# 665 03rd St

Block 3788, lot 041. Page: https://www.permitgraph.org/a/3788/041

- City's use: Commercial Office
- Built: 1916
- Stories: 5
- Rooms: 9 bathrooms
- Building: 134,445 sq ft
- Lot: 24,320 sq ft
- Zoning: SLI
- Construction type: B

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

61 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202504255233](https://www.permitgraph.org/p/202504255233) | Apr 25, 2025 | Completed: final sign-off Sep 2025 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Metropolitan Electrical Construction](https://www.permitgraph.org/contractor/metropolitan-electrical-construction-401047) | at&t modification: remove e) 9 antennas on slads, relocate n) steell framesto parapet wall, r/r/ 9 rru's, r/r e) panel w/ n) 200a ppc, rmove 4 e) cabinets, install n) vertiv 7100 scpp w/ 9 rectifiers… | $50,000 |
| [202403228399](https://www.permitgraph.org/p/202403228399) | Mar 22, 2024 | Completed: final sign-off Apr 2024 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | revision pa# 202206247101 existing hvac system and all associated support to remain and in operation |  |
| [202401123916](https://www.permitgraph.org/p/202401123916) | Jan 12, 2024 | Completed: final sign-off Jan 2024 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | revision to pa 202206247101. change in direction of the new concrete ramp inside the suite. |  |
| [202206247101](https://www.permitgraph.org/p/202206247101) | Jun 24, 2022 | Completed: final sign-off Apr 2024 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | complete suite vacation of an (e) telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switche… | $550,000 |
| [202106182780](https://www.permitgraph.org/p/202106182780) | Jun 18, 2021 | Expired or cancelled: withdrawn Apr 2025 | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | no antenna work. equipment room:remove(3)(e) at&t 206 rbs cabinets,remove(3)(e)at&t rrus-12b2,remove(24)(e) aty&t batteries.install (3)(n)at&trrus-4478 b5,install(3)(n) at&t rrus-4415 b25,install(1)(… | $25,000 |
| [202103055952](https://www.permitgraph.org/p/202103055952) | Mar 5, 2021 | Completed: final sign-off Jun 2021 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting com… | $80,000 |
| [202009265128](https://www.permitgraph.org/p/202009265128) | Sep 26, 2020 | Never finaled: issued Oct 2020, no final | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | voluntary notification upgrade to (e) building fire alarm system. add (7) power supplies, (6) smoke detectors, (103) strobes only, (197) horn/strobes | $110,000 |
| [201903266275](https://www.permitgraph.org/p/201903266275) | Mar 26, 2019 | Never finaled: issued Mar 2019, no final | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | add 1 duct det at (e) fan. add 1 relay for fan shut down | $2,500 |
| [201903155425](https://www.permitgraph.org/p/201903155425) | Mar 15, 2019 | Completed: final sign-off Apr 2019 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Main Electric Inc.](https://www.permitgraph.org/contractor/main-electric-inc-1023829) | tenant improvement: new lighting & office furniture & title 24. 2nd fl. ref pa #201901039524. | $40,000 |
| [201902153026](https://www.permitgraph.org/p/201902153026) | Feb 15, 2019 | Completed: final sign-off Mar 2019 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | add/relocate sprinklers in area of work to provide adequate fire sprinkler coverage to new tenant improvement walls and ceiling layout on 2nd fl ref 201901039524. | $8,500 |
| [201901039524](https://www.permitgraph.org/p/201901039524) | Jan 3, 2019 | Completed: final sign-off Apr 2019 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | 2nd fl - interior tenanat improvement of partial floor. | $83,650 |
| [201811166132](https://www.permitgraph.org/p/201811166132) | Nov 16, 2018 | Never finaled: issued Nov 2018, no final | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Main Electric Inc.](https://www.permitgraph.org/contractor/main-electric-inc-1023829) | electrical title 24, lighting | $140,000 |
| [201811166094](https://www.permitgraph.org/p/201811166094) | Nov 16, 2018 | Never finaled: issued Nov 2018, no final | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | remove/replace 3/4" lines feed last head on line. relocate ssu's as required. install new branch line retraints throughout. n/a for maher | $18,000 |
| [201810223782](https://www.permitgraph.org/p/201810223782) | Oct 22, 2018 | Completed: final sign-off Apr 2019 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | inter ti improvement of partial (e) 3rd floor | $83,650 |
| [201805229746](https://www.permitgraph.org/p/201805229746) | May 22, 2018 | Completed: final sign-off May 2018 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | show updated as built address changes. reflect conventional duct detector on 5th floor. n/a for maher. ref app#201805038142 |  |
| [201805038142](https://www.permitgraph.org/p/201805038142) | May 3, 2018 | Completed: final sign-off May 2018 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm revision show add elevator upgrade items as to scope clouded on floor plan |  |
| [201804095776](https://www.permitgraph.org/p/201804095776) | Apr 9, 2018 | Completed: final sign-off Apr 2018 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | removal of 1 sprinkler head ;pcated at the top of the elevator shaft maher na | $1,000 |
| [201803204110](https://www.permitgraph.org/p/201803204110) | Mar 20, 2018 | Completed: final sign-off May 2018 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | emergency panel replacement and elevator modernization. n/a for maher | $15,000 |
| [201705015360](https://www.permitgraph.org/p/201705015360) | May 1, 2017 | Completed: final sign-off May 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | revision to 201602179851. remove 3rd floor shower from scope. revise 2nd flr new bathrooms. maher na |  |
| [201703232174](https://www.permitgraph.org/p/201703232174) | Mar 23, 2017 | Completed: final sign-off Aug 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | build new fence on both sides of ally to keep homeless out. both sides will have panic bars. n/a for maher | $12,000 |
| [201702239953](https://www.permitgraph.org/p/201702239953) | Feb 23, 2017 | Completed: final sign-off Mar 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Lincoln Air Conditioning](https://www.permitgraph.org/contractor/lincoln-air-conditioning-387662) | to obtain final inspection for work approved under pa#2015-0626-0006. all work is complete. |  |
| [201702099099](https://www.permitgraph.org/p/201702099099) | Feb 9, 2017 | Completed: final sign-off May 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Colevan Electric Inc](https://www.permitgraph.org/contractor/colevan-electric-inc-860761) | 3rd flr, suite 333: electrical receptacles title 24 lighting and power maher na. ref t.i. 201603253143. |  |
| [201701177243](https://www.permitgraph.org/p/201701177243) | Jan 17, 2017 | Completed: final sign-off Jan 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | revision to pa# 201603021005, install exhaust system for new bathrooms. tie to (e) bldg exhaust | $2,100 |
| [201608054375](https://www.permitgraph.org/p/201608054375) | Aug 5, 2016 | Completed: final sign-off May 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | revision: submit shop drawings for (e) permit stairs 201603253143 for stairs between 2nd & 3rd floors. maher na |  |
| [201606170221](https://www.permitgraph.org/p/201606170221) | Jun 17, 2016 | Never finaled: issued Jun 2016, no final | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Aegis Enterprises Inc](https://www.permitgraph.org/contractor/aegis-enterprises-inc-971124) | 2nd floor office, unit 200: add 8, relocate 15 upright & add 3 pendent fire sprinklers to accomodate new ti changes. ref pa 2016 0217 9851 maher na | $5,200 |
| [201603253143](https://www.permitgraph.org/p/201603253143) | Mar 25, 2016 | Completed: final sign-off May 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | 2nd floor ti including new connecting stair to 3rd floor | $72,000 |
| [201603021005](https://www.permitgraph.org/p/201603021005) | Mar 2, 2016 | Completed: final sign-off Jan 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | revision to pa 2016-0201-8516, adding one more shower to existing basement level. maher na | $2,200 |
| [201602179851](https://www.permitgraph.org/p/201602179851) | Feb 17, 2016 | Completed: final sign-off May 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | 2nd fl tenant improvement, new ada restrooms, office/phone rooms. minor improvements to 3rd fl including ada shower | $72,000 |
| [201602018516](https://www.permitgraph.org/p/201602018516) | Feb 1, 2016 | Completed: final sign-off Jan 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | adding 3 showers at existing basement level - interior wall additions and cleaned up interior finishes as required. mep under separate permit. not visible from street | $15,830 |
| [201506260006](https://www.permitgraph.org/p/201506260006) | Jun 26, 2015 | Completed: final sign-off May 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Lincoln Air Conditioning](https://www.permitgraph.org/contractor/lincoln-air-conditioning-387662) | install new a.c. unit above bathrooms and install duct work. ref app201505297519. n/a for maher. | $20,500 |
| [201506108631](https://www.permitgraph.org/p/201506108631) | Jun 10, 2015 | Completed: final sign-off Aug 2015 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) | unit #333: revise sprinkler system for new tenant floor plan, 2 new and 3 relocate, 5 sprinklers (t.i. 201504153715 and 201505297519); maher n/a new bracing | $1,800 |
| [201505297519](https://www.permitgraph.org/p/201505297519) | May 29, 2015 | Completed: final sign-off May 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | 3rd flr/suite 333: revision to pa 2015 0415 3715- addition of 2 offices. maher na | $12,500 |
| [201504153715](https://www.permitgraph.org/p/201504153715) | Apr 15, 2015 | Completed: final sign-off May 2017 | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | 3rd floor sutie #333: interior t.i. includes interior walls additions and demo/clean up interior finishes as required. mep under separate permit. no change of use. not visisble from street. maher n/a. | $72,000 |
| [201503090232](https://www.permitgraph.org/p/201503090232) | Mar 9, 2015 | Completed: final sign-off Apr 2015 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | extend 1 rigid duct 15 feet, install 2 exhaust fans. ref #201408153952. compliance with maher ordinance no 155-13 not required. | $2,200 |
| [201410038022](https://www.permitgraph.org/p/201410038022) | Oct 3, 2014 | Never finaled: issued Oct 2014, no final | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) | suite 320: relocate 11 fire sprinklers. add 10 fire sprinkler, plug 16 fire sprinklers. install earthquake bracing and branch line restraints in area of work ref 201408153952 | $9,700 |
| [201408153952](https://www.permitgraph.org/p/201408153952) | Aug 15, 2014 | Completed: final sign-off Apr 2015 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | 3rd flr: interior tenant improvements, ste 320, including ada bathroom upgrades, interior wall additions, and cleaned up interior finishes. maher n/a | $172,000 |
| [201405307063](https://www.permitgraph.org/p/201405307063) | May 30, 2014 | Completed: final sign-off Sep 2016 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | replacement of ground floor window sash along 3rd st elevation. replace 2 entry doors. ** maher: compliance with ordinance no# 155-13 not required ** | $300,000 |
| [201405206288](https://www.permitgraph.org/p/201405206288) | May 20, 2014 | Expired or cancelled: withdrawn Apr 2015 | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | modification to an (e) facility consisting of adding 3 (n) rrus with a-2 units attached and installing 1 (n) dvs-41 units in an (e) environment rack | $6,000 |
| [201311222636](https://www.permitgraph.org/p/201311222636) | Nov 22, 2013 | Completed: final sign-off Mar 2014 | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | (compli.w/maher ord.- extended ordin.#155-13 not required.excavation less than 50 cu. yd.)no const.proposed -for record purposes only-legalize prior change of use fr.lightmanufacturing to office for… |  |
| [M400547](https://www.permitgraph.org/p/M400547) | Jun 10, 2013 | Never finaled: issued Jun 2013, no final | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | street space permit |  |
| [M388107](https://www.permitgraph.org/p/M388107) | Apr 24, 2013 | Never finaled: issued Apr 2013, no final | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | street space |  |
| [201203287025](https://www.permitgraph.org/p/201203287025) | Mar 28, 2012 | Expired or cancelled: cancelled Jan 2026 | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | installation of wi-fi connectors (2) and associated cabling and exterior equipment cabinets (2) on roof. | $17,000 |
| [201003128162](https://www.permitgraph.org/p/201003128162) | Mar 12, 2010 | Expired or cancelled: cancelled Jun 2024 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Broken Arrow Communications Inc](https://www.permitgraph.org/contractor/broken-arrow-communications-inc-853651) | adding new 3206 rbs cabinet, removing & replacing 3 (e) antennas, 3 new antennas with new ret's to antennas ret powered by low voltage signed thru (e) coax cable, paint to match (e) building. adding… | $25,000 |
| [200812239114](https://www.permitgraph.org/p/200812239114) | Dec 23, 2008 | Completed: final sign-off Feb 2010 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Transceive Communications Inc.](https://www.permitgraph.org/contractor/transceive-communications-inc-845538) | remove 3106 cabinet, replace with micro cabinet inside existing room (tenant improvement) additionally add (3) remote electronic units (ret) which are small and added to base of the antenna. no visua… | $5,000 |
| [200808018248](https://www.permitgraph.org/p/200808018248) | Aug 1, 2008 | Expired or cancelled: cancelled Jan 2026 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Level 8 Construction Inc](https://www.permitgraph.org/contractor/level-8-construction-inc-851171) | add mechanical plans to original plans hood with ducting for kitchen area in restaurant. all (e) he tied into (e) system | $20,000 |
| [200512281188](https://www.permitgraph.org/p/200512281188) | Dec 28, 2005 | Never finaled: issued Dec 2005, no final | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Blackford Construction](https://www.permitgraph.org/contractor/blackford-construction-767743) | renew pa no 200307119247 for final insp on fire sprinkler on 5th floor t.i. |  |
| [200512281185](https://www.permitgraph.org/p/200512281185) | Dec 28, 2005 | Expired or cancelled: expired Aug 2007 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Blackford Construction](https://www.permitgraph.org/contractor/blackford-construction-767743) | renew permit ref pa no 200401154104 & 200503298689 & 200306207318 for final inspections only |  |
| [200503298689](https://www.permitgraph.org/p/200503298689) | Mar 29, 2005 | Expired or cancelled: expired Aug 2007 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Blackford Construction](https://www.permitgraph.org/contractor/blackford-construction-767743) | renew app #200401154104/200306207318 |  |
| [200403199131](https://www.permitgraph.org/p/200403199131) | Mar 19, 2004 | Expired or cancelled: expired Dec 2004 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) | remove (e) dry pipe valve & convert preaction system back to wet pipe sprinkler system. work is on 1 | $750 |
| [M26597](https://www.permitgraph.org/p/M26597) | Mar 5, 2004 | Never finaled: issued Mar 2004, no final | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | sidewalk repair only |  |
| [200401154104](https://www.permitgraph.org/p/200401154104) | Jan 15, 2004 | Expired or cancelled: expired Dec 2004 | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | rev.appl#200306207318 indicated visual alarms provided is not required and will not be provided |  |
| [200401123792](https://www.permitgraph.org/p/200401123792) | Jan 12, 2004 | Completed: final sign-off Jun 2004 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) | add 6 upright sprinklers for coverage to new full height walls, add 2 pennant sprinklers under new b | $2,500 |
| [200311049387](https://www.permitgraph.org/p/200311049387) | Nov 4, 2003 | Completed: final sign-off Jun 2004 | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | #420- single t.i. to (e) 4/fl office space. install new non-bearing partitions,provide new separate | $95,000 |
| [200307119247](https://www.permitgraph.org/p/200307119247) | Jul 11, 2003 | Expired or cancelled: expired Sep 2005 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Simplex Grinnell](https://www.permitgraph.org/contractor/simplex-grinnell-802591) | add 3, relocate 3, and plug 3 sprinkler heads at 5th floor only | $2,480 |
| [200306207318](https://www.permitgraph.org/p/200306207318) | Jun 20, 2003 | Expired or cancelled: expired Dec 2004 | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | oti 1-5th floor, ltg, mech, l/s, spr | $87,000 |
| [200206259895](https://www.permitgraph.org/p/200206259895) | Jun 25, 2002 | Completed: final sign-off Jul 2002 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Simplex Grinnell*** See 802591****](https://www.permitgraph.org/contractor/simplex-grinnell-see-802591-280525) | fire alarm in basement | $11,000 |
| [200109077787](https://www.permitgraph.org/p/200109077787) | Sep 7, 2001 | Completed: final sign-off Jul 2002 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Simplex Grinnell*** See 802591****](https://www.permitgraph.org/contractor/simplex-grinnell-see-802591-280525) | modify (e) pre-action detection system @ basement only | $9,000 |
| [200106081136](https://www.permitgraph.org/p/200106081136) | Jun 8, 2001 | Expired or cancelled: expired Mar 2002 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Simplex Grinnell*** See 802591****](https://www.permitgraph.org/contractor/simplex-grinnell-see-802591-280525) | esten pre-action system throughout | $9,500 |
| [200105179457](https://www.permitgraph.org/p/200105179457) | May 17, 2001 | Completed: final sign-off Jul 2002 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Dalzell Corporation](https://www.permitgraph.org/contractor/dalzell-corporation-202440) | installfire wall aroung tankamd pump and door | $3,000 |
| [200103164466](https://www.permitgraph.org/p/200103164466) | Mar 16, 2001 | Expired or cancelled: expired Jul 2002 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | demo (e) walls & doors indicated, new 1 hr. rated partitions, new doors, new partial height window | $64,000 |
| [200004298628](https://www.permitgraph.org/p/200004298628) | Apr 29, 2000 | Expired or cancelled: expired May 2001 | [665 03rd St](https://www.permitgraph.org/a/3788/041) |  | new walls new doorsdemo of existing walls no struct add restrms new lighting new hvac | $243,642 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) (18), [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) (8), [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) (4), [Blackford Construction](https://www.permitgraph.org/contractor/blackford-construction-767743) (3), [Simplex Grinnell*** See 802591****](https://www.permitgraph.org/contractor/simplex-grinnell-see-802591-280525) (3), [Lincoln Air Conditioning](https://www.permitgraph.org/contractor/lincoln-air-conditioning-387662) (2), [Main Electric Inc.](https://www.permitgraph.org/contractor/main-electric-inc-1023829) (2), [Aegis Enterprises Inc](https://www.permitgraph.org/contractor/aegis-enterprises-inc-971124), [Broken Arrow Communications Inc](https://www.permitgraph.org/contractor/broken-arrow-communications-inc-853651), [Colevan Electric Inc](https://www.permitgraph.org/contractor/colevan-electric-inc-860761), [Dalzell Corporation](https://www.permitgraph.org/contractor/dalzell-corporation-202440), [Level 8 Construction Inc](https://www.permitgraph.org/contractor/level-8-construction-inc-851171), [Metropolitan Electrical Construction](https://www.permitgraph.org/contractor/metropolitan-electrical-construction-401047), [Simplex Grinnell](https://www.permitgraph.org/contractor/simplex-grinnell-802591), [Transceive Communications Inc.](https://www.permitgraph.org/contractor/transceive-communications-inc-845538), [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639)
- Architects: [Albert Costa](https://www.permitgraph.org/professional/albert-costa-C25678) (6), [Dutch Wickes](https://www.permitgraph.org/professional/dutch-wickes-29461) (3), [Denis Henmi](https://www.permitgraph.org/professional/denis-henmi-C11009), [Naomi Miroglio](https://www.permitgraph.org/professional/naomi-miroglio-22990), [Seung Oh](https://www.permitgraph.org/professional/seung-oh-S6836)
- Engineers: [Stephen Shafeer](https://www.permitgraph.org/professional/stephen-shafeer-E21097) (2), [Babak Vaziri](https://www.permitgraph.org/professional/babak-vaziri-S3985), [John M. Anderson Jr.](https://www.permitgraph.org/professional/john-m-anderson-jr-69368), [Jose Herrera](https://www.permitgraph.org/professional/jose-herrera-M31241), [Leonard Rose](https://www.permitgraph.org/professional/leonard-rose-M25094)
- Designers: [Steven Terry](https://www.permitgraph.org/professional/steven-terry-C66211)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3788/041.