# 144 Townsend St

Block 3788, lot 009A. Page: https://www.permitgraph.org/a/3788/009A

- City's use: Commercial Office
- Built: 1922
- Stories: 3
- Units: 1
- Rooms: 3 bathrooms
- Building: 45,000 sq ft
- Lot: 16,496 sq ft
- Zoning: SSO
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

44 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202509175506](https://www.permitgraph.org/p/202509175506) | Sep 17, 2025 | Completed: final sign-off Mar 2026 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Martin Sign Co Inc.](https://www.permitgraph.org/contractor/martin-sign-co-inc-980058) | the fabrication and installation of 1 set of halo-lit dimentional channel letters onto building exterior. (anteler) | $885 |
| [202507231427](https://www.permitgraph.org/p/202507231427) | Jul 23, 2025 | Expired or cancelled: withdrawn Nov 2025 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) |  | fabricate and install a non-electric, single faced wall signage as shown in the drawing package | $1,500 |
| [202101273462](https://www.permitgraph.org/p/202101273462) | Jan 27, 2021 | Never finaled: issued May 2021, no final | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Martin Sign Co Inc.](https://www.permitgraph.org/contractor/martin-sign-co-inc-980058) | the fabrication and installation of projecting lightbox hardwarde with faces to bldg exterior. | $1,500 |
| [202101273466](https://www.permitgraph.org/p/202101273466) | Jan 27, 2021 | Never finaled: issued Mar 2021, no final | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Martin Sign Co Inc.](https://www.permitgraph.org/contractor/martin-sign-co-inc-980058) | the fabrication and installation of halo-lit dimensional channel letters to bldg exterior. | $6,500 |
| [201809129847](https://www.permitgraph.org/p/201809129847) | Sep 12, 2018 | Completed: final sign-off Sep 2019 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | abe program: update entrance and stair to ada compliance. n/a for maher | $3,000 |
| [201809119753](https://www.permitgraph.org/p/201809119753) | Sep 11, 2018 | Never finaled: issued Sep 2018, no final | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | install new gas meter maher na | $2,000 |
| [201806263016](https://www.permitgraph.org/p/201806263016) | Jun 26, 2018 | Completed: final sign-off Jan 2019 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) |  | to legalize change of use from self storage to office use per approved plan commission motion #19846, no construction work to be done, all work done under pa #201712085848, 201508015852 & 20150902589… | $5,000 |
| [201712085948](https://www.permitgraph.org/p/201712085948) | Dec 8, 2017 | Completed: final sign-off Nov 2018 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | add lockers and bike storage. maher na | $10,000 |
| [201604144774](https://www.permitgraph.org/p/201604144774) | Apr 14, 2016 | Completed: final sign-off Jun 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 1st flr: project consists of ti to ofc space plan for floor lighting & power systems. work consists of connecting power to new or relocated light fixtures, power outlets and tenant equipment.all work… | $160,000 |
| [201602190069](https://www.permitgraph.org/p/201602190069) | Feb 19, 2016 | Never finaled: issued Aug 2017, no final | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Martin Sign Co Inc.](https://www.permitgraph.org/contractor/martin-sign-co-inc-980058) | erect a non-electric single faced wall sign. n/a maher ordinance | $3,851 |
| [201511303737](https://www.permitgraph.org/p/201511303737) | Nov 30, 2015 | Completed: final sign-off Dec 2015 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 1st fl: fire alarm ti - install 21 horn-strobes, install 13 strobes, install 3 control relay modules, install 5 duct detectors, install 5 smoke detectors. ref pa 2015-0911-6761. maher na. | $17,600 |
| [201511102286](https://www.permitgraph.org/p/201511102286) | Nov 10, 2015 | Completed: final sign-off May 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Bay City Mechanical Inc](https://www.permitgraph.org/contractor/bay-city-mechanical-inc-645126) | 1st floor - furnish & install (9) new vrv fan coils, furnish & install (1) new branch selector, install (1) vrv condensing unit, fabricate & isntall new ductwork, insulation & independent air balanci… | $200,000 |
| [201510200159](https://www.permitgraph.org/p/201510200159) | Oct 20, 2015 | Completed: final sign-off Jun 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | project consistes of ti to office space plan for floor lighting & power systems. work consists of connecting power to new or relocated light fixtures, power outlets and tenant equipment.all work cons… | $195,000 |
| [201509237860](https://www.permitgraph.org/p/201509237860) | Sep 23, 2015 | Completed: final sign-off Nov 2015 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 3rd floor: fire alarm ti - 201508144344 install 1 facu, 10 smoke det w/base, 1 pull station, 4 duct det, 5 control relay modules, 1 signal module, 1 dual monitor module, 1 booster w/expander, 19 horn… | $13,600 |
| [201509237857](https://www.permitgraph.org/p/201509237857) | Sep 23, 2015 | Completed: final sign-off Nov 2015 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 2nd floor: fire alarm ti - 2015 0901 5852. install 10 strobes, 16 horn strobes, 4 duct detectors with bases, 4 control relays.maher na | $13,600 |
| [201509167195](https://www.permitgraph.org/p/201509167195) | Sep 16, 2015 | Completed: final sign-off May 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Bay City Mechanical Inc](https://www.permitgraph.org/contractor/bay-city-mechanical-inc-645126) | limited demo of (e) ductwork modification of (e) ductwork, insulation as reqd by t-24. furnish & install 7 new vrv fancoils independent a18 balancing | $78,000 |
| [201509116761](https://www.permitgraph.org/p/201509116761) | Sep 11, 2015 | Completed: final sign-off May 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | on ground 1st floor: construct new walls, doors, glazing and ceiling grid system. previous application #201504022684. n/a for maher. adding pantry and coffee kiosk |  |
| [201509106554](https://www.permitgraph.org/p/201509106554) | Sep 10, 2015 | Completed: final sign-off Dec 2015 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) |  | fire sprinkler permit: relocate 20 and add 10 pendents. relocate 9, add 5 and delete 3 uprights on 1/f. t.i. pa#201504022684. n/a ordinance #155-13 | $13,555 |
| [201509106557](https://www.permitgraph.org/p/201509106557) | Sep 10, 2015 | Completed: final sign-off Dec 2015 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) |  | fire sprinkler permit: relocate 18 and add 16 pendent sprinklers. relocate 14 and delete 5 upright sprinklers on 3/f. t.i. pa#201506260064. n/a ordinance #155-13 | $14,672 |
| [201509106556](https://www.permitgraph.org/p/201509106556) | Sep 10, 2015 | Completed: final sign-off Dec 2015 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) |  | fire sprinkler permit: relocate 32 and add 23 pendent sprinklers. relocate 14 and delete 9 upright sprinklers on 2/f. t.i. pa#201506259939. n/a ordinance #155-13 | $21,091 |
| [201509086376](https://www.permitgraph.org/p/201509086376) | Sep 8, 2015 | Completed: final sign-off Jun 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Bay City Mechanical Inc](https://www.permitgraph.org/contractor/bay-city-mechanical-inc-645126) | modify (e) supply ductwork. install 7 new fancoils and 1 exhaust fan. insulation and air balancing | $78,000 |
| [201509025891](https://www.permitgraph.org/p/201509025891) | Sep 2, 2015 | Completed: final sign-off Jun 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 3rd fl -consists of t.i. to office space for floor lighting & power sys. work consists of connecting power to new or relocated light fixtures, power outlets & tenant equipment. all work consists of m… | $190,000 |
| [201509015852](https://www.permitgraph.org/p/201509015852) | Sep 1, 2015 | Completed: final sign-off May 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 2nd fl ti of exsting office. new non bearing walls, new ceiling grid. core and shell under 201506259939 maher not req | $130,000 |
| [201508144344](https://www.permitgraph.org/p/201508144344) | Aug 14, 2015 | Completed: final sign-off May 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | 3rd floor: ti work. new walls, doors, glazing, and ceiling grid system. revision to pa 201506260064. maher na | $100,000 |
| [201506260064](https://www.permitgraph.org/p/201506260064) | Jun 26, 2015 | Completed: final sign-off May 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | 3rd floor tenant improvement, new walls, doors per plans. core and shell works including ada compliance rest rooms & elevator are under approved permit bpa# 201503201524. all electrical and mechanica… | $90,000 |
| [201506259939](https://www.permitgraph.org/p/201506259939) | Jun 25, 2015 | Completed: final sign-off May 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | 2/f - t.i. -construct new walls, doors, per plan. core & shell works incld ada compliance restroom & elevator under approved 201503050095; all elec & mech work will be under separate permit;maher n/a | $90,000 |
| [201506169132](https://www.permitgraph.org/p/201506169132) | Jun 16, 2015 | Completed: final sign-off Jun 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | mechanical work per plan for 3rd floor only. t.i. pa#201503201524. n/a ordinance #155-13 | $8,000 |
| [201506159035](https://www.permitgraph.org/p/201506159035) | Jun 15, 2015 | Completed: final sign-off Jun 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | electrical work per plan. ref app#201503201524. n/a for the maher. | $8,000 |
| [201505287375](https://www.permitgraph.org/p/201505287375) | May 28, 2015 | Completed: final sign-off Sep 2015 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Highland Commercial Roofing](https://www.permitgraph.org/contractor/highland-commercial-roofing-632551) | reroofing | $68,000 |
| [201504032808](https://www.permitgraph.org/p/201504032808) | Apr 3, 2015 | Completed: final sign-off Jun 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | 2nd flr: rewire entire floor. maher - not req'd | $10,000 |
| [201504022684](https://www.permitgraph.org/p/201504022684) | Apr 2, 2015 | Completed: final sign-off Jul 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | all work is on the 1st fl and consist of minor demo and construction as follows. new walls, doors, sidelights, power, lighting, finishes, ada restrooms and shower. n/a ordinance #155-13 | $250,000 |
| [201503262000](https://www.permitgraph.org/p/201503262000) | Mar 26, 2015 | Completed: final sign-off May 2016 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [M C Mechanical](https://www.permitgraph.org/contractor/m-c-mechanical-929991) | new exhaust fans & new force air units, all works at 2nd flr and roof; maher n/a | $20,000 |
| [201503201524](https://www.permitgraph.org/p/201503201524) | Mar 20, 2015 | Completed: final sign-off Oct 2015 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | 2 ada restrooms and storage rooms. all work at 3rd floor. n/a for the maher. mep, sprinkler & life safety under separate permit. | $40,000 |
| [M566427](https://www.permitgraph.org/p/M566427) | Mar 6, 2015 | Never finaled: issued Mar 2015, no final | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) |  | street space |  |
| [201503050095](https://www.permitgraph.org/p/201503050095) | Mar 5, 2015 | Completed: final sign-off Oct 2015 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | all works at 2nd floor. consists of minor demo and construction. remove existing walls, doors, fixtures and finish. construct new walls, doors, lighting and ada restroom. occupancy not to change. n/a… | $60,000 |
| [201502117996](https://www.permitgraph.org/p/201502117996) | Feb 11, 2015 | Completed: final sign-off Oct 2015 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) | remove (e) walls, doors, & finishes. construct (n) walls, doors, ada lift, ada restrooms, ada parking, and bike storage; maher n/a. mep is to be design build and deferred. stair, bollards and guardra… | $96,000 |
| [201110187072](https://www.permitgraph.org/p/201110187072) | Oct 18, 2011 | Completed: final sign-off Oct 2011 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [R.M.R. Construction Company](https://www.permitgraph.org/contractor/r-m-r-construction-company-404737) | remove office non bearing partition wall on 2nd fl | $800 |
| [200903184347](https://www.permitgraph.org/p/200903184347) | Mar 18, 2009 | Completed: final sign-off Dec 2009 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912) | renew pa# 2006/06/13/3902 to obtain final inspection. all work has been completed. |  |
| [200803257977](https://www.permitgraph.org/p/200803257977) | Mar 25, 2008 | Expired or cancelled: cancelled Jan 2026 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) |  | add additional storage units on 1st floor of existing storage facility. no structural work. | $5,000 |
| [200606133902](https://www.permitgraph.org/p/200606133902) | Jun 13, 2006 | Expired or cancelled: expired Feb 2009 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) | [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912) | add 4 sprinkler heas total. work on all floors. | $800 |
| [M16983](https://www.permitgraph.org/p/M16983) | Aug 29, 2001 | Expired or cancelled: expired Dec 2001 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) |  | sidewalk |  |
| [200008097468](https://www.permitgraph.org/p/200008097468) | Aug 9, 2000 | Never finaled: filed Aug 2000, never issued | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) |  | int remodel of ex building convert ex slf strge to off/business svc uses with parkng on gr floor | $500,000 |
| [200005261206](https://www.permitgraph.org/p/200005261206) | May 26, 2000 | Completed: final sign-off Jul 2000 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) |  | install havc system | $10,000 |
| [200003033436](https://www.permitgraph.org/p/200003033436) | Mar 3, 2000 | Completed: final sign-off Jul 2000 | [144 Townsend St](https://www.permitgraph.org/a/3788/009A) |  | remodel (e) 2nd floor office to restore portion of former office area |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Design Max Construction](https://www.permitgraph.org/contractor/design-max-construction-868106) (13), [Martin Sign Co Inc.](https://www.permitgraph.org/contractor/martin-sign-co-inc-980058) (4), [Bay City Mechanical Inc](https://www.permitgraph.org/contractor/bay-city-mechanical-inc-645126) (3), [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) (3), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) (3), [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) (2), [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912) (2), [Highland Commercial Roofing](https://www.permitgraph.org/contractor/highland-commercial-roofing-632551), [M C Mechanical](https://www.permitgraph.org/contractor/m-c-mechanical-929991), [R.M.R. Construction Company](https://www.permitgraph.org/contractor/r-m-r-construction-company-404737)
- Architects: [Dennis Smith](https://www.permitgraph.org/professional/dennis-smith-C32605) (2), [Robert Roth](https://www.permitgraph.org/professional/robert-roth-C22892) (2), [Dennis Smith](https://www.permitgraph.org/professional/dennis-smith-C7294), [Jeremy Schaub](https://www.permitgraph.org/professional/jeremy-schaub-C32289)
- Engineers: [Donald Gate Yu](https://www.permitgraph.org/professional/donald-gate-yu-M34907), [Elisabeth M Allen](https://www.permitgraph.org/professional/elisabeth-m-allen-E17659), [Robert Raymond Roth](https://www.permitgraph.org/professional/robert-raymond-roth-C22892), [Theodore G. Garcia](https://www.permitgraph.org/professional/theodore-g-garcia-M31511)
- Designers: [Aue Consulting](https://www.permitgraph.org/professional/aue-consulting-E17659)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3788/009A.