# 1000 Harrison St

Block 3754, lot 067. Page: https://www.permitgraph.org/a/3754/067

- City's use: Commercial Misc
- Built: 1970
- Stories: 1
- Units: 2
- Rooms: 3 bathrooms
- Building: 5,399 sq ft
- Lot: 23,400 sq ft
- Zoning: SLR
- Construction type: S

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

17 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202606183570](https://www.permitgraph.org/p/202606183570) | Jun 18, 2026 | In progress: issued Aug 2026 | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) | [Wayne Perry Inc](https://www.permitgraph.org/contractor/wayne-perry-inc-300345) | remove & replace (6) dispensers, wayne ovation 2. remove incon tank monitoring panel. replace tls 350 tank monitoring planel w/ tls 450 panel. install dplld transducers, tank over fill alarm, cat 6 u… | $20,000 |
| [202604038821](https://www.permitgraph.org/p/202604038821) | Apr 3, 2026 | Completed: final sign-off Oct 2026 | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) | [Xpress Technical Iec Services](https://www.permitgraph.org/contractor/xpress-technical-iec-services-1064168) | electric wall sign "extra mile" | $5,850 |
| [202604038829](https://www.permitgraph.org/p/202604038829) | Apr 3, 2026 | In progress: issued Apr 2026 | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) | [Xpress Technical Iec Services](https://www.permitgraph.org/contractor/xpress-technical-iec-services-1064168) | install faux wood panel at storefront ( two seccions) | $1,000 |
| [201802080794](https://www.permitgraph.org/p/201802080794) | Feb 8, 2018 | Never finaled: issued Feb 2018, no final | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) |  | installation of co2 tanks & alert sensor & horn system. compressed gas system | $800 |
| [201602119375](https://www.permitgraph.org/p/201602119375) | Feb 11, 2016 | Never finaled: issued Feb 2016, no final | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) | [Sign Designs Inc.](https://www.permitgraph.org/contractor/sign-designs-inc-268001) | install double faced electric sign | $12,000 |
| [201507091075](https://www.permitgraph.org/p/201507091075) | Jul 9, 2015 | Never finaled: issued Jul 2015, no final | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) | [Compass Services](https://www.permitgraph.org/contractor/compass-services-943537) | dig and pour footing for area light pole. n/a for maher. | $1,300 |
| [201412093339](https://www.permitgraph.org/p/201412093339) | Dec 9, 2014 | Never finaled: issued Dec 2014, no final | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) | [Able Maintenance Inc](https://www.permitgraph.org/contractor/able-maintenance-inc-312844), [Compass Services](https://www.permitgraph.org/contractor/compass-services-943537) | per title 24 compliances, replace existing light fixtures with led energy efficient led fixtures, install led lamps in fixtures. n/a ordinance #155-13 | $16,000 |
| [201403180981](https://www.permitgraph.org/p/201403180981) | Mar 18, 2014 | Completed: final sign-off Jun 2014 | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) | [Gettler-Ryan Inc](https://www.permitgraph.org/contractor/gettler-ryan-inc-220793) | remove and dispose and install new fuel dispensers in kind. install new udc. minor electrical for the new dispensers. n/a for the maher ordinance #155-13 | $45,000 |
| [201201031621](https://www.permitgraph.org/p/201201031621) | Jan 3, 2012 | Never finaled: issued Jan 2012, no final | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) | [Wayne Perry Inc](https://www.permitgraph.org/contractor/wayne-perry-inc-300345) | saw cut and remove steel manways. install new fl 90 manways. install 5 gallon spill buckets and drop tubes. replace any rusty piping in sumps. repair bad penetrations. reglass reducer collar to cente… | $12,000 |
| [201112200981](https://www.permitgraph.org/p/201112200981) | Dec 20, 2011 | Completed: final sign-off Mar 2012 | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) | [Gettler-Ryan Inc](https://www.permitgraph.org/contractor/gettler-ryan-inc-220793) | replace 10'x12' concrete drive slab at handy cap zone. replace handicap ramp. install truncated domes.relocate (1) water closet in restroom. | $15,000 |
| [200909026038](https://www.permitgraph.org/p/200909026038) | Sep 2, 2009 | Completed: final sign-off Apr 2010 | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) | [Gettler-Ryan Inc](https://www.permitgraph.org/contractor/gettler-ryan-inc-220793) | evr phase ii upgrade with healy clean air separator cas and in station diagnostics. 3 new guard posts with calcraft enclosure. upgrade liquid condensate trap. project contact liddy mckenzie, gettler… | $65,000 |
| [200709132608](https://www.permitgraph.org/p/200709132608) | Sep 13, 2007 | Completed: final sign-off Nov 2007 | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) |  | tenant improvement, new & modify cabinetry, remove & replace can lights, update merchandising equipt. infill existing exterior door. existing hvac system to remain. | $25,000 |
| [200709122504](https://www.permitgraph.org/p/200709122504) | Sep 12, 2007 | Never finaled: filed Sep 2007, never issued | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) |  | non structural tenant improvement to (e) convenient store of chevron gas station. work including new and modification of cabinets, update merchandise equipment, remove and replace can lights, and inf… | $25,000 |
| [200701040998](https://www.permitgraph.org/p/200701040998) | Jan 4, 2007 | Never finaled: issued Aug 2007, no final | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) |  | to erect a double-faced, electric, ground sign. | $1,500 |
| [200701041000](https://www.permitgraph.org/p/200701041000) | Jan 4, 2007 | Never finaled: issued Aug 2007, no final | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) |  | to erect a single faced, electric, wall sign. | $3,000 |
| [200701040997](https://www.permitgraph.org/p/200701040997) | Jan 4, 2007 | Never finaled: issued Aug 2007, no final | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) |  | cheveron station reimage consisting of replacing signs, replacing existing canopy fascia with new canopy fascia. adding l.e.d. down lighting with valance and paint exterior of bldg earth tones. | $30,500 |
| [200701040996](https://www.permitgraph.org/p/200701040996) | Jan 4, 2007 | Never finaled: issued Aug 2007, no final | [1000 Harrison St](https://www.permitgraph.org/a/3754/067) |  | sign permit - ground, non electric, double faced. | $1,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Gettler-Ryan Inc](https://www.permitgraph.org/contractor/gettler-ryan-inc-220793) (3), [Compass Services](https://www.permitgraph.org/contractor/compass-services-943537) (2), [Wayne Perry Inc](https://www.permitgraph.org/contractor/wayne-perry-inc-300345) (2), [Xpress Technical Iec Services](https://www.permitgraph.org/contractor/xpress-technical-iec-services-1064168) (2), [Able Maintenance Inc](https://www.permitgraph.org/contractor/able-maintenance-inc-312844), [Sign Designs Inc.](https://www.permitgraph.org/contractor/sign-designs-inc-268001)
- Architects: [John Johnson](https://www.permitgraph.org/professional/john-johnson-C13289) (3), [Gary Semling](https://www.permitgraph.org/professional/gary-semling-C21541) (2)
- Engineers: [Mark Robison](https://www.permitgraph.org/professional/mark-robison-E15095), [Thompson Wyper](https://www.permitgraph.org/professional/thompson-wyper-M30464)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.