# 928 Harrison St

Block 3753, lot 150. Page: https://www.permitgraph.org/a/3753/150

- City's use: Industrial
- Built: 1988
- Stories: 2
- Rooms: 3 bathrooms
- Building: 15,150 sq ft
- Lot: 14,000 sq ft
- Zoning: MUR
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

15 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202407257285](https://www.permitgraph.org/p/202407257285) | Jul 25, 2024 | Completed: final sign-off Oct 2024 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [Teracom Services Llc](https://www.permitgraph.org/contractor/teracom-services-llc-1051813) | demo of 2 side wall exhaust fans will be rmeoved from electrical room. motor controlled dampers will be removed from electrical rooms side wall louvers. install new 3 roof exhaust fans will be added… | $100,000 |
| [202310319819](https://www.permitgraph.org/p/202310319819) | Oct 31, 2023 | Completed: final sign-off Nov 2023 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | as built ref 202207158541. revised as built sow: updataed addresses. |  |
| [202302011168](https://www.permitgraph.org/p/202302011168) | Feb 1, 2023 | Completed: final sign-off Apr 2024 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | revision to bpa# 202106182812. minor mod to drive aisle in parking area & bollard layment @ chargers. 2 over current. protection devies added to main electrical room. |  |
| [202207219056](https://www.permitgraph.org/p/202207219056) | Jul 21, 2022 | Completed: final sign-off Apr 2024 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | rev 202106182812: foam protection added to(e) beams in equipment platform area. low headroom signs added to all (e) beam in equipment platform area/north access stairway to provide warning as profess… | $700 |
| [202207158541](https://www.permitgraph.org/p/202207158541) | Jul 15, 2022 | Completed: final sign-off Nov 2023 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | as built fire alarm system. ref ti #202204252888 |  |
| [202206216778](https://www.permitgraph.org/p/202206216778) | Jun 21, 2022 | Completed: final sign-off Nov 2023 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 1st fl: add 171. under mezzanine: add 22 sprinkler heads per t.i.. ref 202106182812 | $101,325 |
| [202204252888](https://www.permitgraph.org/p/202204252888) | Apr 25, 2022 | Completed: final sign-off Feb 2024 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | provide part & smarts only for an emergency panel replacement, & waterflow monitoring system. all conduct boxes, fittings, installation of all devices is provided by others. | $11,958 |
| [202108055907](https://www.permitgraph.org/p/202108055907) | Aug 5, 2021 | Completed: final sign-off Feb 2024 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [Signtech Electrical Advertising Inc.](https://www.permitgraph.org/contractor/signtech-electrical-advertising-inc-457406) | sign 3: install 1 illuminated double faced projecting sign. " electrify america" | $500 |
| [202108055904](https://www.permitgraph.org/p/202108055904) | Aug 5, 2021 | Completed: final sign-off Feb 2024 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [Signtech Electrical Advertising Inc.](https://www.permitgraph.org/contractor/signtech-electrical-advertising-inc-457406) | sign 1: install 1 illuminated single faced wall sign. "electrity america" | $7,000 |
| [202108055908](https://www.permitgraph.org/p/202108055908) | Aug 5, 2021 | Completed: final sign-off Nov 2023 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [Signtech Electrical Advertising Inc.](https://www.permitgraph.org/contractor/signtech-electrical-advertising-inc-457406) | sign 4: install 1 non-illuminated single faced wall sign. "exit only" | $1,500 |
| [202108055906](https://www.permitgraph.org/p/202108055906) | Aug 5, 2021 | Expired or cancelled: cancelled Mar 2024 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [Signtech Electrical Advertising Inc.](https://www.permitgraph.org/contractor/signtech-electrical-advertising-inc-457406) | sign 2: install 1 non-illuminated wall sign. "entrance" inside store. | $750 |
| [202108055910](https://www.permitgraph.org/p/202108055910) | Aug 5, 2021 | Completed: final sign-off Nov 2023 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [Signtech Electrical Advertising Inc.](https://www.permitgraph.org/contractor/signtech-electrical-advertising-inc-457406) | sign 6: install 1 non-illuminated single faced wall sign. "electrify america ev charging only" | $500 |
| [202108055909](https://www.permitgraph.org/p/202108055909) | Aug 5, 2021 | Completed: final sign-off Nov 2023 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [Signtech Electrical Advertising Inc.](https://www.permitgraph.org/contractor/signtech-electrical-advertising-inc-457406) | sign 5: install 1 non-illuminated single faced wall sign. "electrify america ev charging enter" | $500 |
| [202106182812](https://www.permitgraph.org/p/202106182812) | Jun 18, 2021 | Completed: final sign-off Apr 2024 | [928 Harrison St](https://www.permitgraph.org/a/3753/150) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | install: 2 utility transformers, 3 switch board assemblies, 10-350kw power unit, 20-173 kw dispensers to provide: ev charging stations, vehicle servie station services, restroom and louge facilites f… | $2,500,000 |
| [M32226](https://www.permitgraph.org/p/M32226) | Apr 27, 2005 | Never finaled: issued Apr 2005, no final | [928 Harrison St](https://www.permitgraph.org/a/3753/150) |  | sidewalk repair |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Signtech Electrical Advertising Inc.](https://www.permitgraph.org/contractor/signtech-electrical-advertising-inc-457406) (6), [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) (3), [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) (3), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967), [Teracom Services Llc](https://www.permitgraph.org/contractor/teracom-services-llc-1051813)
- Engineers: [Noel Z Herrera](https://www.permitgraph.org/professional/noel-z-herrera-C80849) (2), [Michael Miller](https://www.permitgraph.org/professional/michael-miller-M32503), [Noel Herrera](https://www.permitgraph.org/professional/noel-herrera-S6199)
- Authorized agents: [Sloane Brown](https://www.permitgraph.org/professional/sloane-brown-92)
- Designers: [H C I Systems Inc](https://www.permitgraph.org/professional/h-c-i-systems-inc-905493)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.