# 185 Berry St

Block 3803, lot 001. Page: https://www.permitgraph.org/a/3803/001

The city's assessor roll has no record for this parcel.

## Permits filed here

169 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202506068118](https://www.permitgraph.org/p/202506068118) | Jun 6, 2025 | In progress: issued Jun 2025 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | replacement of hvac rooftop unit on roof including new structural support structure. | $100,000 |
| [202309156708](https://www.permitgraph.org/p/202309156708) | Sep 15, 2023 | Completed: final sign-off Nov 2023 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 4/fl-suite 4800: as-built fire alarm to reflect field markups and relocation of 2 fcu units. ref pa# 202306059206. |  |
| [202308214817](https://www.permitgraph.org/p/202308214817) | Aug 21, 2023 | Completed: final sign-off Sep 2023 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 4/f ste 4800: fire sprinkler as built for pa# 202306079405. |  |
| [202306079405](https://www.permitgraph.org/p/202306079405) | Jun 7, 2023 | Completed: final sign-off Sep 2023 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | relocate 78 pendents, add 7 pendents, 2 uprights. convert 14 pendents to uprights, 4 uprights t pendents. remove 12 pendents, 2 uprights. ref: 202304105357 | $4,000 |
| [202306059206](https://www.permitgraph.org/p/202306059206) | Jun 5, 2023 | Completed: final sign-off Nov 2023 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 4/fl - suite 4800: fire alarm t.i.: add 1 smoke detector, 8 ceiling strobes. 12 ceiling horn strobes to provide proper coverage. mech ref. pa 2023-0516-7807. | $3,500 |
| [202305167807](https://www.permitgraph.org/p/202305167807) | May 16, 2023 | Completed: final sign-off Nov 2023 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4/f ste 4800: mep for tenant improvement, ref pa# 202304105357. | $175,000 |
| [202304105357](https://www.permitgraph.org/p/202304105357) | Apr 10, 2023 | Completed: final sign-off Nov 2023 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | suite 4800: t.i., new private office, open office, meeting rooms, employee break area. mep under separate permit | $850,000 |
| [202210124166](https://www.permitgraph.org/p/202210124166) | Oct 12, 2022 | Never finaled: issued Oct 2022, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | remove back flow preventer. revision to pa# 202208110319 |  |
| [202208110319](https://www.permitgraph.org/p/202208110319) | Aug 11, 2022 | Never finaled: issued Aug 2022, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | boiler replacement. demo 4 (e) boilers and replace with 3 new boilers on existing penthouse. | $2,314,000 |
| [202203149901](https://www.permitgraph.org/p/202203149901) | Mar 14, 2022 | Completed: final sign-off Dec 2022 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | ste 1500: selective demo of partitions, door / frame / hardware, power / data & ceiling / lighting & finishes. mep, lift safety & fire protection modification will be submitted under separate permit. | $287,000 |
| [202112204730](https://www.permitgraph.org/p/202112204730) | Dec 20, 2021 | Completed: final sign-off Apr 2022 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Signature Const. Co., Inc](https://www.permitgraph.org/contractor/signature-const-co-inc-219324) | install 4 monitors at 185 berry street lobby 6, suite 180b and suite 190. provide power and data if required. | $4,000 |
| [202108096037](https://www.permitgraph.org/p/202108096037) | Aug 9, 2021 | Never finaled: issued Feb 2022, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Cameron Builders Inc.](https://www.permitgraph.org/contractor/cameron-builders-inc-830798) | suite 180c: demo of int. partitions, & int. drywall layer & selected furring channels of demising partition & ext. walls, flooring & ceiling systems & unused me systems. construction of complete (n)… | $2,000,000 |
| [202106021467](https://www.permitgraph.org/p/202106021467) | Jun 2, 2021 | Completed: final sign-off Aug 2021 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers; relocate 9 pendent sprinklers andrelocate 4 uprights on the 1st floor. t.i. ref # 2021-0503-9689 | $6,825 |
| [202103015614](https://www.permitgraph.org/p/202103015614) | Mar 1, 2021 | Completed: final sign-off Sep 2021 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fire alarm. this is an addition to the existing facu. 1 pull station, 3 ceiling strobes, 1 ceiling horn strobe to be added to provide proper coverage. | $1,500 |
| [202101263362](https://www.permitgraph.org/p/202101263362) | Jan 26, 2021 | Completed: final sign-off Apr 2021 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers; relocate 9 pendent sprinklers and relocate 1 upright on the 2nd floor suite 2300. no hydraulic calculations for flex heads, there are under 10 sprinklers. t.i. ref # 2020-11-13-8822 | $5,000 |
| [202101263360](https://www.permitgraph.org/p/202101263360) | Jan 26, 2021 | Never finaled: issued Feb 2021, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers; relocate 7 pendent sprinklers and relocated 6 uprights on the 1st floor. suite 170. no hydraulic calculations for flex heads, there are under 10 sprinklers. t.i. ref# 2020-10-07-6109 | $6,500 |
| [202001212318](https://www.permitgraph.org/p/202001212318) | Jan 21, 2020 | Completed: final sign-off Apr 2020 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Orr Protection Systems Inc](https://www.permitgraph.org/contractor/orr-protection-systems-inc-952133) | fire alarm tenant improvement: submit as builts for existing permit; garage, 1st, 2nd floors. revision to pa# 2015-10-09-3946. | $19,315 |
| [201911046314](https://www.permitgraph.org/p/201911046314) | Nov 4, 2019 | Expired or cancelled: cancelled Aug 2023 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [R I C Construction Co Inc.](https://www.permitgraph.org/contractor/r-i-c-construction-co-inc-747268) | 6/f: ste 6800. voluntary upgrade to (e) fire detection system. maher n/a. | $300,000 |
| [201905019378](https://www.permitgraph.org/p/201905019378) | May 1, 2019 | Completed: final sign-off Jan 2021 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Emcor Services/Mesa Energy Systems Inc](https://www.permitgraph.org/contractor/emcor-services-mesa-energy-systems-inc-611215) | remove and replace cooling tower & 2 boilers | $310,000 |
| [201903044259](https://www.permitgraph.org/p/201903044259) | Mar 4, 2019 | Completed: final sign-off Jun 2019 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th flr. mech and electric for tenant improvement. ref pa 201902062172 and 201808278369 | $50,000 |
| [201901220925](https://www.permitgraph.org/p/201901220925) | Jan 22, 2019 | Completed: final sign-off Nov 2022 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 4th fl - add & relocate fire sprinklers per ti: 6 add and 32 relocate. ref #201802201675. | $10,350 |
| [201809190723](https://www.permitgraph.org/p/201809190723) | Sep 19, 2018 | Completed: final sign-off Oct 2018 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | 3rd flr - fire sprinklers. relocate 5 pendents and 13 uprights, ref 201808278367 maher na | $5,000 |
| [201808278369](https://www.permitgraph.org/p/201808278369) | Aug 27, 2018 | Completed: final sign-off Jun 2019 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | suite 4700 - ti to include demo, new partitions, new ceiling. mep under sep permit maher na | $425,000 |
| [201807255476](https://www.permitgraph.org/p/201807255476) | Jul 25, 2018 | Completed: final sign-off Sep 2018 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 3/f: suite 3700-demoltion of non-structural partitions, ceilings and floors, ab 017 | $5,000 |
| [201805250161](https://www.permitgraph.org/p/201805250161) | May 25, 2018 | Expired or cancelled: cancelled Nov 2019 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | revision to 201802201675 to remove dish room c4-113 from scope maher not req |  |
| [201803052788](https://www.permitgraph.org/p/201803052788) | Mar 5, 2018 | Never finaled: issued Mar 2018, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | 1st flr - fire sprinkler relocate 88. add 13, delete 5 pendents and relocate 1, add 1 and delete 7 upright ref 201711274822 maher na | $26,000 |
| [201801027688](https://www.permitgraph.org/p/201801027688) | Jan 2, 2018 | Completed: final sign-off Mar 2020 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 6th flr- fire alarm ti - replacing 4 ceiling mount notification devices, maher na ref 201708144745 | $1,500 |
| [201801027691](https://www.permitgraph.org/p/201801027691) | Jan 2, 2018 | Completed: final sign-off Feb 2018 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 2nd flr- fire alarm ti - provide 2 new ceiling mount horn/strobes, maher na | $500 |
| [201711274822](https://www.permitgraph.org/p/201711274822) | Nov 27, 2017 | Completed: final sign-off Oct 2018 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 1st flr: suite 1000, construction of primary and speciality care clinic upgrade mep. fire alarm & fire sprinklers on sep permit | $750,000 |
| [201711033066](https://www.permitgraph.org/p/201711033066) | Nov 3, 2017 | Completed: final sign-off Feb 2018 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | f/s: suite 2000, 2nd fl: relocate 255, add 5, and delete 19 fire sprinklers on the 2nd fl. ref ti #201708144745. maher na | $55,000 |
| [201709289793](https://www.permitgraph.org/p/201709289793) | Sep 28, 2017 | Completed: final sign-off Oct 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | f/s: remove 4 pendents & install 5 upright sprinklers on the 5th fl. ref ti #201708164958. maher na. | $1,500 |
| [201708235687](https://www.permitgraph.org/p/201708235687) | Aug 23, 2017 | Never finaled: issued Aug 2017, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | 1st floor: add 1 return air grille. add 2 supply air grilles to extg water source heat pump. add one return air grille to extg water source heat pump. | $2,000 |
| [201708164958](https://www.permitgraph.org/p/201708164958) | Aug 16, 2017 | Completed: final sign-off Aug 2018 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | ti on the 5th fl to include renovation of office area, dining, elevator lobbies, conference rooms, and millwork. mep, life safety & sprinkler under sep permit. maher na | $1,175,000 |
| [201706169565](https://www.permitgraph.org/p/201706169565) | Jun 16, 2017 | Never finaled: issued Jun 2017, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fire alarm ti suites 4801, 4805 & 4807, add new fire alarm devices and connect to (e) fire alarm system pa 201703282565 | $20,000 |
| [201705257621](https://www.permitgraph.org/p/201705257621) | May 25, 2017 | Completed: final sign-off Jul 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fa t.i. to 5th floor: add 1 smoke detector, 3 nac appliances. relocate 3 smoke detectors and 6 nac appliances. ref app#201612074365. | $2,000 |
| [201705227284](https://www.permitgraph.org/p/201705227284) | May 22, 2017 | Completed: final sign-off Jun 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 5th floor (wharf side) - existing fire sprinkler ti, 24 relocated sprinklers, 10 added sprinklers. ref pa 2016-0818-5322 | $17,500 |
| [201705055811](https://www.permitgraph.org/p/201705055811) | May 5, 2017 | Completed: final sign-off May 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinkler suite 6700 8 pendents from overhead shell sytem, add 2 pendant heads | $5,000 |
| [201704204440](https://www.permitgraph.org/p/201704204440) | Apr 20, 2017 | Completed: final sign-off Jul 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 6th floor: f/a t.i. to suite 6500. relocate 6 nac devices. reconnect to extg fire alarm system. ref app#201703292631 | $1,500 |
| [201704113649](https://www.permitgraph.org/p/201704113649) | Apr 11, 2017 | Completed: final sign-off Jun 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 6th floor, ste. 6700 - add 5 smoke detectors, 2 relay modules, 7 horn strobes, 2 strobes. connect to extg fire alarm system. ref app# 2017-0328-2561 | $12,000 |
| [201703211945](https://www.permitgraph.org/p/201703211945) | Mar 21, 2017 | Completed: final sign-off Apr 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 5th flr: (e) fire sprinkler system- relocate 23 sprinklers add 4 sprinklewrs. ti #201608185322. | $14,000 |
| [201701278082](https://www.permitgraph.org/p/201701278082) | Jan 27, 2017 | Never finaled: issued Jan 2017, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 5th floor: t.i. add 3 notification appliances, 1 relay, connect to extg fire alarm system. ref app#2016012074365. | $5,000 |
| [201612124670](https://www.permitgraph.org/p/201612124670) | Dec 12, 2016 | Completed: final sign-off Apr 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinklers t/i suite 1600 level #1, added 195 spinklers | $100,800 |
| [201610251103](https://www.permitgraph.org/p/201610251103) | Oct 25, 2016 | Completed: final sign-off Feb 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinklers t/1 "suite #1000" level #1 - (112) added sprinklers. pa 2014-1107-0971 | $57,900 |
| [201603293316](https://www.permitgraph.org/p/201603293316) | Mar 29, 2016 | Never finaled: issued Apr 2016, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | phase 1 ste 200/220, power and lighting for expansion of suite 200 & 220. ref pa 2015*0827-5430. maher na |  |
| [201603293319](https://www.permitgraph.org/p/201603293319) | Mar 29, 2016 | Never finaled: issued Apr 2016, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | phase 2 ste 200/210, power and lighting for expansion of suite 200 & 210. ref pa 2015-1211-4823. maher na |  |
| [201603242972](https://www.permitgraph.org/p/201603242972) | Mar 24, 2016 | Completed: final sign-off Jul 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | level #4 phase 2 (east half) - (318) added fire sprinklers. ref pa #201412194129. | $163,400 |
| [201603071368](https://www.permitgraph.org/p/201603071368) | Mar 7, 2016 | Completed: final sign-off Mar 2016 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | ste. #1430 - fire sprinklers - 32 added pendents, 2 added dry pendents in freeze: ste.#1510 - 11 added pendents. total 45 sprinklers. maher n/a | $23,100 |
| [201601288212](https://www.permitgraph.org/p/201601288212) | Jan 28, 2016 | Completed: final sign-off May 2016 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | 2nd & 3rd: addition of 6 vav boxes w/reheat & relocation of 4 (e) boxes. addition of 1 new exhaust fan for new copy/mail room, adition of ductwork & grilles downstream of () boxes as necessary ref pa… | $95,000 |
| [201512114823](https://www.permitgraph.org/p/201512114823) | Dec 11, 2015 | Completed: final sign-off May 2016 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | suite 200 & 210 level 2 & 3 expansion of existing space by 14,000sf including int walls, doors, frames ceiling & int windows. t.i. novation to 3000 sf of office @ suite 300 including replacement of (… | $1,090,000 |
| [201512094599](https://www.permitgraph.org/p/201512094599) | Dec 9, 2015 | Completed: final sign-off Jan 2016 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | relocate 1 existing notification appliance for a tenant improvement in existing building | $1,000 |
| [201511092116](https://www.permitgraph.org/p/201511092116) | Nov 9, 2015 | Never finaled: issued Nov 2015, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | to go with approved pa 2014-1216-3809 | $2,000 |
| [201510099365](https://www.permitgraph.org/p/201510099365) | Oct 9, 2015 | Completed: final sign-off Nov 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 2nd floor, suite 200 & 220: fire alarm device for ti - 1 power supply, 3 modules, 2 voltage relay , 2 pull stations, 5 smoke detectors, 22 horn/strobe, 6 strobes. ref pa 2015 0827 5430 | $7,430 |
| [201509258037](https://www.permitgraph.org/p/201509258037) | Sep 25, 2015 | Completed: final sign-off Nov 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 2nd flr: fire sprinkler - relocate 35 hds, added 5 and 5 delete ref pa 2015 0827 5430 | $20,720 |
| [201508124012](https://www.permitgraph.org/p/201508124012) | Aug 12, 2015 | Completed: final sign-off Nov 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire spinkler t.i. in level #1 suite 1050. 16 added fire sprinklers. t.i. app#201412194129. n/a for maher. ref base permit 201411070971 | $8,200 |
| [201508043324](https://www.permitgraph.org/p/201508043324) | Aug 4, 2015 | Never finaled: issued Oct 2015, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | suite 300 -scope to install walls, doors, exit lighting as required for 2 new doors to separate lobby from office space. relocate of light fixture. separate permits for mep, and fire safety | $7,700 |
| [201506259932](https://www.permitgraph.org/p/201506259932) | Jun 25, 2015 | Completed: final sign-off Jul 2016 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | suite #1050 ground floor - consist of partial demo work & construction of new walls & doors of (e) wharfside building in china basin. demo consists of door & partial ceiling removal. new construction… | $120,000 |
| [201506118787](https://www.permitgraph.org/p/201506118787) | Jun 11, 2015 | Expired or cancelled: cancelled Jan 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | ~kf21&partial demo and construction of new demising walls o the 2nd fl within the existing berry building in china basin. demo consists of removal of doors, walls, finishes, fixtures, partial ceiling… | $45,500 |
| [201505206810](https://www.permitgraph.org/p/201505206810) | May 20, 2015 | Completed: final sign-off Feb 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | level 4: add 355 sprinkler heads maher not req ref app#201412194129 | $182,400 |
| [201505146351](https://www.permitgraph.org/p/201505146351) | May 14, 2015 | Completed: final sign-off Jun 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | #3800- revision to pa#201406279897 to add 3 phone rooms. n/a ordinance #155-13 |  |
| [201504274641](https://www.permitgraph.org/p/201504274641) | Apr 27, 2015 | Completed: final sign-off Feb 2017 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 6th floor: tie in new branch lines to the extg mains. mains installed under app#201411070971. 683 sprinkler heads. | $200,000 |
| [M576027](https://www.permitgraph.org/p/M576027) | Apr 7, 2015 | Never finaled: issued Apr 2015, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | street space permit |  |
| [201501276754](https://www.permitgraph.org/p/201501276754) | Jan 27, 2015 | Never finaled: issued Feb 2015, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | 5th flr, ste 5100: reference to permit 201406097837; added gyp soffit and accoustical ceiling tile (05-a2.1); revise lighting layout and power data plan, all revisions are clouded (05-a21 and 05-a3.1… | $350,000 |
| [201501226437](https://www.permitgraph.org/p/201501226437) | Jan 22, 2015 | Completed: final sign-off Sep 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 3/f - demolition of non-compliant auxiliary restrooms and construc of 2 new accessible rooms. mep separate deferred submittals. | $32,700 |
| [201501064997](https://www.permitgraph.org/p/201501064997) | Jan 6, 2015 | Completed: final sign-off Jul 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | demolition work to be performed on vacant part of 5th floor excluding suite 5100 within the existing wharfside building.this work precludes a subsequent ti. the demolition includes doors, walls, susp… | $36,420 |
| [201412093410](https://www.permitgraph.org/p/201412093410) | Dec 9, 2014 | Completed: final sign-off Mar 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | suite 6600 & 6700: demo work only to be performed in suites located on the 6th fl within existing wharfside building in china basin. do consists of removal of doors, partitons, susp ceilings, finishe… | $47,760 |
| [201411131457](https://www.permitgraph.org/p/201411131457) | Nov 13, 2014 | Completed: final sign-off Feb 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 5th floor: demolition only to be performed in multiple suites on 5th flr except ste 5100 in (e) wharfside building. demo of interior doors, partitions, susp. ceiling system, finishes, lighting, mech… | $300,000 |
| [201410280140](https://www.permitgraph.org/p/201410280140) | Oct 28, 2014 | Never finaled: issued Oct 2014, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | ste 6190 & 6200: new fire alarm devices for t.i. to existing building to include: 1 power supply, 2 control modules, 2 horn/strobes. ref. t.i. appl. 2014.0917.6510. maher n/a. | $2,400 |
| [M520607](https://www.permitgraph.org/p/M520607) | Sep 24, 2014 | Never finaled: issued Sep 2014, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | street space permit |  |
| [201409176510](https://www.permitgraph.org/p/201409176510) | Sep 17, 2014 | Completed: final sign-off May 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [R I C Construction Co Inc.](https://www.permitgraph.org/contractor/r-i-c-construction-co-inc-747268) | ste 6800: soft demolition permit only. this permit application is for the demo of partitions, ceiling tile & grid, mechanical equipment & distribution ducting and electrical service distribution. fir… | $300,000 |
| [201409166454](https://www.permitgraph.org/p/201409166454) | Sep 16, 2014 | Completed: final sign-off Nov 2014 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 2nd floor suite 2001 - relocate & remove fire sprinklers per tenant imprvoements - relcoate 7, remove 5. ref #2014.06.26.9543 | $3,598 |
| [201409156272](https://www.permitgraph.org/p/201409156272) | Sep 15, 2014 | Completed: final sign-off Sep 2014 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | ste 4610: mechanical system reworked to accomodate new layout; t.i. 201407100887. | $30,000 |
| [201409085769](https://www.permitgraph.org/p/201409085769) | Sep 8, 2014 | Completed: final sign-off Jul 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [R I C Construction Co Inc.](https://www.permitgraph.org/contractor/r-i-c-construction-co-inc-747268) | work on ste#6800. t-i within (e) space (office ste). (e) suite to be demised into two separate ste. scope of work includes the demolition & construction of partitions doors & finishes. mechnical, ele… | $1,800,000 |
| [201407100908](https://www.permitgraph.org/p/201407100908) | Jul 10, 2014 | Completed: final sign-off Feb 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | voluntary disabled access barrier removal in wharfside. bldg lobby 3 3rd floor. the extg restrooms will have minor alterations to make them compliant with the current code cycle. there will be no mec… | $30,000 |
| [201407100887](https://www.permitgraph.org/p/201407100887) | Jul 10, 2014 | Completed: final sign-off Sep 2014 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 4th floor #4610 - construction of 1 new work room. the suite is currently unoccupied. mech, elec, life safety & sprinkler system modificaiton are not included under this permit & deferred submittal. | $30,000 |
| [201406279897](https://www.permitgraph.org/p/201406279897) | Jun 27, 2014 | Completed: final sign-off Jun 2015 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 3rd floor: office t. i. of an extg office bldg. it is a multi-tenant floor. consists of an expansion of extg office space with demo of extg demising walls and construction of new interior walls. adju… | $600,000 |
| [201406097837](https://www.permitgraph.org/p/201406097837) | Jun 9, 2014 | Completed: final sign-off Sep 2014 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5th flr; ste 5100: tenant improvement consisting of non-structural non-load bearing partitions glazing ceiling millwork and finishes, mep included | $880,000 |
| [201404294421](https://www.permitgraph.org/p/201404294421) | Apr 29, 2014 | Completed: final sign-off Jun 2014 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 6th fl: demo permit only. demolish non structural partitions. ti to be submitted separately. building is not is not fully sprinklered | $13,000 |
| [201404012121](https://www.permitgraph.org/p/201404012121) | Apr 1, 2014 | Never finaled: issued Apr 2014, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | 5th floor ste 5425/5475/5501 - consists of infilling (3) existing door openings to create (3) separate suites. | $7,500 |
| [201312265026](https://www.permitgraph.org/p/201312265026) | Dec 26, 2013 | Completed: final sign-off Jan 2014 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler ti add 6 sprinklers, relocate 10 sprinklers, relocate and c.o. 8 sprinklers | $12,351 |
| [201311272976](https://www.permitgraph.org/p/201311272976) | Nov 27, 2013 | Completed: final sign-off Dec 2013 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 5th fl. fire sprinkler ti add 39 heads, relocate 4 heads, relocate/change out 3 heads. total 46 heads. | $23,750 |
| [201309096309](https://www.permitgraph.org/p/201309096309) | Sep 9, 2013 | Never finaled: issued Sep 2013, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 4th floor-ste #4800-hvac for t.i on 4th fl to add new air distribution, vav boxes, exhaust fans & fan coils. refer to pa# 2013-0729-3004 for t.i work | $150,000 |
| [201308154418](https://www.permitgraph.org/p/201308154418) | Aug 15, 2013 | Completed: final sign-off Sep 2013 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | suite 4603: add new devices and relocate devices to new tenant build-out. 1 return air smoke detector. 3 strobes. 4 horn/strobes. 2 relay modules. 2 rl horn/strobes. | $5,000 |
| [201307293004](https://www.permitgraph.org/p/201307293004) | Jul 29, 2013 | Never finaled: issued Aug 2013, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | 4th flr ste 4800-demolition of (e) ceiling height partitions, construction of new ceiling height partitions & slab-to-slab partitions. associated life safety system changes. some upgrades to path of… | $1,400,000 |
| [201306250387](https://www.permitgraph.org/p/201306250387) | Jun 25, 2013 | Completed: final sign-off Jan 2014 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Fisher Development Inc](https://www.permitgraph.org/contractor/fisher-development-inc-271781) | 4th floor t.i. of (e) office space, new construction consists of new walls, finishes. some accessibility upgrades of (e) restrooms nearest the area of remodel. a local equivalency form for the use of… | $250,000 |
| [201209240484](https://www.permitgraph.org/p/201209240484) | Sep 24, 2012 | Completed: final sign-off Feb 2013 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | the (e) elevator hoistway on the 2nd, 3rd, 4th and 5th floor of the wharfside bldg nare not separated from the circulation corridors on each floor by an elevator lobby. install a new smoke curtain at… | $30,000 |
| [201209179915](https://www.permitgraph.org/p/201209179915) | Sep 17, 2012 | Completed: final sign-off Jan 2013 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | voluntary disabled access barrer work within berry street side bldg. extg drink fountains in ground floor lobbies and exgt fountain on 2nd floor to be altered from single low fountain to combo "hi-lo… | $75,000 |
| [201208238083](https://www.permitgraph.org/p/201208238083) | Aug 23, 2012 | Completed: final sign-off Sep 2012 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 5th floor-expansion to the (e) class 1 standpipe system-2 fire hose valves at horizontal exit opening. tenant improvement (e) fire sprinkler system. refer pa# 2012-0710-4410 | $5,000 |
| [201207104410](https://www.permitgraph.org/p/201207104410) | Jul 10, 2012 | Never finaled: issued Jul 2012, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | tenant improvements to existing fire sprinkler system add 24 pendent sprinklers, add 1 upright sprinkler, lower 2 sprinklers, relocate 5 sprinklers. all work on the 5th floor. | $15,000 |
| [201201192553](https://www.permitgraph.org/p/201201192553) | Jan 19, 2012 | Completed: final sign-off Mar 2012 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | tenant improvement. existing fire sprinkler system, add 3 upright sprinklers. basement/garage | $1,500 |
| [201112160843](https://www.permitgraph.org/p/201112160843) | Dec 16, 2011 | Completed: final sign-off Apr 2012 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 4th floor:t. i. extg fire sprinkler system. 37 added sprinklers. | $19,000 |
| [201112080312](https://www.permitgraph.org/p/201112080312) | Dec 8, 2011 | Expired or cancelled: cancelled Apr 2013 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | to erect electric, wall, single faced sign. | $10,000 |
| [201111229440](https://www.permitgraph.org/p/201111229440) | Nov 22, 2011 | Completed: final sign-off Feb 2012 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 4th floor-add new horn/strobes to conference rooms, meeting rooms, open office area. add new smoke detector to lobby doors, new duct smoke detectors to fan power boxes for global shutdown. monitor mo… | $37,545 |
| [201111189272](https://www.permitgraph.org/p/201111189272) | Nov 18, 2011 | Completed: final sign-off Jan 2012 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 5th floor - add 14 new pendent sprinkler in bathrooms, relocate existing branchlines out of new walls. | $10,000 |
| [201110136684](https://www.permitgraph.org/p/201110136684) | Oct 13, 2011 | Completed: final sign-off Feb 2012 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Intelligent Technologies & Services Inc](https://www.permitgraph.org/contractor/intelligent-technologies-services-inc-592289) | new clean agent systems within 4th floor server room and idf rooms | $22,625 |
| [201109124392](https://www.permitgraph.org/p/201109124392) | Sep 12, 2011 | Completed: final sign-off Oct 2011 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | #5100- add new door holders to lobby doors, control with control relay, add new storbe to reception area | $3,500 |
| [201109074000](https://www.permitgraph.org/p/201109074000) | Sep 7, 2011 | Never finaled: issued Sep 2011, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 4th and 5th floor core additions of 6 field power supply, 6 smoke detectors, 4 duct detectors, 50 induct smokes for suply and return fire smoke dampers. 6 new strobes for 4th floor restrooms | $20,000 |
| [201109063896](https://www.permitgraph.org/p/201109063896) | Sep 6, 2011 | Completed: final sign-off Dec 2011 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Cameron Builders Inc.](https://www.permitgraph.org/contractor/cameron-builders-inc-830798) | 1st floor-(e) interior tenant improvement construction of a new dianostic imaging center & floor slab to support new imaging equipment | $320,000 |
| [201108152460](https://www.permitgraph.org/p/201108152460) | Aug 15, 2011 | Completed: final sign-off Sep 2011 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler system upgrade,relocate 20 pendent sprinkler heads on the 2nd floor | $10,300 |
| [201107291300](https://www.permitgraph.org/p/201107291300) | Jul 29, 2011 | Completed: final sign-off Mar 2013 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 1st floor-add field power supply to electrical closet for added horn/strobes in open areas. detectors added to units for global shut down | $6,000 |
| [201107190561](https://www.permitgraph.org/p/201107190561) | Jul 19, 2011 | Completed: final sign-off Sep 2011 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | add 1 horn strobe to tenant space at 2nd fl | $2,500 |
| [201106299143](https://www.permitgraph.org/p/201106299143) | Jun 29, 2011 | Expired or cancelled: expired Mar 2013 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st floor-installation of 1 piece of floor standing equipment hook up utility to this equipment | $75,000 |
| [201105125913](https://www.permitgraph.org/p/201105125913) | May 12, 2011 | Completed: final sign-off Jul 2011 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | add horn/strobes and strobes to open office area, conf rooms, breakrooms, reception area. add duct detectors to units for global shutdown, add pull station at exit | $6,000 |
| [201104123896](https://www.permitgraph.org/p/201104123896) | Apr 12, 2011 | Completed: final sign-off May 2011 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | add 2 strobes and 1 horn strobe to open area and multiple use office space. relocate 2 horn/strobe to open office space. | $4,000 |
| [201011245616](https://www.permitgraph.org/p/201011245616) | Nov 24, 2010 | Never finaled: issued Nov 2010, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 3rd floor - add horn/strobes in open office areas, conference rooms, breakrooms & other areas. add duct detector to units for global shut down, smoke detectors added to server rooms, 27 duct detector… | $15,000 |
| [201009080385](https://www.permitgraph.org/p/201009080385) | Sep 8, 2010 | Completed: final sign-off Apr 2011 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 3rd floor - add relay module for control of elevator smoke guards. | $5,000 |
| [201004210686](https://www.permitgraph.org/p/201004210686) | Apr 21, 2010 | Expired or cancelled: expired Mar 2013 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 2nd floor-add new strobe to conference room, relocate 2 smoke detectors & 1 horn/strobe for proper coverage | $5,000 |
| [201001074304](https://www.permitgraph.org/p/201001074304) | Jan 7, 2010 | Expired or cancelled: expired Oct 2013 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | structural work to support new hvac units on 6th floor. ref. arch 2009-1120-1787. | $24,000 |
| [200912283913](https://www.permitgraph.org/p/200912283913) | Dec 28, 2009 | Completed: final sign-off May 2010 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | suites 6400, 6500 and roof - 6th floor. add horn/strobes to open office areas, conference rooms, shower room. smoke detectots added to server rooms above electrical panels. duct detectors added to 4… | $13,000 |
| [200912283912](https://www.permitgraph.org/p/200912283912) | Dec 28, 2009 | Never finaled: issued Dec 2009, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | suite 4815 - 4th fl. add strobe coverage to open areas and conference room. one sd added to it room. 4 horn, 1 strobe, 1 smoke, 2 strobes | $5,000 |
| [200911121059](https://www.permitgraph.org/p/200911121059) | Nov 12, 2009 | Completed: final sign-off Dec 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | strobes added to conf. rm. 105, (e) horn/strobes & smokes to be relocated in order to provide proper coverage, (e) smoke detectors to be demo, all other (e) devices to remain. | $5,000 |
| [200906160517](https://www.permitgraph.org/p/200906160517) | Jun 16, 2009 | Completed: final sign-off Jul 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | 6th floor - new demising wall to demise private office into 2 offices. | $5,000 |
| [200905128181](https://www.permitgraph.org/p/200905128181) | May 12, 2009 | Completed: final sign-off Jun 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 5th flr, suite 5100 - horn/strobes added to conference rooms, reception area & open office area. smoke detector is provided in server room | $7,000 |
| [200902121983](https://www.permitgraph.org/p/200902121983) | Feb 12, 2009 | Completed: final sign-off Apr 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | #4801- new signal power extender, horn/strobe & strobes are added to changing room, chamber room & waiting area. smoke detector is provided in storage closet for electrical equipment-1 power supply,… | $5,400 |
| [200901150259](https://www.permitgraph.org/p/200901150259) | Jan 15, 2009 | Completed: final sign-off Feb 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 4th floor-revision to pa# 2008-0929-2915-add new fire alarm devices to (e) fire alarm system-26 duct detectors | $7,000 |
| [200901130092](https://www.permitgraph.org/p/200901130092) | Jan 13, 2009 | Completed: final sign-off Mar 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 5th floor- electrical & mechanical work for tenant improvement, ref arch pa#200812299280. | $14,850 |
| [200812239117](https://www.permitgraph.org/p/200812239117) | Dec 23, 2008 | Completed: final sign-off Feb 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | add new a/v devices to existing fire alarm panel 2-horn/strobes 1 strob. | $5,000 |
| [200810295358](https://www.permitgraph.org/p/200810295358) | Oct 29, 2008 | Completed: final sign-off Feb 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 1st floor ste 1600 add new fire alarm devices to existing fire alarm control panel - 24 duct detectors, 1 field power supply , 3 smoke detectors, 10 strobes, 31 horn/strobes. | $15,000 |
| [200810033306](https://www.permitgraph.org/p/200810033306) | Oct 3, 2008 | Completed: final sign-off Jan 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 3 floor suite 300 - t.i. modifying 3 office to 2 private offices finishes to suit. elec under separate permit. | $40,000 |
| [200809292915](https://www.permitgraph.org/p/200809292915) | Sep 29, 2008 | Completed: final sign-off Feb 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 4th floor-new fire alarm devices added to (e) fire alarm panel. 1 smoke detector, 9 strobes ceiling, 39 strobes wall, 7 horn/strobes ceiling, 13 horn/strobes wall | $15,000 |
| [200809151613](https://www.permitgraph.org/p/200809151613) | Sep 15, 2008 | Completed: final sign-off Jan 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | lobby 6 - as built submittal to (e) 200802195002 fire alarm. new 1 duct detector & 1 relay module. |  |
| [200809050858](https://www.permitgraph.org/p/200809050858) | Sep 5, 2008 | Never finaled: issued Sep 2008, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | 4th floor-revision to pa# 2008-0528-3061-original restroom drawings were the wrong ones. correcting the mistake for the record |  |
| [M131786](https://www.permitgraph.org/p/M131786) | Aug 21, 2008 | Never finaled: issued Aug 2008, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | street space permit |  |
| [200806023447](https://www.permitgraph.org/p/200806023447) | Jun 2, 2008 | Completed: final sign-off Feb 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | 4th floor: minor new walls, doors to secure suite. minor demo at entry, new office, modify entry. new finishes in area of work. design build hvac/elec sep permit. | $37,316 |
| [200805283061](https://www.permitgraph.org/p/200805283061) | May 28, 2008 | Completed: final sign-off Feb 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | 4th floor - office expanding into adjacent suites. t.i. interior demo of non-structural corridors & walls/doors, new partitions & doors. mechanical, electrical & voluntary fire alarm life safety unde… | $317,150 |
| [200805071467](https://www.permitgraph.org/p/200805071467) | May 7, 2008 | Never finaled: issued May 2008, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | 4th floor interior non stuctural demo of walls and doors. ab-017 disabled access will be addressed when ti submitted for permit | $8,000 |
| [200803318391](https://www.permitgraph.org/p/200803318391) | Mar 31, 2008 | Completed: final sign-off Apr 2008 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 5th & 6th floor - renew 200506013901 for final. revision to 200709142670 to correct. (remove 200506013903). |  |
| [200802195002](https://www.permitgraph.org/p/200802195002) | Feb 19, 2008 | Completed: final sign-off Jan 2009 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | lobby# 6 renovation for fire alarm on the ground floor. add 1 field power supply, 4 horn strobes, 2 pull stations and 1 smoke detector | $6,000 |
| [200801222974](https://www.permitgraph.org/p/200801222974) | Jan 22, 2008 | Completed: final sign-off Jul 2008 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | addition of new fire alarm devices to ex. fire alarm panel in suite 1200. add 1 field power supply, 2 relays, 2 smoke detectors, 7 strobes, 11 duct detectors and 16 horn strobes | $9,000 |
| [200712200942](https://www.permitgraph.org/p/200712200942) | Dec 20, 2007 | Completed: final sign-off Jul 2008 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | mechanical & electrical work. include new ducts, registers, heat, pumps, exhaust fans, lighting & plugs. | $40,000 |
| [200712100053](https://www.permitgraph.org/p/200712100053) | Dec 10, 2007 | Never finaled: issued Dec 2007, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | add 4 strobes and 3 horn strobes to ex, facp | $5,000 |
| [200711268875](https://www.permitgraph.org/p/200711268875) | Nov 26, 2007 | Completed: final sign-off Jul 2008 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | tenant improvement on the ground floor. non-load bearing partitions, suspended ceiling, millwork and finsihes. no exterior work. mep & electrical under separate permit | $400,000 |
| [200709203230](https://www.permitgraph.org/p/200709203230) | Sep 20, 2007 | Never finaled: issued Sep 2007, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | 2nd floor-interior non-structural demolition of suite 2100 of 2nd floor. office space will remain vacant pending approval of tenant improvement plan. fire safety devices will remain operational and f… | $2,500 |
| [200610044097](https://www.permitgraph.org/p/200610044097) | Oct 4, 2006 | Completed: final sign-off May 2007 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-4 2nd floor sp | $10,800 |
| [200608250630](https://www.permitgraph.org/p/200608250630) | Aug 25, 2006 | Completed: final sign-off Jun 2007 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | the general scope of this project is to correct various ada access compliance issues that have been identified within the code defined 'path of travel' to the edd suite #200 space. | $125,000 |
| [200608048657](https://www.permitgraph.org/p/200608048657) | Aug 4, 2006 | Completed: final sign-off Aug 2007 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | suite 461 - installation of additonal batteries, structural supportfor same, hydrogen detector with intake and exhaust fan. | $50,000 |
| [200607257466](https://www.permitgraph.org/p/200607257466) | Jul 25, 2006 | Expired or cancelled: expired May 2008 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | commercial t.i. life safety addition of 8 new devices horn strobes (7) & smoke detector (1) | $9,000 |
| [200607257464](https://www.permitgraph.org/p/200607257464) | Jul 25, 2006 | Expired or cancelled: expired May 2008 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | t.i. for spec. suite. new a/v devices, new power supply and new s.d. | $15,000 |
| [200607207167](https://www.permitgraph.org/p/200607207167) | Jul 20, 2006 | Never finaled: issued Jul 2006, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) | tenant improvement 2nd floor, ste. 2200 & 2400, new signal power expander (to be calculated at full load), add devices total of (101) new devices to be added, full coverage of smoke detector in lieu… | $30,000 |
| [200512291227](https://www.permitgraph.org/p/200512291227) | Dec 29, 2005 | Never finaled: issued Dec 2005, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) | add to existing fire alarm control panel. new signal power expanders to be used for tenant area nac's. new horn'strobe & smoke detector to be added to server room. relay module provided in server roo… | $3,500 |
| [200510195975](https://www.permitgraph.org/p/200510195975) | Oct 19, 2005 | Completed: final sign-off Dec 2005 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | life safety upgrade of (e) space. | $18,000 |
| [200509193201](https://www.permitgraph.org/p/200509193201) | Sep 19, 2005 | Completed: final sign-off Jul 2006 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | construction of a staircase from the basement to the first floor & revising basement t.i. work.revision to appl#200507157771 | $18,000 |
| [200506013896](https://www.permitgraph.org/p/200506013896) | Jun 1, 2005 | Expired or cancelled: expired Jan 2012 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-4, 5th floor, sp. | $50,000 |
| [200506013901](https://www.permitgraph.org/p/200506013901) | Jun 1, 2005 | Expired or cancelled: expired Apr 2008 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-4, 6th floor, sp. | $17,000 |
| [200505172622](https://www.permitgraph.org/p/200505172622) | May 17, 2005 | Expired or cancelled: expired Apr 2008 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2 5/f me | $240,000 |
| [200503238168](https://www.permitgraph.org/p/200503238168) | Mar 23, 2005 | Completed: final sign-off Apr 2005 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-3 3rd/fl-me | $59,000 |
| [200502115327](https://www.permitgraph.org/p/200502115327) | Feb 11, 2005 | Completed: final sign-off Apr 2005 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2 3rd floor ls | $13,000 |
| [200502105239](https://www.permitgraph.org/p/200502105239) | Feb 10, 2005 | Completed: final sign-off Mar 2005 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-3 5/f ls | $8,200 |
| [200412010475](https://www.permitgraph.org/p/200412010475) | Dec 1, 2004 | Completed: final sign-off Jan 2005 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm system upgrade on 5th floor. | $4,200 |
| [200411199691](https://www.permitgraph.org/p/200411199691) | Nov 19, 2004 | Expired or cancelled: expired Feb 2006 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm for a tenant improvement construction in suite 6000. | $12,000 |
| [200411199670](https://www.permitgraph.org/p/200411199670) | Nov 19, 2004 | Completed: final sign-off Jan 2005 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2 5th floor, el, me | $22,000 |
| [200411018184](https://www.permitgraph.org/p/200411018184) | Nov 1, 2004 | Completed: final sign-off Jun 2005 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2, 6th floor - el, me. | $83,500 |
| [200409103808](https://www.permitgraph.org/p/200409103808) | Sep 10, 2004 | Completed: final sign-off Dec 2004 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2 2/f, el, me, sp | $225,000 |
| [200407128484](https://www.permitgraph.org/p/200407128484) | Jul 12, 2004 | Completed: final sign-off May 2005 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2 4/f el me | $16,000 |
| [200407098382](https://www.permitgraph.org/p/200407098382) | Jul 9, 2004 | Completed: final sign-off May 2005 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2, 4th floor, el, me. | $21,000 |
| [200407098381](https://www.permitgraph.org/p/200407098381) | Jul 9, 2004 | Completed: final sign-off May 2005 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2, 4th floor, el, me. | $19,000 |
| [200403259610](https://www.permitgraph.org/p/200403259610) | Mar 25, 2004 | Completed: final sign-off Jun 2004 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | i-2 5th floor el,me | $279,000 |
| [200402247039](https://www.permitgraph.org/p/200402247039) | Feb 24, 2004 | Completed: final sign-off Jun 2004 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | oti-1 5th fl-me, el | $150,000 |
| [M25174](https://www.permitgraph.org/p/M25174) | Oct 9, 2003 | Never finaled: issued Oct 2003, no final | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | street permit |  |
| [200308081583](https://www.permitgraph.org/p/200308081583) | Aug 8, 2003 | Completed: final sign-off May 2004 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | new and existing rooftop equipment, structural support for new equipmen | $500,000 |
| [200308081587](https://www.permitgraph.org/p/200308081587) | Aug 8, 2003 | Completed: final sign-off Apr 2004 | [185 Berry St](https://www.permitgraph.org/a/3803/001) |  | tenant improvement at 2nd floor. work includes soft demo, partitions, doors, hardware, and finishes | $700,000 |
| [200211010628](https://www.permitgraph.org/p/200211010628) | Nov 1, 2002 | Expired or cancelled: expired Jun 2005 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Intelligent Technologies & Services Inc](https://www.permitgraph.org/contractor/intelligent-technologies-services-inc-592289) | install new fire alarm devices to (e)edward 6500 fire alarm panel for 3rd fl | $3,000 |
| [200109249055](https://www.permitgraph.org/p/200109249055) | Sep 24, 2001 | Completed: final sign-off Mar 2002 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | install new preaction system at server room on 5th floor | $10,550 |
| [200109178423](https://www.permitgraph.org/p/200109178423) | Sep 17, 2001 | Completed: final sign-off Mar 2002 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Intelligent Technologies & Services Inc](https://www.permitgraph.org/contractor/intelligent-technologies-services-inc-592289) | intelli tech to design provide equipmt perform testing on clean agent fire alarm system | $7,000 |
| [200108287045](https://www.permitgraph.org/p/200108287045) | Aug 28, 2001 | Completed: final sign-off Mar 2002 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2 5th floor, suite 5601, el & me. | $140,000 |
| [200108287042](https://www.permitgraph.org/p/200108287042) | Aug 28, 2001 | Completed: final sign-off Mar 2002 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-1, 5th floor, el & me | $25,000 |
| [200106292652](https://www.permitgraph.org/p/200106292652) | Jun 29, 2001 | Completed: final sign-off Mar 2002 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2 5th floor, ltg, mech | $30,000 |
| [200101109552](https://www.permitgraph.org/p/200101109552) | Jan 10, 2001 | Completed: final sign-off Aug 2001 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Sasco](https://www.permitgraph.org/contractor/sasco-583536) | monitor 4 water flow switches & 4 tamper switches in new parking area in basement | $10,000 |
| [200010112693](https://www.permitgraph.org/p/200010112693) | Oct 11, 2000 | Expired or cancelled: expired Jul 2001 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | construct 1 hr doors with panic bars at common corridor for security. | $10,000 |
| [200009059632](https://www.permitgraph.org/p/200009059632) | Sep 5, 2000 | Completed: final sign-off Aug 2007 | [185 Berry St](https://www.permitgraph.org/a/3803/001) | [Tishman Construction Corp Of Calif.](https://www.permitgraph.org/contractor/tishman-construction-corp-of-calif-322670) | demolition of office area demo permit only | $5,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) (23), [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) (22), [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) (17), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) (9), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (8), [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) (7), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (7), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (6), [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) (5), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) (4), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (4), [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) (4), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (3), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (3), [Intelligent Technologies & Services Inc](https://www.permitgraph.org/contractor/intelligent-technologies-services-inc-592289) (3), [R I C Construction Co Inc.](https://www.permitgraph.org/contractor/r-i-c-construction-co-inc-747268) (3), [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) (3), [Cameron Builders Inc.](https://www.permitgraph.org/contractor/cameron-builders-inc-830798) (2), [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) (2), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (2), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) (2), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (2), [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986), [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749), [Emcor Services/Mesa Energy Systems Inc](https://www.permitgraph.org/contractor/emcor-services-mesa-energy-systems-inc-611215), [Fisher Development Inc](https://www.permitgraph.org/contractor/fisher-development-inc-271781), [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363), [Orr Protection Systems Inc](https://www.permitgraph.org/contractor/orr-protection-systems-inc-952133), [Sasco](https://www.permitgraph.org/contractor/sasco-583536), [Signature Const. Co., Inc](https://www.permitgraph.org/contractor/signature-const-co-inc-219324), [Tishman Construction Corp Of Calif.](https://www.permitgraph.org/contractor/tishman-construction-corp-of-calif-322670)
- Architects: [Megan J Ackerley](https://www.permitgraph.org/professional/megan-j-ackerley-C24057) (9), [Lionakis](https://www.permitgraph.org/professional/lionakis-C20296) (2), [M Melissa Duffy](https://www.permitgraph.org/professional/m-melissa-duffy-C28015) (2), [Felix A. Rodriguez](https://www.permitgraph.org/professional/felix-a-rodriguez-C12982), [J. Edgar Fennies Jr](https://www.permitgraph.org/professional/j-edgar-fennies-jr-C20310), [Jack Echols](https://www.permitgraph.org/professional/jack-echols-744147), [John Flath](https://www.permitgraph.org/professional/john-flath-C21560), [John Flath](https://www.permitgraph.org/professional/john-flath-C31560), [Justin Beadle](https://www.permitgraph.org/professional/justin-beadle-C34818), [Martha L. Breed](https://www.permitgraph.org/professional/martha-l-breed-C32618), [Melissa Pesci](https://www.permitgraph.org/professional/melissa-pesci-C32725), [Michael Lino Garcia](https://www.permitgraph.org/professional/michael-lino-garcia-C24690), [Paul Bosman](https://www.permitgraph.org/professional/paul-bosman-C7254), [Sashikala Murthy](https://www.permitgraph.org/professional/sashikala-murthy-C39484)
- Engineers: [Antonio Jakosalem](https://www.permitgraph.org/professional/antonio-jakosalem-E15401) (2), [Detection Logic Detection Logic Fire Protectio](https://www.permitgraph.org/professional/detection-logic-detection-logic-fire-protectio-713099) (2), [Mustafa Colak](https://www.permitgraph.org/professional/mustafa-colak-109950) (2), [Simon Younan](https://www.permitgraph.org/professional/simon-younan-113099) (2), [Stephen M. Glatt](https://www.permitgraph.org/professional/stephen-m-glatt-M22887) (2), [Stephen M. Glatt](https://www.permitgraph.org/professional/stephen-m-glatt-22887) (2), [Xuong Quach](https://www.permitgraph.org/professional/xuong-quach-M31981) (2), [Anindya Dutta](https://www.permitgraph.org/professional/anindya-dutta-S4905), [Bradley Hollub](https://www.permitgraph.org/professional/bradley-hollub-M33234), [Douglas K. Van Meter](https://www.permitgraph.org/professional/douglas-k-van-meter-E22270), [Elisabeth M Allen](https://www.permitgraph.org/professional/elisabeth-m-allen-E17659), [Habtom Nugusse Tewelde](https://www.permitgraph.org/professional/habtom-nugusse-tewelde-M39065), [Lorenzo A Rios Castellon](https://www.permitgraph.org/professional/lorenzo-a-rios-castellon-M21000), [Louis Almgren](https://www.permitgraph.org/professional/louis-almgren-M24193), [Lucas Sean Wilson](https://www.permitgraph.org/professional/lucas-sean-wilson-S5933), [Martha Breed](https://www.permitgraph.org/professional/martha-breed-C32618), [Peter Mchugh](https://www.permitgraph.org/professional/peter-mchugh-392967), [Sherry Chaumpluke](https://www.permitgraph.org/professional/sherry-chaumpluke-M34646), [Simon Yarnan](https://www.permitgraph.org/professional/simon-yarnan-E13180), [Simon Younan](https://www.permitgraph.org/professional/simon-younan-E13186)
- Authorized agents: [Janey Chan](https://www.permitgraph.org/professional/janey-chan-S6081), [Paul Henri Durand](https://www.permitgraph.org/professional/paul-henri-durand-S4222)
- Designers: [Imran Khan](https://www.permitgraph.org/professional/imran-khan-C33511)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.