# 1098 Harrison St

Block 3754, lot 017. Page: https://www.permitgraph.org/a/3754/017

- City's use: Commercial Office
- Built: 1924
- Stories: 2
- Rooms: 4 bathrooms
- Building: 42,039 sq ft
- Lot: 27,512 sq ft
- Zoning: WMUG
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

52 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202405031398](https://www.permitgraph.org/p/202405031398) | May 3, 2024 | Completed: final sign-off Dec 2024 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | g/f t.i.: f/a bring (e) shung trip function.add 1 control, 1 monitoringmodule for power of shunt trip breaker.add 1 head detectors at 23in from f/s head in elevator maching rm.replace 1 (e) conventio… | $5,160 |
| [202309065982](https://www.permitgraph.org/p/202309065982) | Sep 6, 2023 | Completed: final sign-off Jan 2024 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | voluntary fa: add 2 addressable monitor modules to monitor existing conventional duct detectors. | $1,200 |
| [202001303154](https://www.permitgraph.org/p/202001303154) | Jan 30, 2020 | Completed: final sign-off Apr 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st fl. egress drawing with occupand load count and to update conditions required by field inspector |  |
| [201912311017](https://www.permitgraph.org/p/201912311017) | Dec 31, 2019 | Completed: final sign-off Feb 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Bay Air Systems, Inc](https://www.permitgraph.org/contractor/bay-air-systems-inc-450929) | as built fire alarm ref 201912048653 |  |
| [201912048653](https://www.permitgraph.org/p/201912048653) | Dec 4, 2019 | Completed: final sign-off Feb 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Bay Air Systems, Inc](https://www.permitgraph.org/contractor/bay-air-systems-inc-450929) | phase 3 of tenant improvement fire life safety. |  |
| [M1157707](https://www.permitgraph.org/p/M1157707) | Oct 24, 2019 | Never finaled: issued Oct 2019, no final | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) |  | street space |  |
| [201910164562](https://www.permitgraph.org/p/201910164562) | Oct 16, 2019 | Completed: final sign-off Mar 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | relocate (10) pendents, relocate (4) uprights, add (2) | $800 |
| [201909192051](https://www.permitgraph.org/p/201909192051) | Sep 19, 2019 | Completed: final sign-off Mar 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Bay Air Systems, Inc](https://www.permitgraph.org/contractor/bay-air-systems-inc-450929) | phase 2 of ti, fire alarm (fls) |  |
| [201909050728](https://www.permitgraph.org/p/201909050728) | Sep 5, 2019 | Completed: final sign-off Jan 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st fl - ti consists of build out of catering kitchen and serving/dining area. updating finishes, (n) non-structural partitions, bike storage. mep included. life safety & sprinkler under separate per… | $800,000 |
| [201908290158](https://www.permitgraph.org/p/201908290158) | Aug 29, 2019 | Completed: final sign-off Feb 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Bay Air Systems, Inc](https://www.permitgraph.org/contractor/bay-air-systems-inc-450929) | revision & as builts to 201908027674 reflecting deleted devices, new seq of operations, change scope from full building alarm to a 3 phase installation of which this is phase one. only work being don… | $1,000 |
| [201908027674](https://www.permitgraph.org/p/201908027674) | Aug 2, 2019 | Completed: final sign-off Sep 2019 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Bay Air Systems, Inc](https://www.permitgraph.org/contractor/bay-air-systems-inc-450929) | install new fire alarm system. ref pa#201906183685. maher ord 155-13 na | $165,000 |
| [201907236594](https://www.permitgraph.org/p/201907236594) | Jul 23, 2019 | Completed: final sign-off Jan 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st floor: meps for 201907165945. n/a for maher restroom, shower room and dressing room upgrade only. |  |
| [201907165945](https://www.permitgraph.org/p/201907165945) | Jul 16, 2019 | Completed: final sign-off Jan 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st fl ti of existing restrooms and showers. new changing rooms, updated finishes etx, meps, life safety under sep permit. sprinklers if needed | $200,000 |
| [201907024947](https://www.permitgraph.org/p/201907024947) | Jul 2, 2019 | Completed: final sign-off Aug 2019 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | f/s: relocate 20 pendents, add 1 pendent, & remove 1 pendent. ref pa #201905201076. | $10,750 |
| [201906183685](https://www.permitgraph.org/p/201906183685) | Jun 18, 2019 | Completed: final sign-off Jan 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st & 2nd fl - meps for 2019-0520-1076 |  |
| [201905201076](https://www.permitgraph.org/p/201905201076) | May 20, 2019 | Completed: final sign-off Jan 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st & 2nd fl ti of single tenant bldg including (n) non-structural partitions. (n) or revised meps, life safety & sprinklers under separate permit. (e) ceiling, lighting & sprinklers to remain in pla… | $733,200 |
| [201904036957](https://www.permitgraph.org/p/201904036957) | Apr 3, 2019 | Completed: final sign-off Jan 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | demo of non structural partitions and finishes, all (e) ceiling, lighting and fire sprinklers shall remain ab017 | $15,000 |
| [M992007](https://www.permitgraph.org/p/M992007) | Oct 11, 2018 | Never finaled: issued Oct 2018, no final | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) |  | street space |  |
| [201810032087](https://www.permitgraph.org/p/201810032087) | Oct 3, 2018 | Never finaled: issued Oct 2018, no final | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Blue Arc Electric](https://www.permitgraph.org/contractor/blue-arc-electric-830904) | electrical service upgrade, relocating main electrical from rear of building to front. installing a 277/480 volt main 800a gear and bring over 300a over to the rear side of property. | $200,000 |
| [201809180582](https://www.permitgraph.org/p/201809180582) | Sep 18, 2018 | Completed: final sign-off Jan 2020 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Bay Air Systems, Inc](https://www.permitgraph.org/contractor/bay-air-systems-inc-450929) | hvac system retrofit | $1,200,000 |
| [201809109498](https://www.permitgraph.org/p/201809109498) | Sep 10, 2018 | Expired or cancelled: cancelled Jan 2026 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) |  | interior renovation of (e) officespace and employee break room. resulting in non structural mixed use occupancy | $4,000,000 |
| [201807305892](https://www.permitgraph.org/p/201807305892) | Jul 30, 2018 | Never finaled: issued Jul 2018, no final | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Bigham Taylor Roofing Co](https://www.permitgraph.org/contractor/bigham-taylor-roofing-co-431631) | reroofing | $100,000 |
| [201805250201](https://www.permitgraph.org/p/201805250201) | May 25, 2018 | Completed: final sign-off Jun 2019 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Centric Construction Inc](https://www.permitgraph.org/contractor/centric-construction-inc-822465) | demolition of 1 bay at 1st and 2nd fl, front cmu infill panels, replace with new glazed openings. renovation of main building entry | $195,000 |
| [201804055658](https://www.permitgraph.org/p/201804055658) | Apr 5, 2018 | Completed: final sign-off May 2018 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Rylko Builders Inc.](https://www.permitgraph.org/contractor/rylko-builders-inc-955155) | renew pa# 201212115895. for final only. |  |
| [201803133548](https://www.permitgraph.org/p/201803133548) | Mar 13, 2018 | Completed: final sign-off Jun 2019 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Centric Construction Inc](https://www.permitgraph.org/contractor/centric-construction-inc-822465) | new roof deck at 2nd floor on extg 2 story building. n/a for maher | $66,875 |
| [201711012893](https://www.permitgraph.org/p/201711012893) | Nov 1, 2017 | Completed: final sign-off Jan 2018 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | install new letter set replacing extg letter set with updated logo and letter font. n/a for maher | $4,000 |
| [201508184617](https://www.permitgraph.org/p/201508184617) | Aug 18, 2015 | Expired or cancelled: expired Mar 2025 | [385 07th St](https://www.permitgraph.org/a/3754/017) | [Clear Channel Outdoor](https://www.permitgraph.org/contractor/clear-channel-outdoor-821059) | clear channel outdoor inc the owner of general advertising sign located at 385-395 7th (aka 1098 harrison) will install a new sign extension 6'-0" h x 36'-0"w extension zone identified with 2 6'h mar… | $1,000 |
| [201508184615](https://www.permitgraph.org/p/201508184615) | Aug 18, 2015 | Expired or cancelled: expired Mar 2025 | [385 07th St](https://www.permitgraph.org/a/3754/017) | [Clear Channel Outdoor](https://www.permitgraph.org/contractor/clear-channel-outdoor-821059) | clear channel outdoor inc the owner of general advertising sign located at 385-395 7th st (aka 1098 harrison st) will remove the current sign extensions "salesforce" at this location. ccd sign no 133… | $1,000 |
| [M523607](https://www.permitgraph.org/p/M523607) | Oct 3, 2014 | Never finaled: issued Oct 2014, no final | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) |  | street space & mta parking meter |  |
| [201406198851](https://www.permitgraph.org/p/201406198851) | Jun 19, 2014 | Expired or cancelled: expired Apr 2017 | [385 07th St](https://www.permitgraph.org/a/3754/017) | [Clear Channel Outdoor](https://www.permitgraph.org/contractor/clear-channel-outdoor-821059) | the owner of general advertising sign located at 385-395 07th street (aka 1098 harrison) will install a new sign extension 6'-0" x 36'-0" w. extension zone identified with two 6' h markers 36' apart.… | $2,000 |
| [201406198850](https://www.permitgraph.org/p/201406198850) | Jun 19, 2014 | Completed: final sign-off May 2015 | [385 07th St](https://www.permitgraph.org/a/3754/017) | [Clear Channel Outdoor](https://www.permitgraph.org/contractor/clear-channel-outdoor-821059) | clear channel outdoor inc the owner of gen advertising sign located at 385-395 7th st aka 1098 harrison will remove current sign extensionsttoyota" at this location cco sign no: 1331. no change to (e… | $1,500 |
| [201404223838](https://www.permitgraph.org/p/201404223838) | Apr 22, 2014 | Expired or cancelled: cancelled Dec 2015 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | remove illuminated sign from sign description on pa#201304013531: change to non-illuminated sign. n/a maher ordinance #155-13. |  |
| [201304013531](https://www.permitgraph.org/p/201304013531) | Apr 1, 2013 | Expired or cancelled: expired Apr 2017 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | erect a electric wall single faced direct new sign | $3,500 |
| [201303283323](https://www.permitgraph.org/p/201303283323) | Mar 28, 2013 | Expired or cancelled: expired Apr 2017 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Coulthard Identity Group Inc Dba Amcoe](https://www.permitgraph.org/contractor/coulthard-identity-group-inc-dba-amcoe-760842) | to erect electrical led blade illuminated sign. | $7,000 |
| [201303152284](https://www.permitgraph.org/p/201303152284) | Mar 15, 2013 | Expired or cancelled: expired Apr 2017 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Columbia Mechanical Contractors](https://www.permitgraph.org/contractor/columbia-mechanical-contractors-273358) | install remote fan panel & provide internal lined ductwork for cyclone projector. cyclone projector to be provided by others. provide 2 window louvers for the exhaust & make up air for the above syst… | $7,000 |
| [201303051558](https://www.permitgraph.org/p/201303051558) | Mar 5, 2013 | Completed: final sign-off Mar 2013 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Mark Latimer Associ. Dba: Coda Tech](https://www.permitgraph.org/contractor/mark-latimer-associ-dba-coda-tech-935420) | install projector screen and projector | $1,000 |
| [201212115895](https://www.permitgraph.org/p/201212115895) | Dec 11, 2012 | Expired or cancelled: expired Apr 2017 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) |  | for record purpose only for compliance with zoning administrator's letter of legitimization of office use dated 9/13/12 & pursuant to planning commission motion no. 18700 approvding an office allocat… |  |
| [201112160876](https://www.permitgraph.org/p/201112160876) | Dec 16, 2011 | Completed: final sign-off Feb 2012 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | restoration of extg bldg opening with storefront to match adjacent extg storefront on sherman street. revision to app#201108263324 | $13,000 |
| [201112150702](https://www.permitgraph.org/p/201112150702) | Dec 15, 2011 | Completed: final sign-off Jan 2012 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) | revision to 201109134434. added sprinklers under stadium seating and created as built drawings |  |
| [201110207271](https://www.permitgraph.org/p/201110207271) | Oct 20, 2011 | Completed: final sign-off Jan 2012 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Code Red Communications Inc](https://www.permitgraph.org/contractor/code-red-communications-inc-888979) | installation of hvac monutoring for new hvac supply uinits. ref pa# 2011.09.21.5165 for hvac permit. not part of fire alarm system, hvac monitoring, local alarm only | $5,670 |
| [201110126564](https://www.permitgraph.org/p/201110126564) | Oct 12, 2011 | Completed: final sign-off Feb 2012 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | revision to pa# 2011.08.26.3324. revised structural locations at roof for hvac equipment, additional struc at duct wall penetrations |  |
| [201109215165](https://www.permitgraph.org/p/201109215165) | Sep 21, 2011 | Completed: final sign-off Feb 2012 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Clinton Heating & A/C Inc](https://www.permitgraph.org/contractor/clinton-heating-a-c-inc-449414) | refer to arch pa# 2011-0826-3324-re-work (e) hvac system, add 5 heat pumps for conference rooms | $100,000 |
| [201109134434](https://www.permitgraph.org/p/201109134434) | Sep 13, 2011 | Completed: final sign-off Jan 2012 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) | fire sprinkler t.i. - add & relocate 63 sprinklers below new ceiling- upright heads to remain.. refer to pa #201108263324.new bracing and seismic calc's | $25,000 |
| [201108263324](https://www.permitgraph.org/p/201108263324) | Aug 26, 2011 | Completed: final sign-off Feb 2012 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | interior work only. minor demolition of non-bearing partitions, ceiling suspension grids & tiles, existing lighting, relocation, conduit/electrical service, break area millwork and sink. renovation w… | $1,200,000 |
| [201107019422](https://www.permitgraph.org/p/201107019422) | Jul 1, 2011 | Completed: final sign-off Jan 2012 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | selective demolition of cupboard (non-bearing) partitions, suspended ceilings, selective lighting, gypboard soffit, electrical conduit, millwork, ventilation fans (switched). space to remain vacant p… | $17,800 |
| [200706143966](https://www.permitgraph.org/p/200706143966) | Jun 14, 2007 | Completed: final sign-off Jul 2007 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Architectural Coatings](https://www.permitgraph.org/contractor/architectural-coatings-422211) | repair rear parapet wall concrete per lang engineering drawings repaid lee than 25% of roof at junction of roof and parapet. | $122,000 |
| [M23752](https://www.permitgraph.org/p/M23752) | May 22, 2003 | Never finaled: issued May 2003, no final | [385 07th St](https://www.permitgraph.org/a/3754/017) |  | street spacce |  |
| [M22689](https://www.permitgraph.org/p/M22689) | Jan 28, 2003 | Never finaled: issued Jan 2003, no final | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) |  | street space permit |  |
| [200010264183](https://www.permitgraph.org/p/200010264183) | Oct 26, 2000 | Expired or cancelled: expired Apr 2001 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) |  | double faced electric wall sign |  |
| [200006152796](https://www.permitgraph.org/p/200006152796) | Jun 15, 2000 | Completed: final sign-off Nov 2000 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | sign - electric, projecting, single faced. | $14,500 |
| [9923560](https://www.permitgraph.org/p/9923560) | Jan 31, 2000 | Expired or cancelled: expired Jan 2002 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) |  | tenant imprvmnt-new partitions,electrical & hvac | $500,000 |
| [9921058](https://www.permitgraph.org/p/9921058) | Jan 26, 2000 | Expired or cancelled: withdrawn Jan 2000 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) |  | tenant improvement wall door bathrooms | $50,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (7), [Bay Air Systems, Inc](https://www.permitgraph.org/contractor/bay-air-systems-inc-450929) (6), [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) (4), [Clear Channel Outdoor](https://www.permitgraph.org/contractor/clear-channel-outdoor-821059) (4), [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) (4), [Centric Construction Inc](https://www.permitgraph.org/contractor/centric-construction-inc-822465) (2), [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) (2), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) (2), [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) (2), [Architectural Coatings](https://www.permitgraph.org/contractor/architectural-coatings-422211), [Bigham Taylor Roofing Co](https://www.permitgraph.org/contractor/bigham-taylor-roofing-co-431631), [Blue Arc Electric](https://www.permitgraph.org/contractor/blue-arc-electric-830904), [Clinton Heating & A/C Inc](https://www.permitgraph.org/contractor/clinton-heating-a-c-inc-449414), [Code Red Communications Inc](https://www.permitgraph.org/contractor/code-red-communications-inc-888979), [Columbia Mechanical Contractors](https://www.permitgraph.org/contractor/columbia-mechanical-contractors-273358), [Coulthard Identity Group Inc Dba Amcoe](https://www.permitgraph.org/contractor/coulthard-identity-group-inc-dba-amcoe-760842), [Mark Latimer Associ. Dba: Coda Tech](https://www.permitgraph.org/contractor/mark-latimer-associ-dba-coda-tech-935420), [Rylko Builders Inc.](https://www.permitgraph.org/contractor/rylko-builders-inc-955155)
- Architects: [Vincent Kelly](https://www.permitgraph.org/professional/vincent-kelly-C12494) (3), [Joseph A. Remling](https://www.permitgraph.org/professional/joseph-a-remling-C34144) (2), [Albert Costa](https://www.permitgraph.org/professional/albert-costa-C25678), [John L Thiele](https://www.permitgraph.org/professional/john-l-thiele-C18141)
- Engineers: [Kylie Lo](https://www.permitgraph.org/professional/kylie-lo-E23357) (2), [Paul Kiley](https://www.permitgraph.org/professional/paul-kiley-E17869), [Real Protection](https://www.permitgraph.org/professional/real-protection-904767), [Vincent Kevin Kelly](https://www.permitgraph.org/professional/vincent-kevin-kelly-12494)
- Authorized agents: [Albert Costa](https://www.permitgraph.org/professional/albert-costa-C25678)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3754/017.
