# 1405 Minnesota St

Block 4294, lot 017. Page: https://www.permitgraph.org/a/4294/017

- City's use: Industrial
- Built: 1962
- Stories: 1
- Units: 3
- Rooms: 4 bathrooms
- Building: 14,315 sq ft
- Lot: 12,501 sq ft
- Zoning: PDR1G
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

29 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202404160043](https://www.permitgraph.org/p/202404160043) | Apr 16, 2024 | Completed: final sign-off Oct 2024 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | install (1) illuminated wall sign facing west at 1405 minnesota st. | $5,000 |
| [202204192516](https://www.permitgraph.org/p/202204192516) | Apr 19, 2022 | Completed: final sign-off Jun 2022 | [1409 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | ref to t.i. 202104239279. mep only. electrical distribution for ti work, add ducting to (e) hvac units | $60,000 |
| [202104239279](https://www.permitgraph.org/p/202104239279) | Apr 23, 2021 | Completed: final sign-off Jun 2022 | [1409 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Actually Design Build](https://www.permitgraph.org/contractor/actually-design-build-1035799), [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | add accessible bathroooms and sinks. interior wall framing, electrical, plumbing and drywall included. new plumbing fixtures and cabinetry to be installed. | $50,000 |
| [201912119188](https://www.permitgraph.org/p/201912119188) | Dec 11, 2019 | Expired or cancelled: cancelled Dec 2021 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to pa #201903135084: revise plans to add phase 2 drawings. this project was originally submitted as a single phase. this revisions rename the plans in the original scope of work as phase 2. |  |
| [201910245425](https://www.permitgraph.org/p/201910245425) | Oct 24, 2019 | Completed: final sign-off Dec 2019 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to 201903135084: adding a 1st phase to original permit. this phase includes the construction of a demising wall and finishes to suite 1407. |  |
| [201904168129](https://www.permitgraph.org/p/201904168129) | Apr 16, 2019 | Expired or cancelled: cancelled Jan 2026 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | demo of interior space, interior walls, floor covering. ref t.i 201903135084. | $22,000 |
| [201711154043](https://www.permitgraph.org/p/201711154043) | Nov 15, 2017 | Completed: final sign-off May 2018 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Douglas J Burrows](https://www.permitgraph.org/contractor/douglas-j-burrows-977587) | electrical distribution of outlets, switching, lighting & new service to new mechanical equipment. ref #201710312793. n/a maher ordinance | $40,000 |
| [201711033104](https://www.permitgraph.org/p/201711033104) | Nov 3, 2017 | Completed: final sign-off May 2018 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Douglas J Burrows](https://www.permitgraph.org/contractor/douglas-j-burrows-977587) | mechanical distribution to newly demized room, exhaust and supply to corridor. (election distribution to new outlets from extg panel under separate permit.) ref app#201710060668. n/a for maher. | $50,000 |
| [201710312793](https://www.permitgraph.org/p/201710312793) | Oct 31, 2017 | Completed: final sign-off May 2018 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Douglas J Burrows](https://www.permitgraph.org/contractor/douglas-j-burrows-977587) | revision to application #2017-1006-0668. to correct original application #2017-1006-0668. to show a change of use from (e) warehouse (s-2) w/ accessory office to (n) analytical lab (b) w/accessory of… |  |
| [201710100827](https://www.permitgraph.org/p/201710100827) | Oct 10, 2017 | Expired or cancelled: cancelled Jan 2026 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Douglas J Burrows](https://www.permitgraph.org/contractor/douglas-j-burrows-977587) | renovate the gr fl of a tenant suite into an analytical lab and office space, add exit corridor | $60,000 |
| [201710060668](https://www.permitgraph.org/p/201710060668) | Oct 6, 2017 | Completed: final sign-off May 2018 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Douglas J Burrows](https://www.permitgraph.org/contractor/douglas-j-burrows-977587) | renovate the ground floor of tenant suite into an analytical lab and office space, add exit corridor. maher na | $60,000 |
| [201505196661](https://www.permitgraph.org/p/201505196661) | May 19, 2015 | Completed: final sign-off Jun 2015 | [1407 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | build new partition walls for new office rooms at 1st floor & mezzanine;maher n/a | $10,000 |
| [201406249240](https://www.permitgraph.org/p/201406249240) | Jun 24, 2014 | Completed: final sign-off Jun 2014 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | rev. to pa#201310119132, add one restroom at each unit at 1/f, add new guardrail at mezzanine. n/a ordinance #155-13 | $15,000 |
| [201401105954](https://www.permitgraph.org/p/201401105954) | Jan 10, 2014 | Never finaled: issued Jan 2014, no final | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [D C Taylor Co](https://www.permitgraph.org/contractor/d-c-taylor-co-451656) | re-roof | $56,789 |
| [201312174394](https://www.permitgraph.org/p/201312174394) | Dec 17, 2013 | Completed: final sign-off Jun 2014 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Ting Kun Chow](https://www.permitgraph.org/contractor/ting-kun-chow-771796) | new mechanical units on platform at roof | $80,000 |
| [201310119132](https://www.permitgraph.org/p/201310119132) | Oct 11, 2013 | Completed: final sign-off Jun 2014 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | revision to app#201309126664. relocate bathroom fixtures at 1st floor. |  |
| [201309126664](https://www.permitgraph.org/p/201309126664) | Sep 12, 2013 | Completed: final sign-off Jun 2014 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | revision to app#201303111946. add 4 bathrooms and space planning. | $45,000 |
| [201308224974](https://www.permitgraph.org/p/201308224974) | Aug 22, 2013 | Completed: final sign-off Jun 2014 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | revision to permit appn. 201305177290; design of new fence wall at front of building | $15,000 |
| [201305177290](https://www.permitgraph.org/p/201305177290) | May 17, 2013 | Never finaled: issued May 2013, no final | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | revision to pa# 2013-0227-1101-provide new fence at front of building, provide new accessible ramp | $15,000 |
| [201303111946](https://www.permitgraph.org/p/201303111946) | Mar 11, 2013 | Completed: final sign-off Jun 2014 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | provide new mezzanine 3528 sq ft | $88,000 |
| [201302271101](https://www.permitgraph.org/p/201302271101) | Feb 27, 2013 | Completed: final sign-off Jun 2014 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | provide bigger opening for new bigger roll up doors & access doors at front. | $10,000 |
| [201212055513](https://www.permitgraph.org/p/201212055513) | Dec 5, 2012 | Never finaled: issued Dec 2012, no final | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | revision to 201107180418, comply with physical inspection cc7005. provide accessible door to the space |  |
| [201211144201](https://www.permitgraph.org/p/201211144201) | Nov 14, 2012 | Completed: final sign-off Jan 2013 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Ting Kun Chow](https://www.permitgraph.org/contractor/ting-kun-chow-771796) | comply with physical inspection report cc-7005. apply mechanical vent system permit of existing installation | $30,000 |
| [201211083874](https://www.permitgraph.org/p/201211083874) | Nov 8, 2012 | Never finaled: issued Nov 2012, no final | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Perfect Connection Inc.](https://www.permitgraph.org/contractor/perfect-connection-inc-812380) | install 4" sprinkler underground. t.i. app#201107180418 oh sprinkler plans must be provided with calcs under separate permit | $3,000 |
| [201209069090](https://www.permitgraph.org/p/201209069090) | Sep 6, 2012 | Completed: final sign-off Dec 2012 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | revision to 201107180418. maintain (e) 2 tenant spaces; remove illegal mezzanine and office partitions. provide accessible restroom to unit 1411. comply with report of physical insp#cc-7005. except m… |  |
| [201203055384](https://www.permitgraph.org/p/201203055384) | Mar 5, 2012 | Expired or cancelled: withdrawn Dec 2012 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | revision to appl #2011.07.18.0418 - keep (e) two spaces (not divide to 4 spaces), provide (n) ada restrooms at #1411 & upgrade (e) ada bath. comply w/physical inspcetion report cc-7005, dated 11/1/11. |  |
| [201107180418](https://www.permitgraph.org/p/201107180418) | Jul 18, 2011 | Never finaled: issued Aug 2011, no final | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | divide (e) 2 spaces into 4 spaces, provide new ada restrooms at each space, provide accessible entrance at each space | $118,000 |
| [M273147](https://www.permitgraph.org/p/M273147) | Jul 18, 2011 | Never finaled: issued Jul 2011, no final | [1407 Minnesota St](https://www.permitgraph.org/a/4294/017) |  | add addresses for sub divided space: 1407, 1409, 1411 minnesota street. |  |
| [200510125324](https://www.permitgraph.org/p/200510125324) | Oct 12, 2005 | Completed: final sign-off Oct 2005 | [1405 Minnesota St](https://www.permitgraph.org/a/4294/017) | [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053) | reroofing | $51,190 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) (12), [Douglas J Burrows](https://www.permitgraph.org/contractor/douglas-j-burrows-977587) (5), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (3), [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) (2), [Ting Kun Chow](https://www.permitgraph.org/contractor/ting-kun-chow-771796) (2), [Actually Design Build](https://www.permitgraph.org/contractor/actually-design-build-1035799), [D C Taylor Co](https://www.permitgraph.org/contractor/d-c-taylor-co-451656), [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363), [Perfect Connection Inc.](https://www.permitgraph.org/contractor/perfect-connection-inc-812380), [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053)
- Architects: [Randall Dowler](https://www.permitgraph.org/professional/randall-dowler-C23107) (4), [Katherine Fontaine](https://www.permitgraph.org/professional/katherine-fontaine-C34740) (2)
- Engineers: [Javed Tharani](https://www.permitgraph.org/professional/javed-tharani-C57676) (5), [Jesus B Cabellon Jr](https://www.permitgraph.org/professional/jesus-b-cabellon-jr-E9278), [Pablo Orozco](https://www.permitgraph.org/professional/pablo-orozco-M27485)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/4294/017.