# 360 Spear St

Block 3745, lot 009. Page: https://www.permitgraph.org/a/3745/009

- City's use: Commercial Office
- Built: 1942
- Stories: 5
- Building: 150,000 sq ft
- Lot: 34,375 sq ft
- Zoning: RC4
- Construction type: S

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

159 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202603167639](https://www.permitgraph.org/p/202603167639) | Mar 16, 2026 | In progress: filed Mar 2026, not yet issued | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | install temp generator base tank alongside building adjacent to tapp access box. r/r 200 gallon day tank. | $200,000 |
| [202507171016](https://www.permitgraph.org/p/202507171016) | Jul 18, 2025 | In progress: issued Oct 2025 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | replace (e) 750 gpm, 80 psi fire pump with a new 750 gpm, 80 psi fire pump. | $96,000 |
| [202308164548](https://www.permitgraph.org/p/202308164548) | Aug 16, 2023 | Never finaled: issued Nov 2023, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | install 11 additional lift assisted bike racks. ref pa# 201812279204. e-bikes are not permitted to charge in bike room. |  |
| [202308013499](https://www.permitgraph.org/p/202308013499) | Aug 1, 2023 | Never finaled: filed Aug 2023, never issued | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) | revision to 202307263013 to obtain sffd stamp for assemble occupant load info for cafe, prep kitchen, a-3 spaces. administractive permit only. no change to scope of work approved under 202201246538 |  |
| [202307263013](https://www.permitgraph.org/p/202307263013) | Jul 26, 2023 | Completed: final sign-off Sep 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) | 3/f: document assembly occupancy load shown on 202201246538 only. no other changes to previosly approved scope. |  |
| [202304216245](https://www.permitgraph.org/p/202304216245) | Apr 21, 2023 | Completed: final sign-off Dec 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) | 5/f: electrical work, replacement of uninterrupted power source (ups) and addition of electrical panels/transformers on lvl 5. | $180,000 |
| [202303073191](https://www.permitgraph.org/p/202303073191) | Mar 7, 2023 | Never finaled: issued Apr 2023, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Icom Mechanical Inc.](https://www.permitgraph.org/contractor/icom-mechanical-inc-408622) | replacement of roof mounted 300 ton air cooled chiller and 2 secondary chilled water pumps | $1,036,840 |
| [202302131898](https://www.permitgraph.org/p/202302131898) | Feb 13, 2023 | Completed: final sign-off Feb 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) | as-built permit to pa#202210144364 |  |
| [202210144364](https://www.permitgraph.org/p/202210144364) | Oct 14, 2022 | Completed: final sign-off Jul 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) | as built permit to pa#202206226885 |  |
| [202210114111](https://www.permitgraph.org/p/202210114111) | Oct 11, 2022 | Completed: final sign-off Jul 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler as built drawings. ref pa#202205275176 & 202209021788 |  |
| [202209132365](https://www.permitgraph.org/p/202209132365) | Sep 13, 2022 | Completed: final sign-off Sep 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) | revise electrical for t.i. under pa# 202208100286. ref pa3 202206096006 & 202201246538 to install 2 800a enclosed breakers for supporting equipment on the 5th fl and install associated feeders frd fr… |  |
| [202209021788](https://www.permitgraph.org/p/202209021788) | Sep 2, 2022 | Completed: final sign-off Nov 2022 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | ref 202205275176 modify sprinkler head locations to accomodate new ceiling and partition layout for new office space on 3rd floor. total sprinklers in project; 92. revision install (3) fire hose valv… | $7,500 |
| [202208100286](https://www.permitgraph.org/p/202208100286) | Aug 10, 2022 | Completed: final sign-off Aug 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) | 3/f: revise island layout @ catering kitchen. ref bpa#202201246538 |  |
| [202206226885](https://www.permitgraph.org/p/202206226885) | Jun 22, 2022 | Completed: final sign-off Jul 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) | fire alarm system t.i., installation of booster power supply with sync module. 41 control relay for hvac shutdown, 1 monitoring module for kitechen hood release, 3 smoke detectors, 38 duct detectors… | $38,461 |
| [202206096006](https://www.permitgraph.org/p/202206096006) | Jun 9, 2022 | Completed: final sign-off Aug 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) | revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups… |  |
| [202205275176](https://www.permitgraph.org/p/202205275176) | May 27, 2022 | Completed: final sign-off Mar 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | modify sprinkler head locations to accommodate new ceiling and partition layout for new offices space on 3rd fl. total sprinklers 92 | $47,288 |
| [202205124140](https://www.permitgraph.org/p/202205124140) | May 12, 2022 | Completed: final sign-off Jul 2022 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) | duct detector add & relay for mau-10 roof. relay add for ahu-1 5th fl. | $10,160 |
| [202205063734](https://www.permitgraph.org/p/202205063734) | May 6, 2022 | Completed: final sign-off Jun 2022 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) | 1st & 2nd fl: fire as-build for pa# 202105130366. |  |
| [202204051638](https://www.permitgraph.org/p/202204051638) | Apr 5, 2022 | Completed: final sign-off Apr 2022 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | as built drawings ref pa #202108176522 |  |
| [202201246538](https://www.permitgraph.org/p/202201246538) | Jan 24, 2022 | Completed: final sign-off Sep 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) | 3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumb… | $5,000,000 |
| [202201206285](https://www.permitgraph.org/p/202201206285) | Jan 20, 2022 | Never finaled: issued Jan 2022, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Specialized Graphics Inc](https://www.permitgraph.org/contractor/specialized-graphics-inc-967185) | install 1 non-electric single faced wall sign "vitalant" | $1,100 |
| [202110070011](https://www.permitgraph.org/p/202110070011) | Oct 7, 2021 | Completed: final sign-off Nov 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Mcclure Electric Inc](https://www.permitgraph.org/contractor/mcclure-electric-inc-248877) | title 24 lighting only. reference # 202010297723 |  |
| [202108317484](https://www.permitgraph.org/p/202108317484) | Aug 31, 2021 | Completed: final sign-off Jan 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | work consists of demolition of extg concrete ramp and guard rail and installation of new concrete loading dock and guard rail. | $175,000 |
| [202108176522](https://www.permitgraph.org/p/202108176522) | Aug 17, 2021 | Completed: final sign-off Apr 2022 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | tenant improvement - sprinkler relocates: 197, sprinkler adds 45 | $150,000 |
| [202108096048](https://www.permitgraph.org/p/202108096048) | Aug 9, 2021 | Completed: final sign-off Sep 2022 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | mep for pa 2021 0112 2527 |  |
| [202108065944](https://www.permitgraph.org/p/202108065944) | Aug 6, 2021 | Completed: final sign-off Nov 2022 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | replacement of (e) fixed aluminum louver system with new aluminum storefront framing to match existing. new in-swinging doors at mechanical store front and relocation of (e) interior wall | $65,000 |
| [202105130366](https://www.permitgraph.org/p/202105130366) | May 13, 2021 | Completed: final sign-off May 2022 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) | small t.i. on the 1st & 2nd floors. 1 smoke, 5 duct, 2 amps, 1 power supply, 23 speakers, 56 speaker strobes. 6 strobes. |  |
| [202105049770](https://www.permitgraph.org/p/202105049770) | May 4, 2021 | Completed: final sign-off Jul 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) | as-built for permit 2021-0114-2731 |  |
| [202103116394](https://www.permitgraph.org/p/202103116394) | Mar 11, 2021 | Completed: final sign-off May 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) | the addition of 11 relays, 10 smoke, 1 duct detector, 8 notification devices. | $6,240 |
| [202102044077](https://www.permitgraph.org/p/202102044077) | Feb 4, 2021 | Completed: final sign-off May 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | fire only - #2020-0915-4216; add 19 uprights & relocate 2 pendents. remove (plug - off) 31 pendents on the 1st floor garage area. | $10,500 |
| [202101142731](https://www.permitgraph.org/p/202101142731) | Jan 14, 2021 | Completed: final sign-off Jun 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) | fire alarm t.i. for voice evac system replace all horn strobes w/speaker strobes replace initiating devices | $12,250 |
| [202101122527](https://www.permitgraph.org/p/202101122527) | Jan 12, 2021 | Completed: final sign-off Sep 2022 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | priority processing per ab-004. t.i. non-structural demo, new interior non-loading bearing partitions, new doors, and new ceilings. new elect,plumbing, mech work to be tie into existing building util… | $3,131,492 |
| [202101072277](https://www.permitgraph.org/p/202101072277) | Jan 7, 2021 | Completed: final sign-off Apr 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Bay City Mechanical Service Llc](https://www.permitgraph.org/contractor/bay-city-mechanical-service-llc-1035982) | installation of air spring isolators for 2 electrical transformers. | $100,000 |
| [202012030192](https://www.permitgraph.org/p/202012030192) | Dec 3, 2020 | Completed: final sign-off May 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | 4th fl: modifications to base building mechanical system at tenant space. | $175,000 |
| [202010297723](https://www.permitgraph.org/p/202010297723) | Oct 29, 2020 | Completed: final sign-off Nov 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | permit to memorialize planning commision motion 20588 authorizing the conversion of portions of internet service exchange use & accessory parking area on 1/f & south half of 2/f to laboratory use gre… |  |
| [202010267419](https://www.permitgraph.org/p/202010267419) | Oct 26, 2020 | Completed: final sign-off May 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) | fire alarm system for 4th floor. deferred permit from bpa 2020-0805-1183. | $20,766 |
| [202010267421](https://www.permitgraph.org/p/202010267421) | Oct 26, 2020 | Completed: final sign-off Jan 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | 4th floor fire alarm voice evacuation system. deferred permit from bpa 2020-0803-1183. | $50,000 |
| [202010227200](https://www.permitgraph.org/p/202010227200) | Oct 22, 2020 | Completed: final sign-off Nov 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | 4/f: work includes modifications to base building electrical and mechanical systems, new finishes and lighting in stairs, and implementation of base building utility sub metering, no work is proposed… | $75,000 |
| [202010166675](https://www.permitgraph.org/p/202010166675) | Oct 16, 2020 | Completed: final sign-off Dec 2020 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | revision to 2020-0820-2267. | $85,000 |
| [202010015673](https://www.permitgraph.org/p/202010015673) | Oct 1, 2020 | Expired or cancelled: withdrawn Dec 2020 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | revision to pa 202008051183. per aprvd minutes of sffd pre-app meeting and plan of action: reduce occupancy of 4th flr prior to voice alarm install. once speakers are provided throughout 4th flr, ten… |  |
| [202009154216](https://www.permitgraph.org/p/202009154216) | Sep 15, 2020 | Completed: final sign-off Nov 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | revision to pa 201907246806. work consists of future tenant shell space, construct portions of 1st & 2nd flrs. work incl (n) secondary entrance, demising walls, trash rm, upgrades to mech & electr. t… | $750,000 |
| [202009113918](https://www.permitgraph.org/p/202009113918) | Sep 11, 2020 | Completed: final sign-off May 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | 1st, 2nd & 4th fl - install 8 emon dmons on 3 floors to moniotr energy usage | $25,000 |
| [202008202267](https://www.permitgraph.org/p/202008202267) | Aug 20, 2020 | Completed: final sign-off Dec 2020 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | 4th flr: add/relocate 67 hard drop pendants in office, conference rooms and huddle rooms. add 20 upright for new full height wall. no seismic upgrade in area of work. 87 total heads. | $33,833 |
| [202008051183](https://www.permitgraph.org/p/202008051183) | Aug 5, 2020 | Completed: final sign-off Dec 2020 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | suite 400 on 4th fl ti: new non-structural partitions, lighting 7 finishes. fire alarm & fire sprinkler under separate permit. maher na | $3,678,903 |
| [202007069595](https://www.permitgraph.org/p/202007069595) | Jul 6, 2020 | Completed: final sign-off Nov 2020 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | revision to app#201812279189 to reflect installation of exterior gas meter enclosure following approved pg&e design. |  |
| [202003137046](https://www.permitgraph.org/p/202003137046) | Mar 13, 2020 | Completed: final sign-off May 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | administrative permit for pa #201812279204 & 201906264490, to confirm that 360 spear st is a "full sprinklered building" as defined by the san francisco building code, no work is proposed. |  |
| [202002255285](https://www.permitgraph.org/p/202002255285) | Feb 25, 2020 | Completed: final sign-off Apr 2020 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers: relocate 3 pendents on ground fl. ref ti #201908138662 | $1,500 |
| [M1187327](https://www.permitgraph.org/p/M1187327) | Jan 24, 2020 | Never finaled: issued Jan 2020, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M1152387](https://www.permitgraph.org/p/M1152387) | Oct 15, 2019 | Never finaled: issued Oct 2019, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M1129127](https://www.permitgraph.org/p/M1129127) | Aug 26, 2019 | Never finaled: issued Aug 2019, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [201908138662](https://www.permitgraph.org/p/201908138662) | Aug 13, 2019 | Completed: final sign-off Dec 2020 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | new panel board on roof to serve new rooftop mech equipment, new lighting on floor 1-5, new power signal on floor 1 | $150,000 |
| [201908078128](https://www.permitgraph.org/p/201908078128) | Aug 7, 2019 | Completed: final sign-off Dec 2020 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | hvac - mechanical improvements including new heating & cooling condensing units, makeup air furnace and exhaust fans. additions of new makeup and exhaust air risers, refrigrant piping riser, two fan… | $575,000 |
| [201908017551](https://www.permitgraph.org/p/201908017551) | Aug 1, 2019 | Completed: final sign-off Dec 2020 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) | new fire alarm system for core and shell building t.i. system to provide detection and shut down of core fsd's and restroom and common area notification. ref pa 201812279204 | $25,000 |
| [M1117187](https://www.permitgraph.org/p/M1117187) | Jul 30, 2019 | Never finaled: issued Jul 2019, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [201907246806](https://www.permitgraph.org/p/201907246806) | Jul 24, 2019 | Completed: final sign-off Nov 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | base building improvements on a portion of the ground floor as a revision to base building improvements on approved pa 2018-1212-8090 & 2018-1227-9204. remodeling of 2 restrooms, installation of (n)… | $500,000 |
| [M1101267](https://www.permitgraph.org/p/M1101267) | Jun 26, 2019 | Never finaled: issued Jun 2019, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [201906264490](https://www.permitgraph.org/p/201906264490) | Jun 26, 2019 | Completed: final sign-off Nov 2019 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | fire sprinklers, flr 1-4. 1st flr -relocate 26 and plug 8. 2nd flr -add 19, relocate 15. 3rd flr -add 11, relocate 14. 4th flr -add 11, relocate 14. | $37,050 |
| [M1098427](https://www.permitgraph.org/p/M1098427) | Jun 20, 2019 | Never finaled: issued Jun 2019, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M1089347](https://www.permitgraph.org/p/M1089347) | Jun 3, 2019 | Never finaled: issued Jun 2019, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M1085667](https://www.permitgraph.org/p/M1085667) | May 24, 2019 | Never finaled: issued May 2019, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M1080187](https://www.permitgraph.org/p/M1080187) | May 15, 2019 | Never finaled: issued May 2019, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M1064847](https://www.permitgraph.org/p/M1064847) | Apr 11, 2019 | Never finaled: issued Apr 2019, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M1036007](https://www.permitgraph.org/p/M1036007) | Feb 6, 2019 | Never finaled: issued Feb 2019, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space only |  |
| [201812279204](https://www.permitgraph.org/p/201812279204) | Dec 27, 2018 | Completed: final sign-off Nov 2021 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | floors 1-4: core & shell work only; ti under separate permit. removal of non-structural partitions, bike parking,showers and lockers serving the office use. n/a for maher | $1,500,000 |
| [201812279189](https://www.permitgraph.org/p/201812279189) | Dec 27, 2018 | Completed: final sign-off Aug 2020 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | replace existing storefront entrance and garage doors in approx 35% of the ground floor openings along spear street. install new canopy meeting sf planning code section 136.1(c)(2)(c). | $500,000 |
| [201812128090](https://www.permitgraph.org/p/201812128090) | Dec 12, 2018 | Completed: final sign-off May 2020 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568), [Fisher Development Inc](https://www.permitgraph.org/contractor/fisher-development-inc-271781) | cut new window openings in the existing perimeter shearwalls and strengthening the piers and spandrels around these openings by installation of carbon fiber wrap. | $500,000 |
| [201812128082](https://www.permitgraph.org/p/201812128082) | Dec 12, 2018 | Completed: final sign-off Aug 2019 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Fisher Development Inc](https://www.permitgraph.org/contractor/fisher-development-inc-271781) | replacement of metal panels in e window frames with safety glass to match adjacent glass panels in color and overall appearance. | $250,000 |
| [201810233916](https://www.permitgraph.org/p/201810233916) | Oct 23, 2018 | Completed: final sign-off Apr 2019 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Fisher Development Inc](https://www.permitgraph.org/contractor/fisher-development-inc-271781) | selective non structural demo on floors 1-4. removal of (e) non operational mep systems, partitions, fixtures & finishes, no exterior demo is proposed maher na | $5,000 |
| [201809119777](https://www.permitgraph.org/p/201809119777) | Sep 11, 2018 | Never finaled: issued Sep 2018, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | admin permit to memorialize pc motions 19515 and 19516,authorizing 49,992 gsf of office use to be flexibly configured at 3rd/4th fl.land use occup apprvd as internet exchange for reminder of bldg rem… |  |
| [201809059137](https://www.permitgraph.org/p/201809059137) | Sep 5, 2018 | Never finaled: issued Sep 2018, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Unger Construction Co](https://www.permitgraph.org/contractor/unger-construction-co-301690) | re-route existing chilled water piping from 5th fl to 1st fl. move & or relocate electrical cabeling & generator annuciators. work include disconnect of several electrical panels. maher na | $199,000 |
| [201702099098](https://www.permitgraph.org/p/201702099098) | Feb 9, 2017 | Never finaled: filed Feb 2017, never issued | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | core drill form 5th floor to penthouse/install 4"emt/install j-box at 4 new locations; provide 2 hour fire sealant at all penetrations; install 4 gps antennas on penthouse via unistrut/install 4 new… | $5,000 |
| [201606089355](https://www.permitgraph.org/p/201606089355) | Jun 8, 2016 | Completed: final sign-off Apr 2017 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [A C Logix Incorporated](https://www.permitgraph.org/contractor/a-c-logix-incorporated-814563) | replace (1) york air cooled chiller due to age and degradation scope of work restricted to roof only. | $107,680 |
| [201508275436](https://www.permitgraph.org/p/201508275436) | Aug 27, 2015 | Completed: final sign-off Sep 2015 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Orr Protection Systems Inc](https://www.permitgraph.org/contractor/orr-protection-systems-inc-952133) | relocate (1) existing horn/strobe, t.i. pa# 201506169112. n/a ordinance #155-13 | $2,000 |
| [M601227](https://www.permitgraph.org/p/M601227) | Jul 8, 2015 | Never finaled: issued Jul 2015, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [201506169112](https://www.permitgraph.org/p/201506169112) | Jun 16, 2015 | Completed: final sign-off Sep 2015 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Unger Construction Co](https://www.permitgraph.org/contractor/unger-construction-co-301690) | rev. to 201503312335 - install new door at 5th floor, add elevated platforms, adjust elevator stops at 3rd & 4th floor. fire alarm separte permit to move devices n/a for maher. | $80,000 |
| [M595747](https://www.permitgraph.org/p/M595747) | Jun 16, 2015 | Never finaled: issued Jun 2015, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space permit |  |
| [201503312335](https://www.permitgraph.org/p/201503312335) | Mar 31, 2015 | Completed: final sign-off Sep 2015 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Unger Construction Co](https://www.permitgraph.org/contractor/unger-construction-co-301690) | this is a permit for demo of t.i.space only.360 spear street is currently a verizon wireless office and server storage facility.unger will be safeoff bldg power, removing lighting,walls,raised floors… | $495,000 |
| [M220326](https://www.permitgraph.org/p/M220326) | Sep 10, 2010 | Never finaled: issued Sep 2010, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M203846](https://www.permitgraph.org/p/M203846) | May 25, 2010 | Never finaled: issued May 2010, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M197951](https://www.permitgraph.org/p/M197951) | Apr 16, 2010 | Never finaled: issued Apr 2010, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M193113](https://www.permitgraph.org/p/M193113) | Mar 15, 2010 | Never finaled: issued Mar 2010, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M190905](https://www.permitgraph.org/p/M190905) | Feb 16, 2010 | Never finaled: issued Feb 2010, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M188647](https://www.permitgraph.org/p/M188647) | Jan 21, 2010 | Never finaled: issued Jan 2010, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M186649](https://www.permitgraph.org/p/M186649) | Dec 18, 2009 | Never finaled: issued Dec 2009, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space permit |  |
| [M184266](https://www.permitgraph.org/p/M184266) | Nov 16, 2009 | Never finaled: issued Nov 2009, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [M182265](https://www.permitgraph.org/p/M182265) | Oct 16, 2009 | Never finaled: issued Oct 2009, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space only |  |
| [M181150](https://www.permitgraph.org/p/M181150) | Oct 1, 2009 | Never finaled: issued Oct 2009, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space permit |  |
| [200909166974](https://www.permitgraph.org/p/200909166974) | Sep 16, 2009 | Completed: final sign-off Mar 2010 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | volunteer repair of cracks in ground bearing slab. install small grade beam to surround switch gear pad | $20,000 |
| [200909156836](https://www.permitgraph.org/p/200909156836) | Sep 15, 2009 | Completed: final sign-off Jun 2010 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Gettler-Ryan Inc](https://www.permitgraph.org/contractor/gettler-ryan-inc-220793) | remove (e)400 gal generator base fuel tank from roof,replace w/ (n) 200 gal.dw steel day tank, dw piping from day tank to (e)generator within (e) 15ft high metal enclosure. (n)veeder root tls-350 tan… | $100,000 |
| [200704279877](https://www.permitgraph.org/p/200704279877) | Apr 27, 2007 | Completed: final sign-off Jun 2007 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | colo serve- oti-1 2nd floor, el, ls, me, sp | $20,000 |
| [200604280188](https://www.permitgraph.org/p/200604280188) | Apr 28, 2006 | Expired or cancelled: expired May 2007 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | remove door, demo (e) office partitions, install (n) raised floor to match (e), relocate electrical/data signage as required | $18,000 |
| [200506104765](https://www.permitgraph.org/p/200506104765) | Jun 10, 2005 | Completed: final sign-off Jan 2007 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) |  | provide soil nail, tieback per plan. | $25,000 |
| [200505122306](https://www.permitgraph.org/p/200505122306) | May 12, 2005 | Completed: final sign-off May 2005 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | renew pa#2004/03/17/8836, 2004/03/17/8831 for final inspection |  |
| [200505122299](https://www.permitgraph.org/p/200505122299) | May 12, 2005 | Completed: final sign-off May 2005 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | renew pa#2003/12/04/1626, 2004/02/12/6228, 2003/12/22/2766 for final inspection |  |
| [200503238155](https://www.permitgraph.org/p/200503238155) | Mar 23, 2005 | Completed: final sign-off May 2005 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Capitol Electric Const](https://www.permitgraph.org/contractor/capitol-electric-const-391802) | fire alarm device installation on 2rd fl (eleven). | $7,500 |
| [200403178831](https://www.permitgraph.org/p/200403178831) | Mar 17, 2004 | Completed: final sign-off May 2005 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | oti-2 2nd floor el me | $20,000 |
| [200403178836](https://www.permitgraph.org/p/200403178836) | Mar 17, 2004 | Completed: final sign-off May 2005 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | oti-2 2nd floor el me | $22,000 |
| [200402126228](https://www.permitgraph.org/p/200402126228) | Feb 12, 2004 | Expired or cancelled: expired Jan 2005 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Mcm & Associates Inc.](https://www.permitgraph.org/contractor/mcm-associates-inc-542334) | renovations to existing sprinkler system for tenant improvement, relocate 2 sprinklers, add 1 sprink | $2,360 |
| [200402065805](https://www.permitgraph.org/p/200402065805) | Feb 6, 2004 | Expired or cancelled: cancelled Jul 2005 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | furnish and test fire alarm system | $16,477 |
| [200312222766](https://www.permitgraph.org/p/200312222766) | Dec 22, 2003 | Never finaled: issued Jan 2004, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | oti-1 2nd fl. el, me, ls, sp | $78,000 |
| [200312192668](https://www.permitgraph.org/p/200312192668) | Dec 19, 2003 | Never finaled: issued Dec 2003, no final | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Mcm & Associates Inc.](https://www.permitgraph.org/contractor/mcm-associates-inc-542334) | renovating to existing sprinkler system due to tenant improvements, relocate 8 sprinklers (for 2nd f | $2,250 |
| [200312041626](https://www.permitgraph.org/p/200312041626) | Dec 4, 2003 | Expired or cancelled: expired Jan 2005 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | oti-1 2nd floor, el, me, ls, sp | $28,000 |
| [200310218105](https://www.permitgraph.org/p/200310218105) | Oct 21, 2003 | Expired or cancelled: expired Jan 2005 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [California Suppresion Dba Calif. Protect](https://www.permitgraph.org/contractor/california-suppresion-dba-calif-protect-327196) | currently 10(10) panels are networked together remove all panels from network of the 10 panels the | $36,840 |
| [200309255788](https://www.permitgraph.org/p/200309255788) | Sep 25, 2003 | Completed: final sign-off Mar 2004 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Unger Construction Co](https://www.permitgraph.org/contractor/unger-construction-co-301690) | rerouting of elec/plumbing/piping to isolate 2/f. (currently mci space to be turned over to bldg.) | $313,000 |
| [200203141426](https://www.permitgraph.org/p/200203141426) | Mar 14, 2002 | Completed: final sign-off Jun 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Aeco Systems, Inc](https://www.permitgraph.org/contractor/aeco-systems-inc-701510) | add one strobe light in new conf rm, relocate existing horn/strobe, reduce candela rating, 1st flr o | $1,800 |
| [200203121206](https://www.permitgraph.org/p/200203121206) | Mar 12, 2002 | Completed: final sign-off Jun 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Design Build Develp. Stru](https://www.permitgraph.org/contractor/design-build-develp-stru-575985) | oti-2, 1st flr, el,me,sp | $8,000 |
| [200203040517](https://www.permitgraph.org/p/200203040517) | Mar 4, 2002 | Completed: final sign-off Jun 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | oti-2 1st floor sp | $1,000 |
| [200202280307](https://www.permitgraph.org/p/200202280307) | Feb 28, 2002 | Completed: final sign-off Jun 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Design Build Develp. Stru](https://www.permitgraph.org/contractor/design-build-develp-stru-575985) | oti-1 1st floor el me ls sp | $40,000 |
| [200202149300](https://www.permitgraph.org/p/200202149300) | Feb 14, 2002 | Completed: final sign-off May 2002 | [350 Spear St](https://www.permitgraph.org/a/3745/009) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | renew 2000/10/24/3901,chg from 100 harrison. chg 31 storiesto 5, 1 bsmt to 0 bsmt.add telecom equip. | $100 |
| [200202149302](https://www.permitgraph.org/p/200202149302) | Feb 14, 2002 | Completed: final sign-off May 2002 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | renew appl#200011155736 add telecom equip | $100 |
| [200202149301](https://www.permitgraph.org/p/200202149301) | Feb 14, 2002 | Expired or cancelled: expired Jun 2002 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | renew for final inspection #200003013222,200008087251 change construction type from 5 to 1 | $100 |
| [200202149299](https://www.permitgraph.org/p/200202149299) | Feb 14, 2002 | Completed: final sign-off May 2002 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | renew appl#200006011499, 200009130345 & 200102232803 for final inspection, add telcom equip | $100 |
| [200202149298](https://www.permitgraph.org/p/200202149298) | Feb 14, 2002 | Completed: final sign-off May 2002 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | renew for final inspection of pa#200007064444 & 200009190891. add telecomm. equip to bldg. descripti | $100 |
| [200112265896](https://www.permitgraph.org/p/200112265896) | Dec 26, 2001 | Completed: final sign-off Mar 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Aeco Systems, Inc](https://www.permitgraph.org/contractor/aeco-systems-inc-701510) | modification to sequence of operations per instr. of fire insp. (work on 1st flr only) | $100 |
| [M17366](https://www.permitgraph.org/p/M17366) | Oct 9, 2001 | Expired or cancelled: expired Oct 2002 | [350 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space permit |  |
| [200108276949](https://www.permitgraph.org/p/200108276949) | Aug 27, 2001 | Expired or cancelled: expired Nov 2003 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | add 5 somke detectors an 1 uv/1r detector to (e) fun2000 detection system @ at&t on 2nd fl | $14,800 |
| [200108025175](https://www.permitgraph.org/p/200108025175) | Aug 2, 2001 | Expired or cancelled: cancelled Sep 2007 | [350 Spear St](https://www.permitgraph.org/a/3745/009) |  | construction of 4 residewntial units on a small portion of an existing building roof | $304,000 |
| [200107063099](https://www.permitgraph.org/p/200107063099) | Jul 6, 2001 | Completed: final sign-off Mar 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | new preaction fire sprinkler system 1/f t/i exposed const sprinkler plan only under this @ 1/f | $15,000 |
| [200107053002](https://www.permitgraph.org/p/200107053002) | Jul 5, 2001 | Completed: final sign-off Mar 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Aeco Systems, Inc](https://www.permitgraph.org/contractor/aeco-systems-inc-701510) | new facp to provide input to pre-action system(f.b.o.)new panel interface into bldg wide facp | $20,000 |
| [200106161720](https://www.permitgraph.org/p/200106161720) | Jun 16, 2001 | Completed: final sign-off Jun 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | install battery archit under app #200105118901 |  |
| [M16355](https://www.permitgraph.org/p/M16355) | Jun 7, 2001 | Expired or cancelled: expired Jun 2002 | [350 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [200106050758](https://www.permitgraph.org/p/200106050758) | Jun 5, 2001 | Expired or cancelled: cancelled Aug 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Bay City Mechanical Inc](https://www.permitgraph.org/contractor/bay-city-mechanical-inc-645126) | oti-2 2nd floor (mech, sp) | $22,000 |
| [200105310306](https://www.permitgraph.org/p/200105310306) | May 31, 2001 | Completed: final sign-off Jun 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | mechanical electrical only install of generator and batteries under separate permit | $50,000 |
| [200105310309](https://www.permitgraph.org/p/200105310309) | May 31, 2001 | Completed: final sign-off Jun 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | install generator | $75,000 |
| [200105118901](https://www.permitgraph.org/p/200105118901) | May 11, 2001 | Completed: final sign-off Jun 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | provide equipment for ground equipment rm which include mech & electrical | $250,000 |
| [M16149](https://www.permitgraph.org/p/M16149) | May 8, 2001 | Expired or cancelled: expired Sep 2001 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | street space |  |
| [200104207368](https://www.permitgraph.org/p/200104207368) | Apr 20, 2001 | Expired or cancelled: expired Nov 2003 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | add new airhandler units w/a-1 (alarm input module) shown at each for monitoring 3rd party duct dete | $400 |
| [200103285400](https://www.permitgraph.org/p/200103285400) | Mar 28, 2001 | Expired or cancelled: expired Nov 2003 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Howard S Wright Construction Co.](https://www.permitgraph.org/contractor/howard-s-wright-construction-co-668575) | oti-1 2nd flr- el,me,ls,sp, | $19,014 |
| [200103194545](https://www.permitgraph.org/p/200103194545) | Mar 19, 2001 | Completed: final sign-off Mar 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | provide tenant improvement per plans for cooling systems only sep for mech sym battery rm & generato | $200,000 |
| [200102232803](https://www.permitgraph.org/p/200102232803) | Feb 23, 2001 | Expired or cancelled: expired May 2002 | [350 Spear St](https://www.permitgraph.org/a/3745/009) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | deleting duct over battaries in suite 200 that was permitted under p.a#200009130345 |  |
| [200102142071](https://www.permitgraph.org/p/200102142071) | Feb 14, 2001 | Expired or cancelled: expired May 2002 | [350 Spear St](https://www.permitgraph.org/a/3745/009) |  | provide mechanical systems in battery room |  |
| [200012127758](https://www.permitgraph.org/p/200012127758) | Dec 12, 2000 | Expired or cancelled: cancelled Aug 2001 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Security Technologies Group Inc.](https://www.permitgraph.org/contractor/security-technologies-group-inc-750719) | installation of cctv surveillance, access control system, and alarm system | $100,000 |
| [200011155736](https://www.permitgraph.org/p/200011155736) | Nov 15, 2000 | Expired or cancelled: expired May 2002 | [350 Spear St](https://www.permitgraph.org/a/3745/009) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | running fuel lines from roof to generator under separate permit-no increase in space | $10,000 |
| [200010243901](https://www.permitgraph.org/p/200010243901) | Oct 24, 2000 | Expired or cancelled: expired May 2002 | [350 Spear St](https://www.permitgraph.org/a/3745/009) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revise showing installation of only 1 4000 gallon fuel tank in lieu of two installation |  |
| [200010173172](https://www.permitgraph.org/p/200010173172) | Oct 17, 2000 | Expired or cancelled: withdrawn Aug 2001 | [350 Spear St](https://www.permitgraph.org/a/3745/009) |  | revision to app #200008087251 include ventilation sym of the battery rm and hydrogen sensor monitori |  |
| [200009261520](https://www.permitgraph.org/p/200009261520) | Sep 26, 2000 | Completed: final sign-off Dec 2000 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) |  | revise app #200008107480 to reflect as built |  |
| [200009190891](https://www.permitgraph.org/p/200009190891) | Sep 19, 2000 | Expired or cancelled: expired May 2002 | [350 Spear St](https://www.permitgraph.org/a/3745/009) |  | new beam for general support |  |
| [200009130345](https://www.permitgraph.org/p/200009130345) | Sep 13, 2000 | Expired or cancelled: expired May 2002 | [350 Spear St](https://www.permitgraph.org/a/3745/009) |  | tenant improvement battery room remainder of mep on app #20008087251 |  |
| [200009059658](https://www.permitgraph.org/p/200009059658) | Sep 5, 2000 | Expired or cancelled: expired Aug 2003 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) | addition of power distribution units to existing facility. this is all electrical scope of work yet | $100,000 |
| [200008309321](https://www.permitgraph.org/p/200008309321) | Aug 30, 2000 | Completed: final sign-off Jan 2001 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | revison to 2000/01/15/220 struct calcs/details for unistru and cable ladder at floors 1-5 |  |
| [200008198326](https://www.permitgraph.org/p/200008198326) | Aug 19, 2000 | Completed: final sign-off Dec 2000 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) |  | provide mechanical per plans |  |
| [200008168062](https://www.permitgraph.org/p/200008168062) | Aug 16, 2000 | Expired or cancelled: expired Nov 2003 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | provide one smoke detection system on the 2nd fl | $55,054 |
| [200008107480](https://www.permitgraph.org/p/200008107480) | Aug 10, 2000 | Completed: final sign-off Dec 2000 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) |  | revise app #200007316475 record as built condition |  |
| [200008087251](https://www.permitgraph.org/p/200008087251) | Aug 8, 2000 | Expired or cancelled: expired Oct 2001 | [350 Spear St](https://www.permitgraph.org/a/3745/009) |  | mech elect and plumbingfor t/idone under app #200003013222 | $280,000 |
| [200007316475](https://www.permitgraph.org/p/200007316475) | Jul 31, 2000 | Completed: final sign-off Dec 2000 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) |  | record as built for wrk done under app #9916374s4 | $500 |
| [200007276236](https://www.permitgraph.org/p/200007276236) | Jul 27, 2000 | Completed: final sign-off Dec 2000 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) |  | record details as built related to app #9916374/s2 |  |
| [200007276242](https://www.permitgraph.org/p/200007276242) | Jul 27, 2000 | Completed: final sign-off Jan 2001 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) |  | revise to app #9916374s separate approved exterior facade fr app #9916374s |  |
| [200007276245](https://www.permitgraph.org/p/200007276245) | Jul 27, 2000 | Completed: final sign-off Dec 2000 | [100 Harrison St](https://www.permitgraph.org/a/3745/009) |  | record detail and corrections of work approved by app #9919299 |  |
| [200007266216](https://www.permitgraph.org/p/200007266216) | Jul 26, 2000 | Completed: final sign-off Jan 2001 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | revision to pa#9924876 |  |
| [200007266220](https://www.permitgraph.org/p/200007266220) | Jul 26, 2000 | Completed: final sign-off Jan 2001 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Cosco Fire Protection Inc.](https://www.permitgraph.org/contractor/cosco-fire-protection-inc-577621) | installation of new fire sprkler system at hvac on (e) bldng (roof) | $4,811 |
| [200007064444](https://www.permitgraph.org/p/200007064444) | Jul 6, 2000 | Expired or cancelled: expired May 2002 | [350 Spear St](https://www.permitgraph.org/a/3745/009) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | structural framing work per app #9914068 | $35,000 |
| [200006082136](https://www.permitgraph.org/p/200006082136) | Jun 8, 2000 | Completed: final sign-off Jan 2001 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) | amendtoappln#200002031017&200003245295newmatrix for system operation |  |
| [200006011499](https://www.permitgraph.org/p/200006011499) | Jun 1, 2000 | Expired or cancelled: expired May 2002 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | fire sprinkler work to be performed. | $9,000 |
| [200003245295](https://www.permitgraph.org/p/200003245295) | Mar 24, 2000 | Completed: final sign-off Jan 2001 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | preaction detection system | $54,800 |
| [200003013222](https://www.permitgraph.org/p/200003013222) | Mar 1, 2000 | Expired or cancelled: expired Oct 2003 | [350 Spear St](https://www.permitgraph.org/a/3745/009) |  | tenant improvements | $500,000 |
| [200002031017](https://www.permitgraph.org/p/200002031017) | Feb 3, 2000 | Completed: final sign-off Jan 2001 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | fn2000 pre-action detection system | $54,800 |
| [20000119451](https://www.permitgraph.org/p/20000119451) | Jan 19, 2000 | Completed: final sign-off Jan 2001 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) | battery supports | $5,000 |
| [20000118241](https://www.permitgraph.org/p/20000118241) | Jan 18, 2000 | Completed: final sign-off Jan 2001 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | fire protection revise 2000/0115/220 |  |
| [20000115220](https://www.permitgraph.org/p/20000115220) | Jan 15, 2000 | Completed: final sign-off Jan 2001 | [360 Spear St](https://www.permitgraph.org/a/3745/009) |  | t/i new partitions new raised floor doors electric hvac plumb. fire alarm fuel storage rms fire spri | $7,500,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) (17), [United Systems Fire And Security Llc](https://www.permitgraph.org/contractor/united-systems-fire-and-security-llc-1048358) (11), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (10), [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) (7), [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) (5), [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) (5), [Unger Construction Co](https://www.permitgraph.org/contractor/unger-construction-co-301690) (4), [Aeco Systems, Inc](https://www.permitgraph.org/contractor/aeco-systems-inc-701510) (3), [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) (3), [Fisher Development Inc](https://www.permitgraph.org/contractor/fisher-development-inc-271781) (3), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (3), [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) (3), [Design Build Develp. Stru](https://www.permitgraph.org/contractor/design-build-develp-stru-575985) (2), [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) (2), [Mcm & Associates Inc.](https://www.permitgraph.org/contractor/mcm-associates-inc-542334) (2), [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) (2), [A C Logix Incorporated](https://www.permitgraph.org/contractor/a-c-logix-incorporated-814563), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967), [Bay City Mechanical Inc](https://www.permitgraph.org/contractor/bay-city-mechanical-inc-645126), [Bay City Mechanical Service Llc](https://www.permitgraph.org/contractor/bay-city-mechanical-service-llc-1035982), [California Suppresion Dba Calif. Protect](https://www.permitgraph.org/contractor/california-suppresion-dba-calif-protect-327196), [Capitol Electric Const](https://www.permitgraph.org/contractor/capitol-electric-const-391802), [Cosco Fire Protection Inc.](https://www.permitgraph.org/contractor/cosco-fire-protection-inc-577621), [Gettler-Ryan Inc](https://www.permitgraph.org/contractor/gettler-ryan-inc-220793), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198), [Howard S Wright Construction Co.](https://www.permitgraph.org/contractor/howard-s-wright-construction-co-668575), [Icom Mechanical Inc.](https://www.permitgraph.org/contractor/icom-mechanical-inc-408622), [Mcclure Electric Inc](https://www.permitgraph.org/contractor/mcclure-electric-inc-248877), [Orr Protection Systems Inc](https://www.permitgraph.org/contractor/orr-protection-systems-inc-952133), [Security Technologies Group Inc.](https://www.permitgraph.org/contractor/security-technologies-group-inc-750719), [Specialized Graphics Inc](https://www.permitgraph.org/contractor/specialized-graphics-inc-967185), [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217)
- Architects: [Charles Bloszies](https://www.permitgraph.org/professional/charles-bloszies-C15414) (14), [Bert Deviterbo](https://www.permitgraph.org/professional/bert-deviterbo-C35090) (6), [Bruce F. Unger](https://www.permitgraph.org/professional/bruce-f-unger-C15804) (2), [Lauren Jordan](https://www.permitgraph.org/professional/lauren-jordan-C36938) (2), [Dan Huntsman](https://www.permitgraph.org/professional/dan-huntsman-C9255), [Gary Semling](https://www.permitgraph.org/professional/gary-semling-C21541), [John W. Johnson](https://www.permitgraph.org/professional/john-w-johnson-C13289), [Stanley H Lew](https://www.permitgraph.org/professional/stanley-h-lew-C29609)
- Engineers: [Gladys Yang](https://www.permitgraph.org/professional/gladys-yang-M35864) (2), [Ronald M Blue](https://www.permitgraph.org/professional/ronald-m-blue-23440) (2), [Blake Dilsworth](https://www.permitgraph.org/professional/blake-dilsworth-S3929), [Brian Featherston](https://www.permitgraph.org/professional/brian-featherston-M32323), [Dennis P.S. Cheung](https://www.permitgraph.org/professional/dennis-p-s-cheung-9279), [Ehab H Omar](https://www.permitgraph.org/professional/ehab-h-omar-M36278), [Galway O'mahony](https://www.permitgraph.org/professional/galway-o-mahony-18393), [Gummadi Dhama Reddy](https://www.permitgraph.org/professional/gummadi-dhama-reddy-29627), [Joon Suk Choi](https://www.permitgraph.org/professional/joon-suk-choi-E24039), [Kevin Kinoshita](https://www.permitgraph.org/professional/kevin-kinoshita-E20067), [Prabhjeet Grewal](https://www.permitgraph.org/professional/prabhjeet-grewal-E15692), [Ronald Laurence](https://www.permitgraph.org/professional/ronald-laurence-34127), [Stephen Shafeer](https://www.permitgraph.org/professional/stephen-shafeer-E21097)
- Authorized agents: [Doris Duong](https://www.permitgraph.org/professional/doris-duong-248877), [Patrick Quach](https://www.permitgraph.org/professional/patrick-quach-1048358)
- Designers: [Patrick Quach](https://www.permitgraph.org/professional/patrick-quach-1048358) (2), [Terrence Olson](https://www.permitgraph.org/professional/terrence-olson-777717)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3745/009.