# 575 Florida St

Block 4017, lot 005. Page: https://www.permitgraph.org/a/4017/005

- City's use: Industrial
- Built: 1923
- Building: 41,500 sq ft
- Lot: 22,245 sq ft
- Zoning: M1
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

28 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202211186841](https://www.permitgraph.org/p/202211186841) | Nov 18, 2022 | Never finaled: issued Nov 2022, no final | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | a new common connection bet. 1960 bryant & 575 florida st. both buildings are protected by their own manual and automatic fire alarm system & monitored independently. addressable fire alarm relays fr… | $8,728 |
| [202211166657](https://www.permitgraph.org/p/202211166657) | Nov 16, 2022 | Completed: final sign-off Jan 2023 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | shift in swing/placentment of commumicating openningg doors bewtween 575 florida & 1960 bryant street as had been previously aproved under pa# 2022-0427-3080 | $5,000 |
| [202206065715](https://www.permitgraph.org/p/202206065715) | Jun 6, 2022 | Completed: final sign-off Mar 2023 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 1/f: new exterior canopy at the entry. | $5,000 |
| [202204273080](https://www.permitgraph.org/p/202204273080) | Apr 27, 2022 | Completed: final sign-off Oct 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 1st fl t.i.: partial demo of common interior walls as well as connection between building at 575 florida & 1960 bryant includes rated corridor. elevated platform at l2 above the connection to acieve… | $5,000 |
| [202203291082](https://www.permitgraph.org/p/202203291082) | Mar 29, 2022 | Completed: final sign-off Apr 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | fire as-build. ref pa# 202106293430 |  |
| [202202037233](https://www.permitgraph.org/p/202202037233) | Feb 3, 2022 | Completed: final sign-off Apr 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | revision to bpa#202110059875 & 202105250928. incorporate steel framing details for 1/f platform. |  |
| [202201186174](https://www.permitgraph.org/p/202201186174) | Jan 18, 2022 | Completed: final sign-off Mar 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | as-built to pa202109148366; add 4 pendents under drop ceiling on 4th floor; total fire sprinklers changed to 31. |  |
| [202201186176](https://www.permitgraph.org/p/202201186176) | Jan 18, 2022 | Completed: final sign-off Aug 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 1/f: tenant improevent.modifty fire sprinkler head locations to accomdate new ceiling and partition layout for (e) office psace on 1/f. 98 total f/s heads. ref t.i.202105250928. | $50,372 |
| [202110059875](https://www.permitgraph.org/p/202110059875) | Oct 5, 2021 | Completed: final sign-off Apr 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | structural demo and arch. infill of an exterior wall at level 1, a new 3 stop ada lift and an elevated platform at level 2. | $50,000 |
| [202109289385](https://www.permitgraph.org/p/202109289385) | Sep 28, 2021 | Completed: final sign-off Jul 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | revision to approved app# 202104088173. demo and replace extg boiler with 2 condensing boilers. install new vfds to serve the extg hot water pumps. |  |
| [202109148366](https://www.permitgraph.org/p/202109148366) | Sep 14, 2021 | Completed: final sign-off Mar 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 4/f: modify (e) sprinkler head locations to accommodate new ceiling and partition layout for (e) office space on 4/f. 27 total heads. ref. t.i. pa202104067948. including standpipe. | $13,878 |
| [202108267221](https://www.permitgraph.org/p/202108267221) | Aug 26, 2021 | Completed: final sign-off Mar 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | modify sprinkler head locations to accommodate new ceiling and partition layout for extg office space on floor 3. total sprinklers in project: 72 | $37,008 |
| [202108116213](https://www.permitgraph.org/p/202108116213) | Aug 11, 2021 | Completed: final sign-off Mar 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | modify sprinkler head locations to accomodate new ceiling and partition layout for extg office space. 575 florida st . total sprinklers in project 83 | $42,662 |
| [202106293430](https://www.permitgraph.org/p/202106293430) | Jun 29, 2021 | Completed: final sign-off Apr 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | install new booster power supply inside electrical rooms on all floors. notification throughout path of travel/common areas, low frequency horns inside nap rooms, elevator recall, damper shutdown, sp… | $54,266 |
| [202105250928](https://www.permitgraph.org/p/202105250928) | May 25, 2021 | Completed: final sign-off Aug 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | tenant improvement at level 1 and p1; work also includes a change of occupancy for assembly space, non-egress communicating stair from level 1 to level 4, and the build out of library at level 2 and… | $2,760,000 |
| [202104088173](https://www.permitgraph.org/p/202104088173) | Apr 8, 2021 | Completed: final sign-off Jul 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 2/f: tenant improvement includes new interior partitions, finishes, and equipment. ref pa 202009265042, 202009265046. | $2,760,000 |
| [202104078027](https://www.permitgraph.org/p/202104078027) | Apr 7, 2021 | Completed: final sign-off Jul 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 3/f: tenant improvement includes new interior partitions, finishes, and equipment. ref pa 202009265042, 202009265046 & 202104068011 for assiocated permit atrium. | $2,750,000 |
| [202104067948](https://www.permitgraph.org/p/202104067948) | Apr 6, 2021 | Completed: final sign-off Jul 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 4/f: tenant improvement includes new interior partitions, finishes, and equipment. ref pa 202009265042, 202009265046. | $1,150,000 |
| [202104068011](https://www.permitgraph.org/p/202104068011) | Apr 6, 2021 | Completed: final sign-off Apr 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | revision to previously approved permit 202009265042. work includes partial wall removal and 2 hr rated shaft enclosure. (n) shotcrete wall & (n) boiler. |  |
| [202009265046](https://www.permitgraph.org/p/202009265046) | Sep 26, 2020 | Completed: final sign-off May 2021 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | interior non-structural demo. work includes removal of fixtures, finishes, millwork, etc | $95,000 |
| [202009265042](https://www.permitgraph.org/p/202009265042) | Sep 26, 2020 | Completed: final sign-off Apr 2022 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | interior structural demo. new openings in the exist concrete floors at levels 2,3 and 4 to be enclosed w/ rated shaft walls. | $125,000 |
| [201911016164](https://www.permitgraph.org/p/201911016164) | Nov 1, 2019 | Completed: final sign-off Dec 2019 | [575 Florida St](https://www.permitgraph.org/a/4017/005) | [Integrity Air Systems Corporation](https://www.permitgraph.org/contractor/integrity-air-systems-corporation-908275) | replace 2 rooftop air conditioners like for like, new units to set on (e) structural frame, new units are approx 500 lbs, lighter than (e) units | $60,000 |
| [201907155939](https://www.permitgraph.org/p/201907155939) | Jul 15, 2019 | Completed: final sign-off Sep 2019 | [575 Florida St](https://www.permitgraph.org/a/4017/005) |  | 575 florida street aka 2828 18th street (4017/005): to obtain a final inspection for work approved under pa#9916250. all work is complete. |  |
| [201811196307](https://www.permitgraph.org/p/201811196307) | Nov 19, 2018 | Completed: final sign-off Dec 2018 | [555 Florida St](https://www.permitgraph.org/a/4017/005) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 1st fl; add (6), relocate (8), and plug (2) sprinklers to conform with the new wall/ceiling layout of the t.i. | $4,950 |
| [201811155945](https://www.permitgraph.org/p/201811155945) | Nov 15, 2018 | Completed: final sign-off Mar 2019 | [555 Florida St](https://www.permitgraph.org/a/4017/005) | [Fire & Security & Alarm Co/ F.S.A.C.](https://www.permitgraph.org/contractor/fire-security-alarm-co-f-s-a-c-690774) | new notification devices will be installed and tie-in to (e) notification circuit & (e) panel located in the lobby ref 201809241214. n/a for maher. | $3,000 |
| [M942947](https://www.permitgraph.org/p/M942947) | Jun 22, 2018 | Never finaled: issued Jun 2018, no final | [575 Florida St](https://www.permitgraph.org/a/4017/005) |  | street space |  |
| [201506189289](https://www.permitgraph.org/p/201506189289) | Jun 18, 2015 | Expired or cancelled: cancelled Feb 2024 | [1900 Bryant St](https://www.permitgraph.org/a/4017/005) |  | remove and replace (11) existing antenas with (11 replacement antennas. install: 9 pipe mounth, 9a2 back packs, reroute 2 cables, install diplexers. n/a for maher. | $10,000 |
| [201310230023](https://www.permitgraph.org/p/201310230023) | Oct 23, 2013 | Completed: final sign-off Dec 2015 | [1900 Bryant St](https://www.permitgraph.org/a/4017/005) | [Quality Telecom Consultants](https://www.permitgraph.org/contractor/quality-telecom-consultants-814859) | remove & replace 6 panel antennas. install 12 remove radio units, 4 surge protection, remove 6 cables & replace with 4 cables, install 1 gps & replace 1 (e) lte cabinet with 1 new cabinet. verizon wi… | $10,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) (13), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (5), [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) (3), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967), [Fire & Security & Alarm Co/ F.S.A.C.](https://www.permitgraph.org/contractor/fire-security-alarm-co-f-s-a-c-690774), [Integrity Air Systems Corporation](https://www.permitgraph.org/contractor/integrity-air-systems-corporation-908275), [Quality Telecom Consultants](https://www.permitgraph.org/contractor/quality-telecom-consultants-814859)
- Architects: [Christopher Hall](https://www.permitgraph.org/professional/christopher-hall-C31549) (8), [Brian Collins-Friedrichs](https://www.permitgraph.org/professional/brian-collins-friedrichs-C28867) (3), [Manuel Tsihlas](https://www.permitgraph.org/professional/manuel-tsihlas-C28021) (2)
- Engineers: [Stephen Shafeer](https://www.permitgraph.org/professional/stephen-shafeer-E21097) (3), [Vanessa O'connor](https://www.permitgraph.org/professional/vanessa-o-connor-M40238) (3), [Marc Andrew Steyer](https://www.permitgraph.org/professional/marc-andrew-steyer-S6022) (2), [Carlo Biscocho](https://www.permitgraph.org/professional/carlo-biscocho-M39690)
- Authorized agents: [Lovella Torres](https://www.permitgraph.org/professional/lovella-torres-905493) (2)
- Designers: [Hany Dimitry Curtis Wayne Vance](https://www.permitgraph.org/professional/hany-dimitry-curtis-wayne-vance-905493)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/4017/005.
