# 101 Townsend St

Block 3794, lot 015. Page: https://www.permitgraph.org/a/3794/015

- City's use: Industrial
- Built: 1913
- Stories: 3
- Rooms: 5 bathrooms
- Building: 33,750 sq ft
- Lot: 12,646 sq ft
- Zoning: M2
- Construction type: B

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

55 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202602276698](https://www.permitgraph.org/p/202602276698) | Feb 27, 2026 | In progress: issued Mar 2026 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Specialized Graphics Inc](https://www.permitgraph.org/contractor/specialized-graphics-inc-967185) | to replace electrical sign (cloud) | $11,600 |
| [202303012838](https://www.permitgraph.org/p/202303012838) | Mar 1, 2023 | Completed: final sign-off Jan 2025 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to ti pa# 202103096202 & 202202258755, phone booths & location & size confirmation on 2nd & 3rd floor. no exterior work. |  |
| [202206226853](https://www.permitgraph.org/p/202206226853) | Jun 22, 2022 | Never finaled: issued Jun 2022, no final | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | as builts to pa 202108126327. show existing relay module for roll up door on 3rd floor plan and matrix for reference per inspector per inspector request. |  |
| [202205113960](https://www.permitgraph.org/p/202205113960) | May 11, 2022 | Completed: final sign-off Jan 2025 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd fl: mechanical and electrical for tenant improvement. ref pa# 202202258755. | $30,000 |
| [202204263052](https://www.permitgraph.org/p/202204263052) | Apr 26, 2022 | Completed: final sign-off Jul 2022 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | rev to pa202204122059: remove 2 new horns/strobes to (e) to reflect the job site. |  |
| [202204122059](https://www.permitgraph.org/p/202204122059) | Apr 12, 2022 | Completed: final sign-off Jul 2022 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | due to interior remodeling on 2nd floor, three new notification devices will be installed to (e) power supply panel in the basement ref 202202258755 | $1,800 |
| [202202258755](https://www.permitgraph.org/p/202202258755) | Feb 25, 2022 | Completed: final sign-off Oct 2022 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd fl - demo of select partitions, ceilings, lighting & finishes. new non-bearing wlls, ceilings, finishes, millwork & lighting. no change of use area or occupancy | $200,000 |
| [202112134292](https://www.permitgraph.org/p/202112134292) | Dec 13, 2021 | Completed: final sign-off Dec 2021 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | fire alarm ti install 1 new wall mount strobe, 3 new horn/strobes and relocate 2 existing horn strobes. ref pa 2021-0309-6202. 1st fl | $5,000 |
| [202111303337](https://www.permitgraph.org/p/202111303337) | Nov 30, 2021 | Completed: final sign-off Jul 2022 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | (e) notification devices will be relocated to (n) location & few (n) will be installed. install (n) relay module & 2 smoke detecttors for (n) roll-up door(installed by others)& tie-in to (e) control… | $5,000 |
| [202109218855](https://www.permitgraph.org/p/202109218855) | Sep 21, 2021 | Completed: final sign-off Feb 2023 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | basement: demo select interior partitions, storefront, door frames, ceiling tiles, lighting/power/data, new interior partitions, ceiling tiles, minor lighting rework, upgrades power/data & some fllor… | $700,000 |
| [202108206843](https://www.permitgraph.org/p/202108206843) | Aug 20, 2021 | Completed: final sign-off Oct 2022 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | ground floor: mechanical and electrical work for t.i. ref arch #202103297470 | $155,000 |
| [202108126327](https://www.permitgraph.org/p/202108126327) | Aug 12, 2021 | Never finaled: issued Aug 2021, no final | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | due to office interior remodeling on 3rd floor, new power supply panel,smoke detector & 2 new notification devices & radio communication will be install and tie-in to exg panel locate in the basement… | $2,500 |
| [202107224932](https://www.permitgraph.org/p/202107224932) | Jul 22, 2021 | Completed: final sign-off Jan 2025 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | mech and elect work for t.i. on 3rd flr. ref# 2021-0309-6202 | $75,000 |
| [202103297468](https://www.permitgraph.org/p/202103297468) | Mar 29, 2021 | Completed: final sign-off Feb 2023 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | sawcut (e) concrete flr slab opening at ground level for future stair. add temp barricade around new slab opening. change room function of (e) all hands space to new open collaboration space. add new… | $1,000,000 |
| [202103297471](https://www.permitgraph.org/p/202103297471) | Mar 29, 2021 | Completed: final sign-off May 2025 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | flip (e) steel picket gate and man door. add new metal mesh panel screens to (e) gate. remove partial (e) deck boards, deck supports and guardrails at 101 townsend. provide new wood slat fence and ne… | $230,000 |
| [202103096202](https://www.permitgraph.org/p/202103096202) | Mar 9, 2021 | Completed: final sign-off Jan 2025 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | demolish a few fixed offices/phones/conferences including interior partitions,storefronts,doors/frames,ceiling tiles, lighting & power/data. in additon a wide mesh partition & casework @ coffe area i… | $100,000 |
| [201810042265](https://www.permitgraph.org/p/201810042265) | Oct 4, 2018 | Completed: final sign-off Oct 2018 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | new add on fire system, installing notification as indicated on plans | $5,000 |
| [201809190780](https://www.permitgraph.org/p/201809190780) | Sep 19, 2018 | Completed: final sign-off Oct 2018 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [O'connor Plumbing & Fire Protection](https://www.permitgraph.org/contractor/o-connor-plumbing-fire-protection-498866) | all floors: add 6 f/s heads at pass through on each floor (2/fl). add 1 f/s head at new bathroom on g/f. ref ta pa#201802090887. maher n/a. | $8,000 |
| [201807194922](https://www.permitgraph.org/p/201807194922) | Jul 19, 2018 | Completed: final sign-off Aug 2018 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | install 3 smoke detectors and three relays to close new fire doors. these doors are installed by others. refer to #2008-04-17-9968 and #2018-02-09-0887. maher n/a | $6,000 |
| [201802090887](https://www.permitgraph.org/p/201802090887) | Feb 9, 2018 | Completed: final sign-off Nov 2018 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | create (3) communicating opening on a shared wall between 101 & 111 townsend st at 1st, 2nd & 3rd foors. add 1 gender neutral bathroom @ 101 townsend | $60,000 |
| [201801178820](https://www.permitgraph.org/p/201801178820) | Jan 17, 2018 | Completed: final sign-off Jan 2018 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | as built 201702280311. relocate 2 ex horn strobes to new location, install horn stronbe and stronbe in sitting area, 1 outdoor horn strobe to reflect job site, new devices tied into e notification ci… | $1,000 |
| [201703020486](https://www.permitgraph.org/p/201703020486) | Mar 2, 2017 | Completed: final sign-off Oct 2017 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [O'connor Plumbing & Fire Protection](https://www.permitgraph.org/contractor/o-connor-plumbing-fire-protection-498866) | basement - add 3 new sprinkler heads @ new trash bin areas per nfpa 13. ref pa #201607081849. n/a maher ordinance | $2,000 |
| [201702280311](https://www.permitgraph.org/p/201702280311) | Feb 28, 2017 | Completed: final sign-off Jan 2018 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | install 1 new strobe and 1 horn/strobe inside new tenant. new devices will be tie in to existing notification circuit. | $2,000 |
| [201701137131](https://www.permitgraph.org/p/201701137131) | Jan 13, 2017 | Completed: final sign-off Nov 2017 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | install new outdoorn horn strobe on new deck and tie in to e notification circuit. install 2 monitor modules in basement to tie in flow and tamper switch to e control panl locate in basement. pa 2016… | $2,000 |
| [201701137158](https://www.permitgraph.org/p/201701137158) | Jan 13, 2017 | Completed: final sign-off Jan 2018 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | t.i for change to cafe use. hvac works inclued tied into (e) building system. new commercial cafe t.i. to include new air handler, new restroom, electrical & plumbing. cabinets & kitchen equipment. *… | $175,000 |
| [201612225729](https://www.permitgraph.org/p/201612225729) | Dec 22, 2016 | Completed: final sign-off Dec 2017 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | revision to 201607081849: structural sheets only 2794 maher na |  |
| [201607081849](https://www.permitgraph.org/p/201607081849) | Jul 8, 2016 | Completed: final sign-off Dec 2017 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | construction of new side deck. project would construct a new side deck and trash storage enclosure. the deck would be approximately 950 sq.ft. & +/-f5 ft above existing finish grade; maher n/a | $65,000 |
| [201602129514](https://www.permitgraph.org/p/201602129514) | Feb 12, 2016 | Never finaled: issued Feb 2016, no final | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | remove 4 manual pull stations and correct/re-label point numbers for devices. refer app#201508103810. n/a for maher |  |
| [201509025948](https://www.permitgraph.org/p/201509025948) | Sep 2, 2015 | Never finaled: issued Sep 2015, no final | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | as builts to reflect the removal of the water flow and tamper switches from the job. refer to pa#2014-0911-6056 |  |
| [201508124042](https://www.permitgraph.org/p/201508124042) | Aug 12, 2015 | Completed: final sign-off Apr 2016 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | 1st floor t.i. revision to pa #201504214160: architectural & structural - original permit #201504214160 took out raise floor & room on raised floor. this permit puts it back w/structural added etc. n… |  |
| [201508103748](https://www.permitgraph.org/p/201508103748) | Aug 10, 2015 | Never finaled: issued Aug 2017, no final | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) | to erect 2 electric, wall, single faced, new sign. ** maher: compliance with ordinance no# 155-13 not required ** | $10,000 |
| [201508103810](https://www.permitgraph.org/p/201508103810) | Aug 10, 2015 | Completed: final sign-off Feb 2016 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | upgrade (e) fire alarm control with unit to ifp-100. install monitor modules to tie-in new duct detectors on all floors. install pull stations at every exit & remove shunt-trip due to change of use f… | $6,400 |
| [201508103754](https://www.permitgraph.org/p/201508103754) | Aug 10, 2015 | Never finaled: issued Aug 2017, no final | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) | to erect non-electric, wall, single faced sign. ** maher: compliance with ordinance no# 155-13 not required ** | $2,000 |
| [201506128875](https://www.permitgraph.org/p/201506128875) | Jun 12, 2015 | Completed: final sign-off Feb 2016 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | install new power supply and new notification appliances throughout all floors due to new tenant moving in . new devices tied into exist control unit located in basement. ref 201404213761 and 2014091… | $13,500 |
| [201505055374](https://www.permitgraph.org/p/201505055374) | May 5, 2015 | Completed: final sign-off Sep 2015 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) |  | record change of use for existing permit, no construction work for this permit. t.i. under separate permit. reference pa #201404213761. |  |
| [201504214160](https://www.permitgraph.org/p/201504214160) | Apr 21, 2015 | Completed: final sign-off Apr 2016 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | 1/f t.i. include build out of the 1st flr w/non-structural partitions. mep, electrical & plumbing included. life safety work under separate permit. (bldg not sprinkelered). change use under ap# 20150… | $629,590 |
| [201504214165](https://www.permitgraph.org/p/201504214165) | Apr 21, 2015 | Completed: final sign-off Apr 2016 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | basement t.i. includes building out of basement level with non-structural partitions, mep included (building not sprinklered); change of use under ap# 2015.0505.5374. maher n/a | $629,590 |
| [201410068155](https://www.permitgraph.org/p/201410068155) | Oct 6, 2014 | Completed: final sign-off Feb 2016 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | 2nd floor - t.i. includes building out with non-structural partitions, ceiling, lighting and finishes. mep included. life safety under separate permit. change of use under ap# 2015-0505-5374. maher n… | $630,000 |
| [201410068156](https://www.permitgraph.org/p/201410068156) | Oct 6, 2014 | Expired or cancelled: withdrawn Nov 2014 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) |  | basement t.i. - includes the build out of non structural partitions, ceilings lights and finishes. mep under separate permit. life safety under separate permit. maher n/a. | $630,000 |
| [201410068151](https://www.permitgraph.org/p/201410068151) | Oct 6, 2014 | Completed: final sign-off Feb 2016 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | 3rd flr: t.i. includes the build out of the 3rd flr with non-structural partitions, ceiling, lighting & finishes. mep included (bldg not sprinklered); bldg not sprinklered. life safety under separate… | $630,000 |
| [201410068158](https://www.permitgraph.org/p/201410068158) | Oct 6, 2014 | Expired or cancelled: withdrawn Nov 2014 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) |  | 1st floor - change use and t.i. improvement include teh non-structural partitions, ceilings, lighting and finishes. all new hvac tied to base building system. electrical, plumbing and life safety und… | $630,000 |
| [201409116056](https://www.permitgraph.org/p/201409116056) | Sep 11, 2014 | Completed: final sign-off Sep 2015 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | sprinkler waterflow & supervisory system with elev. recal for bldg shell. install new control unit in the basement, smoke det.above & pull stn near. elev. recall will be installed to comply with elev… | $3,100 |
| [201404213761](https://www.permitgraph.org/p/201404213761) | Apr 21, 2014 | Completed: final sign-off Sep 2015 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | new restrooms & hvac for warm shell. new windows @ 2nd & 3rd floor. new glass roll up doors. paint & patch exterior. new roof deck with stair & elevator penthouses. ** maher: compliance with ordinanc… | $1,500,000 |
| [201311152106](https://www.permitgraph.org/p/201311152106) | Nov 15, 2013 | Completed: final sign-off Sep 2015 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | interior demo, add interior stairs & elevator, add seismic walls & footings, lower basement slab 2'-0" | $1,500,000 |
| [201304013490](https://www.permitgraph.org/p/201304013490) | Apr 1, 2013 | Completed: final sign-off Jan 2014 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Oliver & Company Inc.](https://www.permitgraph.org/contractor/oliver-company-inc-276682) | new painted steel vehicle and person gate. chipseal driveway and restripe. | $10,000 |
| [201101289233](https://www.permitgraph.org/p/201101289233) | Jan 28, 2011 | Completed: final sign-off Mar 2011 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Oliver & Company Inc.](https://www.permitgraph.org/contractor/oliver-company-inc-276682) | demolition of overhang in alley. small portion of overhang is on neighboring property at 750 - 2nd street. | $900 |
| [201009201207](https://www.permitgraph.org/p/201009201207) | Sep 20, 2010 | Completed: final sign-off Jan 2013 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Oliver & Company Inc.](https://www.permitgraph.org/contractor/oliver-company-inc-276682) | shoring work only under this permit. see licensing agreement on sheet 5.0 for temporary construction easement, excavation and shoring agreement. | $1,800 |
| [200806255349](https://www.permitgraph.org/p/200806255349) | Jun 25, 2008 | Never finaled: issued Jul 2008, no final | [101 Townsend St](https://www.permitgraph.org/a/3794/015) |  | to erect 2 electric wall signs |  |
| [200806255357](https://www.permitgraph.org/p/200806255357) | Jun 25, 2008 | Expired or cancelled: cancelled Jan 2026 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) |  | remove existing roll up doors, remove portions of non structural walls, remove noted windows along 2nd st elevation, add new storefront windows in replacement of roll up doors and in replacment of no… | $15,000 |
| [200804300962](https://www.permitgraph.org/p/200804300962) | Apr 30, 2008 | Never finaled: issued May 2008, no final | [101 Townsend St](https://www.permitgraph.org/a/3794/015) |  | erect an electric wall, single faced sign. | $3,000 |
| [200804300953](https://www.permitgraph.org/p/200804300953) | Apr 30, 2008 | Completed: final sign-off Jun 2008 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) |  | replace existing glass storefronts and door with new storefront. add new 7ft storefront glass | $16,000 |
| [200804179968](https://www.permitgraph.org/p/200804179968) | Apr 17, 2008 | Completed: final sign-off Jun 2008 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | 1st floor: install fire alarm system - 1 fire panel, 1 annunicator, 12 smoke detectors, 1 heat detector, 3 manual pulls, 3 smoke beams, and 5 audibles. | $12,000 |
| [200802084398](https://www.permitgraph.org/p/200802084398) | Feb 8, 2008 | Completed: final sign-off Jun 2008 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) |  | interior tenant improvement to construct new non load bearing partitions, install new lighting, new wall finishes and new floor finishes on the ground floor. | $76,000 |
| [M75644](https://www.permitgraph.org/p/M75644) | Jul 2, 2007 | Never finaled: issued Jul 2007, no final | [101 Townsend St](https://www.permitgraph.org/a/3794/015) |  | street space permit |  |
| [200408060827](https://www.permitgraph.org/p/200408060827) | Aug 6, 2004 | Completed: final sign-off Jan 2005 | [101 Townsend St](https://www.permitgraph.org/a/3794/015) | [Star Roofing Co](https://www.permitgraph.org/contractor/star-roofing-co-193396) | reroofing | $40,750 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) (17), [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) (11), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (9), [Oliver & Company Inc.](https://www.permitgraph.org/contractor/oliver-company-inc-276682) (3), [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) (2), [O'connor Plumbing & Fire Protection](https://www.permitgraph.org/contractor/o-connor-plumbing-fire-protection-498866) (2), [Specialized Graphics Inc](https://www.permitgraph.org/contractor/specialized-graphics-inc-967185), [Star Roofing Co](https://www.permitgraph.org/contractor/star-roofing-co-193396)
- Architects: [Denis Henmi](https://www.permitgraph.org/professional/denis-henmi-C11009) (5), [Joseph A. Remling](https://www.permitgraph.org/professional/joseph-a-remling-C34144) (3), [Douglas Dahlin](https://www.permitgraph.org/professional/douglas-dahlin-C8788) (2), [Robert Baum](https://www.permitgraph.org/professional/robert-baum-C12094) (2), [Donald Ruthroff](https://www.permitgraph.org/professional/donald-ruthroff-C24946), [Jace Levinson](https://www.permitgraph.org/professional/jace-levinson-C23075), [Karl Danielson](https://www.permitgraph.org/professional/karl-danielson-C11201), [Karl Danielson](https://www.permitgraph.org/professional/karl-danielson-11201), [William Fee](https://www.permitgraph.org/professional/william-fee-2537)
- Engineers: [Daniel Ahkiam](https://www.permitgraph.org/professional/daniel-ahkiam-S6351) (2), [Anson Shumcheng](https://www.permitgraph.org/professional/anson-shumcheng-S4835), [Donald David](https://www.permitgraph.org/professional/donald-david-S3928), [Edward Rivera](https://www.permitgraph.org/professional/edward-rivera-2835), [Jesus B Cabellon Jr](https://www.permitgraph.org/professional/jesus-b-cabellon-jr-E9278), [Mansour Firouzian](https://www.permitgraph.org/professional/mansour-firouzian-M26662), [Meng Hsiu Chen](https://www.permitgraph.org/professional/meng-hsiu-chen-M19582), [Taghi Esfahani](https://www.permitgraph.org/professional/taghi-esfahani-E16082)
- Designers: [Michael Williams](https://www.permitgraph.org/professional/michael-williams-806216)
- Pmt consultant/expediters: [Ryan Wall](https://www.permitgraph.org/professional/ryan-wall-992731)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.