# 200 Florida St

Block 3924, lot 006. Page: https://www.permitgraph.org/a/3924/006

- City's use: Miscellaneous/Mixed-Use
- Lot: 48,268 sq ft
- Zoning: M1
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

44 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [201403140725](https://www.permitgraph.org/p/201403140725) | Mar 14, 2014 | Completed: final sign-off Feb 2015 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Paganini Electric Corp(See Signatories)](https://www.permitgraph.org/contractor/paganini-electric-corp-see-signatories-309677) | electrical drawings to be submitted as building alteration to application 201311202436. electrical work including new lighting and power upgrades. compliance with ordinance no 155-13 not required. | $300,000 |
| [201402289546](https://www.permitgraph.org/p/201402289546) | Feb 28, 2014 | Completed: final sign-off Jul 2014 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796) | addition of 26 speakers/strobes, 12 strobes, and 1 power supply for the "sf spca" remodel on floors 1 and 2. all new devices connect onto the fire alarm system. ref pa 201311202436 | $19,800 |
| [201402188700](https://www.permitgraph.org/p/201402188700) | Feb 18, 2014 | Never finaled: issued Feb 2014, no final | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | add, relocate & remove fire sprinkler heads per tenant improvement. lower floor: 12 add, 9 relocate, 5 remove. main floor: 25 add, 61 relocate, 16 remove. total 107. | $54,998 |
| [201401277127](https://www.permitgraph.org/p/201401277127) | Jan 27, 2014 | Completed: final sign-off Feb 2015 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | work at unit# a only. m.e.p. associated with t.i. under pa# 2013/11/20/2436. all other work under separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $75,000 |
| [201312184459](https://www.permitgraph.org/p/201312184459) | Dec 18, 2013 | Completed: final sign-off Feb 2015 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | work @ unit# a only. front lobby to be updated with new cement plaster & a new storefront system to provide a transparent entry. new skylights to be added for optimal daylight. interior lobby new fin… | $92,250 |
| [201312023101](https://www.permitgraph.org/p/201312023101) | Dec 2, 2013 | Completed: final sign-off Feb 2015 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | non-structural interior demo of (e) maddies adoption center. demo includes partitions, doors & frames, ceilings & light fixtures. t.i. under pa#2013-1120-2436. no work to core or shell per ab 017. sp… | $25,000 |
| [201311202436](https://www.permitgraph.org/p/201311202436) | Nov 20, 2013 | Completed: final sign-off Feb 2015 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | t.i for (e) animal shelter "maddies" adiption center. work includes (n) wall + window partitions furniture + equipment. front lobby toget (n) cement plaster. no exterior work. compliance w/ ordinance… | $2,800,000 |
| [M420247](https://www.permitgraph.org/p/M420247) | Aug 23, 2013 | Never finaled: issued Aug 2013, no final | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | street space |  |
| [201207195255](https://www.permitgraph.org/p/201207195255) | Jul 19, 2012 | Completed: final sign-off Aug 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | revision to appl #2011.1220.1064 - additional storage racks in existing warehouse. | $5,000 |
| [201205029676](https://www.permitgraph.org/p/201205029676) | May 2, 2012 | Completed: final sign-off Jul 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Zebra Awning Co Inc](https://www.permitgraph.org/contractor/zebra-awning-co-inc-715027) | non-structural sign, graphic paint on existing canopy. | $500 |
| [201205029674](https://www.permitgraph.org/p/201205029674) | May 2, 2012 | Completed: final sign-off Jul 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Zebra Awning Co Inc](https://www.permitgraph.org/contractor/zebra-awning-co-inc-715027) | fabricate 1 canopy | $2,000 |
| [201204057601](https://www.permitgraph.org/p/201204057601) | Apr 5, 2012 | Completed: final sign-off Jul 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 1st and 2nd floor, t.i. fire sprinklers. added 18 fire sprinkler heads and relocated 2 fire sprinkler heads. | $10,000 |
| [201203135913](https://www.permitgraph.org/p/201203135913) | Mar 13, 2012 | Never finaled: issued Mar 2012, no final | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 1st floor-phase 1-fire alarm tenant improvement-2 smoke detectors, 1 heat detector, 3 duct detectors, 6 control relays, 2 horn/strobes & 1 strobe | $10,000 |
| [201203135916](https://www.permitgraph.org/p/201203135916) | Mar 13, 2012 | Completed: final sign-off Aug 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 2nd floor-phase 3-fire alarm tenant improvement-1 smoke detector & 1 control relay | $2,000 |
| [201203135915](https://www.permitgraph.org/p/201203135915) | Mar 13, 2012 | Completed: final sign-off Aug 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 2nd & 3rd floors-phase 2-fire alarm tenant improvement-3 smoke detectors, 1 control relay, 5 duct detectors, 30 horn/strobes & 4 strobes | $10,000 |
| [201203125899](https://www.permitgraph.org/p/201203125899) | Mar 12, 2012 | Completed: final sign-off Jun 2013 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Durkin Signs & Graphics Inc](https://www.permitgraph.org/contractor/durkin-signs-graphics-inc-904644) | erect an illuminated sign | $60,000 |
| [201203125844](https://www.permitgraph.org/p/201203125844) | Mar 12, 2012 | Completed: final sign-off Jul 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | add (159) heads to (e) fire sprinkler system; floors 2 & 3. | $79,500 |
| [201201262943](https://www.permitgraph.org/p/201201262943) | Jan 26, 2012 | Completed: final sign-off Aug 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | phase 2, 2nd, 3rd & roof floor - mechanical work only. ref t.i. #201108182700. install 1 new fire/smoke damper. |  |
| [201201262939](https://www.permitgraph.org/p/201201262939) | Jan 26, 2012 | Completed: final sign-off Aug 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | phase 1, t.i. of 1st floor storage - mechanical portion (work) only. ref t.i. #201108182698. 2 new fire/smoke dampers. field verify fa system. |  |
| [201201262944](https://www.permitgraph.org/p/201201262944) | Jan 26, 2012 | Completed: final sign-off Jul 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | phase 3, 2nd floor maddie's connection - mechanical work only. ref t.i. #201108182702. |  |
| [201112201064](https://www.permitgraph.org/p/201112201064) | Dec 20, 2011 | Completed: final sign-off Aug 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | installation of new storage racks in existing storage area. | $11,050 |
| [201112050095](https://www.permitgraph.org/p/201112050095) | Dec 5, 2011 | Expired or cancelled: withdrawn Sep 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | to document the seismic work previously completed under pa 200705010109, conforms w/ seismic requirt in the 2001 cbc w. sf amendments subject to review in current pa 201108182700. for record keeping… |  |
| [201108182700](https://www.permitgraph.org/p/201108182700) | Aug 18, 2011 | Completed: final sign-off Aug 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | phase 2 - tenant improvement of approx 18,964 sf of adminstrative space for animal service facility. this includes a new 7,889 sf 3rd floor.adding a communicating door on grid line 1. seismic upgrade… | $1,695,000 |
| [201108182702](https://www.permitgraph.org/p/201108182702) | Aug 18, 2011 | Completed: final sign-off Aug 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | phase 3 - tenant improvement of approx 693 sf of animal shelter space which including a lift, stair, and a connection to (existing) sf/spca space next door. | $28,000 |
| [201108182698](https://www.permitgraph.org/p/201108182698) | Aug 18, 2011 | Completed: final sign-off Sep 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | phase 1 - tenant improvement of approx 15,045 sf of 1st floor storage, office and laundry space, including a new structural mechanical platform on the roof. | $32,500 |
| [M261366](https://www.permitgraph.org/p/M261366) | May 13, 2011 | Never finaled: issued May 2011, no final | [200 Florida St](https://www.permitgraph.org/a/3924/006) |  | add additional address for 201-b alabama street. |  |
| [201005122297](https://www.permitgraph.org/p/201005122297) | May 12, 2010 | Expired or cancelled: cancelled Jan 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | provide new driveway and (n) curb cut for entrance into parking lot. provide new ramp inside the building parking lot. (n) fence & gate. | $7,000 |
| [201001225191](https://www.permitgraph.org/p/201001225191) | Jan 22, 2010 | Expired or cancelled: expired Feb 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | 1st floor-fire alarm t.i.-valve tamper & exterior horn add, 2 monitor modules & 1 waterproof exterior horn. fire inspector to field verify that the siga-ct1 tamper monitor modules are covered in the… | $9,450 |
| [200906231056](https://www.permitgraph.org/p/200906231056) | Jun 23, 2009 | Completed: final sign-off Jul 2009 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | add one duct mounted smoke detector with associated control relay | $2,290 |
| [200904247044](https://www.permitgraph.org/p/200904247044) | Apr 24, 2009 | Expired or cancelled: expired Feb 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | install (2) new signs (6'x32' each) on alabama st. (west) & treat ave. (north) facades. | $4,000 |
| [200904025408](https://www.permitgraph.org/p/200904025408) | Apr 2, 2009 | Expired or cancelled: expired Feb 2012 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Durkin Signs & Graphics Inc](https://www.permitgraph.org/contractor/durkin-signs-graphics-inc-904644) | erect non electric wall sign | $3,300 |
| [200903134106](https://www.permitgraph.org/p/200903134106) | Mar 13, 2009 | Completed: final sign-off Jan 2010 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Ken Johns Plumbing](https://www.permitgraph.org/contractor/ken-johns-plumbing-364471) | fire sprinkler upgrade, change out 299 spk heads, change out 1200 ft of pipe, ref pa #200902021255r-1. | $25,000 |
| [200903123998](https://www.permitgraph.org/p/200903123998) | Mar 12, 2009 | Completed: final sign-off Jan 2010 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Warehouse Engineering & Equipment Servic](https://www.permitgraph.org/contractor/warehouse-engineering-equipment-servic-581921) | installation of pallet racking, cantilever racking,and clip shelving in warehouse area. comply with high pile storage chp. 23, ca. fire code 2007. | $164,000 |
| [200903124011](https://www.permitgraph.org/p/200903124011) | Mar 12, 2009 | Completed: final sign-off Jul 2009 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | add a supply fan and 5 separate heating coils to warm outside air being suplied to the dog wards in the spca. work also includes a new window system in (e) openings facing florida st. ref pa#20070501… | $200,000 |
| [M154486](https://www.permitgraph.org/p/M154486) | Mar 6, 2009 | Never finaled: issued Mar 2009, no final | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | to request (#201a alabama street) to be the 2nd address for block 3924 lot 006 |  |
| [200902101796](https://www.permitgraph.org/p/200902101796) | Feb 10, 2009 | Never finaled: issued Feb 2009, no final | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | revision to pa# 2007-0827-1015-revise freight elevator matrix & add 1 horn strobe in food prep area. |  |
| [200902021255](https://www.permitgraph.org/p/200902021255) | Feb 2, 2009 | Completed: final sign-off Apr 2009 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Vic - 1 Construction](https://www.permitgraph.org/contractor/vic-1-construction-707041) | (unit #201a) verify legal use. provide 1-hr. separation between s-2/b occupancy provide 1-hr. separation adequate bracing for 200 ft. long wall. | $19,000 |
| [200809192142](https://www.permitgraph.org/p/200809192142) | Sep 19, 2008 | Completed: final sign-off Dec 2008 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | install aluminum frame with decorative finish over (e) building facade. +/- 960 s.f. | $34,600 |
| [200809192141](https://www.permitgraph.org/p/200809192141) | Sep 19, 2008 | Completed: final sign-off Dec 2008 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | erect a non-electric wall single faced non-illuminated new sign | $31,500 |
| [200805162264](https://www.permitgraph.org/p/200805162264) | May 16, 2008 | Completed: final sign-off Feb 2009 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | new front fence and gate at entry to southwest cortyard | $35,000 |
| [200804149629](https://www.permitgraph.org/p/200804149629) | Apr 14, 2008 | Completed: final sign-off Oct 2008 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | new mechanical equipment enclosure in equipment yard 4 hr cmu walls with chain link covering at roof. all mep is under seperate permit | $35,000 |
| [200709102169](https://www.permitgraph.org/p/200709102169) | Sep 10, 2007 | Completed: final sign-off Oct 2008 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) |  | interior non-structural demo. 1/f & 2/f. no exterior work to be performed under this permit. | $20,000 |
| [200708271011](https://www.permitgraph.org/p/200708271011) | Aug 27, 2007 | Completed: final sign-off Nov 2008 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | new fully sprinklered floor system at 2/f mezzanine area and relocate existing sprinklers on 1/f | $130,000 |
| [200708271015](https://www.permitgraph.org/p/200708271015) | Aug 27, 2007 | Completed: final sign-off Feb 2009 | [201 Alabama St](https://www.permitgraph.org/a/3924/006) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | new fire alarm system for anumal care center. rest of bldg fire alarm under separate application. | $85,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) (9), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) (3), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) (3), [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) (3), [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) (3), [Durkin Signs & Graphics Inc](https://www.permitgraph.org/contractor/durkin-signs-graphics-inc-904644) (2), [Zebra Awning Co Inc](https://www.permitgraph.org/contractor/zebra-awning-co-inc-715027) (2), [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565), [Ken Johns Plumbing](https://www.permitgraph.org/contractor/ken-johns-plumbing-364471), [Paganini Electric Corp(See Signatories)](https://www.permitgraph.org/contractor/paganini-electric-corp-see-signatories-309677), [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796), [Vic - 1 Construction](https://www.permitgraph.org/contractor/vic-1-construction-707041), [Warehouse Engineering & Equipment Servic](https://www.permitgraph.org/contractor/warehouse-engineering-equipment-servic-581921)
- Architects: [James Sunseri](https://www.permitgraph.org/professional/james-sunseri-C19143) (9), [Warren Freedenfeld](https://www.permitgraph.org/professional/warren-freedenfeld-C24580) (2), [Diversified / Fire Product](https://www.permitgraph.org/professional/diversified-fire-product-627565)
- Engineers: [Kevin Menninger](https://www.permitgraph.org/professional/kevin-menninger-S3163) (4), [Craig W. Ristow](https://www.permitgraph.org/professional/craig-w-ristow-M30828) (3), [Dfp Dfp](https://www.permitgraph.org/professional/dfp-dfp-C27565), [Elizabeth Allen](https://www.permitgraph.org/professional/elizabeth-allen-E17659)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3924/006.