# 505 Howard St

Block 3736, lot 183. Page: https://www.permitgraph.org/a/3736/183

- City's use: Commercial Office
- Built: 2014
- Stories: 10
- Building: 307,000 sq ft
- Lot: 37,968 sq ft
- Zoning: C3OSD
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

162 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202609117975](https://www.permitgraph.org/p/202609117975) | Sep 11, 2026 | In progress: issued Nov 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th floor: alterations to walls at existing full floor tenant interior office. mep deferred | $15,194 |
| [202608106316](https://www.permitgraph.org/p/202608106316) | Aug 10, 2026 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | deferred health dept. submittal for bldg pa#: 202510207678. reception coffee bar 08-104, pantry 08-212p and pantry 08-411p |  |
| [202608046039](https://www.permitgraph.org/p/202608046039) | Aug 4, 2026 | Completed: final sign-off Aug 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216) | 2 way emergency comm addendum to 202604209707 revised location of 1 call station to match approved architectural drawings. fire alarm pa fire26-372/1328 bldg pa 202510287678 |  |
| [202607285676](https://www.permitgraph.org/p/202607285676) | Jul 28, 2026 | In progress: issued Jul 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | install evacuation maps. (level 6,7, & 8) | $2,000 |
| [202606092839](https://www.permitgraph.org/p/202606092839) | Jun 9, 2026 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | mech revisions for 8th floor ti permit # 202510207678. |  |
| [202604239945](https://www.permitgraph.org/p/202604239945) | Apr 23, 2026 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | def. health dept submittal for bpa: 202510207678 - l8 catering pantry. |  |
| [202604209707](https://www.permitgraph.org/p/202604209707) | Apr 20, 2026 | Completed: final sign-off Aug 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216) | 2 way emergency communication ti adding 2 cell station, one to horizontal exit on floor 8. fire alarm permit fire-26-372, building 2025-1020-7678 | $6,500 |
| [202603238073](https://www.permitgraph.org/p/202603238073) | Mar 23, 2026 | Completed: final sign-off Apr 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Kr Johnston Construction Inc](https://www.permitgraph.org/contractor/kr-johnston-construction-inc-1123938) | 1st/f: deffered interior only added project scope to pa# 202510288253, 202510248150, 202510207678: barrier removal only at ground fl shower rooms | $20,000 |
| [202602024998](https://www.permitgraph.org/p/202602024998) | Feb 2, 2026 | Completed: final sign-off Feb 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Abm Electrical Solutions Dba Linc Lighti](https://www.permitgraph.org/contractor/abm-electrical-solutions-dba-linc-lighti-967676) | revision to pa #2025-0527-7274 provide additional scope to previous permit: installation of (1) l2 dual hose charger and (2) l2 single hose chargers in valet only parking garage |  |
| [202601274627](https://www.permitgraph.org/p/202601274627) | Jan 27, 2026 | In progress: issued Jan 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | installing and anchoring 5 furniture phone booths on the 5th fl | $150,000 |
| [202601133710](https://www.permitgraph.org/p/202601133710) | Jan 13, 2026 | In progress: issued Jan 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) | rev to pa# 202512302934: revise location of approvd sign from 6th fl. to 7th fl. |  |
| [202601123676](https://www.permitgraph.org/p/202601123676) | Jan 12, 2026 | Completed: final sign-off Aug 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216) | 2-4/fl- ref ti 202510157462- fire alarm ti adding 22 speaker, strobes, monitor module and 2 relay modules to (e) notifiers nf52-3030 fire alarm system. adding 1 call station to (e) cornell 2 way comm… | $23,050 |
| [202512302934](https://www.permitgraph.org/p/202512302934) | Dec 30, 2025 | In progress: issued Dec 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) | install (1) illuminated single faced wall sign: "kpmb" 9'9" x 23'3", 5" thick on 6th floor. | $35,000 |
| [202512161896](https://www.permitgraph.org/p/202512161896) | Dec 16, 2025 | In progress: issued Dec 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | floors 2-4: add 22 fire sprinklers t.i. (apn: 202510157462) | $10,815 |
| [202510248150](https://www.permitgraph.org/p/202510248150) | Nov 17, 2025 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 7th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms. | $4,123,250 |
| [202510207678](https://www.permitgraph.org/p/202510207678) | Nov 17, 2025 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 8th floor: .ti including - build out of new open work space, enclosed offices, meeting rooms, restrooms and pantry. | $3,083,100 |
| [202511109277](https://www.permitgraph.org/p/202511109277) | Nov 10, 2025 | Completed: final sign-off Sep 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | selective interior demo of (e) parttions, finishes, mep, demo pa linked to the following building applications: l6-202510288253, l7-202510248150, l8 202510207678 | $275,000 |
| [202511048867](https://www.permitgraph.org/p/202511048867) | Nov 4, 2025 | In progress: issued Apr 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 5th fl - millwork and equipment for back of house pantry. interior non-structural partitions, new finishes millwork. | $700,000 |
| [202510288253](https://www.permitgraph.org/p/202510288253) | Oct 28, 2025 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 6th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms. | $4,163,600 |
| [202510157462](https://www.permitgraph.org/p/202510157462) | Oct 15, 2025 | Completed: final sign-off Sep 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | installation of phone booths throughout the 2nd, 3rd, and 4th floor. | $660,000 |
| [202510157465](https://www.permitgraph.org/p/202510157465) | Oct 15, 2025 | Completed: final sign-off Feb 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | documenting the 2 way commander system location in the elevator lobby on the 3rd floor . | $125,000 |
| [202508052326](https://www.permitgraph.org/p/202508052326) | Aug 5, 2025 | In progress: issued Aug 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 5th fl - ada actuator project, retrofit of (e) elevator lobby, reception and restroom doors with new ada actuator push plates and door operators. total of 5 doors, 2 double leaf 3 single doors | $5,000 |
| [202507231452](https://www.permitgraph.org/p/202507231452) | Jul 23, 2025 | Completed: final sign-off Sep 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 9-10/fl- evacuation signs | $12,000 |
| [202505277274](https://www.permitgraph.org/p/202505277274) | Jun 6, 2025 | Completed: final sign-off Feb 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Abm Electrical Solutions Dba Linc Lighti](https://www.permitgraph.org/contractor/abm-electrical-solutions-dba-linc-lighti-967676) | installation of 2-boltdown level 2 ev chargers for used by valet service in garage. install (4) 40amp 2-pole breakers into existing electrical panel. run conduit on existing racks and pull wire to ac… | $48,740 |
| [202505146478](https://www.permitgraph.org/p/202505146478) | May 14, 2025 | Completed: final sign-off May 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | to obtain final inspection for work approved under pa # 201908219434 and 201907014766. all work is complete. |  |
| [202504114221](https://www.permitgraph.org/p/202504114221) | Apr 11, 2025 | In progress: issued Apr 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | adminstrative permit to obtain fire department approved place of assembly, occupant load 269 for 8th flr roof decks. ref pa# 200610316514 s3/r2. |  |
| [202503273126](https://www.permitgraph.org/p/202503273126) | Mar 27, 2025 | Completed: final sign-off Jul 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) |  | 10th fl, ti sprinkler - add 10, relocate 25 and delete 2 fs ref pa 202412166932 | $12,250 |
| [202503273125](https://www.permitgraph.org/p/202503273125) | Mar 27, 2025 | Completed: final sign-off May 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) |  | 9th fl, ti sprinkler - add 3, relocate 34 and delete 8 fs ref pa 202412166931 | $11,000 |
| [202503273132](https://www.permitgraph.org/p/202503273132) | Mar 27, 2025 | Completed: final sign-off Sep 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216) | 10th fl/ fire alarm ti: adding 08 speakers/strobes and 2 speakers and one addressable relay to existing notifier nfs2-3030 fire alarm system ref# 202412166932 | $24,000 |
| [202503273130](https://www.permitgraph.org/p/202503273130) | Mar 27, 2025 | Completed: final sign-off May 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216) | 9th fl/ fire alarm ti: adding 12 speakers/strobes and 5 speakers to existing notifier nfs2-3030 fire alarm system ref#2024-1216-6931 | $14,000 |
| [202412166931](https://www.permitgraph.org/p/202412166931) | Dec 16, 2024 | In progress: issued Jan 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 9th fl - demo (e) non-structural partitions & replace with (n) non structural partitions. (n) lighting & associated mep upgrades & bathroom upgrades | $643,100 |
| [202412166932](https://www.permitgraph.org/p/202412166932) | Dec 16, 2024 | In progress: issued Jan 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 10/fl- ti demo (e) partitions (nonstructural) and replace w/ (n) partitions, (n) associated millwork, lighting, mep and bathroom upgrades structural upgrades on (e) slab | $1,210,990 |
| [202412126680](https://www.permitgraph.org/p/202412126680) | Dec 12, 2024 | Completed: final sign-off Mar 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | evactuation signage for the 5th fl ti | $1,000 |
| [202411215454](https://www.permitgraph.org/p/202411215454) | Nov 21, 2024 | Completed: final sign-off Jan 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216) | 5th floor. fire alarm ti adding 5 speakers, 6 speaker. strobes and 3 relay module to existing notifier nfs2-3030 fire alarm system. ref pa 202409120595 | $32,680 |
| [202411134875](https://www.permitgraph.org/p/202411134875) | Nov 13, 2024 | Completed: final sign-off Nov 2024 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216) | fire alarm ti revising record as built drawing to include most recent smoke control narrative |  |
| [202410152890](https://www.permitgraph.org/p/202410152890) | Oct 15, 2024 | Completed: final sign-off Dec 2024 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 5/fl-ti 202409120595- relocate (10 ) pendents and add (6) uprights | $4,000 |
| [202409201237](https://www.permitgraph.org/p/202409201237) | Oct 9, 2024 | In progress: issued Nov 2024 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 4-5/f: revision to pa# 202406285521, to update smoke control report. |  |
| [202409170902](https://www.permitgraph.org/p/202409170902) | Sep 17, 2024 | Completed: final sign-off Mar 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | mechanical, electrical, plumbing, and structural work for tenant improvement on the 5th fl. ref 202409120595 | $250,000 |
| [202409120595](https://www.permitgraph.org/p/202409120595) | Sep 12, 2024 | Completed: final sign-off Mar 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 5th floor: interior tenant improvement. to include non-load bearing partitions, ceilings and finishes. mep under seperate permit. structural under separate permit. no cfc until mep and structural def… | $3,822,000 |
| [202408229256](https://www.permitgraph.org/p/202408229256) | Aug 22, 2024 | In progress: issued Aug 2024 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216) | 4th & 5th/f: fire alarm t.i. no near devices are being added. 1 e) speaker strobe candela raring is being adjuested on e) notifier nfs2-3030 fire alarm system. ref to 202406285521 | $6,624 |
| [202408209045](https://www.permitgraph.org/p/202408209045) | Aug 20, 2024 | Completed: final sign-off Oct 2024 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | remove existing sprinkler, drops and arm-over in areas where ceiling is being demolished. plug of existing outlet | $1,400 |
| [202408198920](https://www.permitgraph.org/p/202408198920) | Aug 19, 2024 | Completed: final sign-off Dec 2024 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 5/f: demolition of interior non-bearing partitions ceiling and finishes | $45,000 |
| [202407307517](https://www.permitgraph.org/p/202407307517) | Jul 30, 2024 | Completed: final sign-off Aug 2024 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 4th fl. add (4) fire sprinkler per ti ref pa# 2024-0628-5521 job# 24-649 | $2,484 |
| [202406285521](https://www.permitgraph.org/p/202406285521) | Jun 28, 2024 | Completed: final sign-off Aug 2024 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | floors 4 and 5- removal of communicating stairs and slab infill between floors | $120,000 |
| [202003116808](https://www.permitgraph.org/p/202003116808) | Mar 11, 2020 | Completed: final sign-off Jul 2020 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Aecore Inc.](https://www.permitgraph.org/contractor/aecore-inc-1036918) | 4th fl - demo only - a wall and door. maher na | $10,000 |
| [201911217861](https://www.permitgraph.org/p/201911217861) | Nov 21, 2019 | Never finaled: issued Nov 2019, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) |  | 9th fl: evacuation plan (x4) | $2,400 |
| [201910174845](https://www.permitgraph.org/p/201910174845) | Oct 17, 2019 | Completed: final sign-off Mar 2020 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 8,9&10/f: ref pa# 201907014766; fire alarm t.i. adding (18) speakers and (5) speaker/strobes to (e) notifier nfs2-3030 fa system | $12,138 |
| [201910043572](https://www.permitgraph.org/p/201910043572) | Oct 4, 2019 | Never finaled: issued Oct 2019, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) |  | 8th and 10th flr evacuation plans x 4 | $4,800 |
| [201908219434](https://www.permitgraph.org/p/201908219434) | Aug 21, 2019 | Expired or cancelled: expired May 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | meps to 2019-0701-4766//vif emergency lights | $350,000 |
| [201908148745](https://www.permitgraph.org/p/201908148745) | Aug 14, 2019 | Completed: final sign-off Feb 2020 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 8, 9 and 10th fl fire sprinkler lk- total 2 plugged, 7 upright, 2 added upright, total 24 pendent. ref pa 2019-0701-4766 | $16,962 |
| [201907014766](https://www.permitgraph.org/p/201907014766) | Jul 1, 2019 | Expired or cancelled: expired May 2025 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | additions of new private offices on flrs 8-10 | $350,000 |
| [201906244204](https://www.permitgraph.org/p/201906244204) | Jun 24, 2019 | Completed: final sign-off Feb 2021 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | revision to pa #201710231998. structural revision to support plate b. not visible from exterior. |  |
| [201903064493](https://www.permitgraph.org/p/201903064493) | Mar 6, 2019 | Completed: final sign-off Jul 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | rev to pa# 201812057472 by adding work scope: demo of non-structural elements, construction of non-structural partitions, millwork, kitchenette, sink, fridge line, counter & cabinetry. n/a for maher. | $20,000 |
| [201901231053](https://www.permitgraph.org/p/201901231053) | Jan 23, 2019 | Completed: final sign-off Jul 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm 1 speaker strobe ref 201706159511, maher not req | $4,000 |
| [201901110114](https://www.permitgraph.org/p/201901110114) | Jan 11, 2019 | Never finaled: issued Jan 2019, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | existing fire sprinkler system-t.i. 3 relocated sprinkler- 1 added sprinkler ref: 2018-1205-7472 | $2,000 |
| [201812208899](https://www.permitgraph.org/p/201812208899) | Dec 20, 2018 | Completed: final sign-off Jul 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | revision to ti app#201812057472. replace 2 sheets regarding ratings of new doors to use in project a0.1 & a2.1 |  |
| [201812057472](https://www.permitgraph.org/p/201812057472) | Dec 5, 2018 | Completed: final sign-off Jul 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 4th flr. tenant improvement (partial) in suite 4200: demo of non-structural elements, constructon of non-structural partitions, dfh, and millwork. ada restroom upgrades | $162,000 |
| [201710231998](https://www.permitgraph.org/p/201710231998) | Oct 23, 2017 | Completed: final sign-off Feb 2021 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | install electric "ibm" wall sign | $3,500 |
| [201708033743](https://www.permitgraph.org/p/201708033743) | Aug 3, 2017 | Completed: final sign-off Oct 2017 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 2nd & 3rd floors:add to extg nfs2-3030: 4 smoke detectors, 1 addressable relay, 1 dual monitoring module, 36 speaker strobes, 2 strobe, 3 speaker strobe that are extg will be relocated. new fsd is be… | $25,800 |
| [201707101306](https://www.permitgraph.org/p/201707101306) | Jul 10, 2017 | Completed: final sign-off Feb 2018 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to 201702270163 to add card reader at hallway 3472 and change details at conference rooms 3471,3470,3469,3467, 3468 |  |
| [201707051016](https://www.permitgraph.org/p/201707051016) | Jul 5, 2017 | Completed: final sign-off Jul 2017 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | ti -8/9 fl 16 speakers, 1 speaker strobe added to e notifier fire alarm system. 2 existing speaker strobes relocated. 1 strobe and 1 speaker strobe replaced by speaker. no initation devices in scope.… | $4,954 |
| [201706219903](https://www.permitgraph.org/p/201706219903) | Jun 21, 2017 | Completed: final sign-off Jan 2018 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | revise the fire water tank fill lines from 2 4" automatic lines to 1 4" manual with new 4" butterfly valve and 1 2" automatic line with new 2" float valve. extend existing 6" overflow line to termina… | $12,000 |
| [201706159459](https://www.permitgraph.org/p/201706159459) | Jun 15, 2017 | Never finaled: issued Jun 2017, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | to erect 3 non-electrical sign panels to property monument. | $2,000 |
| [201706149312](https://www.permitgraph.org/p/201706149312) | Jun 14, 2017 | Never finaled: issued Jun 2017, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical, electrical and plumbing for ti on the 8th & 9th floors. ref pa 2017-0511-6311. | $10,000 |
| [201705247576](https://www.permitgraph.org/p/201705247576) | May 24, 2017 | Completed: final sign-off Aug 2017 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler t.i. under gc permit#201705116311 for 8th floor and 201705116310 for the 9th floor. relocates 41 and adds 3 total 44 | $22,643 |
| [201705116310](https://www.permitgraph.org/p/201705116310) | May 11, 2017 | Completed: final sign-off Jan 2018 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 9th floor selective/partial ti - interior demolition and reconfiguration of (3) office space areas totaling about 700 sq ft | $6,000 |
| [201705116311](https://www.permitgraph.org/p/201705116311) | May 11, 2017 | Completed: final sign-off Jan 2018 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8th floor ti - partial interior demolition new partitions in 3800 sq ft of office space. fire/mep under separate permits | $120,000 |
| [201705035621](https://www.permitgraph.org/p/201705035621) | May 3, 2017 | Completed: final sign-off Jul 2017 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | ref 201702038617: security access card reader associated door lock (fbo) at door #614 on the 6th flr. (e) fire alar system is programmed to unlock misc door during fire alarm events. (e) control rela… | $3,110 |
| [201704123813](https://www.permitgraph.org/p/201704123813) | Apr 12, 2017 | Never finaled: issued Apr 2017, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 2nd & 3rd floor - fire sprinkler only ref pa 2017-0227-0163 2nd floor - relocate 24 pendents, add 4, relocate 1 upright, add 2, (31); 3rd floor - relocate 81 pendents, add 2 relocate, 5 upright, add… | $31,000 |
| [201704063311](https://www.permitgraph.org/p/201704063311) | Apr 6, 2017 | Completed: final sign-off Feb 2018 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd & 3rd flrs: mechanical & electrical work for ti ref 2017-0227-0163 maher na | $375,000 |
| [201702270163](https://www.permitgraph.org/p/201702270163) | Feb 27, 2017 | Completed: final sign-off Jul 2017 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | selective demolition of ceiling height partition and raised floor panels. new full height partitions and finishes mep under sep permit. new fsd and revision to smoke control. | $1,200,000 |
| [201702038617](https://www.permitgraph.org/p/201702038617) | Feb 3, 2017 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | 6th floor #614 - revision to pa #201603253070 & ref t.i. #201512185489: add badge reader, emergency push button. n/a maher ordinance | $10,000 |
| [201612165159](https://www.permitgraph.org/p/201612165159) | Dec 16, 2016 | Never finaled: issued Dec 2016, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 6th flr: add 1 duct det, 2 monitor modules to (e) notifier nfs2-3030 panel. this project to monitor 2 ansul panels & supervise fan coil maher na ref 201601147103 | $5,800 |
| [201610311549](https://www.permitgraph.org/p/201610311549) | Oct 31, 2016 | Expired or cancelled: cancelled Jan 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) |  | install vinyl graphic ibm maher na | $1,000 |
| [201610311496](https://www.permitgraph.org/p/201610311496) | Oct 31, 2016 | Completed: final sign-off Feb 2017 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Golden State Fire Safety/Dba:Gs Fire S](https://www.permitgraph.org/contractor/golden-state-fire-safety-dba-gs-fire-s-924716) | 6th flr: hook up ventless ansul prepiped fire system. for self contined electric combi oven. app #2016-03-25-3070. maher na | $3,000 |
| [201608165092](https://www.permitgraph.org/p/201608165092) | Aug 16, 2016 | Never finaled: issued Aug 2016, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 4/f- electrical work associated with approved pa 2016-0627-0983 | $23,500 |
| [201608114801](https://www.permitgraph.org/p/201608114801) | Aug 11, 2016 | Completed: final sign-off Dec 2017 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | sprinklers for full 7th and partial 8th floors. ref t.i. app# 201601086655. relocates 110 and add 57. total 86,392 | $89,497 |
| [201607071781](https://www.permitgraph.org/p/201607071781) | Jul 7, 2016 | Completed: final sign-off Dec 2017 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 7th & 8th flrs: fire alarm: add 3 power supplies, 5 smoke det. 8 duct det. 14 relays, 11 modules, 11 speakers & 65 speaker/strobes, 2 emergency phones, 1 emergency phone switch as part of ti. ref pa… | $70,000 |
| [201606270983](https://www.permitgraph.org/p/201606270983) | Jun 27, 2016 | Completed: final sign-off Sep 2016 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 4/f- south side, removel of partition, minor floor finish change and minor power + data work. n/a ordinance #155-13 | $80,000 |
| [201605258289](https://www.permitgraph.org/p/201605258289) | May 25, 2016 | Completed: final sign-off Feb 2017 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 6th floor: fire alarm. add (2)power supplies, (6)smoke detectors, (4)duct detectors, (2)modules, (4)relays, (1)relays, (1)strobe, (4) speakers & (51)speaker/strobes as part of a ti. ref bldg #2016-03… | $56,000 |
| [201605127212](https://www.permitgraph.org/p/201605127212) | May 12, 2016 | Completed: final sign-off Oct 2016 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 6/f- fire sprinkler t.i. under gc permit 6th floor: (201512185489) modify 185 heads. maher na | $95,200 |
| [201604296159](https://www.permitgraph.org/p/201604296159) | Apr 29, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | fl 7 & 8: revisions to permit 2016-0127-8112, including restroom core changes and minor hvac and electrical revisions. ref architecturals: 2016-0108-6655 & 2016-0418-5015. life safety deferred. |  |
| [201604185015](https://www.permitgraph.org/p/201604185015) | Apr 18, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | revisions to pa 2016-0108-6655 - add storage room; updated door schedule, updated plan for mech platform. maher na |  |
| [201604144786](https://www.permitgraph.org/p/201604144786) | Apr 14, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | revision to mep pa#201601207450 to revise lan room layout and restroom cores. arch. & structural under pa#201512185489. mep pa#201601207450. n/a ordinance #155-13 |  |
| [201603253070](https://www.permitgraph.org/p/201603253070) | Mar 25, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | revision to existing pa 2015-1218-5489 lan from layout revised & reconfigured general clarifications added to sheet notes, dimensions added, finish call outs modified, and card reader locations revis… |  |
| [201603253111](https://www.permitgraph.org/p/201603253111) | Mar 25, 2016 | Never finaled: issued Apr 2016, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) |  | modify (e) permit for higher assembly occupancy ref. to pa #201412153701. n/a maher ordinance |  |
| [201603081410](https://www.permitgraph.org/p/201603081410) | Mar 8, 2016 | Never finaled: issued Mar 2016, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | demo on floors 2, 3 and limited area on 4 | $25,000 |
| [201601278112](https://www.permitgraph.org/p/201601278112) | Jan 27, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | new mep for 1st time tenant improvement to levels 7 & partial 8/f. arch. t.i. pa# 201601086655. n/a ordinance #155-13 | $1,785,000 |
| [201601207450](https://www.permitgraph.org/p/201601207450) | Jan 20, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | first time ti to level 6 inlcuding new mep. addition of rooftop equipment. architectural structural under separate permit. ref pa 2015-1218-5489. n/a for maher ordinance no.155-13 | $2,000,000 |
| [201601207475](https://www.permitgraph.org/p/201601207475) | Jan 20, 2016 | Completed: final sign-off Feb 2016 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm add 1 smoke detector and 1 control relay on the 1st floor upper level loading dock. no associated bldg permit | $1,500 |
| [201601147103](https://www.permitgraph.org/p/201601147103) | Jan 14, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | permit for non cooking warming pantry for a commercial ti. no cooking or raw food prep to occur. because of rated shaft limitations in existing building design, installation of ventless hood system w… | $100,000 |
| [201601086655](https://www.permitgraph.org/p/201601086655) | Jan 8, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | 1st time tenant improvement to level 7 and 8. part of 8th fl. new non load bearing walls. new doors, new ceilings, new finishes, new furniture, mep, sprinklers, fire alarm sep permit. new structural… | $3,500,000 |
| [201512185489](https://www.permitgraph.org/p/201512185489) | Dec 18, 2015 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) | ti project for the 6th floor. standard open office space with conference & meeting rooms, employee break room. mep,sprinklers & f/a separate permit. n/a for maher. | $3,500,000 |
| [201507222185](https://www.permitgraph.org/p/201507222185) | Jul 22, 2015 | Completed: final sign-off Jul 2015 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler ti. relocate/change 14 heads, 21 heads. total 35 heads. ref pa#201502042414. compliance with maher ordinance no 155-13 not required. | $18,012 |
| [201507161687](https://www.permitgraph.org/p/201507161687) | Jul 16, 2015 | Never finaled: issued Jul 2015, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | update map sections of evac/aor signs for the 8,9, & 10 floors. | $5,400 |
| [201507161689](https://www.permitgraph.org/p/201507161689) | Jul 16, 2015 | Never finaled: issued Jul 2015, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | to erect non electrical sign " perkinscoie" | $1,200 |
| [201507010417](https://www.permitgraph.org/p/201507010417) | Jul 1, 2015 | Completed: final sign-off Jul 2015 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm- add 2 power supplies, 1 module, 4 smoke detectors, 3 relays, 4 strobe, 25 speakers & 44 speaker strobes due to t.i. on the 10/f. t.i. pa# 201501286855. n/a ordinance #155-13 | $49,000 |
| [201507010414](https://www.permitgraph.org/p/201507010414) | Jul 1, 2015 | Completed: final sign-off Jul 2015 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | add one power supply, 1 module, 3 smoke detectors, 3 relays, 1 strobe, 8 speakers & 16 speaker strobes as part of a t.i. on the 8/f. t.i. pa# 201502047414. n/a ordinance #155-13 | $20,000 |
| [201507010416](https://www.permitgraph.org/p/201507010416) | Jul 1, 2015 | Never finaled: issued Jul 2015, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm add 2 power supplies, 2 modules, 4 smoke detectors, 3 relays, 4 strobes, 43 speakers & 34 speaker strobes as part of a t.i. on the 9/f. t.i. pa# 201502047416. n/a ordinance #155-13 | $54,000 |
| [201506169056](https://www.permitgraph.org/p/201506169056) | Jun 16, 2015 | Completed: final sign-off Jan 2016 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | electrical/plumbing work for ti on the 9th fl. ref 201502047416 | $90,000 |
| [201506118755](https://www.permitgraph.org/p/201506118755) | Jun 11, 2015 | Completed: final sign-off Jul 2015 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler t.i. under pa# 201502047414 (8/f), 201502047416 (9/f), 201501286855 (10/f), relocate 199 heads, add 242 heads, total 449 heads. n/a ordinance #155-13 | $236,725 |
| [201506088334](https://www.permitgraph.org/p/201506088334) | Jun 8, 2015 | Completed: final sign-off Jan 2016 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 9th floor - mechanical worn for tenant improvement. ref pa #2015.0204.7416. life safety deferred. | $250,000 |
| [201506048050](https://www.permitgraph.org/p/201506048050) | Jun 4, 2015 | Never finaled: issued Jun 2015, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | 7 evacuation plan maps, floor 1 n/a maher ord. 155-3 | $2,100 |
| [201506027755](https://www.permitgraph.org/p/201506027755) | Jun 2, 2015 | Completed: final sign-off Aug 2015 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | 2 illuminated signs. n/a ordinance #155-13 | $10,000 |
| [201506017719](https://www.permitgraph.org/p/201506017719) | Jun 1, 2015 | Never finaled: issued Jun 2015, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | revision to 201502128204 addition of 3 lighting fixtures to green room and update title 24 |  |
| [201505206797](https://www.permitgraph.org/p/201505206797) | May 20, 2015 | Completed: final sign-off Jan 2016 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision to opa 2015 0204 7416 - structural work for filing system | $5,000 |
| [M580187](https://www.permitgraph.org/p/M580187) | Apr 23, 2015 | Never finaled: issued Apr 2015, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) |  | street space permit & mta permit |  |
| [201503231534](https://www.permitgraph.org/p/201503231534) | Mar 23, 2015 | Completed: final sign-off Jul 2015 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | grnd flr: nasdaq - fire sprinklers: add 85 heads, relocate 17 heads. maher - not req'd | $52,500 |
| [201503201423](https://www.permitgraph.org/p/201503201423) | Mar 20, 2015 | Completed: final sign-off Jun 2015 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm- 1st floor: add 23 speakers/strobes, 5 speakers, 1 smoke detector, 7 duct detectors, 1 monitoring module & 1 power supply as part od ti ref pa 2014 1215 3701 maher - not req'd | $24,000 |
| [201503191278](https://www.permitgraph.org/p/201503191278) | Mar 19, 2015 | Completed: final sign-off Jan 2016 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8th floor: mchanical and eletrical work for ti on 8th flr. ref pa# 2015 0204 7414 maher - not req'd | $5,000 |
| [201503191275](https://www.permitgraph.org/p/201503191275) | Mar 19, 2015 | Completed: final sign-off Jan 2016 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 10th floor: mechanical & electrical work for ti ref pa# 2015 0128 6855 maher - not req'd | $60,000 |
| [201503191284](https://www.permitgraph.org/p/201503191284) | Mar 19, 2015 | Completed: final sign-off Jan 2016 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | structural work for new steel beams and posts to support operable partitions. n/a ordinance #155-13 reference permit # 2015-0128-6855 | $5,000 |
| [201503160958](https://www.permitgraph.org/p/201503160958) | Mar 16, 2015 | Completed: final sign-off Jan 2016 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8th floor: electrical work for t.i. ref app#201502047414. n/a for the maher. | $30,000 |
| [201503090233](https://www.permitgraph.org/p/201503090233) | Mar 9, 2015 | Completed: final sign-off Jul 2015 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | remove fire smoke damper on mech plan revision to pa 2015 0212 8204 maher - not req'd |  |
| [201502128204](https://www.permitgraph.org/p/201502128204) | Feb 12, 2015 | Completed: final sign-off Sep 2015 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | mechanical and electrical scope for ground fl t.i. for permit #201412153701 to include new areas for a exhibit/event space. broadcast studio, conference room, bookstore, and back of house support are… | $413,265 |
| [201502047416](https://www.permitgraph.org/p/201502047416) | Feb 4, 2015 | Never finaled: issued Mar 2015, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 9th floor: t.i. to include new open work areas, private office conference rooms, support and storage areas. n/a for the maher | $700,000 |
| [201502047414](https://www.permitgraph.org/p/201502047414) | Feb 4, 2015 | Never finaled: issued Feb 2015, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8th floor: t.i. to include new open work areas office and conference rooms, support and storage areas. mep under seperate permit. n/a for the maher | $520,000 |
| [201501286855](https://www.permitgraph.org/p/201501286855) | Jan 28, 2015 | Never finaled: issued Mar 2015, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | t. i. on the 10/f to include new open work areas, offices & conference rooms, support & storage areas. mep under seperate permit. n/a ordinance #155-13 | $750,000 |
| [201412153701](https://www.permitgraph.org/p/201412153701) | Dec 15, 2014 | Completed: final sign-off Sep 2015 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | architectural t.i. in 2 ground floor spaces that have not previously been occupied. work includes new partitions, flooring, ceilings and millwork. mep, sprinkler and life safety as deffered submittal… | $711,711 |
| [201411191883](https://www.permitgraph.org/p/201411191883) | Nov 19, 2014 | Expired or cancelled: withdrawn Feb 2015 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8th,9th and 10th floor: construction of non-egress communicating stairs connecting 3 floors. maher n/a. | $200,000 |
| [201410280058](https://www.permitgraph.org/p/201410280058) | Oct 28, 2014 | Completed: final sign-off Dec 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical work for tenant improvement on the 1st floor. kitchen area only. t.i. pa# 201404284312. n/a ordinance #155-13 | $4,000 |
| [201410249821](https://www.permitgraph.org/p/201410249821) | Oct 24, 2014 | Completed: final sign-off Nov 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 1st floor - fire sprinkler to relocate 2 heads. ref. t.i. appl. 2014.0428.4314. maher n/a. | $1,050 |
| [201410229551](https://www.permitgraph.org/p/201410229551) | Oct 22, 2014 | Never finaled: issued Oct 2014, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 1st flr: electrical work for tenant improvement, ref. arch 201404284314 and 201404284312; maher n/a | $10,000 |
| [201410027895](https://www.permitgraph.org/p/201410027895) | Oct 2, 2014 | Completed: final sign-off Dec 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | ground floor: revision to app# 201404284314 to revise reflected ceiling plan details. ref app#201404284314. n/a for the maher |  |
| [201409095848](https://www.permitgraph.org/p/201409095848) | Sep 9, 2014 | Never finaled: issued Oct 2014, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | add 3 smoke detectors (total) on flrs 3,4&5 @ request of fire ref bldg permit 201404022297, 201403281925 inspector, 201403201290 & 201402259272; maher n/a | $2,000 |
| [201408264752](https://www.permitgraph.org/p/201408264752) | Aug 26, 2014 | Completed: final sign-off Sep 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 2nd floor: relocate 36, remove 24 fire sprinklers. 3rd floor: relocate 41, remove 1. 4th floor:relocate 25 remove 1 fire sprinkler. t.i. app#201402259272. n/a for the maher ordinance #155-13 | $20,000 |
| [201408224483](https://www.permitgraph.org/p/201408224483) | Aug 22, 2014 | Completed: final sign-off Sep 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | add 2 power supplies, 4 smoke detectors, 4 modules, 3 relays, 6 strobes & 51 speaker/strobes to the (e) fa system due to a tenant improvement on the 2nd flr ref 201406168470; maher n/a | $44,000 |
| [201408083427](https://www.permitgraph.org/p/201408083427) | Aug 8, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to 201406168474. revise ceiling plan to remove the special inspection requirement. maher not req |  |
| [201408073299](https://www.permitgraph.org/p/201408073299) | Aug 7, 2014 | Never finaled: issued Aug 2014, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 3rd floor t.i. adding 2 remote power supplies, 9 smoke detectors, 1 duct smoke detectors, 6 dual monitoring modules, 2 monitoring modules, 1 strobe and 60 speaker strobes to extg notifier nfs2-3030.… | $64,000 |
| [201408073297](https://www.permitgraph.org/p/201408073297) | Aug 7, 2014 | Completed: final sign-off Aug 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 4th floor t.i. adding 1 smoke detector, 1 relay, 2 strobes, 33 speaker strobes to extg notifier nfs2-3030. ref app#201403281925. n/a for the maher. | $32,000 |
| [201408063177](https://www.permitgraph.org/p/201408063177) | Aug 6, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to pa#201406168473 bldg plan checked approved of a revised ceiling & removal of special inspection. n/a ordinance #155-13 |  |
| [201406269633](https://www.permitgraph.org/p/201406269633) | Jun 26, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd flr: mep only, sprinkler under separate permit (ref. pa 201406168470), maher n/a | $20,000 |
| [201406269632](https://www.permitgraph.org/p/201406269632) | Jun 26, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 3rd flr: mep only sprinkler on separate plans, reference pa 201406168473 ; maher n/a | $20,000 |
| [201406269631](https://www.permitgraph.org/p/201406269631) | Jun 26, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th flr: mep only, sprinkler on separate plans (reference pa #201406168474), maher n/a | $20,000 |
| [201406168473](https://www.permitgraph.org/p/201406168473) | Jun 16, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 3rd floor - revision to appl #2014.0402.2297 including new offices conference rooms & break area with new finishes in elevator lobby. mep sprinkler, fire alarm on separate permit. n/a maher ordinance | $50,000 |
| [201406168470](https://www.permitgraph.org/p/201406168470) | Jun 16, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd floor - revision to appl #2014.0424.4115 including new offices conference rooms & break rooms elevator lobby finishes. mep, sprinkler fire alarm on separate permit. n/a maher ordinance | $50,000 |
| [201406168474](https://www.permitgraph.org/p/201406168474) | Jun 16, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th floor - revision to appl #2014.0328.1925 including new offices conference rooms & break rooms, new elevator lobby finishes. mep, sprinkler fire alarm on separate permit. n/a maher ordinance | $100,000 |
| [201406057609](https://www.permitgraph.org/p/201406057609) | Jun 5, 2014 | Completed: final sign-off Jun 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 1/f - add 4 speaker/ strobes & relocate 1 existing speaker/strobe as part of a tenant improvement of the 1st floor. ref approved building permit 201402078002 | $3,000 |
| [201406037388](https://www.permitgraph.org/p/201406037388) | Jun 3, 2014 | Never finaled: issued Jun 2014, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 1st floor mechanical work for tenant improvement. ref #2014.0421.3733. compliance with ord 155-13 not required. architectural revision to delete bike room scope of work. | $8,000 |
| [201405286817](https://www.permitgraph.org/p/201405286817) | May 28, 2014 | Completed: final sign-off Jun 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 1st floor: fire sprinkler t.i. add 5 heads. ref app#201404213733. n/a for the maher ordinance #155-13 | $2,573 |
| [201405226463](https://www.permitgraph.org/p/201405226463) | May 22, 2014 | Never finaled: issued Jun 2014, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | add 4 power supplies, 15 smoke detectors, 2 duct detectors,16 monitoring modules, 16 control relays, 3 strobes, 18 sepakers & 80 speakers/strobes to the (e) fire alarm system on the 4th&5th flrs, ref… | $96,000 |
| [201405054936](https://www.permitgraph.org/p/201405054936) | May 5, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 3rd floor mep. reference approved architechtural pa# 2014.0402.2297. | $500,000 |
| [201405024812](https://www.permitgraph.org/p/201405024812) | May 2, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | mechanical only, full floor tenant improvement. architecture pa#201404244115. n/a ordinance #155-13 | $550,000 |
| [201404284314](https://www.permitgraph.org/p/201404284314) | Apr 28, 2014 | Completed: final sign-off Dec 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | change of use from b to new a-2 consisting of plaza rooms 3.1.e 420 to include demolition of wall seperating storage room 3.1.e 430 millwork, wall cladding, and ceiling array. mep, f/a, sprinkler und… | $15,000 |
| [201404284312](https://www.permitgraph.org/p/201404284312) | Apr 28, 2014 | Completed: final sign-off Dec 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | t.i. to include addition of casework, countertops, kitchen equipment pass through egress. dropped ceiling with mep under seperate permit. | $36,000 |
| [201404244115](https://www.permitgraph.org/p/201404244115) | Apr 24, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd floor: full floor t.i. with new office and conference rooms, partitions, break area, and new finishes. mep, sprinkler, & fire alarm on a seperate permit.n/a for the maher ordinance#155-13 | $1,583,804 |
| [201404213733](https://www.permitgraph.org/p/201404213733) | Apr 21, 2014 | Never finaled: issued May 2014, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 1st floor:t.i. include small conference room, office area with small kitchen and bicycle storage room. n/a for the maher ordinance #155-13 | $292,250 |
| [201404213767](https://www.permitgraph.org/p/201404213767) | Apr 21, 2014 | Expired or cancelled: cancelled Jan 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | cut an opening in extg slab and then will fill slab. no stairs is currently planned. n/a for the maher ordinance #155-13 | $150,000 |
| [201404022312](https://www.permitgraph.org/p/201404022312) | Apr 2, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | north side 4th floor - mechanical, electrical & plumbing work. ref pa #2014.0328.1925. compliance with ordinance #155-13 not required | $10,000 |
| [201404022297](https://www.permitgraph.org/p/201404022297) | Apr 2, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 3rd floor:full floor t.i. with new office and conference room partition and break area. new finishes, mep, sprinklers, fire alarm on seperate permit.n/a for maher ordinance #155-13 | $1,874,286 |
| [201404022309](https://www.permitgraph.org/p/201404022309) | Apr 2, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | south side 4th floormechanical, electrical & plumbing work. ref pa #2014.0328.1925. compliance with ordinance #155-13 not required | $10,000 |
| [201403312014](https://www.permitgraph.org/p/201403312014) | Mar 31, 2014 | Completed: final sign-off Apr 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | revision to 201402078002. change out walls in 2 areas. conc-2 concrete floor topping. slb to match existing |  |
| [201403281925](https://www.permitgraph.org/p/201403281925) | Mar 28, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | south side of 4th floor tenant improvement new offices, conference room, break area, mep sprinklers,fire alarm on seperate permit. maher ordinance #155-13 n/a | $1,040,782 |
| [201403261738](https://www.permitgraph.org/p/201403261738) | Mar 26, 2014 | Completed: final sign-off Sep 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 3rd flr- add (102)pendants,(2) uprights removed/replaced w/200 degree uprights. 4th flr: (96) pendants added,(4) uprights removed/replaced w/200 degree uprights. 5th flr:(94) added pendants,2 upright… | $35,000 |
| [201403241543](https://www.permitgraph.org/p/201403241543) | Mar 24, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | mep for ti on 5th fl ref 201402259272. maher not required per ord 155-13 | $250,000 |
| [201403201290](https://www.permitgraph.org/p/201403201290) | Mar 20, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | north side of 4th floor and multi tenant corridor work will include new offices, conference rooms and break areas in addition to elevator lobby finishes. mep, sprinklers, fire alarm under separate pe… | $835,273 |
| [201403120501](https://www.permitgraph.org/p/201403120501) | Mar 12, 2014 | Completed: final sign-off Apr 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Critchfield Mechanical Inc](https://www.permitgraph.org/contractor/critchfield-mechanical-inc-341107) | 1st floor suite 125 - installation of new heat pump + connecting ductwork & piping. t.i. #2014.0207.8002 | $22,240 |
| [201403070156](https://www.permitgraph.org/p/201403070156) | Mar 7, 2014 | Completed: final sign-off Apr 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler ti add 1. ref 201402078002; compliance with ord 155-13 not required | $515 |
| [201403049813](https://www.permitgraph.org/p/201403049813) | Mar 4, 2014 | Completed: final sign-off Apr 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | #125- add 4 speaker/strobes to the existing fire alarm system. na compliance #155-13. | $2,500 |
| [201402259272](https://www.permitgraph.org/p/201402259272) | Feb 25, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 5th floor tenant improvement of full floor with new bearing partitoins. mep, fire alarm & sprinklers on separate permit. compliance with ordinance #155-13 not required | $2,186,972 |
| [201402259268](https://www.permitgraph.org/p/201402259268) | Feb 25, 2014 | Completed: final sign-off Oct 2014 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | installation of convenience stair between 4th & 5th floors. tenant improvements, fire alarm, sprinklers, mep under separate permit. compliance with ordinance #155-13 not required | $250,000 |
| [M463607](https://www.permitgraph.org/p/M463607) | Feb 14, 2014 | Never finaled: issued Feb 2014, no final | [505 Howard St](https://www.permitgraph.org/a/3736/183) |  | street space |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (35), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (27), [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) (20), [Skanska Usa Building Inc](https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578) (12), [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) (8), [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216) (8), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (7), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (5), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (4), [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) (4), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) (4), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (3), [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) (3), [Abm Electrical Solutions Dba Linc Lighti](https://www.permitgraph.org/contractor/abm-electrical-solutions-dba-linc-lighti-967676) (2), [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) (2), [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) (2), [Aecore Inc.](https://www.permitgraph.org/contractor/aecore-inc-1036918), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967), [Critchfield Mechanical Inc](https://www.permitgraph.org/contractor/critchfield-mechanical-inc-341107), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198), [Golden State Fire Safety/Dba:Gs Fire S](https://www.permitgraph.org/contractor/golden-state-fire-safety-dba-gs-fire-s-924716), [Kr Johnston Construction Inc](https://www.permitgraph.org/contractor/kr-johnston-construction-inc-1123938), [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639)
- Architects: [M Melissa Duffy](https://www.permitgraph.org/professional/m-melissa-duffy-C28015) (14), [Levi J Rippy](https://www.permitgraph.org/professional/levi-j-rippy-C41014) (7), [Douglas Zucker](https://www.permitgraph.org/professional/douglas-zucker-C12821) (4), [Victoria Salgado](https://www.permitgraph.org/professional/victoria-salgado-C37053) (4), [Marc Pfenninger](https://www.permitgraph.org/professional/marc-pfenninger-C278800) (3), [Shivayogi Gajabe](https://www.permitgraph.org/professional/shivayogi-gajabe-C41300) (2), [Thomas Yee](https://www.permitgraph.org/professional/thomas-yee-C9839) (2), [Gary Martinez](https://www.permitgraph.org/professional/gary-martinez-C32595), [Hok Hok](https://www.permitgraph.org/professional/hok-hok-C10181), [J Edgar Fennie Fennie & Mehi](https://www.permitgraph.org/professional/j-edgar-fennie-fennie-mehi-C20310), [Jason Mccarthy](https://www.permitgraph.org/professional/jason-mccarthy-C27514), [Justin Schultz](https://www.permitgraph.org/professional/justin-schultz-M35462), [Lawrence Smith](https://www.permitgraph.org/professional/lawrence-smith-C26160), [Michael Castro](https://www.permitgraph.org/professional/michael-castro-C24073), [Michael Grant](https://www.permitgraph.org/professional/michael-grant-C41747), [Peter Van Dine](https://www.permitgraph.org/professional/peter-van-dine-C9228), [Teresa Emery](https://www.permitgraph.org/professional/teresa-emery-C14087), [Todd Joseph Frederick](https://www.permitgraph.org/professional/todd-joseph-frederick-E23357)
- Engineers: [Erik Elmtoft](https://www.permitgraph.org/professional/erik-elmtoft-M38361) (4), [Anthony Bruno](https://www.permitgraph.org/professional/anthony-bruno-M33190) (3), [Joshua Mcmahan](https://www.permitgraph.org/professional/joshua-mcmahan-E18209) (3), [Keegan Mccoy Brochu](https://www.permitgraph.org/professional/keegan-mccoy-brochu-37134) (3), [Alan Charles Burr](https://www.permitgraph.org/professional/alan-charles-burr-SE5062) (2), [Jullian White](https://www.permitgraph.org/professional/jullian-white-18350) (2), [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378), [Amit Wadhwa](https://www.permitgraph.org/professional/amit-wadhwa-M30894), [Joseph Fay](https://www.permitgraph.org/professional/joseph-fay-E10951), [Julian White](https://www.permitgraph.org/professional/julian-white-E18350), [L.H. Nishkian](https://www.permitgraph.org/professional/l-h-nishkian-28549), [Levi G. Abarte](https://www.permitgraph.org/professional/levi-g-abarte-E17622), [Rudolfo P Bustos Iii](https://www.permitgraph.org/professional/rudolfo-p-bustos-iii-M37462), [Shiyam Kumar](https://www.permitgraph.org/professional/shiyam-kumar-M37046), [Steven Curry](https://www.permitgraph.org/professional/steven-curry-S3364), [Tony Jacob](https://www.permitgraph.org/professional/tony-jacob-C59022)
- Attorneys: [Anthony Bruno](https://www.permitgraph.org/professional/anthony-bruno-M33190)
- Authorized agents: [Janey Chan](https://www.permitgraph.org/professional/janey-chan-S6081)
- Designers: [Douglas Zucker](https://www.permitgraph.org/professional/douglas-zucker-C12821) (2), [Rlh Fire Protection](https://www.permitgraph.org/professional/rlh-fire-protection-777717)
- Pmt consultant/expediters: [Jacob Nguyen](https://www.permitgraph.org/professional/jacob-nguyen-63094), [Janey Chan](https://www.permitgraph.org/professional/janey-chan-S6081)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3736/183.