# 2342 03rd St

Block 4108, lot 003A. Page: https://www.permitgraph.org/a/4108/003A

- City's use: Commercial Hotel
- Built: 1900
- Stories: 3
- Rooms: 4 bathrooms
- Building: 5,850 sq ft
- Lot: 2,395 sq ft
- Zoning: M2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

14 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202605131194](https://www.permitgraph.org/p/202605131194) | May 13, 2026 | Completed: final sign-off Jun 2026 | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) |  | addressing permit only: purpose of this permit is to formally address the residential units associated with 2342 03rd st |  |
| [202304105411](https://www.permitgraph.org/p/202304105411) | Apr 10, 2023 | Never finaled: issued Apr 2023, no final | [2344 03rd St](https://www.permitgraph.org/a/4108/003A) |  | change of use m to b. establish a personal service use (tattoo shop) no residential guest rooms will be removed or converted. no construction work done, only furniture added. |  |
| [202002033344](https://www.permitgraph.org/p/202002033344) | Feb 3, 2020 | Completed: final sign-off Dec 2020 | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) | [Crime Watch Security Sys Llc](https://www.permitgraph.org/contractor/crime-watch-security-sys-llc-808503) | new fire alarm system with sprinkler monitoring new facu, aes 7707, pull station, smoke detector, horn strobe, strobe, low frequency, door holders, and modules | $16,000 |
| [201910255598](https://www.permitgraph.org/p/201910255598) | Oct 25, 2019 | Completed: final sign-off Feb 2020 | [2344 03rd St](https://www.permitgraph.org/a/4108/003A) | [A -1 Roof Management & Construction, Inc](https://www.permitgraph.org/contractor/a-1-roof-management-construction-inc-929384) | otc approval - overlay existing roof, install felt underlayment followed by the installation of shingles. | $15,412 |
| [M1138327](https://www.permitgraph.org/p/M1138327) | Sep 13, 2019 | Never finaled: issued Sep 2019, no final | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) |  | street space |  |
| [201908158944](https://www.permitgraph.org/p/201908158944) | Aug 15, 2019 | Completed: final sign-off Jul 2023 | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) |  | revision to pa 2015-0317-1039. to update the demo calculations due to sub-standard and deterioration of existing structure membranes. all work to be performed within existing boundary of bldg. |  |
| [201906173534](https://www.permitgraph.org/p/201906173534) | Jun 17, 2019 | Completed: final sign-off Sep 2021 | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) | [M L S Builder Inc.](https://www.permitgraph.org/contractor/m-l-s-builder-inc-899863) | new fire sprinkler system for interior and underground connection. | $20,000 |
| [M1094967](https://www.permitgraph.org/p/M1094967) | Jun 13, 2019 | Never finaled: issued Jun 2019, no final | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) |  | street space |  |
| [201905221467](https://www.permitgraph.org/p/201905221467) | May 22, 2019 | Completed: final sign-off Jul 2023 | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) |  | to comply with nov 201956861 temp shoring |  |
| [201904238736](https://www.permitgraph.org/p/201904238736) | Apr 23, 2019 | Completed: final sign-off Jul 2023 | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) |  | revision to approved pa 2015-0317-1039 to perform minor interior layout adjustment. structural revision to match architectural- all work to be performed within existing boundary of the bldg. no kitch… |  |
| [201708235651](https://www.permitgraph.org/p/201708235651) | Aug 23, 2017 | Completed: final sign-off Jul 2023 | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) |  | exploratory surface removal per elevations per dcp request: removal of flront elevation surace (not to exceed 5% of facade area). removal of left elevation surface (not to exceed 5% of elevation area… | $1,000 |
| [201505277206](https://www.permitgraph.org/p/201505277206) | May 27, 2015 | Expired or cancelled: cancelled Jan 2026 | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) |  | interior work to include new ada compliant stairs/handrails, new ada commercial restroom and kitchenette. 18 sro bathrooms(4 accessible and kitchenette). repair wood framing in kind per pest report.… | $100,000 |
| [201503171039](https://www.permitgraph.org/p/201503171039) | Mar 17, 2015 | Completed: final sign-off Nov 2021 | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) |  | new ada compliant walkwy, storefront, entry, comm'l restrm, kitchenette,lobby entranc. install 18 sro bathrms & kitchenettes. replace all (e) aluminum windows w/double hang wood windows, replace rear… | $200,000 |
| [200002101605](https://www.permitgraph.org/p/200002101605) | Feb 10, 2000 | Completed: final sign-off Jun 2000 | [2342 03rd St](https://www.permitgraph.org/a/4108/003A) |  | stairs repair |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [A -1 Roof Management & Construction, Inc](https://www.permitgraph.org/contractor/a-1-roof-management-construction-inc-929384), [Crime Watch Security Sys Llc](https://www.permitgraph.org/contractor/crime-watch-security-sys-llc-808503), [M L S Builder Inc.](https://www.permitgraph.org/contractor/m-l-s-builder-inc-899863)
- Architects: [Bahman Ghassemzadeh](https://www.permitgraph.org/professional/bahman-ghassemzadeh-C75941), [Scott Pelichoff](https://www.permitgraph.org/professional/scott-pelichoff-C26219)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/4108/003A.
