# 1376 De Haro St

Block 4259, lot 053. Page: https://www.permitgraph.org/a/4259/053

- City's use: Single Family Residential
- Built: 1987
- Units: 1
- Building: 2,250 sq ft
- Lot: 1,769 sq ft
- Zoning: RH2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

9 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [S20251103287](https://www.permitgraph.org/p/S20251103287) | Nov 5, 2025 | Completed: final sign-off Sep 2026 | [1376 De Haro St](https://www.permitgraph.org/a/4259/053) | [Cleanlyte Inc Dba Lytegen](https://www.permitgraph.org/contractor/cleanlyte-inc-dba-lytegen-1130477) | solar permit: installing 10 solar pv modules, 410 watts per module, total no. of rating 4.1 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units… | $24,440 |
| [202402055277](https://www.permitgraph.org/p/202402055277) | Feb 5, 2024 | Completed: final sign-off Feb 2024 | [1376 De Haro St](https://www.permitgraph.org/a/4259/053) | [Ciaran Horgan Construction](https://www.permitgraph.org/contractor/ciaran-horgan-construction-795708) | (unit #200) revision to permit # 202308164558: an area of dryrot was found in the kitchen and repair/replacement of (3) studs to the right of the window and 48" x 48" of siding ply in-kind at lightwe… |  |
| [202308164558](https://www.permitgraph.org/p/202308164558) | Aug 16, 2023 | Completed: final sign-off Feb 2024 | [1376 De Haro St](https://www.permitgraph.org/a/4259/053) | [Ciaran Horgan Construction](https://www.permitgraph.org/contractor/ciaran-horgan-construction-795708) | unit #200: kitchen (3rd flr) and master bathroom (4th flr) remodel in kind. no structural change. | $65,000 |
| [202305047140](https://www.permitgraph.org/p/202305047140) | May 4, 2023 | Completed: final sign-off Feb 2024 | [1376 De Haro St](https://www.permitgraph.org/a/4259/053) | [Ciaran Horgan Construction](https://www.permitgraph.org/contractor/ciaran-horgan-construction-795708) | unit# 200: 1 bath remodel in kind. no structural changes. new fixtures and tile, sheetrock | $40,000 |
| [200808199567](https://www.permitgraph.org/p/200808199567) | Aug 19, 2008 | Completed: final sign-off Aug 2008 | [1376 De Haro St](https://www.permitgraph.org/a/4259/053) | [Tom Lee Roofing Inc.](https://www.permitgraph.org/contractor/tom-lee-roofing-inc-731731) | reroofing | $10,000 |
| [200804149651](https://www.permitgraph.org/p/200804149651) | Apr 14, 2008 | Completed: final sign-off May 2008 | [1376 De Haro St](https://www.permitgraph.org/a/4259/053) | [Charles Window & Door/Golden Gate Home I](https://www.permitgraph.org/contractor/charles-window-door-golden-gate-home-i-840757) | replace siding on south side facing from street. trim to be painted to match existing. siding on 4 floors & bsmt approx area 40x40 feet. james hardie lap siding to be used in monterey taupe color. | $26,300 |
| [200602215001](https://www.permitgraph.org/p/200602215001) | Feb 21, 2006 | Completed: final sign-off Jun 2006 | [1376 De Haro St](https://www.permitgraph.org/a/4259/053) |  | strensthen framing to add a spa. provide new palatized wood decking over new membrane roof. install windscreen structure up to 42" h. upper unit occupies upper two floors only. | $10,000 |
| [200601263133](https://www.permitgraph.org/p/200601263133) | Jan 26, 2006 | Completed: final sign-off Jun 2006 | [1376 De Haro St](https://www.permitgraph.org/a/4259/053) | [Van Der Sterre Construction](https://www.permitgraph.org/contractor/van-der-sterre-construction-456718) | add windscreen to extg roof | $10,000 |
| [200401274970](https://www.permitgraph.org/p/200401274970) | Jan 27, 2004 | Completed: final sign-off Feb 2004 | [1376 De Haro St](https://www.permitgraph.org/a/4259/053) |  | change 16 windows in front | $13,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Ciaran Horgan Construction](https://www.permitgraph.org/contractor/ciaran-horgan-construction-795708) (3), [Charles Window & Door/Golden Gate Home I](https://www.permitgraph.org/contractor/charles-window-door-golden-gate-home-i-840757), [Cleanlyte Inc Dba Lytegen](https://www.permitgraph.org/contractor/cleanlyte-inc-dba-lytegen-1130477), [Tom Lee Roofing Inc.](https://www.permitgraph.org/contractor/tom-lee-roofing-inc-731731), [Van Der Sterre Construction](https://www.permitgraph.org/contractor/van-der-sterre-construction-456718)
- Architects: [Nancy Scheinholtz](https://www.permitgraph.org/professional/nancy-scheinholtz-C14265)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/4259/053.
