# 943 Howard St

Block 3732, lot 109. Page: https://www.permitgraph.org/a/3732/109

The city's assessor roll has no record for this parcel.

## Permits filed here

10 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [201604285918](https://www.permitgraph.org/p/201604285918) | Apr 28, 2016 | Completed: final sign-off Aug 2017 | [943 Howard St](https://www.permitgraph.org/a/3732/109) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | rework existing registers for new layout. installation of new ac including spiral ductin & exhaust fans. arch set ref pa 2015-0928-8218. sheets a2.1.1 and a2.3.1 maher na | $86,460 |
| [201603182431](https://www.permitgraph.org/p/201603182431) | Mar 18, 2016 | Never finaled: issued Mar 2016, no final | [943 Howard St](https://www.permitgraph.org/a/3732/109) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | new office configuration including light/electrical changes. provide new lighting & branch circuiting to existing panel. ref. to arch. pa#201509288218. n/a ordinance #155-13 | $119,500 |
| [201602109270](https://www.permitgraph.org/p/201602109270) | Feb 10, 2016 | Completed: final sign-off Feb 2016 | [943 Howard St](https://www.permitgraph.org/a/3732/109) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | new dedicated elevator recall system in e building to include 1 facu, 5 smoke detector, 3 relay modules- pull station and access panel for elevator shaft | $12,000 |
| [201509288218](https://www.permitgraph.org/p/201509288218) | Sep 28, 2015 | Completed: final sign-off Aug 2017 | [943 Howard St](https://www.permitgraph.org/a/3732/109) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 2nd & 3rd floors: ti- new office, breakrooms and structural work. mep/fire/life safety under sep permit. maher na | $800,000 |
| [201508265307](https://www.permitgraph.org/p/201508265307) | Aug 26, 2015 | Completed: final sign-off Aug 2017 | [943 Howard St](https://www.permitgraph.org/a/3732/109) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | demolition of non-structural interior partitions and finishes of 2nd & 3rd floor. full seismic strengthening per sfbc 3404.7 (substantial change) and disable access will comply under t.i. permit. (ma… | $50,000 |
| [200903264961](https://www.permitgraph.org/p/200903264961) | Mar 26, 2009 | Never finaled: issued Apr 2009, no final | [943 Howard St](https://www.permitgraph.org/a/3732/109) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | title 24 drawing for lighting. tenant improvement under app #200812017503 | $10,000 |
| [200901281009](https://www.permitgraph.org/p/200901281009) | Jan 28, 2009 | Never finaled: issued Jan 2009, no final | [943 Howard St](https://www.permitgraph.org/a/3732/109) | [Yum's Mechanical Co Inc](https://www.permitgraph.org/contractor/yum-s-mechanical-co-inc-583839) | replace rooftop gas pack unit with new (5 ton) & (2 ton). new split system cooling system fur server room (1 ton). replace all ductwork and diffusers with new. restroom exhaust fans to be installed.… | $40,000 |
| [200812037705](https://www.permitgraph.org/p/200812037705) | Dec 3, 2008 | Completed: final sign-off Aug 2009 | [943 Howard St](https://www.permitgraph.org/a/3732/109) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | clarification to permit 2008 1112 6370 to include new gate and garage door previuosly approved by planning |  |
| [200812017503](https://www.permitgraph.org/p/200812017503) | Dec 1, 2008 | Completed: final sign-off Aug 2009 | [943 Howard St](https://www.permitgraph.org/a/3732/109) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | selective demolition of wall and floor finishes, install new partitions, new wall 2nd floor finishes, mep separate permit, replace lobby door. | $107,000 |
| [200811126370](https://www.permitgraph.org/p/200811126370) | Nov 12, 2008 | Completed: final sign-off Apr 2009 | [943 Howard St](https://www.permitgraph.org/a/3732/109) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | replace windows in (e) openings in front & rear yard | $22,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) (4), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (4), [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153), [Yum's Mechanical Co Inc](https://www.permitgraph.org/contractor/yum-s-mechanical-co-inc-583839)
- Architects: [Stanley Lew](https://www.permitgraph.org/professional/stanley-lew-C29609)
- Engineers: [Brian Featherston](https://www.permitgraph.org/professional/brian-featherston-M32323), [Jesus B Cabellon Jr](https://www.permitgraph.org/professional/jesus-b-cabellon-jr-E9278)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.