# 645 Harrison St

Block 3763, lot 105. Page: https://www.permitgraph.org/a/3763/105

- City's use: Industrial
- Built: 1948
- Stories: 3
- Rooms: 8 bathrooms
- Building: 148,076 sq ft
- Lot: 37,121 sq ft
- Zoning: SSO
- Construction type: B

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

81 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202611120663](https://www.permitgraph.org/p/202611120663) | Nov 12, 2026 | In progress: filed Nov 2026, not yet issued | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | deferred structural permit to pa# 202608206930 for equipment anchorage. |  |
| [202610159481](https://www.permitgraph.org/p/202610159481) | Oct 15, 2026 | In progress: filed Oct 2026, not yet issued | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [U A Construction](https://www.permitgraph.org/contractor/u-a-construction-707819) | interior ti: construct a new electrical transformer room fully within the interior of the building. work includes converting an e loading bay to house the new transformer and modify the east elevatio… | $260,500 |
| [202608206930](https://www.permitgraph.org/p/202608206930) | Aug 20, 2026 | In progress: issued Sep 2026 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | limited t.i. on level 3, removal of 8 non-structural screening partitions, patch & re-finish, replace (2) doors. equipment relocation. | $107,970 |
| [202510107149](https://www.permitgraph.org/p/202510107149) | Oct 10, 2025 | In progress: issued Oct 2025 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | remove and replace vrf fan coil unit with new duct, pipe and branch controller | $50,000 |
| [202406204935](https://www.permitgraph.org/p/202406204935) | Jun 20, 2024 | In progress: filed Jun 2024, not yet issued | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | interior tenant improvement to provide new location for a future electrical panel | $6,000 |
| [202306029119](https://www.permitgraph.org/p/202306029119) | Jun 2, 2023 | Completed: final sign-off Jun 2023 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | as-builts to show 2 added duct detectors, ref pa#202304206136. mech ref #202302282747 |  |
| [202304276561](https://www.permitgraph.org/p/202304276561) | Apr 27, 2023 | Completed: final sign-off May 2023 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers; relocate 4 pendent sprinklers and relocate 2 uprights on the ground floor; add 3 uprights and delete 3 uprights. ref pa 2023-0228-2747 | $4,950 |
| [202304206136](https://www.permitgraph.org/p/202304206136) | Apr 20, 2023 | Completed: final sign-off Jun 2023 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | per tenant improvement, modify existing fire alarm system, ref 202302282747. add 7 horn strobes, 4 strobes ceiling. | $1,500 |
| [202302282747](https://www.permitgraph.org/p/202302282747) | Feb 28, 2023 | Completed: final sign-off Jul 2023 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 1st fl - 5189 ti interior ti with associated mep | $1,000,000 |
| [202003137021](https://www.permitgraph.org/p/202003137021) | Mar 13, 2020 | Expired or cancelled: cancelled Jan 2026 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | interior tenant improvement on the 1st fl including storage and liquid nitrogen tank. structural work included | $95,000 |
| [201912068937](https://www.permitgraph.org/p/201912068937) | Dec 6, 2019 | Never finaled: filed Dec 2019, never issued | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | retain the historic 4 story building & construct new 237,750 sf vertical addition above (e) bldg. existing ground floor would feature mixed-use retail space & a basement will be added the (e) office… | $100,000,000 |
| [201906052563](https://www.permitgraph.org/p/201906052563) | Jun 5, 2019 | Never finaled: issued Jun 2019, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | to obtain final inspection for work approved under pa # 201703101213, 201712287568. all work is complete. |  |
| [201901039508](https://www.permitgraph.org/p/201901039508) | Jan 3, 2019 | Completed: final sign-off Jan 2019 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | as-builts to ref pa #201808066483. change led annuc and device address changes. maher na |  |
| [201809109539](https://www.permitgraph.org/p/201809109539) | Sep 10, 2018 | Never finaled: issued Sep 2018, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to pa #201806071243 to add fan coil shut down sequence to sheets ac1.01, ac702, ac7.03. 4th fl |  |
| [201808066483](https://www.permitgraph.org/p/201808066483) | Aug 6, 2018 | Completed: final sign-off Jan 2019 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fire alarm t.i. 4th fl. addition of new fire alarm devices. referance to pa #201806071243. voluntary upgrade of (e) fire alarm sytem to voice. replace all (e) audible dvices in bldg with new audible… | $85,000 |
| [201807265667](https://www.permitgraph.org/p/201807265667) | Jul 26, 2018 | Never finaled: issued Jul 2018, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 1st fl: install a new fdc to connect to new fhv on 4th fl. 4th fl: add 318, relocate 52, and plug 13 sprinklers in order to conform with the new wall/ceiling layout. #18-614. ref #201711204458. | $178,650 |
| [201806071243](https://www.permitgraph.org/p/201806071243) | Jun 7, 2018 | Never finaled: issued Jul 2018, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | rev to pa# 201711204458 for interior t.i. on 4th fl. of (e) building for open office, cafe, suppport spaces, conference rooms & storage | $10,000 |
| [201806040883](https://www.permitgraph.org/p/201806040883) | Jun 4, 2018 | Completed: final sign-off Aug 2018 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to app#201712116095 to remove tank and pad from scope of work. |  |
| [201805219672](https://www.permitgraph.org/p/201805219672) | May 21, 2018 | Completed: final sign-off May 2019 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | revision to 201711154091 remove proposed lighting at ground level room 121 and remove (1) incorrect exit sign |  |
| [201805219707](https://www.permitgraph.org/p/201805219707) | May 21, 2018 | Never finaled: issued Jun 2018, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | provide new 1-hr fire proofing at (e) metal deck & structural members ref 201711204458 maher na | $10,000 |
| [201803083209](https://www.permitgraph.org/p/201803083209) | Mar 8, 2018 | Completed: final sign-off May 2018 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | piro comm will provide 7 new audible/visual devices, 5 duct detectors, 6 relay modules and 6 multi voltage relays. maher n/a | $5,000 |
| [201802201709](https://www.permitgraph.org/p/201802201709) | Feb 20, 2018 | Completed: final sign-off Mar 2018 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | fire sprinkler ti - 7 relocated pendent; 4 added pendent; 1 deleted pendent; 7 relocated upright; 2 replaced pendent with upright; 2 deleted upright. ref pa 2017-1115-4091 | $5,200 |
| [201802161582](https://www.permitgraph.org/p/201802161582) | Feb 16, 2018 | Completed: final sign-off Apr 2019 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | revision to app#201711154091. mechanical revision only. add duct detectors at fcus. n/a for maher. |  |
| [201802080735](https://www.permitgraph.org/p/201802080735) | Feb 8, 2018 | Completed: final sign-off Aug 2019 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fa ti pyro comm will be adding 5 smk det, 14 duct det, 15 relay modeule, 1 ceiling strobe, 16 ceiling mount horns & relocate 7 ceiling horm strobes maher na | $25,000 |
| [M887329](https://www.permitgraph.org/p/M887329) | Feb 8, 2018 | Never finaled: issued Feb 2018, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | street space w/mta |  |
| [201802080725](https://www.permitgraph.org/p/201802080725) | Feb 8, 2018 | Completed: final sign-off Aug 2018 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st fl: revision to pa #201712116095 to add structural details for wall strengthening at mechanical openings. maher na |  |
| [201801309845](https://www.permitgraph.org/p/201801309845) | Jan 30, 2018 | Completed: final sign-off Apr 2018 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 1st floor: add, removed, relocate, & change out fire sprinklers per t.i. at 1st floor. 18 add, 32 relocate, 16 plugged, 274 change out. ref 2017-12-11-6095. n/a for maher. | $75,000 |
| [201712287568](https://www.permitgraph.org/p/201712287568) | Dec 28, 2017 | Never finaled: issued Dec 2017, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th flr - demo of walls, ceiling and abandoned mep of (e) bld. maher na ref 201711204458 | $10,000 |
| [201712116095](https://www.permitgraph.org/p/201712116095) | Dec 11, 2017 | Completed: final sign-off Oct 2018 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st fl - ti, new open office, pantry, support spaces | $2,000,000 |
| [201711204458](https://www.permitgraph.org/p/201711204458) | Nov 20, 2017 | Never finaled: issued Mar 2018, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th flr: office ti of (e) vacant floor level referrence pa# 201703101213 for office allocation new employee cafeteria space. bike parking, showers & lockers under sep permit. maher na | $5,000,000 |
| [201711154091](https://www.permitgraph.org/p/201711154091) | Nov 15, 2017 | Completed: final sign-off May 2019 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | core and shell improvements and toilet room upgrades 1st fl maher not req | $250,000 |
| [201708094362](https://www.permitgraph.org/p/201708094362) | Aug 9, 2017 | Never finaled: issued Aug 2017, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | interior demolition of interior, non rated, non bearing partitoin walls on gr lvl per submitted plans on gr flevel only. no exterior demo proposed | $167,982 |
| [201707273031](https://www.permitgraph.org/p/201707273031) | Jul 27, 2017 | Completed: final sign-off Aug 2017 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 2/f- revision to pa 2017-0511-6329, addition of 5 duct detectors and 6 relay modules, connect to (e) fa system. n/a ordinance #155-13 | $5,000 |
| [201706058368](https://www.permitgraph.org/p/201706058368) | Jun 5, 2017 | Completed: final sign-off Sep 2017 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fa ti to 3rd floor add 1 duct detector; 1 relay module, relocate 2 existing nac appliances. connect to (e) fire alarm system. -pa 2017-0412-3765. maher na | $1,000 |
| [201705176847](https://www.permitgraph.org/p/201705176847) | May 17, 2017 | Completed: final sign-off Oct 2017 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 2nd & 3rd floors - t-24 mechanical for work under pa #201704123765, #201703091105. n/a maher ordinance. | $170,000 |
| [201705176846](https://www.permitgraph.org/p/201705176846) | May 17, 2017 | Completed: final sign-off Sep 2017 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | t 24 electrical for work under 201704123765. maher not req | $183,000 |
| [201705116345](https://www.permitgraph.org/p/201705116345) | May 11, 2017 | Never finaled: issued May 2017, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only - relovate 4 sprinkler pendent, relocate 2 uprights. add 10 sprinkler uprights. ref 2017-0309-1104 | $4,000 |
| [201705116329](https://www.permitgraph.org/p/201705116329) | May 11, 2017 | Completed: final sign-off Aug 2017 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 2nd flr: fa ti - add 10 nac appliances. connect to (e) fa system pa 201703091104 & 201704123765 maher na | $5,000 |
| [201704214518](https://www.permitgraph.org/p/201704214518) | Apr 21, 2017 | Completed: final sign-off Sep 2017 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | ~encrypt&3/f -non-structural partitions, doors, glazing, lights, finishes & power. no change in area, occupancy or use; maher ord 155-13 na | $218,400 |
| [201704123765](https://www.permitgraph.org/p/201704123765) | Apr 12, 2017 | Completed: final sign-off Sep 2017 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | (n) non-structural partitions, lighting, electrical, finishes. no change in occupancy, use or area; n/a maher | $630,630 |
| [201703101213](https://www.permitgraph.org/p/201703101213) | Mar 10, 2017 | Never finaled: issued Apr 2017, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | no work under this building permit. hv-645 harrison street, inc. proposes to apply for building permit for office development allocation under planning code section(s) 321, 322 & 818.48 that will aut… |  |
| [201703091105](https://www.permitgraph.org/p/201703091105) | Mar 9, 2017 | Completed: final sign-off Sep 2017 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 3rd flr: select demo of non structural partitions demo only ab-017 maher na | $5,500 |
| [201703091104](https://www.permitgraph.org/p/201703091104) | Mar 9, 2017 | Completed: final sign-off Sep 2017 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 2nd flr: select demo of non structural partitions demo only ab-017 maher na | $7,500 |
| [201310078689](https://www.permitgraph.org/p/201310078689) | Oct 7, 2013 | Never finaled: issued Oct 2013, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | fire sprinkler as built 1st fl |  |
| [201308083831](https://www.permitgraph.org/p/201308083831) | Aug 8, 2013 | Expired or cancelled: cancelled Jan 2026 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | elevator repairs/upgrades to (e) | $300,000 |
| [M412409](https://www.permitgraph.org/p/M412409) | Jul 30, 2013 | Never finaled: issued Jul 2013, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | street space permit |  |
| [201303263014](https://www.permitgraph.org/p/201303263014) | Mar 26, 2013 | Completed: final sign-off Jun 2013 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Eagle Bay Enterprises, Inc (Dba Garnett](https://www.permitgraph.org/contractor/eagle-bay-enterprises-inc-dba-garnett-956216) | 3rd floor-install 4 evac signs | $1,000 |
| [201302261018](https://www.permitgraph.org/p/201302261018) | Feb 26, 2013 | Completed: final sign-off Jun 2013 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Mc Carthy Building Companies Inc](https://www.permitgraph.org/contractor/mc-carthy-building-companies-inc-411173) | revision to app#201208228000 to reclassification of office 330 to "classroom office" on the 3rd floor, 645 harrision st. |  |
| [201301319227](https://www.permitgraph.org/p/201301319227) | Jan 31, 2013 | Never finaled: issued Jan 2013, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 1st & 3rd floors-add, relocate & removed fire sprinkler heads per ti-3rd fl-28 added, 54 relocated, 15 removed. 1st fl-5 added & 21 relocated. ti pa's# 2012-0822-8000 & 2012-1022-2550 | $50,372 |
| [201301288910](https://www.permitgraph.org/p/201301288910) | Jan 28, 2013 | Completed: final sign-off May 2013 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 3rd floor t.i. project fire alarm, t.i. pa #2012.08.22.8000. facu under seperate permit. floors: ground,2,4, and penthouse under permit. | $40,000 |
| [201301288926](https://www.permitgraph.org/p/201301288926) | Jan 28, 2013 | Completed: final sign-off Oct 2013 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | voluntary fire alarm upgrade project. 1st, 2nd & 4th floor. 3rd floor will be a separate ti project. | $120,000 |
| [201211134140](https://www.permitgraph.org/p/201211134140) | Nov 13, 2012 | Completed: final sign-off Jun 2013 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [U A Construction](https://www.permitgraph.org/contractor/u-a-construction-707819) | replace and install hvac vents per plans. rvision to 201209190128/201208228000 | $10,000 |
| [201210222550](https://www.permitgraph.org/p/201210222550) | Oct 22, 2012 | Expired or cancelled: withdrawn May 2014 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | provide accessible path and ramp and restroom upgrade on ground floor. no work on exterior. add partitions on ground floor. limited office t.i. structural, mechanical & elect, plumbing included. | $750,000 |
| [201209190128](https://www.permitgraph.org/p/201209190128) | Sep 19, 2012 | Completed: final sign-off May 2013 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [U A Construction](https://www.permitgraph.org/contractor/u-a-construction-707819) | 3rd floor: mechanical, plumbing & electrical system work for 3rd floor ti work under pa# 2012/08/22/8000. | $500,000 |
| [201209079191](https://www.permitgraph.org/p/201209079191) | Sep 7, 2012 | Expired or cancelled: cancelled Jan 2026 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | mechanical, plumbing, electrical work for 3rd floor t.i. improvement under permit 201208228000 | $350,000 |
| [201209069087](https://www.permitgraph.org/p/201209069087) | Sep 6, 2012 | Completed: final sign-off Sep 2012 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [O'connor Plumbing & Fire Protection](https://www.permitgraph.org/contractor/o-connor-plumbing-fire-protection-498866) | installtion of 3 fire sprinkler heads in telephone rooms in suite 200. ti: 201207124738 | $1,200 |
| [201208228000](https://www.permitgraph.org/p/201208228000) | Aug 22, 2012 | Completed: final sign-off May 2013 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [U A Construction](https://www.permitgraph.org/contractor/u-a-construction-707819) | 3rd floor-tenant improvements & accessibilty upgrades. no exterior work to be done | $750,000 |
| [201207124738](https://www.permitgraph.org/p/201207124738) | Jul 12, 2012 | Completed: final sign-off Sep 2012 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [A M Rocca Inc.](https://www.permitgraph.org/contractor/a-m-rocca-inc-757461) | #200- tenant improvement of an office. add and remove partition walls. mep, sprinklers seperate permit. | $10,000 |
| [M284207](https://www.permitgraph.org/p/M284207) | Oct 14, 2011 | Never finaled: issued Oct 2011, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | street and sidewalk permits (pp2011014721) |  |
| [201011195363](https://www.permitgraph.org/p/201011195363) | Nov 19, 2010 | Completed: final sign-off Feb 2011 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety system on ground, 2, 3,4 and elevator machine room. 5 smoke detectirs, 6 heat detectors | $3,300 |
| [201009211265](https://www.permitgraph.org/p/201009211265) | Sep 21, 2010 | Expired or cancelled: cancelled Jul 2018 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | convert existing textile use to public storage including rental office. | $500,000 |
| [201009100659](https://www.permitgraph.org/p/201009100659) | Sep 10, 2010 | Completed: final sign-off Nov 2010 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 4th floor-relocate fire sprinkler heads at elevator room & penthouse, total 3. (change out (e) to new heads see plan) | $1,600 |
| [201007015758](https://www.permitgraph.org/p/201007015758) | Jul 1, 2010 | Completed: final sign-off Jan 2011 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Mc Carthy Building Companies Inc](https://www.permitgraph.org/contractor/mc-carthy-building-companies-inc-411173) | barrier removal by removing a non-accessible elevator and replacing with an ada accessible elevator. fire alarm on separate permit. | $350,000 |
| [200901069657](https://www.permitgraph.org/p/200901069657) | Jan 6, 2009 | Never finaled: issued Jan 2009, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Tyco Integrated Security](https://www.permitgraph.org/contractor/tyco-integrated-security-707408) | to obtain final inspection for work approved under pa#200804089132. all work has been completed. |  |
| [M140404](https://www.permitgraph.org/p/M140404) | Nov 3, 2008 | Never finaled: issued Nov 2008, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | street space permit |  |
| [200804089132](https://www.permitgraph.org/p/200804089132) | Apr 8, 2008 | Never finaled: issued Apr 2008, no final | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Tyco Integrated Security](https://www.permitgraph.org/contractor/tyco-integrated-security-707408) | replace old panel with new unimode loud panel, install new smoke above panel & pull station next to it. connect (e) horn/strobe, pull stations, water flows and tamper switches to new panel and monito… | $6,000 |
| [200209257388](https://www.permitgraph.org/p/200209257388) | Sep 25, 2002 | Completed: final sign-off Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | renew pa#2000/03/06/3567,2000/05/23/0779,2000/07/27/6358,2000/09/05/9646,2001/10/25/1698 for final |  |
| [200207181740](https://www.permitgraph.org/p/200207181740) | Jul 18, 2002 | Completed: final sign-off Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | renew#200201096532 for final inspection |  |
| [200202259955](https://www.permitgraph.org/p/200202259955) | Feb 25, 2002 | Completed: final sign-off Mar 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | response correction notice dated 1/24/02. approve ramp installed as an equilavent facilitation. |  |
| [200201096532](https://www.permitgraph.org/p/200201096532) | Jan 9, 2002 | Expired or cancelled: expired Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | renew #200109057570 for final inspection |  |
| [200110251698](https://www.permitgraph.org/p/200110251698) | Oct 25, 2001 | Expired or cancelled: expired Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | rev to 200005230779;ti on 2nd flr | $2,500 |
| [200110029749](https://www.permitgraph.org/p/200110029749) | Oct 2, 2001 | Expired or cancelled: expired Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | renew three expired app#200003063567,200005230779,200009059646 for final inspection |  |
| [200109057570](https://www.permitgraph.org/p/200109057570) | Sep 5, 2001 | Expired or cancelled: expired Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | renewal for final inspection only 200004127076 |  |
| [200102283120](https://www.permitgraph.org/p/200102283120) | Feb 28, 2001 | Completed: final sign-off Mar 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | barrier free work to entry for access compliance rv 200005230779 new 1:12 ramp betwn prop line entry | $35,000 |
| [200009059646](https://www.permitgraph.org/p/200009059646) | Sep 5, 2000 | Expired or cancelled: expired Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | addendum to app #200005230779 |  |
| [200007276358](https://www.permitgraph.org/p/200007276358) | Jul 27, 2000 | Expired or cancelled: expired Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | furnish and install 6 air conditioning units within the ce8ling of the 2nd floor ref: pa#20000523077 | $92,000 |
| [200006142664](https://www.permitgraph.org/p/200006142664) | Jun 14, 2000 | Expired or cancelled: expired Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Marquee Fire Protection Dba Pye Barker F](https://www.permitgraph.org/contractor/marquee-fire-protection-dba-pye-barker-f-1077494) | revamp (e) fire sprinkler system 2nd floor -add (7) new sprinkler-relocate (7) existing | $2,800 |
| [200005230779](https://www.permitgraph.org/p/200005230779) | May 23, 2000 | Expired or cancelled: expired Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | 2nd floor tentant improvement & changes of front entry | $300,000 |
| [200004127076](https://www.permitgraph.org/p/200004127076) | Apr 12, 2000 | Expired or cancelled: expired Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | install fm200 fire system on 2nd fl | $21,298 |
| [200003134129](https://www.permitgraph.org/p/200003134129) | Mar 13, 2000 | Expired or cancelled: expired Jul 2000 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | [Marquee Fire Protection Dba Pye Barker F](https://www.permitgraph.org/contractor/marquee-fire-protection-dba-pye-barker-f-1077494) | remove existing fire sprinkler heads (7), five adds-17 relocates-pipe schedule | $2,400 |
| [200003063567](https://www.permitgraph.org/p/200003063567) | Mar 6, 2000 | Expired or cancelled: expired Oct 2002 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) |  | remodel: one computer workrm, new finishes, work to (e) elevator for ada complience, restrm upgrades | $45,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) (11), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (9), [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) (6), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (5), [U A Construction](https://www.permitgraph.org/contractor/u-a-construction-707819) (4), [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) (3), [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) (3), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (2), [Marquee Fire Protection Dba Pye Barker F](https://www.permitgraph.org/contractor/marquee-fire-protection-dba-pye-barker-f-1077494) (2), [Mc Carthy Building Companies Inc](https://www.permitgraph.org/contractor/mc-carthy-building-companies-inc-411173) (2), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (2), [Tyco Integrated Security](https://www.permitgraph.org/contractor/tyco-integrated-security-707408) (2), [A M Rocca Inc.](https://www.permitgraph.org/contractor/a-m-rocca-inc-757461), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873), [Eagle Bay Enterprises, Inc (Dba Garnett](https://www.permitgraph.org/contractor/eagle-bay-enterprises-inc-dba-garnett-956216), [O'connor Plumbing & Fire Protection](https://www.permitgraph.org/contractor/o-connor-plumbing-fire-protection-498866)
- Architects: [Timothy Ward](https://www.permitgraph.org/professional/timothy-ward-C6769) (3), [Alfred Quezada, Jr](https://www.permitgraph.org/professional/alfred-quezada-jr-28274) (2), [George Soskin](https://www.permitgraph.org/professional/george-soskin-C9223) (2), [Alex Yang Nie](https://www.permitgraph.org/professional/alex-yang-nie-C31413), [Bert Deviterbo](https://www.permitgraph.org/professional/bert-deviterbo-C35090), [Clifton K. Boswell](https://www.permitgraph.org/professional/clifton-k-boswell-C26963), [Michael Patrick Mussano](https://www.permitgraph.org/professional/michael-patrick-mussano-C23000), [Steve Lawler](https://www.permitgraph.org/professional/steve-lawler-C29399)
- Engineers: [Sherry Chaumpluke](https://www.permitgraph.org/professional/sherry-chaumpluke-M34646) (2), [Clifton Penry](https://www.permitgraph.org/professional/clifton-penry-13517), [Edwin Obias](https://www.permitgraph.org/professional/edwin-obias-E17007), [Kent Sezen](https://www.permitgraph.org/professional/kent-sezen-3716), [Ronald Zeiger](https://www.permitgraph.org/professional/ronald-zeiger-E7218), [Stephen Shafeer](https://www.permitgraph.org/professional/stephen-shafeer-E21097), [Steven Curry](https://www.permitgraph.org/professional/steven-curry-S3364), [Walter Chang](https://www.permitgraph.org/professional/walter-chang-S6988), [Zack Kardon](https://www.permitgraph.org/professional/zack-kardon-C69106)
- Authorized agents: [John Winder](https://www.permitgraph.org/professional/john-winder-C13305)
- Designers: [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/professional/pyro-comm-systems-inc-612153), [Sherry Chaumpluke](https://www.permitgraph.org/professional/sherry-chaumpluke-120696)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3763/105.