org/contractor/nibbi-bros-assoc-inc-757362) (40), [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369) (22), [Mitchell Engineering](https://www.permitgraph.org/contractor/mitchell-engineering-754676) (2), [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) (2), [Meloni Construction](https://www.permitgraph.org/contractor/meloni-construction-1048837), [Xin Xin Construction](https://www.permitgraph.org/contractor/xin-xin-construction-870223)
- Architects: [Michelle Anne Sullivan](https://www.permitgraph.org/professional/michelle-anne-sullivan-C25093) (34), [Henry Kwong](https://www.permitgraph.org/professional/henry-kwong-C15355)
- Engineers: [Desmond Blake](https://www.permitgraph.org/professional/desmond-blake-C81024), [Peter Bekey](https://www.permitgraph.org/professional/peter-bekey-14786)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.