# 410 Townsend St

Block 3785, lot 002A. Page: https://www.permitgraph.org/a/3785/002A

- City's use: Commercial Office
- Built: 1912
- Stories: 4
- Lot: 20,000 sq ft
- Zoning: MUO
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

82 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202603046926](https://www.permitgraph.org/p/202603046926) | Mar 4, 2026 | In progress: issued Mar 2026 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 2nd fl: new power + signal devises throughout the space. new 2022 title 24 complaint lighting + controls. ref # 202507221314. | $10,000 |
| [202603046928](https://www.permitgraph.org/p/202603046928) | Mar 4, 2026 | In progress: issued Mar 2026 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 3/f: new power and signal devices throughout the space. new 2022 title 24 compliant lighting and controls. ref permit 202508042220 | $10,000 |
| [202509115074](https://www.permitgraph.org/p/202509115074) | Sep 11, 2025 | In progress: issued Sep 2025 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | tenant improvement on 2nd & 3rd fl. provide 9 install new notification appliances. revise (e) notification appliance candela. ref pa # 2025-0722-1314 & 2025-0804-2220. | $22,000 |
| [202508042220](https://www.permitgraph.org/p/202508042220) | Aug 4, 2025 | Completed: final sign-off Jun 2026 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [San Francisco Commercial Builders Inc](https://www.permitgraph.org/contractor/san-francisco-commercial-builders-inc-801883) | 3/f: new demising wall to separate existing full floor tenant space into 2 suites (suite 301 and 302). suite 302 - new pantry and upgrades to existing unisex restroom/shower. core area - ada restroom… | $213,630 |
| [202507221314](https://www.permitgraph.org/p/202507221314) | Jul 22, 2025 | Completed: final sign-off Jun 2026 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [San Francisco Commercial Builders Inc](https://www.permitgraph.org/contractor/san-francisco-commercial-builders-inc-801883) | 2nd/f: new demsing wall to separate e) full floor tenant to 2 suites #201 & 202. new pantry & upgrade to e) shower at #202. new floor 2 restroom & building path of travel mep deferred. | $213,630 |
| [202501309386](https://www.permitgraph.org/p/202501309386) | Jan 30, 2025 | Completed: final sign-off Jul 2025 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | install (1) internally illuminated double faced projecting sign: "envoy" with logo on three sides | $16,390 |
| [202112094056](https://www.permitgraph.org/p/202112094056) | Dec 9, 2021 | Completed: final sign-off Apr 2022 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | direct replacement of (3) water source heat and ac units no alterations to electrical or piping | $25,000 |
| [202106041702](https://www.permitgraph.org/p/202106041702) | Jun 4, 2021 | Completed: final sign-off Nov 2021 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | replace: 1 cooling tower with new of same capacity, 1 boiler with new of the same capacity,1 primary pump of same capacity, 2 condenser water pumps with new of same capacity. | $220,000 |
| [202102255419](https://www.permitgraph.org/p/202102255419) | Feb 25, 2021 | Completed: final sign-off Oct 2021 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | to replace existing fire alarm control unit w/new facu to system obsolence. this is a voluntary work. no bldg permit | $28,624 |
| [202012211462](https://www.permitgraph.org/p/202012211462) | Dec 21, 2020 | Completed: final sign-off Jan 2021 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [City Mechanical Inc](https://www.permitgraph.org/contractor/city-mechanical-inc-622065) | ventilation improvements for pa202006098271. maher n/a. | $10,000 |
| [202011309818](https://www.permitgraph.org/p/202011309818) | Nov 30, 2020 | Completed: final sign-off Feb 2021 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | bike room & shower - basement t.i. add (2) new wall mount horn/strobes. add (1) new weatherproof horn/strobe. add (1) new control relay for door lock. bldg # 2020-0609-8271. | $11,000 |
| [202011128792](https://www.permitgraph.org/p/202011128792) | Nov 12, 2020 | Completed: final sign-off Dec 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | fire sprinkler permit. relocate 1 and add 5 sprinklers on the basement level. t.i. # 2020-0609-8271 |  |
| [202011128764](https://www.permitgraph.org/p/202011128764) | Nov 12, 2020 | Completed: final sign-off Nov 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | room 103: add (1) new optical smoke detector | $11,000 |
| [202009265104](https://www.permitgraph.org/p/202009265104) | Sep 26, 2020 | Completed: final sign-off Nov 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 1/f: ph 2, (1) new wall mount horn/strobe, (2) new optical smoke detectors, (1) new control relay, relocate (2) (e) nac devices | $9,000 |
| [202009144173](https://www.permitgraph.org/p/202009144173) | Sep 14, 2020 | Completed: final sign-off Mar 2021 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Mcclure Electric Inc](https://www.permitgraph.org/contractor/mcclure-electric-inc-248877) | title 24 lighting only, ref bpa#202006098271 | $11,040 |
| [202009033410](https://www.permitgraph.org/p/202009033410) | Sep 3, 2020 | Expired or cancelled: cancelled Jan 2026 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | submittal for planning only. review for design intent for new entry building canopy and storefront system and new mural on east elevation. | $120,000 |
| [202006098271](https://www.permitgraph.org/p/202006098271) | Jun 9, 2020 | Completed: final sign-off Mar 2021 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | basement: construction of new single user shower and restroom, new valet office and bike room storage at the basement level. maher n/a | $260,000 |
| [202003096521](https://www.permitgraph.org/p/202003096521) | Mar 9, 2020 | Completed: final sign-off Nov 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st fl - mechanical & electrical work for ti at ste 120 ref pa 2019-1230-0889 | $95,000 |
| [202002114071](https://www.permitgraph.org/p/202002114071) | Feb 11, 2020 | Completed: final sign-off Apr 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm on 1st fl: add 1 new horn/strobe, relocate 1 existing horn/strobe. | $11,000 |
| [202002073829](https://www.permitgraph.org/p/202002073829) | Feb 7, 2020 | Completed: final sign-off Aug 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 1/2/3 floors: relocate 8 fire sprinkler pendents and added fire sprinkleruprights. ref pa201911076718. | $4,500 |
| [202002053584](https://www.permitgraph.org/p/202002053584) | Feb 5, 2020 | Completed: final sign-off Nov 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to pa# 2020-0113-1713. to reuse heat pump 1-20 |  |
| [202001131713](https://www.permitgraph.org/p/202001131713) | Jan 13, 2020 | Completed: final sign-off Nov 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | mechanical and electrical work for tenant improvement on the 1st fl ref 201912098973 | $60,000 |
| [201912300889](https://www.permitgraph.org/p/201912300889) | Dec 30, 2019 | Completed: final sign-off Nov 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | tentant improvement on the 1st fl. to include selective demo and construction of new non load bearning partitions, modification of ceilng and tile. mep under sep permit | $500,000 |
| [201912098973](https://www.permitgraph.org/p/201912098973) | Dec 9, 2019 | Completed: final sign-off Nov 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | suite 120: t.i. to include selective demo and construction of non load bearing partitons modifications to ceilng grid & tile mep & fire life safety under separate permit. maher n/a. | $120,000 |
| [201912048608](https://www.permitgraph.org/p/201912048608) | Dec 4, 2019 | Completed: final sign-off Jul 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd & 3rd fl - mep for tenant improvement. ref pa 2019-1107-6718 | $800,000 |
| [201911086877](https://www.permitgraph.org/p/201911086877) | Nov 8, 2019 | Completed: final sign-off Mar 2021 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Saunders Construction Inc](https://www.permitgraph.org/contractor/saunders-construction-inc-616856) | voluntary seismic improvements: wall anchorage & coninuity ties at roof. **maher n/a** | $150,000 |
| [201911076718](https://www.permitgraph.org/p/201911076718) | Nov 7, 2019 | Completed: final sign-off Jul 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd & 3rd fl t.i. to include selective demolition and construction of non load bearing partitions, modification of ceiling grid & tile | $1,200,000 |
| [201911066558](https://www.permitgraph.org/p/201911066558) | Nov 6, 2019 | Completed: final sign-off Aug 2020 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | upgrading path of travel elements. installation of new wheel guards at lobby pedestrian ramp, new door opener at exterior entrance, and truncated domes and signage at basement level. | $15,000 |
| [201910245449](https://www.permitgraph.org/p/201910245449) | Oct 24, 2019 | Expired or cancelled: cancelled Jul 2024 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | construction of new roof deck within existing building footprint. extending (e) 2nd stairwell to roof deck new vertical lift from 4th floor. new deck will be tenant une only. structural,t-24, life sa… | $200,000 |
| [201909091009](https://www.permitgraph.org/p/201909091009) | Sep 9, 2019 | Never finaled: issued Sep 2019, no final | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 4th fl: new lighting & controls. install (1) 52' linear fixture and (1) 56' linear fixture in corridor. | $25,000 |
| [201901099922](https://www.permitgraph.org/p/201901099922) | Jan 9, 2019 | Expired or cancelled: cancelled Jan 2026 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | t.i. renovation of kitchenette, upgrade interior finishes, minor wall & door modification mep under seperate permit fully sprinklered | $100,000 |
| [201802121046](https://www.permitgraph.org/p/201802121046) | Feb 12, 2018 | Completed: final sign-off Aug 2018 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Creative Designs Construction](https://www.permitgraph.org/contractor/creative-designs-construction-923547) | project consists only of barrier removal. restroom access upgrades. demolition of extg 2nd & 3rd restroom plmg fixture finishes & accessories. new plmg fixture, finishes, and access. extg cieling and… | $100,000 |
| [M886847](https://www.permitgraph.org/p/M886847) | Feb 8, 2018 | Never finaled: issued Feb 2018, no final | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | street space |  |
| [201704244643](https://www.permitgraph.org/p/201704244643) | Apr 24, 2017 | Completed: final sign-off May 2017 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 4th floor suite b - fire alarm ti - relocation of two (2) strobes and one (1) hornstrobe. reference #2017-0221-9801 maher n/a. | $2,500 |
| [201704214582](https://www.permitgraph.org/p/201704214582) | Apr 21, 2017 | Never finaled: issued Apr 2017, no final | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [All Temperature Service Air Conditioning](https://www.permitgraph.org/contractor/all-temperature-service-air-conditioning-466960) | minor alterations to ductwork, air distribution and thermostats. ref app#201702219801. n/a for maher | $14,988 |
| [201703201880](https://www.permitgraph.org/p/201703201880) | Mar 20, 2017 | Never finaled: filed Mar 2017, never issued | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | demo existing electrical in studio 1016 smothers room 4065 on 4th fl addd new lighting, ctrol and electrical as shown on plan, new lighting from existing pnl hi new plug from e in li | $6,500 |
| [201703171660](https://www.permitgraph.org/p/201703171660) | Mar 17, 2017 | Completed: final sign-off Apr 2017 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) | 4th flr: add 1 new ssp. relocate plug 1(e) ssp. ref 201702219801 maher na | $2,800 |
| [201702219801](https://www.permitgraph.org/p/201702219801) | Feb 21, 2017 | Never finaled: issued Mar 2017, no final | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th flr: sutie b: the project involves mod of (e) ti to include selective demo & construction of non load bearing partitions, (e) mod to ceiling grid tile, light fixture relocation and new including… | $74,750 |
| [201602058930](https://www.permitgraph.org/p/201602058930) | Feb 5, 2016 | Completed: final sign-off Jun 2016 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [D A Pope Inc](https://www.permitgraph.org/contractor/d-a-pope-inc-381993) | 1-4 floors: project consist only of barrier removal. demolition of extg drinking fountain of floors 1-4 and upgrading to ada compliance. extg mep, life safty and sprinkler modification are under sepe… | $6,000 |
| [201512084479](https://www.permitgraph.org/p/201512084479) | Dec 8, 2015 | Completed: final sign-off Jun 2016 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [D A Pope Inc](https://www.permitgraph.org/contractor/d-a-pope-inc-381993) | project consist of barrier removal. domo of existing 4th fl restroom finishes and accessories. finsihes and accessories upgraded. mech,elec, life safety, sprinkler sep permit. n/a ordinance #155-13 | $70,000 |
| [201508144268](https://www.permitgraph.org/p/201508144268) | Aug 14, 2015 | Expired or cancelled: cancelled Jan 2026 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | revision to pa 2015-0615-8931 - relocating accessible water closet at men's and women's restroom is technically intensible due to structural column |  |
| [201506158931](https://www.permitgraph.org/p/201506158931) | Jun 15, 2015 | Never finaled: issued Aug 2015, no final | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [D A Pope Inc](https://www.permitgraph.org/contractor/d-a-pope-inc-381993) | ground floor: project consist of demolition of extg ground floor restroom finishes and water closet relocation. finishes will be upgraded mep, life safty, and sprinkler are not included in this permi… | $70,000 |
| [201506118738](https://www.permitgraph.org/p/201506118738) | Jun 11, 2015 | Completed: final sign-off Nov 2015 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Westower Communications](https://www.permitgraph.org/contractor/westower-communications-744137) | remove nextel radio equipment, antennas and above ground coax. n/a ordinance #155-13. fire rated assemblies to be maintained/patch roofing as necessary | $10,000 |
| [201505015100](https://www.permitgraph.org/p/201505015100) | May 1, 2015 | Completed: final sign-off May 2015 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) | studio 113- relocate 2 existing drop pendant sprinklers. studio 113/office 109- rework existing line, add 3 upright sprinklers, removal of cloud ceiling, demo 2 existing drop pendant sprinklers. t.i.… | $4,375 |
| [201504304975](https://www.permitgraph.org/p/201504304975) | Apr 30, 2015 | Never finaled: issued May 2015, no final | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Howell Electric Inc.](https://www.permitgraph.org/contractor/howell-electric-inc-700113) | 1st floor - new ligting & additional elecgtrical outlets. ref #2015.0417.3977. n/a maher ordinance | $40,000 |
| [201504173977](https://www.permitgraph.org/p/201504173977) | Apr 17, 2015 | Completed: final sign-off Jun 2015 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st floor: t.i. include demo of non structural partitions and bldg.new nonstructural partitions, all new or revised hvac electrical and life safety work will be design build and submitted on seperate… | $60,250 |
| [201502178518](https://www.permitgraph.org/p/201502178518) | Feb 17, 2015 | Completed: final sign-off Mar 2015 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | minor demo of non structural wall at room 102 | $5,000 |
| [201404153278](https://www.permitgraph.org/p/201404153278) | Apr 15, 2014 | Never finaled: issued Apr 2014, no final | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [All Temperature Service Air Conditioning](https://www.permitgraph.org/contractor/all-temperature-service-air-conditioning-466960) | add 1 heat pump unit with associated ductwork and cooling water pipings. rf 201403039729. n/a maher ordinance # 155-13 | $25,000 |
| [201403130625](https://www.permitgraph.org/p/201403130625) | Mar 13, 2014 | Never finaled: issued Apr 2014, no final | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | t.i. on 4th floor, providing notification appliances, duct detectors and control relays at tenant heat pumps. add 8 duct detectors, 9 horns & 9 horn strobes, 1 power supply. asociated with pa 2014-03… | $11,000 |
| [201403120494](https://www.permitgraph.org/p/201403120494) | Mar 12, 2014 | Completed: final sign-off Apr 2014 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) | fire sprinklers: in light hazard studio, existing end lines shall be worked to add 4 new ssp, 1 new ssu and relocate 4 e ssu not to exceed pipe schedule for hazard.for new full ht walk for new pass t… | $7,000 |
| [201403039729](https://www.permitgraph.org/p/201403039729) | Mar 3, 2014 | Completed: final sign-off Apr 2014 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | minor remodel existing tenant improvement demolition, construction (2) new rooms & dividing (e) conf. room into 2. mech/elec/life safety under seperate permit. | $125,525 |
| [201306260587](https://www.permitgraph.org/p/201306260587) | Jun 26, 2013 | Never finaled: issued Oct 2015, no final | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | this permit submitted for record purposes only; no work done - change of use per western soma rezoning. |  |
| [201306068847](https://www.permitgraph.org/p/201306068847) | Jun 6, 2013 | Completed: final sign-off Jun 2013 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | relocate 19 pendent sprinkler heads on the 1st floor. t.i pa# 201302210687 | $9,785 |
| [201305167142](https://www.permitgraph.org/p/201305167142) | May 16, 2013 | Expired or cancelled: cancelled Jan 2026 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | revision to pa# 2013-0221-0687 & 2013-0122-8380-maintain (e) non rated wall status at 1st floor av/it room, 2nd floor electrical closet, idc/av & ups rooms & 3rd floor electrical closet & idc/av room |  |
| [201304305796](https://www.permitgraph.org/p/201304305796) | Apr 30, 2013 | Completed: final sign-off Jul 2013 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | six evacuation signs to be posted on 2nd & 3rd floors. no construction work. ti pa# 201301228380 | $1,800 |
| [201303202598](https://www.permitgraph.org/p/201303202598) | Mar 20, 2013 | Completed: final sign-off Oct 2013 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | 1st, 2nd, and 3rd floor:provide fire alarm devices for t.i. . 52 duct detectors, 84 notification, and one power supply. | $80,000 |
| [201303182413](https://www.permitgraph.org/p/201303182413) | Mar 18, 2013 | Completed: final sign-off Jul 2022 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 2nd & 3rd floor-relocate 27 pendent sprinkler heads-relocate 3 upright heads & delete 2 uprights. relocate 30 pendent sprinkler heads, relocate 3 uprights & delete 2 uprights. ti pa# 2013-0122-8380 | $32,445 |
| [201302210687](https://www.permitgraph.org/p/201302210687) | Feb 21, 2013 | Completed: final sign-off Oct 2013 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | tenant improvement of 7132 gsf consisting of non structural demo of e office space on 1st floor to be replaced with new office space. work includes new non load bearing partitions and millwork | $400,000 |
| [201302130136](https://www.permitgraph.org/p/201302130136) | Feb 13, 2013 | Completed: final sign-off Oct 2013 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | mechanical and electrical work for tenant improvement on the 2nd & 3rd floor. ref arch pa# 201301228380 | $750,000 |
| [201302120051](https://www.permitgraph.org/p/201302120051) | Feb 12, 2013 | Expired or cancelled: withdrawn Feb 2013 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st floor t.i. ot include demolitoin of existing office space to be replaced with new office space, gallery space & reconfigured conference areas including non-load bearing partiitons. | $320,940 |
| [201301228380](https://www.permitgraph.org/p/201301228380) | Jan 22, 2013 | Completed: final sign-off Oct 2013 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | interior ti to include demolition of interior non-structural partitions, new partitions. mep, life safety & fire sprinkler under separate permit. | $1,648,215 |
| [201301107723](https://www.permitgraph.org/p/201301107723) | Jan 10, 2013 | Expired or cancelled: cancelled Sep 2015 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | demo/const non-bearing partitions @ all flr incl basemnt. restripe pkg area &install bollards & wheel stops,rehinge basemt doors,relocate drink fountains,replace ada doors @ restrm stalls, install gr… | $150,000 |
| [201207094327](https://www.permitgraph.org/p/201207094327) | Jul 9, 2012 | Never finaled: issued Jul 2012, no final | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | commercent of work not started under previously approved pa# 200911231977 |  |
| [201205089984](https://www.permitgraph.org/p/201205089984) | May 8, 2012 | Completed: final sign-off May 2012 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | to comply with violation 200560847; the wall signs have been painted over and removed from the building |  |
| [201007156669](https://www.permitgraph.org/p/201007156669) | Jul 15, 2010 | Expired or cancelled: expired May 2012 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Landmark Builders](https://www.permitgraph.org/contractor/landmark-builders-842416) | office ti- playdom on the 4th floor. remove (e0 open office landscape furniture ( furniture panels and partitions). all below 5'9" height and repalce with different open officer landsscape furniture… | $22,000 |
| [201006164609](https://www.permitgraph.org/p/201006164609) | Jun 16, 2010 | Expired or cancelled: cancelled Aug 2022 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Howell Electric Inc.](https://www.permitgraph.org/contractor/howell-electric-inc-700113) | 4th. flr.: run power & communication cabling to 87 cubicle locations | $35,000 |
| [200911231977](https://www.permitgraph.org/p/200911231977) | Nov 23, 2009 | Expired or cancelled: cancelled Feb 2019 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | renovation of (e) building as follows: adding 36 new windows on each side of (e) building | $50,000 |
| [200404201764](https://www.permitgraph.org/p/200404201764) | Apr 20, 2004 | Completed: final sign-off Apr 2004 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Oliveira Sign Service](https://www.permitgraph.org/contractor/oliveira-sign-service-492533) | erect sign permit- electric, projecting & double-faced. |  |
| [200402035506](https://www.permitgraph.org/p/200402035506) | Feb 3, 2004 | Completed: final sign-off Apr 2004 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | relocation of (e) strobes. life safety (ref#200312222770.) no increase in office space | $20,000 |
| [200401073546](https://www.permitgraph.org/p/200401073546) | Jan 7, 2004 | Completed: final sign-off Jan 2004 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | provide sprinklers on g/f, total 2 heads | $500 |
| [200401073544](https://www.permitgraph.org/p/200401073544) | Jan 7, 2004 | Completed: final sign-off Mar 2004 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | provide electrical & lighting on g/f | $15,000 |
| [200312222770](https://www.permitgraph.org/p/200312222770) | Dec 22, 2003 | Completed: final sign-off Mar 2004 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | 1/f-t.i. interior soft demo,mew partitions,acoustic ceiling,millwork,doors,hardware & finishes | $250,000 |
| [200204295188](https://www.permitgraph.org/p/200204295188) | Apr 29, 2002 | Completed: final sign-off May 2002 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | provide new partitions on the first fl, er pa #200108216482 |  |
| [200112215824](https://www.permitgraph.org/p/200112215824) | Dec 21, 2001 | Completed: final sign-off Apr 2002 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | utilize (e) locker room for new network equipment demo (e)shower for storage for 3/f | $10,000 |
| [200112215822](https://www.permitgraph.org/p/200112215822) | Dec 21, 2001 | Completed: final sign-off Apr 2002 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | remove doors for new reception area new employee kitchen (4th floor) | $5,000 |
| [200112185443](https://www.permitgraph.org/p/200112185443) | Dec 18, 2001 | Expired or cancelled: expired Apr 2002 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | installation of electric locks on the 2/f stairwell doors |  |
| [200111263770](https://www.permitgraph.org/p/200111263770) | Nov 26, 2001 | Completed: final sign-off Apr 2002 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | tenant improvement incl new full height partition walls,doors, glazing, etc | $40,000 |
| [200111132976](https://www.permitgraph.org/p/200111132976) | Nov 13, 2001 | Expired or cancelled: withdrawn Jan 2002 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | exterior entry upgrade new colored concrete walkwy on (e) sloped sidewlk install new bollards at wal | $10,000 |
| [200108216482](https://www.permitgraph.org/p/200108216482) | Aug 21, 2001 | Expired or cancelled: expired Feb 2002 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | 1/f provide new partitions on the first floor per plans | $5,000 |
| [200108095621](https://www.permitgraph.org/p/200108095621) | Aug 9, 2001 | Completed: final sign-off Apr 2002 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | 4/f remove existing door frame and hardware provide partitions per plans | $75,000 |
| [200104267768](https://www.permitgraph.org/p/200104267768) | Apr 26, 2001 | Completed: final sign-off May 2001 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) |  | revision to app #932761/change of coax cable |  |
| [200011085230](https://www.permitgraph.org/p/200011085230) | Nov 8, 2000 | Completed: final sign-off May 2001 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | [Park Place Contractors](https://www.permitgraph.org/contractor/park-place-contractors-520850) | one stop, maoe tjoe, mount two 18"omni to corner of building | $65,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (15), [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) (3), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) (3), [D A Pope Inc](https://www.permitgraph.org/contractor/d-a-pope-inc-381993) (3), [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) (3), [All Temperature Service Air Conditioning](https://www.permitgraph.org/contractor/all-temperature-service-air-conditioning-466960) (2), [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) (2), [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) (2), [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) (2), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (2), [Howell Electric Inc.](https://www.permitgraph.org/contractor/howell-electric-inc-700113) (2), [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) (2), [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) (2), [San Francisco Commercial Builders Inc](https://www.permitgraph.org/contractor/san-francisco-commercial-builders-inc-801883) (2), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696), [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794), [City Mechanical Inc](https://www.permitgraph.org/contractor/city-mechanical-inc-622065), [Creative Designs Construction](https://www.permitgraph.org/contractor/creative-designs-construction-923547), [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779), [Landmark Builders](https://www.permitgraph.org/contractor/landmark-builders-842416), [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232), [Mcclure Electric Inc](https://www.permitgraph.org/contractor/mcclure-electric-inc-248877), [Oliveira Sign Service](https://www.permitgraph.org/contractor/oliveira-sign-service-492533), [Park Place Contractors](https://www.permitgraph.org/contractor/park-place-contractors-520850), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862), [Saunders Construction Inc](https://www.permitgraph.org/contractor/saunders-construction-inc-616856), [Westower Communications](https://www.permitgraph.org/contractor/westower-communications-744137)
- Architects: [Martha Breed](https://www.permitgraph.org/professional/martha-breed-C32618) (3), [Bret Thoeny](https://www.permitgraph.org/professional/bret-thoeny-C21047) (2), [Candace Chan](https://www.permitgraph.org/professional/candace-chan-C40716) (2), [Donna K Cook](https://www.permitgraph.org/professional/donna-k-cook-C34846) (2), [Scott Clement](https://www.permitgraph.org/professional/scott-clement-C36455) (2), [Bill Turner](https://www.permitgraph.org/professional/bill-turner-C21000), [Joseph A. Remling](https://www.permitgraph.org/professional/joseph-a-remling-C34144), [Lars P. Mortensen](https://www.permitgraph.org/professional/lars-p-mortensen-M38284)
- Engineers: [Stephen Shaffer](https://www.permitgraph.org/professional/stephen-shaffer-E21097) (2), [Acco Engineers](https://www.permitgraph.org/professional/acco-engineers-M30828), [Donna Kim Cook](https://www.permitgraph.org/professional/donna-kim-cook-C34864), [Jeffrey Dyer](https://www.permitgraph.org/professional/jeffrey-dyer-S2774), [Jesus B Cabellon Jr](https://www.permitgraph.org/professional/jesus-b-cabellon-jr-E9278), [Joseph Mastro Valerio](https://www.permitgraph.org/professional/joseph-mastro-valerio-C21000), [Lars P. Mortensen](https://www.permitgraph.org/professional/lars-p-mortensen-M38284), [Pablo Orozco](https://www.permitgraph.org/professional/pablo-orozco-M27485), [Prabhjeet Grewal](https://www.permitgraph.org/professional/prabhjeet-grewal-E15692), [Rey Solidum](https://www.permitgraph.org/professional/rey-solidum-M30309), [Rodney Ochoa](https://www.permitgraph.org/professional/rodney-ochoa-577621)
- Authorized agents: [Cindy Li](https://www.permitgraph.org/professional/cindy-li-248877), [Nick Vetzmadian](https://www.permitgraph.org/professional/nick-vetzmadian-314794)
- Designers: [Arrow Sign Company](https://www.permitgraph.org/professional/arrow-sign-company-314794), [C B F Inc](https://www.permitgraph.org/professional/c-b-f-inc-335873)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.