# 211 Main St

Block 3740, lot 033. Page: https://www.permitgraph.org/a/3740/033

- City's use: Commercial Office
- Built: 1973
- Stories: 17
- Units: 1
- Rooms: 38 bathrooms
- Building: 417,226 sq ft
- Lot: 31,258 sq ft
- Zoning: C3OSD
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

The 200 most recent permits filed for this property.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202111172631](https://www.permitgraph.org/p/202111172631) | Nov 17, 2021 | Completed: final sign-off Jan 2022 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 9/f: fire life safety: as built to permit 202009033424 to reflect existing field conditions. |  |
| [202109138259](https://www.permitgraph.org/p/202109138259) | Sep 13, 2021 | Completed: final sign-off Nov 2021 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | to obtain final inspection for work approved under permit application 201801188946. all work is complete. | $9,000 |
| [202109077828](https://www.permitgraph.org/p/202109077828) | Sep 7, 2021 | Completed: final sign-off Nov 2021 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | basement/ground floor: fire life safety: install 2 ceiling mount speaker strobes. relocate 1 wall mount speaker strobe. | $1,320 |
| [202101213041](https://www.permitgraph.org/p/202101213041) | Jan 21, 2021 | Completed: final sign-off Feb 2021 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire life safety: as-built in reference to fa permit # 2020-1221-1481. remove from scope of work the installation of (2) control relays per inspector's request. both control relays are existing. | $1,320 |
| [202012211481](https://www.permitgraph.org/p/202012211481) | Dec 21, 2020 | Completed: final sign-off Aug 2021 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire life safety: install (5) ceiling mount speaker strobes, (2) control relays. reference #: 2020-0926-5155 | $4,620 |
| [202010307895](https://www.permitgraph.org/p/202010307895) | Oct 30, 2020 | Never finaled: filed Oct 2020, never issued | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | addition of bike parking & enclosure in exterior breezeway. the breezeway is monitored by on site security 24 hrs/day. pot drawings from approved pa# 202007099861. | $70,000 |
| [202009265155](https://www.permitgraph.org/p/202009265155) | Sep 26, 2020 | Completed: final sign-off Mar 2021 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 16/f: t.i.: non-structural partitions, millwork, finishes, lighting & associated mep. ada upgrades to restrooms. maher n/a. | $2,597,000 |
| [202009265089](https://www.permitgraph.org/p/202009265089) | Sep 26, 2020 | Completed: final sign-off Dec 2020 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire life safety: install (1) control panel, (2) power supplies, (1) expansion switch, (2) call stations, (2) monitor modules, (1) dual monitor module. ref bpa#202006028060 | $5,940 |
| [202009204581](https://www.permitgraph.org/p/202009204581) | Sep 20, 2020 | Completed: final sign-off Oct 2020 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 9/f: add 7, relocate 43, plug 2 sprinklers to conform with the new wlal/ceiling layout of t.i. pa202006028060. maher n/a. | $13,350 |
| [202009033424](https://www.permitgraph.org/p/202009033424) | Sep 3, 2020 | Completed: final sign-off Jan 2022 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire life safety: install 14 ceiling mount speaker strobes, 1 smoke detector with base, 2 duct detectors, 3 control relays. ref app#202006028060 | $13,200 |
| [202008292913](https://www.permitgraph.org/p/202008292913) | Aug 29, 2020 | Completed: final sign-off Oct 2020 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire life safety: install 2 wall mount speaker strobes and 2 wall mount weatherproof speaker strobes. ref ti# 202007099861 | $2,640 |
| [202008222448](https://www.permitgraph.org/p/202008222448) | Aug 22, 2020 | Completed: final sign-off Aug 2021 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | 1st flr. fire sprinkler permit. relocate 3, add 1 and delete 3 sprinklers. ref t.i 202007099861. | $1,500 |
| [202007099861](https://www.permitgraph.org/p/202007099861) | Jul 9, 2020 | Completed: final sign-off Oct 2020 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Deb Construction Llc](https://www.permitgraph.org/contractor/deb-construction-llc-372419) | new shower room, all gender restrooms & locker room at main building lobby, security desk will be extended and the atm will be replaced with new | $465,000 |
| [202006028060](https://www.permitgraph.org/p/202006028060) | Jun 2, 2020 | Completed: final sign-off Feb 2021 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 9th flr: commercial ti to include new private offices & upgrade existing offices, conference rooms, & break area. new led lighting. new ada upgrades in restrooms. pre-app letters included on sheet 9… | $900,000 |
| [202001303209](https://www.permitgraph.org/p/202001303209) | Jan 30, 2020 | Completed: final sign-off Aug 2020 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 6th fl: add 2 and relocate 17 sprinklers to conform with the new wall/ceiling layout of the tenant improvement | $4,875 |
| [202001303092](https://www.permitgraph.org/p/202001303092) | Jan 30, 2020 | Completed: final sign-off Apr 2020 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm, 6th floor: ref# 2019-1218-9845: install 1 ceiling mount strobe, 14 wall mount strobe, 26 ceiling mount speaker strobe, 1 wall mount speaker strobe. replace 6 (e) smoke detectors, 3 (e) pu… | $34,320 |
| [201912189845](https://www.permitgraph.org/p/201912189845) | Dec 18, 2019 | Completed: final sign-off Feb 2021 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 6th fl: commercial ti to include new conference storefronts, offices, breakroom, finishes, and ada upgrades in restrooms. new lighting throughout. | $1,200,000 |
| [201908279895](https://www.permitgraph.org/p/201908279895) | Aug 27, 2019 | Completed: final sign-off Oct 2019 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 4th fl: as-built - install 1 control relay. ref pa #201908088220. ref ti #201905100305. | $660 |
| [201908088220](https://www.permitgraph.org/p/201908088220) | Aug 8, 2019 | Completed: final sign-off Oct 2019 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | ref pa# 201905100305; instll 1 power supply 2 ceiling strobe, 10 ceiling speaker strobes, 1 control relay, 1 duct detector, remove and replace 6 smoke detectores, 5 wall strobes, 1 wall speaker strob… | $21,780 |
| [201906193829](https://www.permitgraph.org/p/201906193829) | Jun 19, 2019 | Completed: final sign-off Jul 2019 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | 4th flr. fire sprinkler permit. relocate 15 and add 4 sprinklers. ref t.i 201905100305 | $6,000 |
| [201905100305](https://www.permitgraph.org/p/201905100305) | May 10, 2019 | Completed: final sign-off Oct 2019 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | ti- new private offices, upgrades to (e) offices, conference rooms and break area. mep modifications and ada upgrades in restrooms | $1,000,505 |
| [201808016079](https://www.permitgraph.org/p/201808016079) | Aug 1, 2018 | Completed: final sign-off Aug 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm tenant improvement. 5th fl - install 1 ceiling mount strobe, install 14 ceiling mount speaker strobes, install 12 wall mount strobe, install 1 wall mount speaker strobe, install 9 ceiling… | $19,000 |
| [201807114286](https://www.permitgraph.org/p/201807114286) | Jul 11, 2018 | Completed: final sign-off Nov 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm ti install 1 wall mount speaker strobe. relocate 1 ceiling mount strobe. ref pa 2018-0523-9867 | $500 |
| [201805310680](https://www.permitgraph.org/p/201805310680) | May 31, 2018 | Completed: final sign-off Oct 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Lewis M Merlo Inc](https://www.permitgraph.org/contractor/lewis-m-merlo-inc-184527) | remove an 8'x8' section of a garage slab to permit drain pipe repair, repair slab, drain pipe repair under seperate permit maher na | $65,000 |
| [M930087](https://www.permitgraph.org/p/M930087) | May 23, 2018 | Never finaled: issued May 2018, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | street space w/mta |  |
| [201805239867](https://www.permitgraph.org/p/201805239867) | May 23, 2018 | Never finaled: issued Jun 2018, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | tenant improvement to include demising wall, carpet, paint, new lights; fire alarm and sprinklers separate | $50,000 |
| [M929047](https://www.permitgraph.org/p/M929047) | May 21, 2018 | Never finaled: issued May 2018, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | street space w/mta |  |
| [201805169249](https://www.permitgraph.org/p/201805169249) | May 16, 2018 | Completed: final sign-off Jul 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | relocat 12 pendent sprinklers on the 5th fl. ref# 201804307769 | $2,500 |
| [201804307769](https://www.permitgraph.org/p/201804307769) | Apr 30, 2018 | Completed: final sign-off Nov 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 5th flr demo and renovation of office space | $600,000 |
| [201804247219](https://www.permitgraph.org/p/201804247219) | Apr 24, 2018 | Completed: final sign-off Apr 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install: 19 ceiling mount speaker/strobes, 20 wall mount strobes, 5 ceiling mount speakers, 2 booster panel/power supply, 2 ceiling mount strobes, 6 wall mount speaker/strobes ref 7th flr - 201801319… | $27,000 |
| [201804186704](https://www.permitgraph.org/p/201804186704) | Apr 18, 2018 | Completed: final sign-off May 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 8/f & 12/f: as-built to reference #201712126267. install (22) ceiling mount speakers | $10,000 |
| [201802201636](https://www.permitgraph.org/p/201802201636) | Feb 20, 2018 | Completed: final sign-off May 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | fire sprinkler, relocate 30, add 5, delete 1 pendant sprinker 7th fl. ti 201801319979; n/a maher | $9,000 |
| [201802141227](https://www.permitgraph.org/p/201802141227) | Feb 14, 2018 | Completed: final sign-off Jun 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | fire sprinkler permit. relocate 32, add 2 , detelet 5 pendent sprinklers on 13th fl ref 201801319980 | $6,000 |
| [M882947](https://www.permitgraph.org/p/M882947) | Jan 31, 2018 | Never finaled: issued Jan 2018, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | street space permt |  |
| [201801319979](https://www.permitgraph.org/p/201801319979) | Jan 31, 2018 | Completed: final sign-off Jul 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 7th flr - commercial ti to include private offices and ipgrades to (e) office & conference rrooms. new led lighting throughout. new ada upgrades in restrooms. maher na | $480,000 |
| [201801319980](https://www.permitgraph.org/p/201801319980) | Jan 31, 2018 | Completed: final sign-off Jul 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 13th flr - commercial ti to include private offices and ipgrades to (e) office & conference rrooms. new led lighting throughout. new ada upgrades in restrooms. maher na | $480,000 |
| [201801188946](https://www.permitgraph.org/p/201801188946) | Jan 18, 2018 | Completed: final sign-off Nov 2021 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | upgrade 3 audio panels, components consist of 3 digial audio distribution boards, 6 digital amplifier, 3 power supply, 6 26 amp batteries. maher n/a | $9,000 |
| [201712126267](https://www.permitgraph.org/p/201712126267) | Dec 12, 2017 | Completed: final sign-off May 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 8th & 12th flrs: fire alarm full floor ti: install- 2 ceiling mount strobes, 18 ceiling mount speaker/strobes, 20 wall mount strobes, 7 wall mount speaker/strobes ref pas# 8th flr - 201710020051, 12t… | $23,500 |
| [201712045392](https://www.permitgraph.org/p/201712045392) | Dec 4, 2017 | Never finaled: issued Dec 2017, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | fire sprinkler relocate 34, add 3, delete 8 pendent sprinklers 12th fl. ti 201710020052 | $9,000 |
| [201712045390](https://www.permitgraph.org/p/201712045390) | Dec 4, 2017 | Never finaled: issued Dec 2017, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | fire sprinkler relocate 37, add 5, delete 8 pendent sprinklers 8th fl | $10,500 |
| [201710020051](https://www.permitgraph.org/p/201710020051) | Oct 2, 2017 | Completed: final sign-off Jul 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 8/f: commericial t.. to include new pvt offices & upgrades to (e) offices, conference rooms & break areas. new led lighting throughout, new ada upgrades in restrooms. | $100,000 |
| [201710020052](https://www.permitgraph.org/p/201710020052) | Oct 2, 2017 | Completed: final sign-off Jul 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 12/f: commericial t.. to include new pvt offices & upgrades to (e) offices, conference rooms & break areas. new led lighting throughout, new ada upgrades in restrooms. | $100,000 |
| [201709219221](https://www.permitgraph.org/p/201709219221) | Sep 21, 2017 | Completed: final sign-off Jul 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053) | reroofing. n/a for maher. | $225,000 |
| [201709117577](https://www.permitgraph.org/p/201709117577) | Sep 11, 2017 | Completed: final sign-off Jun 2018 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm t.i. - as built to reference pa # 2017-0905-6900. theatrical lighting no longer in use. |  |
| [201709056900](https://www.permitgraph.org/p/201709056900) | Sep 5, 2017 | Completed: final sign-off Sep 2017 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm tenant improvement, remove 4 ceiling mount speakrs, 8 wall mount speaker strobes, 1 control relay module ref 201706220159 | $4,500 |
| [201708074095](https://www.permitgraph.org/p/201708074095) | Aug 7, 2017 | Completed: final sign-off Sep 2017 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler, relocate 52, add 25, total 77 | $38,799 |
| [201706220159](https://www.permitgraph.org/p/201706220159) | Jun 22, 2017 | Never finaled: issued Jun 2017, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | tenant improvement project includes the new construction for auditorium, reception, & hallways including new mechanical, electrical & lighting work. n/a maher ordinance | $1,200,000 |
| [201706219940](https://www.permitgraph.org/p/201706219940) | Jun 21, 2017 | Completed: final sign-off Sep 2017 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | on 14th & 15th floors- fire alarm ti - install 4 ceiling mount strobes, install 18 wall mount strobes, install 6 wall mount speaker strobes, install 10 ceiling mount speakers, install 2 booster panel… | $20,000 |
| [201706209772](https://www.permitgraph.org/p/201706209772) | Jun 20, 2017 | Never finaled: issued Jun 2017, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 15th fl: revision to #2017-0417-4089. electrical drawings have been revised to remove the title 24 power distribution forms and controlled power outlet.s no other updates. maher na |  |
| [201706209769](https://www.permitgraph.org/p/201706209769) | Jun 20, 2017 | Never finaled: issued Jun 2017, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 14th fl: revision to #2017-0417-4086. electrical drawings have been revised to remove the title 24 power distribution forms and controlled power outlet.s no other updates. maher na |  |
| [201705307845](https://www.permitgraph.org/p/201705307845) | May 30, 2017 | Completed: final sign-off Sep 2017 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | 14th flr: fire sprinkler - relocate 29 add 3 and delete 7 pendent sprinklers. ti 201704174086 maher na | $7,500 |
| [201705307848](https://www.permitgraph.org/p/201705307848) | May 30, 2017 | Completed: final sign-off Sep 2017 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | 15th flr: fire sprinkler - relocate 29 add 3 and delete 9 pendent sprinklers. ti 201704174089 maher na | $7,500 |
| [201704174086](https://www.permitgraph.org/p/201704174086) | Apr 17, 2017 | Never finaled: issued Apr 2017, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 14th floor commercial tenant improvement to include new private offices & upgrades to exisitng offices, conference rooms & break area. new led lighting throughout. new ada upgrades in restrooms. n/a… | $50,000 |
| [201704174089](https://www.permitgraph.org/p/201704174089) | Apr 17, 2017 | Never finaled: issued Apr 2017, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 15th floor commercial tenant improvement to include new private offices & upgrades to exisitng offices, conference rooms & break area. new led lighting throughout. new ada upgrades in restrooms. n/a… | $50,000 |
| [201702099072](https://www.permitgraph.org/p/201702099072) | Feb 9, 2017 | Completed: final sign-off Mar 2017 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 10 & 11/f: fire larm ti remove and replace 16 wall mount strobes, 7 wall mount strobes, 5 ceiling mount strobes, 18 ceiling mount speaker strobes 201612205400, 201612215529. maher ord 155-13 na | $18,400 |
| [201701177213](https://www.permitgraph.org/p/201701177213) | Jan 17, 2017 | Completed: final sign-off Mar 2017 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only - 10th fl: relocate 26 pendents, add 2 (28 heads) 11th fl: relocate 24 penedents, add 26 heads. maher not req | $16,200 |
| [201612215529](https://www.permitgraph.org/p/201612215529) | Dec 21, 2016 | Completed: final sign-off Oct 2017 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 11/f: commercial tenant improvements to include new conference rooms, offices, and huddle rooms. new led lighting throughout. new ada upgrdes in the bathrooms. maher n/a | $853,491 |
| [201612205400](https://www.permitgraph.org/p/201612205400) | Dec 20, 2016 | Completed: final sign-off Oct 2017 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 10/f: commercial tenant improvements to include new conference rooms, offices, and huddle rooms. new led lighting throughout. new ada upgrdes in the bathrooms. maher n/a | $853,491 |
| [201603283192](https://www.permitgraph.org/p/201603283192) | Mar 28, 2016 | Never finaled: issued Mar 2016, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | ti 2nd floor: 8 adds, 92 relocates, 17 removed. of the 92 relocations, 9 will be disconnected from pre-action system and converted to light hazard office space. 3rd floor: 18 adds, 46 relocates, 8 re… | $85,280 |
| [201603031116](https://www.permitgraph.org/p/201603031116) | Mar 3, 2016 | Completed: final sign-off Oct 2016 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | add 10 speakers & 13 strobes to an (e) fire alarm system; relocated 2 speakers & 12 strobes, remove 10 smoke detectors. maher na ref 2/f: pa201512175337; 3/f:201512175336. | $6,000 |
| [201601076605](https://www.permitgraph.org/p/201601076605) | Jan 7, 2016 | Never finaled: issued Jan 2016, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | 18th floor - two (n) vfd's to be installed fo rchilled water pumps. n/a maher ordinance | $16,000 |
| [201512175337](https://www.permitgraph.org/p/201512175337) | Dec 17, 2015 | Completed: final sign-off Nov 2016 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 2nd floor: buildout of new offices millwork and finishes including mep. no structural work to be performed. n/a for maher | $2,965,768 |
| [201512175336](https://www.permitgraph.org/p/201512175336) | Dec 17, 2015 | Completed: final sign-off Nov 2016 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 3rd floor: buildout of new offices millwork and finishes. no structural work to be performed. n/a for maher. sprinklers/alarms deferred. | $1,482,884 |
| [201512114831](https://www.permitgraph.org/p/201512114831) | Dec 11, 2015 | Never finaled: issued Dec 2015, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 1st floor program system to add disable function for smoke detector zone. no t.i related. customer adding feature to the system. | $500 |
| [201512104665](https://www.permitgraph.org/p/201512104665) | Dec 10, 2015 | Completed: final sign-off Aug 2016 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 2nd floor - demolition of offices & affected ceiling tile & grid & l2nd ighting per ab-017. n/a maher ordinance | $30,000 |
| [201512104659](https://www.permitgraph.org/p/201512104659) | Dec 10, 2015 | Completed: final sign-off Aug 2016 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 3rd floor - demolition of offices & affected ceiling tile & grid & lighting per ab-017. n/a maher ordinance | $30,000 |
| [201412053148](https://www.permitgraph.org/p/201412053148) | Dec 5, 2014 | Completed: final sign-off Dec 2014 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 5th flr: fire alarm tenant improvement. replace and relocate 2 wall mount strobes. replace and relocate 1 wall mount speaker-strobe. replace and replace 4 wall mount strobes. replace and replace 1 wa… | $3,200 |
| [201410280123](https://www.permitgraph.org/p/201410280123) | Oct 28, 2014 | Completed: final sign-off Mar 2015 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | ground floor: fire alarm t.i. emergency replace fire alarm control unit. ul certififcation number fc35418229. 100 pewrcent functional required plaus 10 percent existing devices.t.i. app#201305227597.… | $400 |
| [201410179207](https://www.permitgraph.org/p/201410179207) | Oct 17, 2014 | Completed: final sign-off Nov 2014 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler ti : relocate 8 | $4,117 |
| [201408143847](https://www.permitgraph.org/p/201408143847) | Aug 14, 2014 | Completed: final sign-off May 2015 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 5th fl:minor demo of office fronts, breakroom millwork and ceiling/lighting at various locations as indicated. new work will include new glass fronts, new breakroom millwork, minor power/signal upgra… | $140,902 |
| [201309166924](https://www.permitgraph.org/p/201309166924) | Sep 16, 2013 | Completed: final sign-off Nov 2013 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 1st floor: relocation of existing (6) strobes and (1) speakers. new duct detectors and relay modules at new heat pumps.new smoke deteector and relcay at a new fire smoke damper | $5,000 |
| [201308083778](https://www.permitgraph.org/p/201308083778) | Aug 8, 2013 | Completed: final sign-off Sep 2013 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler t.i. relocate 28 fire sprinkler. relocate 1 total 29x514.62=14924.00 deleted =3 (ti app#201305227597) | $14,924 |
| [201307111565](https://www.permitgraph.org/p/201307111565) | Jul 11, 2013 | Completed: final sign-off Jan 2014 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | install sign a new illuminated letter set | $6,000 |
| [201307111571](https://www.permitgraph.org/p/201307111571) | Jul 11, 2013 | Never finaled: issued Aug 2013, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | install 1 illuminated ground sign. | $4,000 |
| [201307111570](https://www.permitgraph.org/p/201307111570) | Jul 11, 2013 | Completed: final sign-off Dec 2013 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | reface existing projection sign. | $1,500 |
| [201307111569](https://www.permitgraph.org/p/201307111569) | Jul 11, 2013 | Never finaled: issued Aug 2013, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | install 1 projecting illuminated sign. | $2,500 |
| [201307111568](https://www.permitgraph.org/p/201307111568) | Jul 11, 2013 | Completed: final sign-off Jan 2014 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | install 2 wall sign murals, illuminated sign | $7,000 |
| [201307111561](https://www.permitgraph.org/p/201307111561) | Jul 11, 2013 | Completed: final sign-off Jan 2014 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | install 2 illuminated cubes, no copy | $4,400 |
| [201305227597](https://www.permitgraph.org/p/201305227597) | May 22, 2013 | Completed: final sign-off Feb 2014 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 1st floor-office t.i includes new non structural partitions & finshes. scope of work includes architectural, electrical, non structural upgrades. no work at exterior of building. no modification to t… | $435,000 |
| [201303071667](https://www.permitgraph.org/p/201303071667) | Mar 7, 2013 | Completed: final sign-off Feb 2014 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 55'-0 lineal feet of new storefront on floor 1. scope of work pursuant to ab-017 | $361,511 |
| [201212055526](https://www.permitgraph.org/p/201212055526) | Dec 5, 2012 | Never finaled: issued Dec 2012, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | instal 2 ceiling mount speaker strobes, install 2 smoke detectors with bases, relocate and install 2 new strobes, connect new strobes to existing circuits, tie speakrers to existing speaker loop | $3,000 |
| [201211274874](https://www.permitgraph.org/p/201211274874) | Nov 27, 2012 | Completed: final sign-off Dec 2012 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 9th floor, t.i. pa# 2012-10-10-09-1561. (e) fire sprinkler system, 8 relocated sprinklers, 7 added sprinklers. | $7,500 |
| [201210091561](https://www.permitgraph.org/p/201210091561) | Oct 9, 2012 | Expired or cancelled: expired Oct 2014 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | approx. 2667 sq. ft. gross on floor 9 office tenant improvement incl. non structural partitions and finish upgrades. the scope of work incluldes archi. mech. and electrical. reconfig. of rooms 901-91… | $90,000 |
| [201208227973](https://www.permitgraph.org/p/201208227973) | Aug 22, 2012 | Completed: final sign-off Sep 2012 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | fire alarm ti-16th fl, install 1 strobe, 1 speaker, relocate 1 strobe & 1 relay. 17th fl, install 4 strobes, 3 speakers, relocate 5 strobes & 4 speakers. | $5,500 |
| [201208107056](https://www.permitgraph.org/p/201208107056) | Aug 10, 2012 | Never finaled: issued Aug 2012, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | relocate 8 and add 1 sprinkler heads on 17th floor t.i. | $4,626 |
| [201206061928](https://www.permitgraph.org/p/201206061928) | Jun 6, 2012 | Never finaled: issued Jun 2012, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 17th floor-life safety system modifications-relocate 1 (e) wall module strobe | $350 |
| [201205251315](https://www.permitgraph.org/p/201205251315) | May 25, 2012 | Completed: final sign-off Jan 2013 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | tenant improvement of (e) interior space on 16th. flr.(single tenant) no structural work. relocation of mechanical diffusers, (n) partitions, relocated lights & ceilings. under separate permit fire l… | $55,000 |
| [201205251317](https://www.permitgraph.org/p/201205251317) | May 25, 2012 | Completed: final sign-off Jan 2013 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | tenant improvement of (e) interior space on 17th. flr.(single tenant). no structural work. relocation of mechanical diffusers & add lights, (n) partitions & lights, finishes & ceiling. under separate… | $1,000,000 |
| [201203146015](https://www.permitgraph.org/p/201203146015) | Mar 14, 2012 | Completed: final sign-off Sep 2012 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 17th floor t.i.- existing fire sprinkler system, add 1 sprinkler. | $500 |
| [201202073673](https://www.permitgraph.org/p/201202073673) | Feb 7, 2012 | Completed: final sign-off Nov 2012 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 17th floor tenant improvement of (e) interior space. (single tenant floor). no sturctural work, relocation mechanical diffusers, new partitions, finishes & ceiling includes minor electrical work. fir… | $119,000 |
| [201111289590](https://www.permitgraph.org/p/201111289590) | Nov 28, 2011 | Completed: final sign-off Jan 2012 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 4th floor-life safety system modifications-remove & relocate 18 new strobes, install 3 new ceiling strobes, remove & relocate 3 new speaker strobes. install 3 new speakers | $7,000 |
| [201111168987](https://www.permitgraph.org/p/201111168987) | Nov 16, 2011 | Completed: final sign-off Dec 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 4th floor revision to pa #201108223001 - ada upgrades mens & womens room ada stalls. | $3,782 |
| [201110146846](https://www.permitgraph.org/p/201110146846) | Oct 14, 2011 | Completed: final sign-off Nov 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 4th floor tenant improvement to existing fire sprinkler system, 4 removed sprinklers, 6 added sprinklers, 20 relcoated sprinklers. | $13,000 |
| [201110076329](https://www.permitgraph.org/p/201110076329) | Oct 7, 2011 | Expired or cancelled: withdrawn Nov 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | 17th floor-tenant improvement of existing interior space on 17th floor by existig tenant. no structural work, relocate mechanical grilles, new partitions, finsishes, ceiling. includes minor elec work… | $25,000 |
| [201110066277](https://www.permitgraph.org/p/201110066277) | Oct 6, 2011 | Completed: final sign-off Dec 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | revision to appl #201108233001 - removed 3 offices & 1 large office from orig. scope. |  |
| [201109205116](https://www.permitgraph.org/p/201109205116) | Sep 20, 2011 | Completed: final sign-off Apr 2013 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Coast Sign Incorporated](https://www.permitgraph.org/contractor/coast-sign-incorporated-654238) | to obtain final inspection for work approved under pa#200906059856. all work is complete. |  |
| [201109094215](https://www.permitgraph.org/p/201109094215) | Sep 9, 2011 | Completed: final sign-off Sep 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety system modifications on the 18th fl boiler room. 2 detector base, 2 heat detectors, 1 speaker strobe and 1 wall speaker | $1,800 |
| [201109084101](https://www.permitgraph.org/p/201109084101) | Sep 8, 2011 | Completed: final sign-off Nov 2015 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Cisco Fire Sprinklers, Inc.](https://www.permitgraph.org/contractor/cisco-fire-sprinklers-inc-715741) | add 7 new ssu, relocate 3 for new wall added in boiler room 18th floor - all sprinklers added to existing system main & lines except 1 new branch line being installed. existing earthquake bracing to… | $3,000 |
| [201108233001](https://www.permitgraph.org/p/201108233001) | Aug 23, 2011 | Completed: final sign-off Dec 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | break room and elevator lobby renovation with office addition including interior non load bearing partitions,doors,glazed office fronts, acuoustic tile ceilings, drywall ceilings and lighting. with a… | $800,000 |
| [201107089742](https://www.permitgraph.org/p/201107089742) | Jul 8, 2011 | Completed: final sign-off Dec 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | penthouse-install new connection to boilers, provide power outlets for convenience & providing new lighting in the boiler room | $30,000 |
| [201106238741](https://www.permitgraph.org/p/201106238741) | Jun 23, 2011 | Completed: final sign-off Jan 2012 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | in penthouse - remove (2) existing boilers & replace with (4) smaller boilers. ref pa #2010.12.23.7290. | $180,000 |
| [201106097761](https://www.permitgraph.org/p/201106097761) | Jun 9, 2011 | Completed: final sign-off Jul 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | t.i. extg fire sprinkler system 2 relocated sprinklers and 1 sprinklers at basement garage level. | $1,500 |
| [201104134013](https://www.permitgraph.org/p/201104134013) | Apr 13, 2011 | Completed: final sign-off Aug 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | t.i.: one new office walls, door, ceiling, finishes in basement. sprinklers and life safety under separate permit. no structural work to be performed. | $20,000 |
| [201102049644](https://www.permitgraph.org/p/201102049644) | Feb 4, 2011 | Completed: final sign-off Mar 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | as builts revision 201010052309. change in smoke detectors installed |  |
| [201012237290](https://www.permitgraph.org/p/201012237290) | Dec 23, 2010 | Completed: final sign-off Sep 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | constructing a new rated enclosure for (e) boilers as well as a rated seperation wall & door assembly. mep & sprinkler upgrades are on seperate permit | $10,000 |
| [201010052309](https://www.permitgraph.org/p/201010052309) | Oct 5, 2010 | Completed: final sign-off Sep 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 9th floor-life safety modifications-adding 2 smoke detectors, 1 relay module, 1 door holder, 1 door holder mounted in header | $800 |
| [201009020090](https://www.permitgraph.org/p/201009020090) | Sep 2, 2010 | Completed: final sign-off Sep 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 1st floor-life safety system modifications-211 main st, garage level-1st floor-shuttle elevator. installation of elevator recall equipment. 3 smoke detectors and 3 relay modules. | $5,000 |
| [201008239416](https://www.permitgraph.org/p/201008239416) | Aug 23, 2010 | Never finaled: issued Aug 2010, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | relocate fire sprinkler heads per ti. 6th fl: 8 relocate, 4 removes. 10th fl: 8 reloacte, 4 removed | $7,200 |
| [201007277562](https://www.permitgraph.org/p/201007277562) | Jul 27, 2010 | Completed: final sign-off Mar 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | repair 25' expansion joist on buidling property at the podium walkway. | $12,000 |
| [201006214914](https://www.permitgraph.org/p/201006214914) | Jun 21, 2010 | Completed: final sign-off Nov 2022 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 9th floor -relocate fire sprinkler per tenant improvements- 29 relocate | $8,500 |
| [201005051768](https://www.permitgraph.org/p/201005051768) | May 5, 2010 | Completed: final sign-off Aug 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | tenant improvment on the 6th floor including new non load bearing partition doors, glazing, ceilings and associated mechanical and electrical work. ls and sprinkler under separate permit | $300,000 |
| [201005051763](https://www.permitgraph.org/p/201005051763) | May 5, 2010 | Completed: final sign-off Sep 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | tenant improvement on the 10th floor including new non load bearing partitions, doors, glazing, ceilings and associated mechanicaland electrical. ls and fire sprinklers under sep permit | $300,000 |
| [201004271133](https://www.permitgraph.org/p/201004271133) | Apr 27, 2010 | Completed: final sign-off Feb 2012 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Coast Sign Incorporated](https://www.permitgraph.org/contractor/coast-sign-incorporated-654238) | install 1-electrical message board sign for "charles schwab": at corner of main & howard sts. | $5,000 |
| [201003269055](https://www.permitgraph.org/p/201003269055) | Mar 26, 2010 | Completed: final sign-off Jun 2011 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 9th floor-new finishes throughout hr office & new ceiling work in common areas. no new structural work to be performed. includes associate mechanical & electrical | $300,000 |
| [201001124560](https://www.permitgraph.org/p/201001124560) | Jan 12, 2010 | Completed: final sign-off May 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | ground floor. construct new interior atm machine room. work includes drywall, doors, celing work, lighting and finishes. sprinkler drawings under separate permit. field verify that existing 1-hour wa… | $30,000 |
| [201001064233](https://www.permitgraph.org/p/201001064233) | Jan 6, 2010 | Never finaled: issued Jan 2010, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety system notifacation at floors 17 and 18. 17th fl 9 new devices | $3,500 |
| [200912223698](https://www.permitgraph.org/p/200912223698) | Dec 22, 2009 | Completed: final sign-off May 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 17th floor-tenant improvements to the (e) fire sprinkler system-added 5, relocated 20 | $5,000 |
| [200912092888](https://www.permitgraph.org/p/200912092888) | Dec 9, 2009 | Completed: final sign-off Aug 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 17th & 18th floors-demolition & remodel of (e) restrooms, pantry & office areas.life safety & sprinklers under separate permit. | $660,000 |
| [200911191678](https://www.permitgraph.org/p/200911191678) | Nov 19, 2009 | Completed: final sign-off Nov 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | to obtain final inspection for work approved under app#200807187030.all work is complete. |  |
| [200910229536](https://www.permitgraph.org/p/200910229536) | Oct 22, 2009 | Completed: final sign-off Jan 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 7th floor life safety system modifications - new syncable devices repalcing at (e) locatio. new remote power supply for strobe devices, relocate (5) existing ceilig speakers & (1) wall strobe, instal… | $8,000 |
| [200910229538](https://www.permitgraph.org/p/200910229538) | Oct 22, 2009 | Completed: final sign-off Jan 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 8th floor life safety system modifications - new syncable devices -replacing at existing locations, ne wremote power supply for strobe devices. relocate (4) exisitng ceiling speakers & (2) existig wa… | $9,000 |
| [200910159039](https://www.permitgraph.org/p/200910159039) | Oct 15, 2009 | Completed: final sign-off Jan 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 7th & 8th floors-relocate fire sprinkler heads per tenant improvement-7th floor: 23 relocates, 8th floor: 25 relocates | $7,200 |
| [200909227333](https://www.permitgraph.org/p/200909227333) | Sep 22, 2009 | Never finaled: issued Sep 2009, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | 9th floor t.i. upgrade on the (e) fire sprinkler system of charles schwab, relocate 3 heads, add 1 head, total 4 heads. | $800 |
| [200909036136](https://www.permitgraph.org/p/200909036136) | Sep 3, 2009 | Completed: final sign-off Jan 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 8th fl - tenant improvment on the 8th flooring including minor demolition and renovation to offices, breakroom, and elevator lobby. new partitions, doors, glazing, ceiling tiles, lighting, and associ… | $350,000 |
| [200909036140](https://www.permitgraph.org/p/200909036140) | Sep 3, 2009 | Completed: final sign-off Jan 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 7th fl - tenant improvment on the 7th flooring including minor demolition and renovation to offices, breakroom, and elevator lobby. new partitions, doors, glazing, ceiling tiles, lighting, and associ… | $350,000 |
| [200908044091](https://www.permitgraph.org/p/200908044091) | Aug 4, 2009 | Expired or cancelled: cancelled Aug 2021 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | application to revise existing room occupant load on first floor refer to permit # 2008/1022/4835. see plans for ammount of occupant load in auditorium sffd permit required |  |
| [200907293673](https://www.permitgraph.org/p/200907293673) | Jul 29, 2009 | Completed: final sign-off Nov 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | upgrade of finishes removal of 2 partitions and construction of new partitions. no new sqft or structural work to be performed tenant improvement of corridors 2 confrence rooms and seating area and a… | $305,600 |
| [200907011739](https://www.permitgraph.org/p/200907011739) | Jul 1, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety system modifications, 3rd fl, new speakers and strobes | $7,000 |
| [200906231084](https://www.permitgraph.org/p/200906231084) | Jun 23, 2009 | Completed: final sign-off Dec 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 17th floor-revision to pa# 2008-0718-7032-reflect field changes to conference room & associated mechanical & electrical work | $56,500 |
| [200906231077](https://www.permitgraph.org/p/200906231077) | Jun 23, 2009 | Completed: final sign-off May 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to application 200904085825. add concrete slab and procuring special inspection. |  |
| [200906100153](https://www.permitgraph.org/p/200906100153) | Jun 10, 2009 | Completed: final sign-off Sep 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | fire alarm modifications at 1st floor main lobby | $6,000 |
| [200906059856](https://www.permitgraph.org/p/200906059856) | Jun 5, 2009 | Expired or cancelled: expired Feb 2012 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Coast Sign Incorporated](https://www.permitgraph.org/contractor/coast-sign-incorporated-654238) | erect a ground, electric, double faced sign. | $3,000 |
| [200906039638](https://www.permitgraph.org/p/200906039638) | Jun 3, 2009 | Completed: final sign-off Nov 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to application 200807187030. add pavers to the roof under the overhang as a finish. this area is not accessible except for maintenance. | $51,600 |
| [200906019485](https://www.permitgraph.org/p/200906019485) | Jun 1, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 3rd floor-relocate & add fire sprinkler heads per tenant improvements. (relocate 6 & add 25). | $7,000 |
| [200905279216](https://www.permitgraph.org/p/200905279216) | May 27, 2009 | Completed: final sign-off Oct 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 6th floor-install 1 new sync module for strobe devices, relocate 4 (e) ceiling speakers, install 3 new ceiling speakers, remove 1 (e) ceiling speaker, remove 2 (e) wall strobes, install 1 new relay m… | $5,000 |
| [200905279215](https://www.permitgraph.org/p/200905279215) | May 27, 2009 | Completed: final sign-off Oct 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 5th floor-install new sync module for strobe devices, relocate 4 (e) ceiling speakers, install 4 new ceiling speakers, install 2 new strobes, remove 3 (e) ceiling strobes, remove 5 (e) wall strobes. | $5,000 |
| [200905208752](https://www.permitgraph.org/p/200905208752) | May 20, 2009 | Completed: final sign-off Nov 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 18th fl - revision to application 200807187030, adding concrete pavers. | $1,800 |
| [200905017486](https://www.permitgraph.org/p/200905017486) | May 1, 2009 | Expired or cancelled: cancelled Aug 2021 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | application to verify assembly occupancy on the 1st floor. reference application 200810224835. requested by fire inspector. |  |
| [200904297290](https://www.permitgraph.org/p/200904297290) | Apr 29, 2009 | Completed: final sign-off Sep 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | t.i. upgrade on existing fire sprinkler system. relcoate 3 heads. (charles schwab lobby). | $600 |
| [200904287241](https://www.permitgraph.org/p/200904287241) | Apr 28, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 3rd floor-new acoustical partition walls & door assemblies, corresponding electrical, hvac & new finishes. | $150,000 |
| [200904236919](https://www.permitgraph.org/p/200904236919) | Apr 23, 2009 | Completed: final sign-off Oct 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | 6th floor-t.i. upgrade on the (e) fire sprinkler system, relocate 16 heads & add 1 heads, total 17 heads | $3,825 |
| [200904236918](https://www.permitgraph.org/p/200904236918) | Apr 23, 2009 | Completed: final sign-off Oct 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | 5th floor-t.i. upgrade on the (e) fire sprinkler system, relocate 19 heads & add 3 heads, total 22 heads | $4,275 |
| [200904176507](https://www.permitgraph.org/p/200904176507) | Apr 17, 2009 | Completed: final sign-off Oct 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to permit#2009/0302/3162 to change panel schedule. | $500 |
| [200904176506](https://www.permitgraph.org/p/200904176506) | Apr 17, 2009 | Completed: final sign-off Oct 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to permit #2009/0224/2683 including revised power and data for furniture systems. | $500 |
| [200904176508](https://www.permitgraph.org/p/200904176508) | Apr 17, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revised to pa#2009/0107/9679 including revised furniture layout, power & data and new & relocated exit signs. | $1,500 |
| [200904166405](https://www.permitgraph.org/p/200904166405) | Apr 16, 2009 | Completed: final sign-off May 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety/fire alarm modifications, 211 main street, 1st floor employee branch. install approx 7 new devices. | $4,200 |
| [200904166401](https://www.permitgraph.org/p/200904166401) | Apr 16, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to approved pa#2009/0107/9680: new enclosure of portion of open office on east side with office front glazing. | $5,500 |
| [200904166398](https://www.permitgraph.org/p/200904166398) | Apr 16, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to pa#2009/0123/0740. add (2) vav boxes, change lighting layout, add (1) exit sign. | $6,600 |
| [200904136109](https://www.permitgraph.org/p/200904136109) | Apr 13, 2009 | Completed: final sign-off Oct 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to application 200903023164, including changes to mechanical & electrical plans. | $15,000 |
| [200904136111](https://www.permitgraph.org/p/200904136111) | Apr 13, 2009 | Completed: final sign-off Oct 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to application 200902242681, including demolition of white boards & addition of new furniture systems. | $200,000 |
| [200904085825](https://www.permitgraph.org/p/200904085825) | Apr 8, 2009 | Completed: final sign-off May 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | pre-fabricated guard kiosk with data & outlets. | $40,000 |
| [200904035533](https://www.permitgraph.org/p/200904035533) | Apr 3, 2009 | Completed: final sign-off May 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | 1st floor - t.i. upgrade on the extg fire sprinkler system for charles schwab's employee branch on the 1st floor. relocate 6 pendents for proper coverage. | $1,200 |
| [200903305146](https://www.permitgraph.org/p/200903305146) | Mar 30, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes.at 11th floor | $2,500 |
| [200903305147](https://www.permitgraph.org/p/200903305147) | Mar 30, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 12th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes. | $2,500 |
| [200903305144](https://www.permitgraph.org/p/200903305144) | Mar 30, 2009 | Completed: final sign-off Sep 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 13th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes. | $2,500 |
| [200903305148](https://www.permitgraph.org/p/200903305148) | Mar 30, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 10th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes. | $2,500 |
| [200903305145](https://www.permitgraph.org/p/200903305145) | Mar 30, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 14th - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes. | $2,500 |
| [200903305137](https://www.permitgraph.org/p/200903305137) | Mar 30, 2009 | Never finaled: issued Mar 2009, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 15th floor - life safety system modifications - change out & relocate existing strobe devices from non-syncable to syncable strobes. | $2,500 |
| [200903264908](https://www.permitgraph.org/p/200903264908) | Mar 26, 2009 | Completed: final sign-off Sep 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | partial remodel of basement and first floor elevator lobbies including minor demolition. new non-load bearing partitions ceilings, finishes, new millwork, mechanical and electrical as required. life… | $550,000 |
| [200903023164](https://www.permitgraph.org/p/200903023164) | Mar 2, 2009 | Completed: final sign-off Oct 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | mechanical & electrical work. ref appl. 200902242681- 5th floor, including relocation of outlets, adjusting cfm (1) new vav box, new power & signal outlets, relocation of (e) lighting , fixtures & in… | $48,900 |
| [200903023162](https://www.permitgraph.org/p/200903023162) | Mar 2, 2009 | Completed: final sign-off Oct 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | mechanical & electrical work. ref appl. 200902242683- 6th floor, including relocation of outlets, adjustin cfm (1) new vanbox, new power & signal outlets, relocation of (e) lighting , fixtures & inst… | $48,900 |
| [200902242683](https://www.permitgraph.org/p/200902242683) | Feb 24, 2009 | Completed: final sign-off Jan 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | (n) interior construction of offices including interior non-load bearing partitions, doors, glazed office fronts, acoustic tile ceilings & lighting associated mech, elec, telecom & fire/life safety t… | $200,000 |
| [200902242681](https://www.permitgraph.org/p/200902242681) | Feb 24, 2009 | Completed: final sign-off Oct 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | (n) interior construction of offices including interior non-load bearing partitions, doors, glazed office fronts, acoutical tile ceiling & lighting associated mech, elec, telecom & fire/life safety t… | $200,000 |
| [200902232582](https://www.permitgraph.org/p/200902232582) | Feb 23, 2009 | Completed: final sign-off Sep 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | t/i: upgrade on the (e) fire sprinkler system; for charles schwab 13th. flr. relocate (8) heads and add (1) head, total (9) heads. | $1,800 |
| [200902232564](https://www.permitgraph.org/p/200902232564) | Feb 23, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | ti upgrade on the e fire sprinkler sytem for charles schwab 11th fl. relocate 8 heads add 1, total 9 heads. | $1,800 |
| [200902232585](https://www.permitgraph.org/p/200902232585) | Feb 23, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | t/i: upgrade on the (e) fire sprinkler system; for charles schwab 14th. flr. relocate (8) heads and add (1) head; total (9) heads. | $1,800 |
| [200902232567](https://www.permitgraph.org/p/200902232567) | Feb 23, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | ti upgrade on the e fire sprinkler system for charles schwab on the 10th fl. relocate 8 heads, add 1, total 9. | $1,800 |
| [200902232566](https://www.permitgraph.org/p/200902232566) | Feb 23, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | ti upgrade on the e fire sprinkler system, for charles schwab 12 th fl. relcoate 8 heads, add 1, toltal 9 heads | $1,800 |
| [200902232588](https://www.permitgraph.org/p/200902232588) | Feb 23, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | t/i: upgrade on the (e) fire sprinkler system; for charles schwab 15th. flr. relocate (8) heads and add (1); total (9) heads. | $1,800 |
| [200902121931](https://www.permitgraph.org/p/200902121931) | Feb 12, 2009 | Completed: final sign-off Apr 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | ti @ 1st: (n) interior construction of offices including interior non-load bearing partitions, doors & glazed office fronts. associated mech., elec., telecomunications & fire life safety to be perfom… | $87,000 |
| [200902121954](https://www.permitgraph.org/p/200902121954) | Feb 12, 2009 | Completed: final sign-off Apr 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 1st floor mechanical & electrical work associated with approved pa #200902121931 tenant improvement including minor demolition, new power & signal outlets & relocation of existing & installation of n… | $22,500 |
| [200901270860](https://www.permitgraph.org/p/200901270860) | Jan 27, 2009 | Never finaled: issued Jan 2009, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | demo of existing concrete window washing runway and installation of 22 new davit bases. new roof will be permitted separately (under separate permit) per plan. | $70,000 |
| [200901270910](https://www.permitgraph.org/p/200901270910) | Jan 27, 2009 | Completed: final sign-off Jun 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053) | reroofing. | $232,000 |
| [200901230696](https://www.permitgraph.org/p/200901230696) | Jan 23, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | mechanical and electrical work associated with approved app 200901079679 including relocation of air outlets, adjusting cfm, 1 vav box, relocation and installation of lighting fixtures and controls.… | $110,500 |
| [200901230740](https://www.permitgraph.org/p/200901230740) | Jan 23, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 11th floor-mechanical & electrical work associated with approved pa# 2009-0107-9680 including relocation of air outlets, adjusting cfm, 1 vav box, minor demo, relocation & installation of lighting fi… | $107,050 |
| [200901230695](https://www.permitgraph.org/p/200901230695) | Jan 23, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 10th floor-mechanical & electrical work associated with approved pa# 2009-0107-9681 including relocation of air outlets, adjusting cfm, 1 vav box, minor demo, relocation & installation of new lightin… | $88,425 |
| [200901220664](https://www.permitgraph.org/p/200901220664) | Jan 22, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 14th floor- mechanical & electrical work associated with approved 200901079673 including relcoation of air outlets adjustin cfm, 1 vav box, minor demo, relocate & installation of lighting fixtures an… | $110,050 |
| [200901220661](https://www.permitgraph.org/p/200901220661) | Jan 22, 2009 | Completed: final sign-off Sep 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 13th floor- mechanical & electrical work associated with approved 200901079673 including relcoation of air outlets adjusting cfm, 1 vav box, minor demo, relocate & installation of lighting fixtures a… | $110,500 |
| [200901210576](https://www.permitgraph.org/p/200901210576) | Jan 21, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | mechanical, electrical associated with approved pa# 200901079678 including relocation of air outlets adjusting cfm, one vav box, minor demo, relocation & installation of lights & controls is under se… | $110,500 |
| [200901150240](https://www.permitgraph.org/p/200901150240) | Jan 15, 2009 | Completed: final sign-off Nov 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | mechanical & electrical work. ref. appl. 200812108173 to include hvac, new exhaust fan, diffusers, vav boxes & lighting. | $62,000 |
| [200901140168](https://www.permitgraph.org/p/200901140168) | Jan 14, 2009 | Completed: final sign-off Nov 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safty system modifications. expand extg fire alarm system due to tenant replacement 18th floor at 211 main st | $8,000 |
| [200901140167](https://www.permitgraph.org/p/200901140167) | Jan 14, 2009 | Completed: final sign-off May 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | addition/revision to l/s system. ref. #200809020556.211 main st 1st floor auditoriam. | $9,000 |
| [200901079677](https://www.permitgraph.org/p/200901079677) | Jan 7, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 14th floor. new interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & fire life safety to be performed under separate permit,… | $200,000 |
| [200901079678](https://www.permitgraph.org/p/200901079678) | Jan 7, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 15th floor interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mech, elec, telecommoncations and fire l… | $200,000 |
| [200901079679](https://www.permitgraph.org/p/200901079679) | Jan 7, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 12th floor. new interior construction of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mechanical, electrical tele… | $200,000 |
| [200901079681](https://www.permitgraph.org/p/200901079681) | Jan 7, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 10th/fl interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mech, elect, tele communications, and fire… | $200,000 |
| [200901079673](https://www.permitgraph.org/p/200901079673) | Jan 7, 2009 | Completed: final sign-off Sep 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 13th floor interior const of offices including interior non-load bearing partitions, doors, glazed store fronts, acoustic tile ceilings & lighting. associated mech, elect, telecommunications and fire… | $200,000 |
| [200901079680](https://www.permitgraph.org/p/200901079680) | Jan 7, 2009 | Completed: final sign-off Aug 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 11th/fl. interior const of offices including interior non-load bearing partitions,doors, glazed store fronts, acoustic tile ceilings & associated mech, elec, telecommications, and fire life safety to… | $200,000 |
| [200812309295](https://www.permitgraph.org/p/200812309295) | Dec 30, 2008 | Completed: final sign-off Apr 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | revision to pa #200808118880. sprinkler work. relocate 57, add 13, delete 10 sprinkler heads. | $1,000 |
| [200812309294](https://www.permitgraph.org/p/200812309294) | Dec 30, 2008 | Completed: final sign-off May 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | t.i. upgrade the (e) fire sprinkler system, relocate 52 heads, add 18 heads, delete 17 heads. total 70 heads. | $15,750 |
| [200812198853](https://www.permitgraph.org/p/200812198853) | Dec 19, 2008 | Completed: final sign-off May 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety modifications, expand fire alarm system due to tenant improvement | $30,000 |
| [200812198854](https://www.permitgraph.org/p/200812198854) | Dec 19, 2008 | Completed: final sign-off Dec 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety system modifications, expand existing fire alarm system due to tenant improvements | $30,000 |
| [200812158498](https://www.permitgraph.org/p/200812158498) | Dec 15, 2008 | Never finaled: issued Sep 2011, no final | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Thyssenkrupp Elevator Corp.](https://www.permitgraph.org/contractor/thyssenkrupp-elevator-corp-651371) | install destination based elevator control | $25,000 |
| [200812108173](https://www.permitgraph.org/p/200812108173) | Dec 10, 2008 | Completed: final sign-off Nov 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 18th fl, partial remodel of floor tenant improvement including demolition, new non load bearing window wall, partitions, ceilings, finishes, new skylight and electrical. life safety under separate pe… | $265,000 |
| [200811207013](https://www.permitgraph.org/p/200811207013) | Nov 20, 2008 | Completed: final sign-off Dec 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to app #200807187032. add new door at 1704. relocate door at 1705. demo 4 foot wall at 1704. no exterior work. | $7,000 |
| [200811196941](https://www.permitgraph.org/p/200811196941) | Nov 19, 2008 | Completed: final sign-off Apr 2010 | [211 Main St](https://www.permitgraph.org/a/3740/033) |  | 18th floor ti upgrade on the (e) fire sprinkler system for the 18th flr of charles schwab. relocate 25hd; add 5hd; delete 6hd. total 30hd | $6,000 |
| [200811126292](https://www.permitgraph.org/p/200811126292) | Nov 12, 2008 | Completed: final sign-off May 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | interior demo, new drywall, ceiling work, doors, vav box, 1 fire damper, supply and return air | $1,000,000 |
| [200810224835](https://www.permitgraph.org/p/200810224835) | Oct 22, 2008 | Completed: final sign-off Apr 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | ground flr lecture hall without fixed seating and revision to (e) pa# 2008-0701-5781-accessory back of house service and relocate stage. m.e.p. and structural upgrade of restrooms, structural work to… | $114,000 |
| [200810023263](https://www.permitgraph.org/p/200810023263) | Oct 2, 2008 | Completed: final sign-off Apr 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to pa #200807015781, demolition of mezzanine & revision of structural beam from w 36" to 24" @ colum line e between 3 & 2. | $30,000 |
| [200810023266](https://www.permitgraph.org/p/200810023266) | Oct 2, 2008 | Completed: final sign-off Apr 2009 | [211 Main St](https://www.permitgraph.org/a/3740/033) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | exterior window replacement from single pane to double pane, relocation of exterior entry from howard st to main st. | $40,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (54), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) (28), [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) (24), [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) (15), [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) (9), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (8), [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) (6), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (5), [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) (4), [Coast Sign Incorporated](https://www.permitgraph.org/contractor/coast-sign-incorporated-654238) (3), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (3), [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053) (2), [Cisco Fire Sprinklers, Inc.](https://www.permitgraph.org/contractor/cisco-fire-sprinklers-inc-715741), [Deb Construction Llc](https://www.permitgraph.org/contractor/deb-construction-llc-372419), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198), [Lewis M Merlo Inc](https://www.permitgraph.org/contractor/lewis-m-merlo-inc-184527), [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232), [Thyssenkrupp Elevator Corp.](https://www.permitgraph.org/contractor/thyssenkrupp-elevator-corp-651371), [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792)
- Architects: [Jack Munson](https://www.permitgraph.org/professional/jack-munson-C9620) (8), [Steve Lawler](https://www.permitgraph.org/professional/steve-lawler-C29399) (8), [Martha L. Breed](https://www.permitgraph.org/professional/martha-l-breed-C32618) (4), [Teresa Emery](https://www.permitgraph.org/professional/teresa-emery-C14087) (4), [Eric Ibsen](https://www.permitgraph.org/professional/eric-ibsen-C25185) (3), [Nichols Booth](https://www.permitgraph.org/professional/nichols-booth-C14737) (3), [Jonathan Tsao](https://www.permitgraph.org/professional/jonathan-tsao-C12728) (2), [Nathaniel M Haynes](https://www.permitgraph.org/professional/nathaniel-m-haynes-C31735) (2), [Nichols Booth](https://www.permitgraph.org/professional/nichols-booth-C14777) (2), [Douglas Zucker](https://www.permitgraph.org/professional/douglas-zucker-C12821), [Michael Thomas](https://www.permitgraph.org/professional/michael-thomas-CO12728), [Mike Howe](https://www.permitgraph.org/professional/mike-howe-14808), [Paul Ferro](https://www.permitgraph.org/professional/paul-ferro-C28809)
- Engineers: [Joshua Mcmahan](https://www.permitgraph.org/professional/joshua-mcmahan-E18209) (6), [Jeffrey Jeong](https://www.permitgraph.org/professional/jeffrey-jeong-22963) (5), [Guil Orihuela](https://www.permitgraph.org/professional/guil-orihuela-M31230) (4), [Eugene Tuan](https://www.permitgraph.org/professional/eugene-tuan-S3982) (3), [Madison R. Roberts](https://www.permitgraph.org/professional/madison-r-roberts-M37821) (3), [Edward Rivera](https://www.permitgraph.org/professional/edward-rivera-S2835), [Josh Mcmahan](https://www.permitgraph.org/professional/josh-mcmahan-16209), [Joshua Mcmahan](https://www.permitgraph.org/professional/joshua-mcmahan-18209), [Michael L. Stanton](https://www.permitgraph.org/professional/michael-l-stanton-M25130), [Mike Howe](https://www.permitgraph.org/professional/mike-howe-14808), [Stephen Bakin](https://www.permitgraph.org/professional/stephen-bakin-E17415), [Terry Emery](https://www.permitgraph.org/professional/terry-emery-C14087)
- Authorized agents: [John Stempniak](https://www.permitgraph.org/professional/john-stempniak-C29399) (6), [Christina Nguyen](https://www.permitgraph.org/professional/christina-nguyen-892772)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3740/033.