## Permits filed here

The 200 most recent permits filed for this property.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202610169557](https://www.permitgraph.org/p/202610169557) | Oct 16, 2026 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | to obtain final inspection for work approved under pa# 202505146466. all work is complete. |  |
| [202609188333](https://www.permitgraph.org/p/202609188333) | Sep 18, 2026 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Vencon Construction](https://www.permitgraph.org/contractor/vencon-construction-1096244) | revision to permit # 202606233763 to correct address suite number. the suite number was shown incorrectly as 104. the correct address is 405 howard st. suite 140. the tenant and permit application is… |  |
| [202609158146](https://www.permitgraph.org/p/202609158146) | Sep 15, 2026 | In progress: filed Sep 2026, not yet issued | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | ti of interior space on the 7th floor, demo of entire suite,build two new comference rooms. | $60,000 |
| [202608267188](https://www.permitgraph.org/p/202608267188) | Aug 26, 2026 | In progress: issued Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Bear Flag Ironworks Llc](https://www.permitgraph.org/contractor/bear-flag-ironworks-llc-1119272) | installation of steel posts on the roof of 405 howard st, the posts are part of a horizontal life line system. designed by others, to be used by maintenance personnel for fall protection. there is no… | $375,000 |
| [202608247041](https://www.permitgraph.org/p/202608247041) | Aug 24, 2026 | In progress: filed Aug 2026, not yet issued | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | ste 130: interior ti, convert an existing restaurant space into a goop kitchen concept. | $1,300,000 |
| [202607315883](https://www.permitgraph.org/p/202607315883) | Jul 31, 2026 | In progress: issued Aug 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 3rd fl - mech work ti ref pa 202607064544 | $56,000 |
| [202607315885](https://www.permitgraph.org/p/202607315885) | Jul 31, 2026 | In progress: issued Aug 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 3rd fl - electrical work ti ref pa 202607064544 | $199,000 |
| [202607064544](https://www.permitgraph.org/p/202607064544) | Jul 6, 2026 | In progress: issued Jul 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 3/f: remodel of existing tenant space including demo and construction of non-structural partitions, doors, millwork, and finishes. new phone booths and food service coffee area. mep deferred. | $1,714,000 |
| [202606233763](https://www.permitgraph.org/p/202606233763) | Jun 23, 2026 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Vencon Construction](https://www.permitgraph.org/contractor/vencon-construction-1096244) | ste 104 - ti for coffee shop (limited restaurant) new counter service and new kitchen equipment. | $30,000 |
| [202511189853](https://www.permitgraph.org/p/202511189853) | Mar 23, 2026 | In progress: issued Apr 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | rev to existing approved permit 2024-1212-6728. to show occupancy loads and call out assembly areas 8th fl. outdoor deck (8300), east patio (8301) breakroom (8246) |  |
| [202510227934](https://www.permitgraph.org/p/202510227934) | Oct 22, 2025 | Completed: final sign-off Nov 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 3rd floor: relocate 2 fire sprinkler per ti job #25-689. ref #202509256075 | $1,242 |
| [202510217793](https://www.permitgraph.org/p/202510217793) | Oct 21, 2025 | In progress: issued Oct 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | 3rd floor. 3rd demo- remove 3 wall mount speaker and 1 duct detector for heat pump 3-1 that is being decommisioned. ref#: 202509256075. | $3,000 |
| [202509256075](https://www.permitgraph.org/p/202509256075) | Sep 25, 2025 | Completed: final sign-off Nov 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 3rd flr. demolition of 7 doors and 3 non structural demising walls at the 3rd floor. no ceiling demolition. floor is currently unoccupied. no change to mep or sprinklers and no fire, life and safety. | $75,000 |
| [202508012140](https://www.permitgraph.org/p/202508012140) | Aug 1, 2025 | Completed: final sign-off Aug 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | fire alarm as built drawing for pa#: 202505227129. identify duct dectator location on plans for fsd per sffd inspector. |  |
| [202506259458](https://www.permitgraph.org/p/202506259458) | Jun 25, 2025 | In progress: issued Jun 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | fire only permit evacuation sign for previously approved application for 8,9, and 10th floor. t.i. work pa# 2024-1212-6728, 2024-1212-6726,and 2025-0103-7683 | $2,000 |
| [202506047869](https://www.permitgraph.org/p/202506047869) | Jun 4, 2025 | Completed: final sign-off Jul 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 1st fl ref pa #2025-0507-5995 (e) fire sprinkler system - tenant improvements relocate 18 and add 1 fire spinkler | $5,100 |
| [202506027727](https://www.permitgraph.org/p/202506027727) | Jun 2, 2025 | Completed: final sign-off Jun 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | fire alarm ti on parking level 1 - break room. replace (e) speaker strobe with new. add (1) smoke detector, (1) control relay for fsd, and (2) control relays for fan shutdown. ref pa# 202412187041 | $3,500 |
| [202505227129](https://www.permitgraph.org/p/202505227129) | May 22, 2025 | Completed: final sign-off Aug 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | repplace 2 speaker strobes with new and add 1 new spaeker only ref pa# 2025-0507-5995 | $3,200 |
| [202505166655](https://www.permitgraph.org/p/202505166655) | May 16, 2025 | Completed: final sign-off Jun 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | demo plan turn 11 sprinklers upright | $2,500 |
| [202505146466](https://www.permitgraph.org/p/202505146466) | May 14, 2025 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8th/f: revision to 202412126728 (no work to be done). update restroom plans per existing conditions. no fixture count changes, measurement correction only |  |
| [202505075995](https://www.permitgraph.org/p/202505075995) | May 7, 2025 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 1st fl: ti for 1,777 sq ft installation of non structural partitions, millwork, doors & hardware. partial replacement of mep distribution: new supply fan, distribution duct, power + signal, lighting… | $251,766 |
| [202504245172](https://www.permitgraph.org/p/202504245172) | Apr 24, 2025 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 7/f: interior tenant improvement. infill stair opening with pan decking/structural support/concrete. patch back raised access flooring. | $172,000 |
| [202504104165](https://www.permitgraph.org/p/202504104165) | Apr 10, 2025 | Completed: final sign-off Aug 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | fire alarm t.i. on 8th floor: replace 26 speaker strobes, add 18 spk. strobe, 80 spk. & replace 4 at 2 control relay for fan shutdown, 2 control relay for card access, 1 control relay for music shutd… | $70,000 |
| [202503263109](https://www.permitgraph.org/p/202503263109) | Mar 26, 2025 | Completed: final sign-off Sep 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | 9th fl - fire alarm ti on replace 26 speaker strobes; add 19 speaker, 93 speaker; replace 7 speaker; 2 control replays for uft shutdown; 1 control relay for card access; 1 power supply w/2 50 watts a… | $60,000 |
| [202503263107](https://www.permitgraph.org/p/202503263107) | Mar 26, 2025 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | 10th fl - fire alarm ti replace 24 speaker strobe w/new; add 18 speaker strobes, 1 speaker, 6 strobes, 1 control relay for uft shutdown; 1 for card access; 1 power supply w/2 50 watts amp & (4) 2-way… | $30,000 |
| [202503242839](https://www.permitgraph.org/p/202503242839) | Mar 24, 2025 | Completed: final sign-off Jul 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 8th fl - existing fire sprinkler system ti ref pa 202412126728 | $32,900 |
| [202502210752](https://www.permitgraph.org/p/202502210752) | Feb 21, 2025 | Completed: final sign-off May 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 1st/f mail rm- convert portion of e) empty office space into cold shell for new mail rm, included demo of walls, doors, flooring, systems, & associated electrical systems. const to include capping of… | $355,000 |
| [202502190622](https://www.permitgraph.org/p/202502190622) | Feb 19, 2025 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8/f: mep for previously approved arch permit 202412126728, office ti. work includes ductwork, lighting, power and signal. | $200,000 |
| [202502140438](https://www.permitgraph.org/p/202502140438) | Feb 14, 2025 | Completed: final sign-off Aug 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 10/fl-ref 202501037683- mep for office ti to include ductwork , lighting, power and signal | $200,000 |
| [202502110066](https://www.permitgraph.org/p/202502110066) | Feb 11, 2025 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | ti existing fire sprinkler system add 1 & relocate 123 sprinklers. ref pa 202501037683 | $31,000 |
| [202502110065](https://www.permitgraph.org/p/202502110065) | Feb 11, 2025 | Completed: final sign-off Jul 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 9th fl - ti existing fire sprinkler system add 5 & relocate 118 sprinklers. ref pa 202412126726 | $31,000 |
| [202501178606](https://www.permitgraph.org/p/202501178606) | Jan 17, 2025 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mep for previously approved architectural pa# 202412126726 hvac/ductwork, new power, signal, lighting controls | $200,000 |
| [202501037683](https://www.permitgraph.org/p/202501037683) | Jan 3, 2025 | Completed: final sign-off Aug 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 10/fl-ref 202410223482- partial ti to install non structural partitions and ceilings no change of use mep fire alarm system and sprinkler under separte permit | $852,000 |
| [202412187041](https://www.permitgraph.org/p/202412187041) | Dec 18, 2024 | Completed: final sign-off Jun 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | basement level 1: convert (e) storage room to (n) break room including relocating (e) lighting & furniture and provide new light fixtures and power receptacles. no plumbing fixtures | $25,458 |
| [202412126726](https://www.permitgraph.org/p/202412126726) | Dec 12, 2024 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | partial interior t.i. on 9th fl. installation of non structural partitions and ceilings (improvement area 7,900 sq) no change of use mep deferred | $1,212,800 |
| [202412126728](https://www.permitgraph.org/p/202412126728) | Dec 12, 2024 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8/f: partial interior tenant improvement. installation of non structural partitions and ceilings. addition of patio millwork. no change of use. fire alarm system, sprinkler, mep under separate permit. | $1,704,000 |
| [202411205343](https://www.permitgraph.org/p/202411205343) | Nov 20, 2024 | Completed: final sign-off Jun 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | document building ground floor entrances, elevators, and parking path of travel to full compliance. includes (n) parking striping, ev charging stalls and exit signage | $8,000 |
| [202410223482](https://www.permitgraph.org/p/202410223482) | Oct 22, 2024 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8-10/fl- partial interior demo of non structural partitions (e) lightings, ceilings, millwork. removal of (e) furniture systems. fire sprinkler plans will be under separate permit by fire protection… | $170,000 |
| [202409130759](https://www.permitgraph.org/p/202409130759) | Sep 13, 2024 | In progress: issued Sep 2024 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | 3/f: fire alarm ti- relocate 1 control relay to interfere w/ access control at new location. | $800 |
| [202310118390](https://www.permitgraph.org/p/202310118390) | Oct 11, 2023 | Completed: final sign-off Jan 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | 3rd/f: fire alarm t.i. add 4 speaker strobes & relocate 2. ref to 202308234998 | $2,500 |
| [202310037889](https://www.permitgraph.org/p/202310037889) | Oct 3, 2023 | Never finaled: issued Oct 2023, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler t.i. relocate 3 pendents and 7 uprights on the 3rd fl. ref pa# 2023-0823-4998 | $6,200 |
| [202308234998](https://www.permitgraph.org/p/202308234998) | Aug 23, 2023 | Completed: final sign-off Feb 2025 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | 3/f: demising of existing tenant space, new partitions, doors, lighting and finishes, no change in occupancy, use or area. interior work only | $169,099 |
| [202210194689](https://www.permitgraph.org/p/202210194689) | Oct 19, 2022 | Completed: final sign-off Oct 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 2/f: as built, add (1) upright to soutsdie in storage (400), ref bpa#202204293272 | $1,000 |
| [202209283339](https://www.permitgraph.org/p/202209283339) | Sep 28, 2022 | Never finaled: issued Sep 2022, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | rev to pa# 2022-0803-9845: update mode/make of notification appliances, update candela settling add 2 power supplies and update | $3,000 |
| [202209222917](https://www.permitgraph.org/p/202209222917) | Sep 22, 2022 | Completed: final sign-off Oct 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Maguire Inc Dba Lahue And Associates](https://www.permitgraph.org/contractor/maguire-inc-dba-lahue-and-associates-928827) | 2/f: evacuation signs (7) | $2,957 |
| [202208039845](https://www.permitgraph.org/p/202208039845) | Aug 3, 2022 | Never finaled: issued Sep 2022, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | 2/f: f/a t.i., add (76) spker/strobes, (60) speakers, (22) strobes, (2) power supplies, (2) smoke detectors, (5) duct detectors w/relays for tsd, (2) duct detectors for ahu w/relays, (1) duct detecto… | $40,000 |
| [202204293272](https://www.permitgraph.org/p/202204293272) | Apr 29, 2022 | Completed: final sign-off Oct 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 2nd fl: fire sprinklers - relocate 284 pendent sprinklers & relocate 232 uprights. ref pa# 202201186188 | $99,250 |
| [202204283228](https://www.permitgraph.org/p/202204283228) | Apr 28, 2022 | Completed: final sign-off Mar 2023 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 2/f: mechanical, electrical, and plumbing system for 2/f tenant improvement. ref ti permit 202201186188. |  |
| [202202037223](https://www.permitgraph.org/p/202202037223) | Feb 3, 2022 | Completed: final sign-off Jun 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | 3/f: reference pa 202109138246: interior tenant improvement including ancourage of new non structural, pavilion elements to existing pt concrete slab. | $10,000 |
| [202201216374](https://www.permitgraph.org/p/202201216374) | Jan 21, 2022 | Completed: final sign-off Apr 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | to obtain final inspection for work approved under pa 202009295358. renew wxpired sign permit for 4th, 5th, 6th floor. |  |
| [202201216377](https://www.permitgraph.org/p/202201216377) | Jan 21, 2022 | Completed: final sign-off Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | to obtain final inspection for work approved under pa 202003036071 (4th fl), 202002204964 (5 & 2020012929922. all work is complete |  |
| [202201186188](https://www.permitgraph.org/p/202201186188) | Jan 18, 2022 | Completed: final sign-off Mar 2023 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | tenant improvement of extg 2nd floor. all work is interior, no exterior or common areas. seperate permit for fire life safety and mep work. | $4,879,800 |
| [202112305216](https://www.permitgraph.org/p/202112305216) | Dec 30, 2021 | Expired or cancelled: withdrawn May 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | g/f: demolition of existing wall partitions, furniture, lighting and fixtures. new partition walls, ceilings, furniture, fixtures, finishes and mep system. | $600,000 |
| [202112224914](https://www.permitgraph.org/p/202112224914) | Dec 22, 2021 | Completed: final sign-off Oct 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler heads upright for demo pa# 202112214824. | $5,000 |
| [202112214824](https://www.permitgraph.org/p/202112214824) | Dec 21, 2021 | Never finaled: issued Jan 2022, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | demo of interior partitions and ceilings. ab-017 applies. no exterior work. sprinkler upright permit #202112224914. | $20,000 |
| [202112083991](https://www.permitgraph.org/p/202112083991) | Dec 8, 2021 | Completed: final sign-off Jan 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | fire alarm ti - add 21 speaker only on 4th fl; 24 speaker only on 5th fl & 20 speaker only on the 6th fl; ref pa 2019-1031-6117, 2019-0925-2631-2019-0820-9311 | $32,500 |
| [202112013436](https://www.permitgraph.org/p/202112013436) | Dec 1, 2021 | Completed: final sign-off Apr 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | fire alarm t.i. on 3rd floor: add 2 speaker strobes,7 speakers, & relocate 2 speaker strobers. ref #202109138246 | $4,000 |
| [202109138246](https://www.permitgraph.org/p/202109138246) | Sep 13, 2021 | Completed: final sign-off Jun 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | 3rd fl: construction of (1) conference room. installation of furniture partitions, lighting, power and finishes. no change in occupancy or use. | $959,900 |
| [202107224888](https://www.permitgraph.org/p/202107224888) | Jul 22, 2021 | Completed: final sign-off Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | structural detail revision to previously approved permit #202105251005 phone booth by eliminating detail #4 of frainery anchorage to raf. |  |
| [202107124187](https://www.permitgraph.org/p/202107124187) | Jul 12, 2021 | Expired or cancelled: cancelled Dec 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | f/a t.i.: add wireless chime system-add (3) new facu for wireless system,12 repeaters,1 gateweay,21 chimes on 4/f;14 repeaters,1 gateway,24 chimes on 5/f;6 repeaters,1gateway,20 chimes on 6/f;3 est m… | $40,000 |
| [202106293396](https://www.permitgraph.org/p/202106293396) | Jun 29, 2021 | Never finaled: issued Jul 2021, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | as-built plans for fire/smoke dampers location with matrix requested by sffd.revision to 4/5/6 floors under pa 202001292992, 202002204904, 202003036071. maher n/a. |  |
| [202106142360](https://www.permitgraph.org/p/202106142360) | Jun 14, 2021 | Completed: final sign-off Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision to pa# 201910316117; 201909252631;201908209311. location of magnetic lock hardware info. and access control doors. |  |
| [202106081918](https://www.permitgraph.org/p/202106081918) | Jun 8, 2021 | Completed: final sign-off Mar 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision to previously approved permit #2020-0211-4190 occupant load from 131 to 97 |  |
| [202105251005](https://www.permitgraph.org/p/202105251005) | May 25, 2021 | Completed: final sign-off Jan 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | rev to pa 201910316117 by adding two ballasy plates (1"x30" each) to each brooth to resist overturning. | $5,000 |
| [202105190609](https://www.permitgraph.org/p/202105190609) | May 19, 2021 | Completed: final sign-off Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | voluntary seismic strengthening of historic unreinforced bearing wall building, previously reinforced with steel braces, & out of plane wall anchors. current retrofit installs additional out of plane… | $94,000 |
| [202104208989](https://www.permitgraph.org/p/202104208989) | Apr 20, 2021 | Completed: final sign-off Jul 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers. relocate 3 pendent sprinklers and 2 uprights on the 1st floor. t.i. ref # 2019-1230-0993 | $2,500 |
| [202104158679](https://www.permitgraph.org/p/202104158679) | Apr 15, 2021 | Completed: final sign-off Jun 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | 3rd fl: revision to pa# 202009265173. reduction of scope. remove 4 private offices, modify some door hardware to panic hardware. delete/relocated some outlets. |  |
| [202104158661](https://www.permitgraph.org/p/202104158661) | Apr 15, 2021 | Completed: final sign-off Jul 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | fire alarm t.i. - 1st flr. add (5) speaker strobes, (5) duct detectors w/relays for fsd, & (1) duct detector for fcu w/relay. ref# 2019-1230-0993 | $7,000 |
| [202103086102](https://www.permitgraph.org/p/202103086102) | Mar 8, 2021 | Completed: final sign-off Oct 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | install 1 new condensing unit. install 1 new fan coil unit. install low pressure duct. install 5 fire/smoke dampers. electrical- power, lighting & signal. ref pa# 201912300993. |  |
| [202103045872](https://www.permitgraph.org/p/202103045872) | Mar 4, 2021 | Completed: final sign-off Jun 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | fire alarm t.i. - 3rd floor. add (4) speaker/strobes, (1) control relay for door release & (1) control relay for fans. add (3) 2-way call stations at elevator lobbies. ti ref # 2021-0415-867; 2-way c… | $7,500 |
| [202102184978](https://www.permitgraph.org/p/202102184978) | Feb 18, 2021 | Completed: final sign-off Mar 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | fire sprinkler permit relocate 6 and add 4 sprinklers on the 3rd floor. ti # 2020-0926-5173 | $4,000 |
| [202101293689](https://www.permitgraph.org/p/202101293689) | Jan 29, 2021 | Completed: final sign-off Oct 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | suite 101-rev to pa201912300993 to replace the pot with newly approved pot under 202008111504, cvoersheet & da checklist. maher n/a. |  |
| [202101283582](https://www.permitgraph.org/p/202101283582) | Jan 28, 2021 | Completed: final sign-off Jan 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | modify existing firefighter's fan control graphic to accomodate tenant improvement changes on floor 4, 5, & 6. reference smoke control report on sheet fa-44. | $5,000 |
| [202009295358](https://www.permitgraph.org/p/202009295358) | Sep 29, 2020 | Completed: final sign-off Apr 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4/f,5/f,6/f: signs for emergency evacuation lan, directional sign, two-way communication system sign. ref pa201908209311, 201909252631 & 201910316117. maher n/a. | $3,000 |
| [202009295461](https://www.permitgraph.org/p/202009295461) | Sep 29, 2020 | Completed: final sign-off May 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision for dph review only in reference to approved bldg permit 201910316117, 201909252631 & 201908209311. |  |
| [202009285289](https://www.permitgraph.org/p/202009285289) | Sep 28, 2020 | Never finaled: issued Nov 2020, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | replace existing network cable for fire alarm system at basement level to meet 2 hr survivability. reference sheet fa-1b approved meeting minutes | $1,000 |
| [202009265173](https://www.permitgraph.org/p/202009265173) | Sep 26, 2020 | Completed: final sign-off Jun 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | 3/f: t.i.:new non-structural partitions, doors, glazing, millwork, finishes. no change in occupancy, use or area. life safety & sprinklers under sep permit. | $383,125 |
| [202009255017](https://www.permitgraph.org/p/202009255017) | Sep 25, 2020 | Completed: final sign-off May 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision to service hub layout near exit stairs #1 & #3 on 4th, 5th, 6th floors previously approved under pa #2019-0820-9311, 2019-0925-2631, & 2019-1031-6117 requested by fire dept. reverify occupna… | $80,000 |
| [202009083706](https://www.permitgraph.org/p/202009083706) | Sep 8, 2020 | Completed: final sign-off Nov 2020 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | ref pa# 201908209311; 6th fl. fire alarm t.i. add 1 weather proof speaker strobe | $1,200 |
| [202008282851](https://www.permitgraph.org/p/202008282851) | Aug 28, 2020 | Completed: final sign-off Nov 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | modify existing fire alarm system evacuation matrix to partial evacuation. no reference drawing. | $2,000 |
| [202008272814](https://www.permitgraph.org/p/202008272814) | Aug 27, 2020 | Completed: final sign-off Sep 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | provide building 2-way communication system head end equipment & riser backbone. scope include 1 command center, 1 sub master station, 2 push button door unlock stations w/ relay, 2 monitoring module… | $10,000 |
| [202008111504](https://www.permitgraph.org/p/202008111504) | Aug 11, 2020 | Completed: final sign-off May 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 1st fl - install new turnstiles elevator lobbies | $250,000 |
| [202006128591](https://www.permitgraph.org/p/202006128591) | Jun 12, 2020 | Completed: final sign-off Mar 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | t.i. on 1st floor - add (6) control relay to interface with lobby turnstile | $3,600 |
| [202005117402](https://www.permitgraph.org/p/202005117402) | May 11, 2020 | Completed: final sign-off Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm t.i. on 5th floor - relocate e appliances as shown on plan. add (1) control relay for crac unit, (96) smoke detectors, (9) duct detectors, (22) monitoring modules for fsd status, (20) cont… | $115,000 |
| [202005117410](https://www.permitgraph.org/p/202005117410) | May 11, 2020 | Completed: final sign-off Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm t.i. on 4th floor - add (1) node to facu includes amps on 4th flr. add (1) power w/sync module, (35) ceiling speakers, (41) strobes, (21) wall speaker strobes, (51) ceiling speaker strobes… | $140,000 |
| [202005087374](https://www.permitgraph.org/p/202005087374) | May 8, 2020 | Completed: final sign-off Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm t.i. on 6th floor - relocate e appliances as shown on plan. replace (1) existing power supply and add (1) new. add (2) ceiling speakers, (1) weatherproof speaker strobes, (24) ceiling stro… | $130,000 |
| [202003036071](https://www.permitgraph.org/p/202003036071) | Mar 3, 2020 | Expired or cancelled: expired Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4th fl - mechanical & electrical system for 4th fl office ti. fire alarm, fire sprinkler, fire life safety system under separate permit. ref pa #201910316117. |  |
| [202003025859](https://www.permitgraph.org/p/202003025859) | Mar 2, 2020 | Expired or cancelled: cancelled Jan 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | existing 6th fl terrance alterations. see pa #201908209311 for full ada compliance. | $75,000 |
| [202002204964](https://www.permitgraph.org/p/202002204964) | Feb 20, 2020 | Expired or cancelled: expired Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical & electrical system for 5th fl office tenant improvement. fire alarm, fire sprinklers, & fire life safety system under separate permits. arch ti permit approved under #201909252631. |  |
| [202002114190](https://www.permitgraph.org/p/202002114190) | Feb 11, 2020 | Completed: final sign-off Mar 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision to 201908209311: renovation to e 6th fl roof terrace. maher not req |  |
| [202002103934](https://www.permitgraph.org/p/202002103934) | Feb 10, 2020 | Completed: final sign-off Mar 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | 4th fl - fire sprinkler permit. install 326 pendents, 189 uprights on 5 new hose valves. ref pa 2019-1010-4129 | $300,000 |
| [202002103966](https://www.permitgraph.org/p/202002103966) | Feb 10, 2020 | Completed: final sign-off May 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | install a new stairway to connect 4th, 5th & 6th floors. revision to approved pa# 2019/10/31/6117, pa# 2019/09/25/2631 & pa# 2019/08/20/9311 (4th, 5th & 6th floor t.i. work) new opening in (e) pt sla… |  |
| [202002073860](https://www.permitgraph.org/p/202002073860) | Feb 7, 2020 | Expired or cancelled: cancelled Dec 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | addition of 13 room phone booths of (e) open office space. addition of (n) sprinklers and fire strobes tied to (e) systems. no mep work. **maher n/a** | $23,675 |
| [202002063775](https://www.permitgraph.org/p/202002063775) | Feb 6, 2020 | Expired or cancelled: cancelled Jan 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | convert existing mdf/idf room 234 and crac room 233 to storage room 234 and storage rm 233 ordinary hazard. no mech, elec, plumbing, fire | $34,275 |
| [202002063750](https://www.permitgraph.org/p/202002063750) | Feb 6, 2020 | Completed: final sign-off May 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision to pa #201910316117, 201909252631, 201908209311 for 4th, 5th, & 6th ti improvement work. structural dmolition of 6th& 5th fl floors for future stairway and provide 2-hr fire rated shaft encl… | $100,000 |
| [202001313238](https://www.permitgraph.org/p/202001313238) | Jan 31, 2020 | Completed: final sign-off Apr 2020 | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | fire sprinkler permit. remove all existing pendent sprinklers and arm-over piping and replace with 294 upright sprinklers. ti pa #2019-0820-9311 | $60,000 |
| [202001293003](https://www.permitgraph.org/p/202001293003) | Jan 29, 2020 | Completed: final sign-off Mar 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | 6/f: f/s only - install 284 pendents, 256 uprights and 5 new fire hose valves on the 6/f. ref t.i. pa#201908209311. maher n/a. | $95,000 |
| [202001292975](https://www.permitgraph.org/p/202001292975) | Jan 29, 2020 | Never finaled: issued Feb 2020, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | 5/f: f/s only - install 326 pendents, 315uprights and 6 new fire hose valves on the 5/f. ref t.i. pa#201909252631. maher n/a. | $99,000 |
| [202001292992](https://www.permitgraph.org/p/202001292992) | Jan 29, 2020 | Expired or cancelled: expired Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 6/f: mechanical & electrical system for 6th fl office ti. fire alarm, fire sprinkler & life safety under separate permit. ref pa 2019-0820-9311 |  |
| [201912300993](https://www.permitgraph.org/p/201912300993) | Dec 30, 2019 | Completed: final sign-off Oct 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | build out of office space with new stairs and lift. 2 offices structural work included. life safety, mech, plmg, & sprinkler system modifications under seperate permits. | $315,000 |
| [201910316117](https://www.permitgraph.org/p/201910316117) | Oct 31, 2019 | Completed: final sign-off Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4th floor: interior improvement/alterations. mep, fire alarm, life safty, and fire sprinker system under seperate permit. modify existing tenant egress plan temporary during demo/const n/a for maher | $6,100,000 |
| [201910215113](https://www.permitgraph.org/p/201910215113) | Oct 21, 2019 | Completed: final sign-off May 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | 4th floor: 313 upright sprinklers. ref app#201910073751 | $66,043 |
| [201910215109](https://www.permitgraph.org/p/201910215109) | Oct 21, 2019 | Completed: final sign-off May 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | 5th floor: 313 upright sprinklers. ref app#201909252631 | $66,040 |
| [201910215070](https://www.permitgraph.org/p/201910215070) | Oct 21, 2019 | Completed: final sign-off May 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5/f: amend 201909252631; add ceiling demolition and sprinkler plan:201910215109. remain vacancy per ab-17. maher n/a. | $50,000 |
| [201910215069](https://www.permitgraph.org/p/201910215069) | Oct 21, 2019 | Completed: final sign-off May 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4/f: amend permit 201910073751 to add ceiling demolition and sprinkler plan 201910215113. remaining vacany per ab-17. maher n/a. | $50,000 |
| [201910174816](https://www.permitgraph.org/p/201910174816) | Oct 17, 2019 | Completed: final sign-off Feb 2020 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | to establish a3 occupancy in e office space. reallocate existing square footage to accomodate a larger employee lounge ref 201507141406 |  |
| [201910104129](https://www.permitgraph.org/p/201910104129) | Oct 10, 2019 | Expired or cancelled: withdrawn Feb 2020 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4th floor: full gut & build out including boardrooms, breakrooms, idf, showers. ** maher: n/a ** | $6,355,000 |
| [201910073751](https://www.permitgraph.org/p/201910073751) | Oct 7, 2019 | Completed: final sign-off May 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4th floor entire demo only | $40,000 |
| [201910023281](https://www.permitgraph.org/p/201910023281) | Oct 2, 2019 | Completed: final sign-off May 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | ref pa# 2019-0925-2631. demo only for 5th floor. |  |
| [201909303094](https://www.permitgraph.org/p/201909303094) | Sep 30, 2019 | Completed: final sign-off Apr 2021 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | interior demo on the 6th floor of 52,456 sf demo to include non load bearing walls furniture and finishes, ref 201908209311 | $40,000 |
| [201909252631](https://www.permitgraph.org/p/201909252631) | Sep 25, 2019 | Completed: final sign-off Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5th floor. full single tenant. horizontal exit, intervening stairs, fire alarm, sprinklers, new smoke control, fire life safety, and mep will be under a seperate permit. **maher n/a** | $6,355,000 |
| [201908209311](https://www.permitgraph.org/p/201908209311) | Aug 20, 2019 | Completed: final sign-off Feb 2022 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 6/fl. full fl single tenant. create horizontal exit. access control drs, intervening stairs,occupant load inc. fire alarm,sprinklers,new smoke ctrl design,2-waycomm,&evac signs on sep permits. revise… | $6,355,000 |
| [201905140522](https://www.permitgraph.org/p/201905140522) | May 14, 2019 | Completed: final sign-off Sep 2020 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | install one non-illuminated single-faced wall sign "orrick/pwc" sign 3. | $3,000 |
| [201905140521](https://www.permitgraph.org/p/201905140521) | May 14, 2019 | Completed: final sign-off Oct 2020 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | install one illuminated single-faced wall sign "orrick/pwc" sign 5. | $10,000 |
| [201905140520](https://www.permitgraph.org/p/201905140520) | May 14, 2019 | Never finaled: issued Jun 2019, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | install one illuminated single-faced wall sign "orrick" sign 4b. | $10,000 |
| [201905140515](https://www.permitgraph.org/p/201905140515) | May 14, 2019 | Completed: final sign-off Sep 2020 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | install one illuminated single-faced wall sign "pwc" sign 4a. | $10,000 |
| [201811276754](https://www.permitgraph.org/p/201811276754) | Nov 27, 2018 | Never finaled: issued Nov 2018, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Blackline Construction](https://www.permitgraph.org/contractor/blackline-construction-783873) | #550:installing a wood facade of the front and side of a house onto the walls of the lobby of an office and installing turf carpet panels on the floor to create a theatrical set piece(temporary) for… | $40,000 |
| [M991508](https://www.permitgraph.org/p/M991508) | Oct 10, 2018 | Never finaled: issued Oct 2018, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | street space |  |
| [201805300498](https://www.permitgraph.org/p/201805300498) | May 30, 2018 | Never finaled: issued May 2018, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | relocate and add fire sprinkler per ti 201801239286. 2 add on 4th flr, 1 relocate 4th flr | $1,275 |
| [201805219657](https://www.permitgraph.org/p/201805219657) | May 21, 2018 | Completed: final sign-off May 2018 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 1st floor: extg fire sprinkler system as build relocated 6 sprinklers. ref# 201803163877 and arch app#201712156655. n/a for maher | $3,000 |
| [201804247198](https://www.permitgraph.org/p/201804247198) | Apr 24, 2018 | Completed: final sign-off Jun 2018 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | parking level & 1st fl. fire alarm ti add 14 wall mount speaker strobes, 11 celiing speakers, 2 duct detectors for fan with 2 control relays for shutdown. ref pa 2017-1215-6655 and mech. 2018/01/31/0… | $14,000 |
| [201803204113](https://www.permitgraph.org/p/201803204113) | Mar 20, 2018 | Completed: final sign-off Apr 2018 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 2 new speaker/strobes. ref app#201712126222. n/a for maher | $5,000 |
| [201803163877](https://www.permitgraph.org/p/201803163877) | Mar 16, 2018 | Completed: final sign-off Jun 2018 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | existing fire sprinkler system ti 26 relocated sprinklers, 15 added sprinklers. ref pa 2017-1215-6655 | $20,000 |
| [201802201631](https://www.permitgraph.org/p/201802201631) | Feb 20, 2018 | Never finaled: issued Feb 2018, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2nd flr - provide exit signage, panic hardware & assembly permit to clear fire violation notice maher na | $10,000 |
| [201801310053](https://www.permitgraph.org/p/201801310053) | Jan 31, 2018 | Never finaled: issued Jan 2018, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to app#201712156655 to change the scope of work to mechanical air distibution only. n/a for maher |  |
| [201801239286](https://www.permitgraph.org/p/201801239286) | Jan 23, 2018 | Completed: final sign-off Nov 2018 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 4th flr #400 - mechanical & electrical work to support approved arch ti ref 201712126222 maher na | $78,000 |
| [201712156655](https://www.permitgraph.org/p/201712156655) | Dec 15, 2017 | Never finaled: issued Jan 2018, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | ti of (e) showroom space by converting (e) vacant showrm to new model unit gallery for the transbay block & residential development. new lobby/recept desk, bld & site model rooms. material library an… | $235,000 |
| [201712126222](https://www.permitgraph.org/p/201712126222) | Dec 12, 2017 | Completed: final sign-off Nov 2018 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 4th fl - minor interior ti -add 1 new office, drywall, doors, finishes. no mech or elec; n/a maher | $13,068 |
| [201710110966](https://www.permitgraph.org/p/201710110966) | Oct 11, 2017 | Completed: final sign-off Feb 2018 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | t.i. interior only for extg coffee shop. installation of new partitions, finishes, fixtures, furnitures, casework, millwork and equipments. n/a for maher. | $140,000 |
| [201708235705](https://www.permitgraph.org/p/201708235705) | Aug 23, 2017 | Never finaled: issued Aug 2017, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm ti on the 6th floor - add 2 control relay for ti equipment interface. ref pa 2016-0301-0885. maher na | $1,200 |
| [201706280529](https://www.permitgraph.org/p/201706280529) | Jun 28, 2017 | Completed: final sign-off Feb 2018 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | add ls device and signage ref 201511243507 |  |
| [M772927](https://www.permitgraph.org/p/M772927) | Mar 31, 2017 | Never finaled: issued Mar 2017, no final | [235 01st St](https://www.permitgraph.org/a/3737/030) |  | street space & mta parking meter |  |
| [201703141410](https://www.permitgraph.org/p/201703141410) | Mar 14, 2017 | Completed: final sign-off Mar 2017 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 3/f- fire alarm as built drawing for pa#201612215641. remove fsd's and associated control relays no longer required due to changes of floor smoke zone n/a ordinance #155-13 |  |
| [201701177282](https://www.permitgraph.org/p/201701177282) | Jan 17, 2017 | Completed: final sign-off Aug 2017 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Maguire Inc Dba Lahue And Associates](https://www.permitgraph.org/contractor/maguire-inc-dba-lahue-and-associates-928827) | 3rd floor - 10 evacuation signs. | $4,060 |
| [201612215641](https://www.permitgraph.org/p/201612215641) | Dec 21, 2016 | Completed: final sign-off Apr 2017 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm ti on 3rd fl. add 8 speaker strobes, 1 ceiling strobe. ref 2016-0610-9611. maher ord 155-13 na | $5,000 |
| [201612094652](https://www.permitgraph.org/p/201612094652) | Dec 9, 2016 | Never finaled: issued Dec 2016, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | ref permit # 201507141406, need to change occupancy of lounge from b to a3 on sheet a04c |  |
| [201610039345](https://www.permitgraph.org/p/201610039345) | Oct 3, 2016 | Completed: final sign-off Oct 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) | revision to permit 201512175329: one sign only and not 2 signs per building inspection comments; maher n/a (signs c&d) | $5,000 |
| [201609278898](https://www.permitgraph.org/p/201609278898) | Sep 27, 2016 | Completed: final sign-off Nov 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 3rd floor fire sprinkler system tenant improvements - relocate 21 sprinklers, add 13 sprinklers. ref #2016-0610-9611 n/a maher ordinance | $11,000 |
| [201609208268](https://www.permitgraph.org/p/201609208268) | Sep 20, 2016 | Never finaled: issued Sep 2016, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 6th flr: fire alarm t.i., add one speaker strobe, ref. 201603010885; maher n/a | $1,000 |
| [201609208282](https://www.permitgraph.org/p/201609208282) | Sep 20, 2016 | Completed: final sign-off Oct 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 1st flr, fire alarm t.i. add 3 speakers and one speaker strobe; ref. # 2016-0509-6904. n/a maher ord. 155-13 | $2,000 |
| [201608054300](https://www.permitgraph.org/p/201608054300) | Aug 5, 2016 | Completed: final sign-off Apr 2017 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | 3/f- rev.to pa#201606109611, atrium to be made "not occupied",new structural infill below new restrooms, minor mep. finish, power, ceiling and millwork revisions.removed 12 fsds associated w/ previou… | $90,000 |
| [201606109611](https://www.permitgraph.org/p/201606109611) | Jun 10, 2016 | Completed: final sign-off Apr 2017 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | selective demolition & construction of non structural partitions, millwork, finishes, ceiling lighting, additional restrooms, mep. included in the submittal. fire sprinkler & life safety under separa… | $1,429,450 |
| [201605096904](https://www.permitgraph.org/p/201605096904) | May 9, 2016 | Never finaled: issued Jul 2016, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | demo millwork and low walls-construction, new partitions, millwork doors frames ceilings, & finishes. install new mechanical electrical lights to accomodate new layout. n/a for maher. | $250,000 |
| [201603101670](https://www.permitgraph.org/p/201603101670) | Mar 10, 2016 | Completed: final sign-off Feb 2018 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | electrical - powerd for 2 small server racks. permit is for idf room only. referenced ti 2015.1124.3507 maher na | $10,000 |
| [201603101672](https://www.permitgraph.org/p/201603101672) | Mar 10, 2016 | Completed: final sign-off Mar 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 1 control module for fan shutdown. t.i. pa#201511243507. n/a ordinance #155-13 | $2,500 |
| [201603091572](https://www.permitgraph.org/p/201603091572) | Mar 9, 2016 | Completed: final sign-off Feb 2018 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 6th floor: install new exhaust fan. install new transfer airboot. ref. app#201511243507. n/a for maher. | $5,000 |
| [201603010885](https://www.permitgraph.org/p/201603010885) | Mar 1, 2016 | Completed: final sign-off Feb 2018 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 6th floor: tenant improvements to convert extg offices into meeting rooms. new carpet and paint. mechanical plan submitted under separate permit. | $67,000 |
| [201602260632](https://www.permitgraph.org/p/201602260632) | Feb 26, 2016 | Completed: final sign-off Oct 2017 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | electrical - new electrical ref pa 2015-1124-3507. maher na |  |
| [201602119350](https://www.permitgraph.org/p/201602119350) | Feb 11, 2016 | Completed: final sign-off Mar 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | add 5 new control relay, 2 new duct sd, 4 new interposing relays,4 new wall mounts, 7 new mount/strobes (1)new ceiling mount speaker,t.i. 201511102314; maher n/a | $1,870 |
| [201602018533](https://www.permitgraph.org/p/201602018533) | Feb 1, 2016 | Completed: final sign-off Mar 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 6th flr: existing fire sprinkler system tenant improvements, 8 sprinklers (4 new and 4 relo) ref ti 2015-1124-3507; maher n/a | $6,500 |
| [201601217618](https://www.permitgraph.org/p/201601217618) | Jan 21, 2016 | Completed: final sign-off Feb 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | fire sprinkler system t.i., 43 sprinklers on g/f. pa#201511102314. n/a ordinance #155-13 | $22,000 |
| [201512175331](https://www.permitgraph.org/p/201512175331) | Dec 17, 2015 | Completed: final sign-off Oct 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) | electric wall sign | $10,000 |
| [201512175329](https://www.permitgraph.org/p/201512175329) | Dec 17, 2015 | Completed: final sign-off Oct 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) | electric wall sign | $15,000 |
| [201511243507](https://www.permitgraph.org/p/201511243507) | Nov 24, 2015 | Completed: final sign-off Oct 2017 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 6th floor tenant improvements. modification to parts of the existing space, reception area, open offices, and support facilities. m.e.p. to be on separate permits. | $105,000 |
| [201511102314](https://www.permitgraph.org/p/201511102314) | Nov 10, 2015 | Completed: final sign-off Oct 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | demo (e) partitions, flooring, finishes. construct new non structural partitions. install (n) doors, frames, finishes, lights and mech to accomodate new layout add 2 ada bathrooms. maher na | $745,000 |
| [201510210315](https://www.permitgraph.org/p/201510210315) | Oct 21, 2015 | Never finaled: issued Oct 2015, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | add 1 speaker/strobe, 17 speakers maher na ref pa 7th floor 2015-0728-2642, 8th floor, 2015-0728-2649; 9th floor, 2015-0728-2650 | $12,000 |
| [201510169907](https://www.permitgraph.org/p/201510169907) | Oct 16, 2015 | Never finaled: issued Oct 2015, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | floors 7, 8, 9: fire sprinkler ti under general contractor ref pa 2015-0728-2642, 2015-0728-2649, 2015-0728-2650. relocate 63, add 8, plug 6. | $14,200 |
| [201509308390](https://www.permitgraph.org/p/201509308390) | Sep 30, 2015 | Completed: final sign-off Jan 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | add 26 speaker/strobe, 1 power supply | $12,000 |
| [201508113898](https://www.permitgraph.org/p/201508113898) | Aug 11, 2015 | Completed: final sign-off Dec 2015 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical and electrical work to tenant improvement on the 2nd fl ref 201507141406 maher not req | $200,000 |
| [201507282650](https://www.permitgraph.org/p/201507282650) | Jul 28, 2015 | Completed: final sign-off Mar 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | partial remodel of 9/f, interior t.i. includes addition of new interior offices, new furniture, interior finish upgrades and minor upgrades to existing restrooms to comply with current code, minimal… | $300,000 |
| [201507282649](https://www.permitgraph.org/p/201507282649) | Jul 28, 2015 | Completed: final sign-off Mar 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | partial remodel of 8/f, interior t.i. includes addition of new interior offices, new furniture, interior finish upgrades and minor upgrades to existing restrooms to comply with current code, minimal… | $300,000 |
| [201507282642](https://www.permitgraph.org/p/201507282642) | Jul 28, 2015 | Completed: final sign-off Mar 2016 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | partial remodel of 7/f, a total of 4,649 sq.ft. of interior t.i. includes addition of new interior offices, new furniture, interior finish upgrades and minor upgrades to existing restrooms to comply… | $300,000 |
| [201507141406](https://www.permitgraph.org/p/201507141406) | Jul 14, 2015 | Completed: final sign-off Apr 2017 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | t.i. on 2/f to include modification of existing tenant space selective demolition and new non-load bearing partitions and new finishes. n/a ordinance #155-13 | $1,000,000 |
| [201506199451](https://www.permitgraph.org/p/201506199451) | Jun 19, 2015 | Completed: final sign-off Aug 2015 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Transceive Communications Inc.](https://www.permitgraph.org/contractor/transceive-communications-inc-845538) | tenants moving out. tennants wanted indoor ceiling antennas to be removed off ceiling tiles. cables are left next tennats. (18) total. | $1,200 |
| [201501145683](https://www.permitgraph.org/p/201501145683) | Jan 14, 2015 | Expired or cancelled: cancelled Jan 2020 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th and 5th floor: as built submitted for mechanical and smoke control work. ref app # |  |
| [201411030519](https://www.permitgraph.org/p/201411030519) | Nov 3, 2014 | Completed: final sign-off Nov 2014 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | revision to appl 2014.0325.1567 as built to fire sprinkler permit. add (1) head. (original arch apn # 201401156307) maher n/a. | $515 |
| [201410280039](https://www.permitgraph.org/p/201410280039) | Oct 28, 2014 | Completed: final sign-off Dec 2014 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | provide (2) control relays for two vfd's, provide (2) monitor modules to monitor vfd run. t.i. pa#201406178572. n/a ordinance #155-13 | $11,000 |
| [201408194126](https://www.permitgraph.org/p/201408194126) | Aug 19, 2014 | Completed: final sign-off Jul 2015 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 1st, 2nd & 3rd floors: voluntary structural upgrade. n/a ordinance #155-13 | $75,000 |
| [201407171512](https://www.permitgraph.org/p/201407171512) | Jul 17, 2014 | Expired or cancelled: cancelled Sep 2023 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | as built submittal for revised smoke control report for 405 howard st 4th & 5th floor. |  |
| [201406178572](https://www.permitgraph.org/p/201406178572) | Jun 17, 2014 | Never finaled: issued Oct 2014, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | floors: 4,5,10 & 11: provide new motor & vfd for existing smoke exhaust fans on 10 & ll, necessitated by opening stairway between floors 4 & 5. n/a for maher ordinance. | $10,000 |
| [201406107965](https://www.permitgraph.org/p/201406107965) | Jun 10, 2014 | Completed: final sign-off Feb 2015 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4th floor:mechanical and electrical work for t.i. on the 4th floor. ref arch #201402259300. sprinkler & alarm to be under separate permit. | $99,000 |
| [201404022293](https://www.permitgraph.org/p/201404022293) | Apr 2, 2014 | Completed: final sign-off Apr 2014 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 4th and 5th floor: add 44 new speaker/strobes. relocate 5 extg speaker/strobes. add one new audio amplifier to extg facp. ref app#201401156307 for 4th floor and 201401226781.n/a for the maher ordinan… | $14,000 |
| [201403251567](https://www.permitgraph.org/p/201403251567) | Mar 25, 2014 | Completed: final sign-off Nov 2014 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | fire sprinkler system tenant improvements 17 new sprinklers | $8,500 |
| [201403130651](https://www.permitgraph.org/p/201403130651) | Mar 13, 2014 | Completed: final sign-off Mar 2014 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | existing fire sprinkler system tenant improvements 4th flr 16 sprinklers 5th floor 57 sprinklers, apn (4flr) 201401156307, apn (5th) 201401226781. maher not required. | $37,500 |
| [201402259294](https://www.permitgraph.org/p/201402259294) | Feb 25, 2014 | Completed: final sign-off Apr 2015 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | new communicating stairs between 4th and 5th floors. new openings in structural post tension concrete slab. no mechanical work under this permit. new smoke control report. ** maher: compliance with o… | $300,000 |
| [201402259300](https://www.permitgraph.org/p/201402259300) | Feb 25, 2014 | Completed: final sign-off Apr 2015 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | tenant improvement existing space includes minor demolition. construction of new partitions and finishes. convience stairs to 5th floor, mechanical, electrical, fire alarm, fire sprinklers, smoke con… | $300,000 |
| [201401287265](https://www.permitgraph.org/p/201401287265) | Jan 28, 2014 | Completed: final sign-off Feb 2014 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 5th floor fire sprinkler system t.i. - corridors, 2 removed sprinklers, 5 added sprinklers, 8 relocated sprinklers, ref pa #2013.1230.5252, compliance with ordinance #155-13 not required | $7,500 |
| [201401226798](https://www.permitgraph.org/p/201401226798) | Jan 22, 2014 | Completed: final sign-off Feb 2015 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4th floor mechanical & electrical work for tenant improvement. ref pa #2014.0115.6307; compliance with ord no 155-13 not required | $85,000 |
| [201401226805](https://www.permitgraph.org/p/201401226805) | Jan 22, 2014 | Completed: final sign-off Feb 2015 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5th floor mechanical & electrical work for tenant improvement. ref pa #2014.0122.6781. compliance with ordinance #155-13 not required. | $25,000 |
| [201401226781](https://www.permitgraph.org/p/201401226781) | Jan 22, 2014 | Completed: final sign-off Apr 2015 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5th floor tenant improvement of existing space including minordemolition, construction of new walls & finishes. mep under separate permit. | $900,000 |
| [201401156307](https://www.permitgraph.org/p/201401156307) | Jan 15, 2014 | Completed: final sign-off Apr 2015 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | tenant improvement of existing space including minor demolition, construction of new walls and finishes. mep. under seperate permit. compliance with ordinance #155-13, not required. | $200,000 |
| [201312305253](https://www.permitgraph.org/p/201312305253) | Dec 30, 2013 | Completed: final sign-off Mar 2014 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to 201309066111. change from metal stud gypsum board wall to exposed wood stud (fire treated and plywood wall) |  |
| [201312305252](https://www.permitgraph.org/p/201312305252) | Dec 30, 2013 | Never finaled: issued Jan 2014, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5th fl. south lobby and corridor off the elevator lobby will be renovated, 2 new tenant entries. north corridor modified so that the door into the tenant entry will be closer o the stairwell; complia… | $125,000 |
| [201312134143](https://www.permitgraph.org/p/201312134143) | Dec 13, 2013 | Completed: final sign-off Mar 2014 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | demo only of selected items per lease termination agreement, selected doors, and non-structural walls and reception desk (per ab-017). space will remain vacant. | $6,400 |
| [201312113893](https://www.permitgraph.org/p/201312113893) | Dec 11, 2013 | Completed: final sign-off Jan 2014 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 4th floor - addition of (12) new speaker/strobes & (1) new control relay to existing fire alarm system. relocation of (4) existing speaker strobes & (1) speaker. ref t.i. #2013.09.06.6111 | $6,500 |
| [201311081534](https://www.permitgraph.org/p/201311081534) | Nov 8, 2013 | Completed: final sign-off Dec 2013 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | addition of nine speakers and nine speaker strobes to existing fire alarm circuits. all work to be completed on 6th floor only- construction plan is 201301107689- | $9,000 |
| [201311071402](https://www.permitgraph.org/p/201311071402) | Nov 7, 2013 | Never finaled: issued Feb 2014, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | new deck on the extg 6/f roof; less than 50 occupants; replace extg cast paver with new tiles, planter boxes and seats. verify exiting and panic hardware; accessory use to office; fire alarm separate… | $8,500 |
| [201311041076](https://www.permitgraph.org/p/201311041076) | Nov 4, 2013 | Completed: final sign-off Dec 2013 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 4th floor fire sprinkler systems existing t/i 22 added sprinklers, three relocated | $12,500 |
| [201309207352](https://www.permitgraph.org/p/201309207352) | Sep 20, 2013 | Completed: final sign-off Dec 2013 | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | 4th floor-demolish an (e) wall & build new tenant demising wall | $15,000 |
| [201309066111](https://www.permitgraph.org/p/201309066111) | Sep 6, 2013 | Completed: final sign-off Mar 2014 | [405 Howard St](https://www.permitgraph.org/a/3737/030) |  | 4th floor-t.i will to renovate & demise an (e) tenant space. 1 conference room will be added to the space as well as other accessory spaces. common area work will include the removal of a storage roo… | $450,000 |
| [201302069614](https://www.permitgraph.org/p/201302069614) | Feb 6, 2013 | Completed: final sign-off Dec 2013 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 6th floor tenant improvement existing fire sprinkler system - 49 relocated sprinklers. ref pa #2011.03.09.1699. | $24,500 |
| [201301107689](https://www.permitgraph.org/p/201301107689) | Jan 10, 2013 | Never finaled: issued Oct 2013, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | ti on 6th floor to expand (e) office space & mep system. construct (n) partitions, doors, millwork & finishing. | $700,000 |
| [201206082204](https://www.permitgraph.org/p/201206082204) | Jun 8, 2012 | Completed: final sign-off Jul 2012 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | add 2 upright sprinkler at 8th floor storage shed. | $500 |
| [201110257524](https://www.permitgraph.org/p/201110257524) | Oct 25, 2011 | Completed: final sign-off Nov 2011 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 3rd floor-t.i. (e) fire sprinkler system-5 added sprinklers, 12 relocated & 1 removed sprinklers | $4,000 |
| [201109134517](https://www.permitgraph.org/p/201109134517) | Sep 13, 2011 | Completed: final sign-off Dec 2011 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 3rd floor-tenant improvement in suite #320-3 new offices & conference room. re-use light fixtures | $239,250 |
| [201105105704](https://www.permitgraph.org/p/201105105704) | May 10, 2011 | Completed: final sign-off Aug 2011 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 6th floor:fire sprinkler t.i./31 relocated heads/18 added heads | $26,216 |
| [201103091699](https://www.permitgraph.org/p/201103091699) | Mar 9, 2011 | Completed: final sign-off Nov 2011 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 6th floor tenant improvement for new office including new non-load bearing partitions & doors, frames, millwork, ceiling, finishes, & m.e.p. | $250,000 |
| [201012076238](https://www.permitgraph.org/p/201012076238) | Dec 7, 2010 | Never finaled: issued Dec 2010, no final | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 6th fl: new preaction system. 138 heads removed, 181 heads added | $85,000 |
| [201008138745](https://www.permitgraph.org/p/201008138745) | Aug 13, 2010 | Completed: final sign-off Aug 2010 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Paradigm General Contractors](https://www.permitgraph.org/contractor/paradigm-general-contractors-608135) | revision to pa# 2010.05.04.1678. relocate 1 existing strobe for new office layout. |  |
| [201005041678](https://www.permitgraph.org/p/201005041678) | May 4, 2010 | Completed: final sign-off Aug 2010 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | [Capitol Electric Const](https://www.permitgraph.org/contractor/capitol-electric-const-391802) | 5th floor ste# 555 - demo (e) audible/visual speaker /strobe. install new audible/visual speaker/strobes. demo 2 existing, install 2 audible visual spker strobe. relocate 1 spkr strobe, install 1 str… | $2,800 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (56), [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) (23), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (18), [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) (17), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) (11), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (9), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (8), [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) (7), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (5), [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) (4), [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) (4), [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) (3), [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) (3), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (2), [Maguire Inc Dba Lahue And Associates](https://www.permitgraph.org/contractor/maguire-inc-dba-lahue-and-associates-928827) (2), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (2), [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) (2), [Vencon Construction](https://www.permitgraph.org/contractor/vencon-construction-1096244) (2), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700), [Bear Flag Ironworks Llc](https://www.permitgraph.org/contractor/bear-flag-ironworks-llc-1119272), [Blackline Construction](https://www.permitgraph.org/contractor/blackline-construction-783873), [Capitol Electric Const](https://www.permitgraph.org/contractor/capitol-electric-const-391802), [Paradigm General Contractors](https://www.permitgraph.org/contractor/paradigm-general-contractors-608135), [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817), [Transceive Communications Inc.](https://www.permitgraph.org/contractor/transceive-communications-inc-845538)
- Architects: [John C. Workley](https://www.permitgraph.org/professional/john-c-workley-C30605) (10), [Tim Murphy](https://www.permitgraph.org/professional/tim-murphy-C27780) (7), [George Soskin](https://www.permitgraph.org/professional/george-soskin-C9223) (4), [Scott Clement](https://www.permitgraph.org/professional/scott-clement-C36455) (4), [Gene Pena](https://www.permitgraph.org/professional/gene-pena-C33511) (3), [Thomas Yee](https://www.permitgraph.org/professional/thomas-yee-C9839) (3), [Eric Ibsen](https://www.permitgraph.org/professional/eric-ibsen-C25185) (2), [Gary Martinez](https://www.permitgraph.org/professional/gary-martinez-C32595) (2), [Lauren Jordan](https://www.permitgraph.org/professional/lauren-jordan-C36938) (2), [Lawrence Smith](https://www.permitgraph.org/professional/lawrence-smith-C26160) (2), [M Melissa Duffy](https://www.permitgraph.org/professional/m-melissa-duffy-C28015) (2), [Aston Pereira](https://www.permitgraph.org/professional/aston-pereira-C12756), [Brad Williams](https://www.permitgraph.org/professional/brad-williams-C30604), [Brandon Socha](https://www.permitgraph.org/professional/brandon-socha-C42123), [Dennis Heath](https://www.permitgraph.org/professional/dennis-heath-C12815), [Donald L Sadler](https://www.permitgraph.org/professional/donald-l-sadler-C15271), [Ha-Pui Iris Chan](https://www.permitgraph.org/professional/ha-pui-iris-chan-C38092), [Naveen Mathur](https://www.permitgraph.org/professional/naveen-mathur-C30108), [Skip Soskin](https://www.permitgraph.org/professional/skip-soskin-C9255), [Stephanie Kwan](https://www.permitgraph.org/professional/stephanie-kwan-C37048)
- Engineers: [Mark Koenigs](https://www.permitgraph.org/professional/mark-koenigs-S6051) (6), [Amanda Garcia](https://www.permitgraph.org/professional/amanda-garcia-M38801) (4), [Christopher Mchugh](https://www.permitgraph.org/professional/christopher-mchugh-35252) (4), [Robert Linsalata](https://www.permitgraph.org/professional/robert-linsalata-21662) (3), [Stephen Shaffer](https://www.permitgraph.org/professional/stephen-shaffer-E21097) (3), [Amit Wadhwa](https://www.permitgraph.org/professional/amit-wadhwa-M30894) (2), [Brad Hollub](https://www.permitgraph.org/professional/brad-hollub-M33234) (2), [Edward Rivera](https://www.permitgraph.org/professional/edward-rivera-2835) (2), [L.H. Nishkian](https://www.permitgraph.org/professional/l-h-nishkian-28549) (2), [Levi G. Abarte](https://www.permitgraph.org/professional/levi-g-abarte-E17622) (2), [Rudolfo P Bustos Iii](https://www.permitgraph.org/professional/rudolfo-p-bustos-iii-M37462) (2), [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378), [Dean Macy](https://www.permitgraph.org/professional/dean-macy-E24383), [Dennis Cheung](https://www.permitgraph.org/professional/dennis-cheung-9279), [Don Penn](https://www.permitgraph.org/professional/don-penn-M30357), [Justin Schultz](https://www.permitgraph.org/professional/justin-schultz-M35462), [Nicole Crone](https://www.permitgraph.org/professional/nicole-crone-M37008), [Peter A Leptuch](https://www.permitgraph.org/professional/peter-a-leptuch-E19072), [Rey T. Solidum](https://www.permitgraph.org/professional/rey-t-solidum-M30309), [Robert Nixdorf](https://www.permitgraph.org/professional/robert-nixdorf-E16495), [Saied Nazeri](https://www.permitgraph.org/professional/saied-nazeri-M29621), [Todd M. See](https://www.permitgraph.org/professional/todd-m-see-M30765), [Xuong Quach](https://www.permitgraph.org/professional/xuong-quach-M31981)
- Authorized agents: [Andrew Parsons](https://www.permitgraph.org/professional/andrew-parsons-767196), [Dillon Peisson](https://www.permitgraph.org/professional/dillon-peisson-960198), [Robert Berkery](https://www.permitgraph.org/professional/robert-berkery-713099)
- Designers: [Brian Willis](https://www.permitgraph.org/professional/brian-willis-1065604) (4), [Robert Buckley](https://www.permitgraph.org/professional/robert-buckley-91594) (2), [Golden Gate Fire Protection](https://www.permitgraph.org/professional/golden-gate-fire-protection-960198)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.